ISSUE STATEMENT
The City Council is requested to approve the project list in FY2005-2007 Metropolitan Transportation
Improvement Program (MTIP). The FY2005-2007 MTIP was adopted by the Metropolitan Policy
Committee (MPC) on December 30, 2004. The project list is shown as Attachment A. The project list
is annotated to reflect the changes from the FY2004-FY2006 MTIP project list to the FY2005-2007
MTIP project list. The project list is further annotated to show the previous council actions taken on
City of Eugene projects.
BACKGROUND
Federal legislation requires that the Metropolitan Planning Organization (MPO), in cooperation with the
state and transit operators, develop an MTIP that is updated and approved at least every two years by the
MPC and the Governor. Copies of the MTIP are provided to the Federal Highway Administration
(FHWA) and the Federal Transit Administration (FTA). Specific requirements for the MTIP are
outlined in various implementation rules developed by FHWA, FTA, and the Environmental Protection
Agency (EPA). In summary, the MTIP must cover a period of not less than three years, must include all
federally funded projects and regionally significant projects, must be consistent with funding that is
expected to be available during the relevant period and must be consistent with the long-range
transportation plan.
The FY2004-2006 MTIP was adopted by the MPC on October 9, 2003 (and was subsequently amended
both by MPC and administratively by the Transportation Planning Committee (TPC)). The FY2004-
2006 MTIP listed transportation projects using federal funds programmed for fiscal years 2004-2006.
The FY2004-2006 MTIP was updated with the adoption of the FY2005-2007 MTIP to be consistent
with the updated Regional Transportation Plan (RTP) and the Statewide Transportation Improvement
Program (STIP). In addition, State regulations require that the MTIP be updated within six months of an
update of the RTP. The RTP, adopted in July 2002 was updated by MPC on December 9, 2004, to meet
the federal requirement to keep the RTP current with respect to the planning horizon (20 years), the
MPO geography, and the financial constraint analysis.
On June 9, 2004, the City Council passed a motion that all project lists or funding allocations for
projects within the City of Eugene or the Eugene urban growth boundary generated through the TPC for
the MPC/MPO approval shall first be reviewed and approved by the Eugene City Council before the
L:\CMO\2005 Council Agendas\M050124\S050124C.doc
TPC recommendations are reviewed for approval by the MPC/MPO, including review of regional
projects in which the City is a stakeholder.
On December 8, 2004 the City Council held a work session on the draft FY2005-2007 MTIP project list.
A motion was passed to table the agenda item until January 19, 2004. The item was later moved to the
January 24, 2005, council work session. The following motions were made before the item was tabled:
1. Ms. Bettman, seconded by Mr. Poling, moved to approve the Eugene's project list in the draft
FY2005-2007 Metropolitan Transportation Improvement Program.
2. Mr. Kelly, seconded by Ms. Taylor, moved to drop the Chad Drive project from the Metropolitan
Transportation Improvement Program.
3. Ms. Bettman, seconded by Ms. Taylor, moved to substitute a motion that the City of Eugene
resubmit all of the City's projects that were competing for STIP-U money under a category of
maintenance and preservation so that the City could still compete for this money but it would be
allocated to maintenance and preservation projects.
RELATED CITY POLICIES
The Regional Transportation Plan (RTP) guides the regional transportation system planning in the
metropolitan area. The RTP includes provisions for meeting the transportation demand of residents over
a 20-year planning horizon while addressing transportation issues and making changes that can
contribute to improvements to the City of Eugene and the region's quality of life and economic vitality.
The Metropolitan Transportation Improvement Program (MTIP) reflects the programming of projects
over a three-year period consistent with the system improvements element of the RTP and the City's
transportation system plan (Transplan).
COUNCIL OPTIONS
Although the MPC has adopted the FY2005-2007 MTIP, the City Council may still request that the
MPC consider changes to the FY2005-2007 MTIP project list. The City Council may:
1. Approve the project list in the FY2005-2007 MTIP;
2. Not approve the project list in the FY2005-2007 MTIP; or
3. Provide comments to the MPC requesting specific changes to the project list in the FY2005-2007
MTIP.
CITY MANAGER'S RECOMMENDATION
The City Manager recommends that the City Council approve the project list in the FY2005-2007
Metropolitan Transportation Improvement Program. The project list does not include any new
allocation of state or federal funds by the MPC. The two new City of Eugene projects, the realignment
of Airport Road and the Patterson Street Underpass, have been previously reviewed and approved by the
City Council. Initial funding for both projects was approved by the council with the adoption of
Supplemental Budget #1 to the FY05 Annual Budget on December 6, 2005.
L:\CMO\2005 Council Agendas\M050124\S050124C.doc
S[IGGESTED MOTION
Move to approve the project list in the FY2005-2007 Metropolitan Transportation Improvement
Program.
ATTACHMENTS
A. Annotated FY2005-2007 MTIP Project List
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 682-5243
Staff E-Mail: mark. a. schoening~ci, eugene, or. us
L:\CMO\2005 Council Agendas\M050124\S050124C.doc
ATTACHt4ENT A
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
NOTES
Modirtcations to FY04-0~ MTIP New
to get to FYOS-0? MTfl) Project? City of Eugme Council Actions
EUGENE ~ ......
R~ional Allow fiu9~e Public Wod~ En9int~n9 sta~ toi i
Transportation participate and actively collaborate with federal, state, $125,000! $243,00(i = $736,000 $368,000 $125,000 STP-U, E
Planning and metro area agencies and governments to form and i I
implement regional transportation plans.
~'"'i i Annual Budget FY2005
Rehabilitate the exisfiog pavement of Fern Ridge path by Annual Budget FY05 and FYO4-0~
Fem Ridge Path overlaying with new concrete surfacing; Chambers to $418,000i $105,000! $523,000 $523,000 $418,000 STP-U, E Capital Improvement Program
Resurfacing City View i
~'...'..~'..:'::._~:.::',.' .~."r.~c~:-...c'J:=, r.:.~,c.~t'.'c.'~ ---...~:L':; L:~c.'~:, L'~t:."::;~Jc.'~ i $796,835 S~ &g OT~,. = FY04 project Note: These funds are not
.... ,' ......... en~c~..:-...~;~t:-, ii ...... programmed for a specific project.
Reconstruct 8e Avenue (Mill Street to Hilyerd Street), 2- i~ ~
lane urban street with parking, curb, gutter and i
sidewalks. Extend Feey Street (nodh from 8e Avenue to i
realigned 6e Avenue), 2-lane urban street with parking, ~
curb, gutter and sidewalks. Construct realigned 6"' t
Courthouse District Avenue (Hilyard Street to High Street), 2-lane urban i i Annual Budget FY05. FY04-09
.=.
Transportation street for one-way westbound traffic with curb. gutter, i $1,600,000 ~ $1.318,00C $2,918,000 $2,918,000 $0 E, LC Capital Improvement Program and
Improvements sidewalks and separated shared-use path. Project wouldi i ! Courthouse District Concept Plan
include new signal at 8e Avenue and Mill Street ~
intersection as well as improvements to Mill Street,
Broadway and Ferry Street
FY05 funding: $500KacquisitionfOr design; $1.100K for ROW!i [
Traffic Operations Safety and transportation system management i i
ImproYement $55.000 $55,00t2 $1t15.000 $110,000 $0 £ Annual Budget FY05 and 1~04-09
Program improvements . I Capital Im~vement Program
i Annuel Budget FY05 and FY04-00
Street Ughfing Artedals/collecters, various locations $60,000 $60,00(, $180,000 $120,000 $0 E Capital Improvement Program
i
Upgrade and capacity enhancements for 3'd Avenue fron i
Pead Street to Uncoln Street just north of the railroadi i I I Annual Budget FY05, FYO4-09
3'd'-4~ Connectcr tracks; Upgrade major collector to urban standards with 2 $1,451,000 $1 571 000'
, , $1,451,000, $0 E Capital Improvement Program,
lanes, turn pockets, curb. gutter, sidewalks and bike Transplan and Whiteacre Plan
lanes ~ .
Traffic Signal Install new traffic signals and upgrade traffic signal i $1fi0'000 i$150'000 i $450,0005:300.000 $0 fi
Annual Bud9et 1~05 and
Improvements and s~tem Capital Improvement Program
Upgrades ) I
Page 1 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Fiscal Year
FY05 FY06 FY07 I NOTES
Project Project Description i i i Total Cost Total Federal Funding
FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New
FederalS] Others Federal $i OtherS Federal $i Others Total Cost FY04-06 to get to FY05-07 MTIP Project? i City of Eugene C il Actions, ....
Int:r:.".c.~g: / .................. ~'.......................... ' ...... ~ ........... { $250,000 $~ $9 ~ ' "" FY04 project , Annual Budget FY05 and FY04-09
,., ........ , ~ .......... [;;c,'t,,h .~!~e] i .... Capital Improvement Program
Judkins Point i i I New project. Additional/new Note: Included in Lane County
Interchange ! Intersection improvements at interchanoe ramp terr~ir~l $220.000 $220.000 $220.000 $0 E. LC YES Annual Budget FY05 and FY05-O9
Glenwood Boulevard [South side] i funding. Capital Improvement Program
i Annual Budget FY05, FY04-09
i i Capital Improvement Program,
Legacy Extension, Extension of Legacy Street; Construct new 3-lane major i $263,000 $823,00(; $1,348,000 $1,086,000 i $0 E
Avalon to Royal collector with curb, gutter, sidewalks and bike lanes i Transplan and Royal Avenue
i r Specific Plan
Infrastructure improvements to support new
Annual Budget FY05 and FY04-09
Services for New development; This category is used as match for capital i $400,000 $400,00C $1,200,000 $800,000 $0 E
Development projects which add capacity to respond to demand from i Capital Improvement Program
new development
Enhance Monroe/Friendly corridor to make it a "bike
Monroe Street / I arterial;" Project still in planning/scoping phase; May
include bike lane or route on either Monroe Street or i Annual Budget FY05, FY04~)9
Fdendly Street Friendly Street between Ruth Bascom Riverbank Trail $224,000~ $26,00( $250,000 $250,000 $224,000 STP-U, E Capital Improvement Program and
i Transplan
Bikeway and 28~h Avenue. Possible intersection and operational
! changes to improve safety for cyclists through corridor
North Bank Trail Rehabilitate the existing pavement of North Bank Trail i
Resudacing: path by overlaying with new concrete surfacing,: i .! Annual Budget FY05 and FY04-09
Greenway Bicycle Bicycle Bridge to 1500' east of Hwy 227 [1105] $381 000i $96,00(:i i $477,000r $477,0001 $381,000 STP-U, E
i i ! Capital Improvement Program
Bridge - 1500' East of! Greenway O-Xing.
__ Hwy 227 i
~ Annual Budget FY05, FY04-09
i i Capitar Improvement Program,
Roosevelt Extension, Extension of Roosevelt Bid; Construct new 3-lane major $270,00£ $274,000 $544,000 $544,000 $0 E l
Terry to Royal i collector with curb, gutter, sidewalks and bike lanes Transplan and Royal Avenue
___ __ Specific Plan
Rehabilitate the existing pavement of Garden Way path i i Annual Budget FY05 and FY04-09
GardenResun, acingWay Path .. (Garden Way to CanOeconcreteCanal)surfacingby overlaying with newi $388,000ii $97,000i $485,000 $485,000 $388,000 STP-U, E ! Capital Improvement Program
Extend Chad Drive to connect to North Game Farm Annual Budget FY05, FY04-O9
Road, including 2 trave~ lanes, center tam lane at i i ii Capital Improvement Program,
Chad Ddve intersections, curb, gutter bike lanes and sidewalks on $695,000 i $565,000 $1,260,000 $1,260,000 $695,000 STP-U, E
Extension i both sides, street trees, street lights, and a traffic signal i , Transplan and V~llakenzie Area
i ! Plan
at Game Farm Road
! i City of Eugene request for new Annual Budget FY05 through
,,~iroort Road Reali(3n Airport Rd and Possible reconfiouration of Airport $180.000 i $20.00(3 $118.180 $2.400.000 $2.400.000 ! $2.261.820 FAA. E project. Project is in City's YES Supplemental Budget #1 and
Realionment i Rd/Greenhill Rd airport entrance intersection. ' : i Airport Master Plan
$2.081.820i
i Tracks and Construct Underpass i i 0001! ;i! , Airpod Master Ptan
Extend Patterson St. from Broadway to North of Railroad i ..................... i I , ; I i
' City of Eugene request for new i YES Annual Budget FY05 through
Patterson
Street
$3.570.000 $8.330.000 $3 570 $11.900.000 $0i E project. ~ Supplemental Budget #1
Undemass FY06: Dreliminarv desion & enaineedna=Y07: construction ~ i ' I
Page 2 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
! Fiscal Year
FY05 FY06 FY07 NOTES
i i i Total Cost Total Federal Funding
Project
Project
Description
FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP ] New
Federal $i Others Federal $i~ OtherS Federal $i OtherS Total Cost FY04_06 t° get t° FY05-07 MTIP IPr°ject? City °f Eugene C°uncil ncti°ns
Allows Springfield Public Works and Development i
Regional Services staff to participate and actively collaborate with $87,500 ! $20,000 $215,000 $107,500 $87,500 STP-U, S
Transpodation ifederal, state, and metro area agencies and governments
Planning to form and implement regional transportation plans.
Preservation and rec°nstructi°n, Olympic t° Main; add $640,000i $710,000 i i $1'350'000 $1,350,000 $640,000 STP-U, SI
21 st Street bike lanes ~ i
i i Remove from MTIP since it is
............. ' ...... ~' .......................i I Federally funded, not regionally
i i i Isignificant)
~;__~, r', ....... not required to be in MTIP (not ]
D~. ~,~ ...... . ................................... Federally funded, not regionally
' '~'~" significant)
Traffic Control Installation of traffic controls such as signals or i $50,000 i $50,00(:] $219,000 $100,000 $0 S,SDC
Projects ~ roundabouts
iii - II _ Springfield request to move I
126/42"d Ramp Construct signal at Highway 126/42"a WB ramp ~200.00( $200,000 $200,000! $0 LC existing funding from FY04 to NO
Signal intersection ! FY05
Gateway Traffic Capacity improvements at vadous locations in the $200,00( $200,000 $600,000 $400,000 $0 S,SDC
Improvements Gateway area
ii i ]I[ I Remove from MTIP since it is
i ] t ~i not required to be in MTIP (not
................. · .... .,~.. . ............... Federally funded, not regionally
...... · i significant)
; i Springfield request to move ! [
Pioneer Parkway I Pavement Preservation, Q Street to Hayden Bridge $400.000 $100.000 $500,000 $500,000 STP-U, S existing funding from FY05 to I NO
FY06
Construct minor arterial; Beltline-Game Farm intersection i ...... ~ ..... Spdngfie~
increased cost & funding of
, to $9.300.00(; $9,300,000 $9,300,000 $0 LC, D project (from $8,950,000 to NO
MLK Parkway i Harlow-Hayden intersection $9,300,000)
Springfield request to replace
McKenzie Highway to Jasper Road, Upgrade to urban $4,125,000 in FY05 with i I
standards, jurisdictional transfer; Upgrade to a three lane $1,550,000 in FY05 and
42"a Street section sidewalks, setbacks, where bike feasible street lanes lighting, where including curbs feasible, pedestrian and landscaped gutters islands, _ $1.550.00£ $1.550.000 $3,100,000~ I ~ I $3,100,000 $0 O $1,550,000 total project $1__ ,050,000) in FY06 funding (reduces by ___ I " NO
Page 3 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Fiscal Year
Y05 Y07 NoTEs
i i i Total Cost Total Federal Funding
Project Project Description FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New
Federal $i OtherS Federal $i Others Federal $i OtherS Total Cost FY04-06 to get to FY05-07 MTIP Project? City of Eugene C il Actions ....
SPRINGFIELD. Continued ~~ ~~ ~~ ~~ ~~ ~~ ~ ~~~
Reconstruction and urban standards, A Street to i
I Thumton Road; Upgrade to a three lane section where ii
feasible including sidewalks, curbs and gutters, drainage i :
69~h Street improvements for a channel (drainage funds), bike lanes, $431,000i $754,00(3 $1,185,000 $1,185,000 $431,000 STP-U, S
street lighting, intersection improvment (signal or
roundabout) at 69th and Thurston intersection
D~jan and Riaht of Way eurchase $2.250.00C i $3.250.00(~ $2.500.000 $5.500.000! $8.000.000 $0 S.D Springfield request; new project YES
Gatewav/Beltline
Intersection i ~ i ~~~
LANE COUNTY
Jcc, F, cr Road i ii
Exton.c!cn, .Mc!:~ c.?.~tc,'~d ~. Ic,'~c a,'tcda! i $2,000,000]
FY04
project
St.-oct tc 5~°th _
existing funding to FY05 and ~ NO
Extension, 57~ to I Extend 2 lane artedal $2.625.00C $2,625,000 $2,625,000 $0 LC change extent to 57~ St. from
Jasper Road 58th St
--
Interchange improvements; Interim safety improvements; Lane County request to move
Delta/Beltline potentially replace/revise existing ramps and widen Delta $8.050.000 $8,050,000 $8,050,000 $0' LC existing funding from FY05 to NO
Interchange Highway bridge to five lanes FY06
! Upgrade from 2-lane to 3-lane urban facility; include a
curb, setback sidewalk, urban bike lane on the
Game Farm North. south/west side and a rural design on the north/east side i Lane County request to increase
Eugene City Limit to including a six foot bike shoulder; include a new traffic $3.025.000ii i $3,025,000 $3,025,000 $0 LC ! amount from $2,200,000 to NO
Coburg Road signal at Crescent Avenue and an improvement of the $3,025,000
Armitage Road alignment as the fourth leg of this
intersection
Ccnctr-'ct ccn,qcctcr road bc~::cc~ Elccmbcr; Road "nd I
McVc? .~!,~.h;;'cy otc d!ffcrc.~t Iccctla.q c.q 30~ ,",':cn:;c; rcc.!!G.~mc.~t i,c ] i ] Lane County request to remove
...... ~ .......... ~ ~ .............................. · ............ · ........... ~ SgO0,OO0 $0 $9i $9 ~ project from MIIP (project NO
~'~--~ ..... °~ l Road i,~t:.~cct!cn and ccntln:;c cn c'.'cr to 30e' Ave at thc , i dropped from County CIP)
..... ........ ,~,..u,,..~ ~ I E!dc,~ Scholar Dri':c trc.~c..cia,cc!; c!d .ccc'Jc~ cf MoVe? ! ~
Page 4 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Fiscal Year
FY05 FY06 FY07 __ NOTES _
i Total Cost Total Federal Funding
Project Project Description i i FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New City of Eugene C .... il Actions
Federal $ i Other $ Federal $ i Other $ Federal $ ] Other $ Total Cost to get to FY05-07 MTIP Project?
LANE
COUNTY.
Continued
Delta Highway Pavement Preservation $632,500! $632,500 i $1,265,000
i Lane County request to remove
...... ~ ................... ~. .................. ~- ....... · .... i eA ~n~ nnn $0 $0 $0 L-G project from MTIP (project NO
.... ~' ............... = ..................... = ................... i dropped from County CIP)
RoyaIstreet Avenue,to GreenhillTerry Upgrade major curb, gutter,C°llect°r sidewalkst° urban andStandardsbike lanesWith 3-lanes i i $2,200,000 __ $2,200,000 $2,200,000 $0 LC,E
Road --
UDorade two lane urban facility with sidewalks andi i Lane County request for new
Hunsaker/Beaver St I;)ikelanes from Division Ave to River Road i $2.200.00(3 $0 $2.200.000 $0 LC project YES
Lane County request for new
Addition of shoulders, curbs and outters, or both. from $2.200.00(3 $0 $2.200.000 $0 LC project YES
Greenhill Rd Royal Ave. to Clear Lake Rd. Desion to be determinated
Coburg TSP Update Update TSP to meet requirements of Periodic Review $20 000i $5,000 i _ $70,000 $25,000! $20,0001 STP-U
and TMA --
Coburg Diamond Overlay pavement $24,000i $6,000 i $30,000 $30,000 $24,000 STP-U
Street oveday ii $40,000 I
Coburg Locust Street Oveday pavement, provide street widening with the right- $30,000i $10,000 $40,000 $30,000 STP-U
improvements of-way and correct drainage problems
CentraluPwpLaneFundingMPO Fund MPO Work Program Activities $250,000i: ii i $500,000 $250,000
$25O,0O0
STP-U
~ ~:~:.:" ~ -.
LTD
C[c,~wCCd m~,4- ...4 ......................................... · ............. ~ ~ ii '
......... 50 !OO cpccc ;.C~ and ,ddc fccillty {n C!cn'::ccd, tc bc $100,000 $0' $~ Fcdcra! 5307 FY04 project
, ,c.c.t..cp,:cc,mca. $8,245,000 ,~ ~ rA~.~, ~n? Project complete
I
lbo Transportation Demand Management work [ i ',
performed is regional in its scope of services and i'
programs. The strategic plan for the TDM work
performed though the Commuter Solutions Program at ! i
Transportation LTD incorporates the TDM strategies in the adopted i~ i Additional funding in FY07
Demand RTP. A TDM Advisory Committee ( which is a sub- $99,6001 $11,400 $99,600i $11,400 $99.600i $11.40£ $333,000 $333,000 $298,800 STP programmed in adopted FY04-07 NO
committee of the Transportation Planning Committee), i STIP
Management
oversees the Commuter Solutions Program withi:
committee members representing Lane Transit District,
I
I Lane County, LCOG, City of Eugene, City of Springfield, i i I
LRAPA, and ODOT. i ] ! I i i
Page 5 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
I Fiscal Year
FY05 FY06 FY07 NOTES
i i ] Total Cost Total Federal Funding
Project Project Description~ i FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New City of Eugene Council Actions
Federal $i Others Federal $i Others Federal $i OtherS Total COst to get to FY05-07 MTIP Project?I
i i FY0446
This project is for ITS systems for the BRT Franklin i NO
Intelligent Corddor (Phase 1 ), and includes traffic control interfaces $160,000i $40,000 $80.000i $20.00(~ $80.000i $20.000 $500,000 $400,000 $320,000 Federal 5307 i LTD request to add $100,000 to
Transportation passenger boarding information, and vehicle tracking i each of FY06, FY07
System systems
Commuter Solutions is the region's TDM program
responsible for implementing TDM strategies that
compliment RTP goals and policies. The Transportation
Demand Management work performed is regional in its
scope of services and programs. The strategic plan for
the TDM work performed though the Commuter Solutions
Regional TDM i Program at LTD incorporates the TDM strategies in the $225,0001 $36,670 $225,000i $36,67C $785,010 $523,3401 $450,000 STP-U
Program i adopted RTP. A TDM Advisory Committee ( which is a
sub- committee of the Transportation Planning
Committee), oversees the Commuter Solutions Program
with committee members representing Lane Transit
District, Lane County, LCOG, City of Eugene, City of
Springfield, LRAPA, and ODOT.
River Road Station This project is a roof rebuild for the existing River Road $240 000i $60,000 $300,000 $300,000 $240,000 Federal 5307
Improvements Transit Station, and will replace the roof structure __
This ~rcjcct i: f.~r P!cnccr Pc,"k,.,:::7 --nd Ccb.,;r.~ Rccd
BRT Cobum & m r~ F.,c, nn:ng ~rcjc=., n.~t c w~. ........... · ~.. vj .... LTD request to change name
Pioneer Parkway and Coburo Road Bus Raoid Transit $1,000,489i $114,511 $2,415,000 $1,115,000 $1,000,489 STP-U, 5309 and project description only NO
Pioneer Parkway oroiect development, includina alionment alternatives
Prelect Develooment develooment. This oroiect is beino carried forward for
gr~nl reimbursement ourooses, and funds for work
beaun in FY04. i ] i
Page 6 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
~ Fiscal Year
FY05 FY06 FY07 NOTES
Total CoSt Total Federal Funding
Project Project Description i : FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New
i] FY04-06
~;.~_ o ......ctoraga a,~d mai:;,'.a,'~:',~cc a~i;.i'jc.'; far thc RidcS~:~rcc
............ ' .*Jr q:Jc!ity *"~'*~: ......... .~, ,~.~! LTD request to change name
Mai:ta~a~cc and Paratra~::. p. rc;ram ...... ·
~"~' ......................... ~ .................. $1.879.152i $215.077 $4,077,958 $2,094,229 $1,879,152 Federal 5307 and description and add NO
RideSource Facility .................................................. additional FY05 funds
Construction Protect ~ ....................... ~. F. ar ,,a~,-.~,~,~;
Construction of RideSource maintenance and ooeration
facility: 2nd and Garfield.
-- ! i i LTD request to add additional
Bus Support This project includes office supplies, computer hardware i NO
Equipment and and software, and other administrative support $2,800 0001 $700,000 $800.000i $200.000 $800.000i $200.000 $8,875,000 $5,500,000 $4,400,000Federal 5307 funding for FY06, FY07
Five vehicles are being purchased for the Franklin FmX
corridor, lhese vehicles are hybrid electric vehicles, and i
Franklin FmX Gorridor, is a four-mile corridor from
downtown Eugene to downtown Springfield. Tho EmX
service will provide rapid transit service throughi
exclusive busways, ! i
Bus Rapid Transit,mechanisms, and signal pdodty. This service will $2,000,00£ $10,000,000 $10,000,000 $8,000,0001, FederaIFedera15309,5307
,
Phase One replace existing service' with the same frequency' $8 000 000ii i
currently provided by the number 11 route. Due to ~
i pdorfiY techniques such as exclusive busways and traffic
i signal priority, as well as hybrid-electric vehicles, it is
anticipated that emissions for the EmX Franklin Corridor i : , ,
will be less than the existing conditions, i i
! ,
_
Page 7 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Final Year
FY05 FY06 FY07 NOTES
i i i Total Cost Total Federal Funding
Project Project Description FY05-07 Cost FY05-07 Source Modiflcation~ to FY04-06 MTIP New
Federal $ i Other $ Federal $ !: Other $ Federal $ i Other $ TotaIFY04_06Cost to get to FY05-07 MTIP Project? City of Eugene C .... il Actions
Passenger Boarding Improvements include new shelter
placements for new service, shelter replacements for
Passenger Boarding shelters at high vandalism locations, improvements to $232,000i $58,000 $232,000i $58,0012 $580,000 $580,000 $464,000 Federal 5307
Improvements accommodate ADA, and improvements to other stations ' i
and park and rideS,at LaneinCludingcommunityimpr°vementSCollege. to the station ii i i ~1 ~
' '~' ................... ~' ............................. ~" LTD request to change NO
Boarding i ';c.,~dc! rc:i:t=nt ;,h;It.~,":. $216,000i $54,000 $216,000i $54,000 $810,000 $540,000 $432,000 STP-U, LTD description only
Improvements - Reolace old shelters in Door condition with new desian
Shelter Replacement i vandal resistent shelter/ADA access improvements
for .~;EPA ccmpllcnc:, end ccnctru~ic.~ ;f a Pa~ cnd~' .
.... ~ ........ , ,~.~ ~_,_..~ ,:_~,:.~ ,~. ,~ ,-.~,...~ c,~.~ eo~ nnn i $200,000 $0 Sg. Sg Fc~crc15307 LTD request to delete project NO
Bus Rolling Stock I Replacement rolling stock for fixed-route fleet, i $5,200,000i $1,300,000 i $6,500,000 $6,500,000 $5,200,000 Federal 5309
Fixed Route Fare I Upgrade fixed-route fare collection system to
accommodate new technology fare readers, such as $886,800! $221,700 $1,108,500 $886,800 Federal 5307 1
Management I proximity cards.
Automated IAutomated passenger information systems for fixed route $161,600i $40,400 i $202,000 $202,000 $161,600 Federal 5307
Passenger , service, i [
Information Systems ! .... --
i i i i LTD request to change name of
RaiL?. ~m~.rc':cmcntc '.
R~dio Infrastructure: Upgrade radio communication system for fixed route $81,600i $20,400 $1.200.000[ $300.000 $102,000 $1,602,000! $1,281,600 Federal 5307 project and add new funds for NO
service, i i i FY07
ImProvements ! i I .... ~ .......~ --- --
Page 8 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Fiscal Year
FY05 FY06 FY07 NOTES
i i i Total Cost Total Federal Funding T
Project Project Description FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New
Federal $i OtherS Federal $i Others Federal $i OtherS Total Cost FY04-06 to get to FY05.07 MTiP ~ Project? City of Eugene C il Actions ....
..... ~' ........... i LTD request to change name
................ ' ................................................ and description and add new NO
BRT Pioneer .... " ..... ~ ............................... ~ ................. ~ $600,000 $620.000i $155.000 $640.000i $160.000 $3,775,000 $4,575,000 $3,660,000 Federal 5309,
Federal 5307
"~ ~;'_' ' 'T- --'-"--~- ........................ $2,400,000i ! funds for FY06 and FY07
parkwav
Prelect
prgiect develOom'ent for'the'pioneer Parkway BRT
Develoement prelect, includine alternatives evaluation, eublic outreach.
oreliminarv eneineedno and desian. NEPA comoliance,ii i
and New Starts documentation =
Relocation of Springfield Station (completed project, i $5,200,000i $5,200,000 $4,160,000 Federal 5309
Springfield Station project programmed for grant reimbursement) $4,160,0001 $1,040,000
Transit Urbanii
$270,000
$270,000
$242,271
Federal
5307
General: Bus Purchase one large bus $242,271 $27,729
Transit Enhancement Replace 1 van; eight shelters; maintenance equipment; $992,548i $113,602i $1,106,150 $1,106,150 $992,548 Federal 5310
Capital Purchases maintain bus shelters; purchase 10 vehicles i
ODOT
Operational ITS I i ODOT request to move $50,000
Improvements - I I-5 @ 30~ Avenue & OR69 west of River Road $50.00C $850,000 $800,000 $0! O funding from FY04 to FY05
NO
Vehicle Management
System
Sidewalks Glenwood Blvd. to Willamette Bridge/McVey
OR-126/Franklin Enhancementi $250,00¢ i $376,00( $626,000, $626,000 $0 O
Blvd. Sidewalks FY05: Engineering & ROW;:
FY06: Construction ] _
................................................... (simplify) project description and
OR222 Safety ] ;;~c".-~.-~; !~-;~-'~i'~;.~,"~...~,~-,";.~ '~;~,i,'-';'"c~.~ ~';?~'"~: 340.00(: $2,690,00( $3,370,000 $3,030,000 $0 O move $340,000 (existing NO
Project i 4'. P=~c~ :..'-.:.:;~cr ;;~;~.!=; c~, =~.~..", =~c ;;'c:;~ ~c tcs'. i funding) from FY04 to FY05
[ SDdnofield south city limits to Jasper Bridoe: widen
~hgulders and remove objects in the clear zone withouti
Beltline Hwy @ / i $2,100,000 i $1.914.000 $1,995,000 $1,914,00 $0 O FY06 funds to FY07 and reduce NO
Coburg Road Improve interchange to provide adequate storage
Interchange by $186,000
Page 9 of 10
FY05-07 MTIP with annotations showing changes fromFY04-06 MTIP
Fiscal Year
FY05 FY06 FY07 NOTES
i ! i Total Cost Total Federal Funding
Project Project Description FY05-07 Cost FY05-07 Source Modifications to FY04-06 MTIP New
Federal $i Others FederalS] Others Federal $I Others Total Cost to get to FY05-07 MTIP Project? ~ City of Eugene C il Actions ....
ii FY04-06
FY04 to FY05 and increase
Interchange Phase One amount from $1,260,000 to NO
I-5 @ Beltline FY05: Land Acquisition $3.950.00(: $17.000.00( $20,950,000 $20,950,000 $0i OTIA,O $3,950,000. Also move existing
FY06: Construction i construction funding from FY05
..................
Move $5,000,000 in existing
funding from FY04 to FY05 and
Interchange Phase Two i $5.000.00£ $2.000.000 $5,000,000 $7,000,000 $0 0 NO
I-5 @ Beltline FY05: Design & Land Acquisition add $2,000,000 in funding in
FY07
ODOT request to change title
OR 126 (;'.'EP) W. 11 ~' St Ca~c!d St., U,'~it I, Pc,~ .".; ,~-"Y. O~: and description and move
West Euaene~--:-~^~--~,,~ ......... ~ ............" m~^" ~--v~. Cc,';:t.'";v~{c,'~ i e,= ~o= n^,~ i $15.587.00( $17,737,000i $15,587,000 $0 O existing funds from FY05 to NO
Parkway (1A1 4 lane new construction. Seneca Rd to Belfline Hiohwav i FY06
I-105: Willamette
River - Pacific Preservation $14,519,00£ i $14,519,000 $14,519,000 $0 O
Highway i ..............................................
OR99: Barger I
Avenue to Preliminary Engineering for Preservation Project i $200,00£ $200,000 $200,000 $0 O
Washington /
jefferson i _
OR99 (7~ St'* at Imorove sianina and strioina
Euoene-SDrinafield FY06: desian $13.500i $1.50£ $30.600[ $3.40£ $15.000 $49.000 $44.100 STPSFTY ODOT request for new project YES
Hiahwav FY07: land ourchase i --
OR99 7~ Street at Realion lanes and orovide dual doht turns
FY06: desian $57.600i $6.40£ $657.900i $73.10£ $64.000 $795.000 $715.5001 STPSFTY ODOT request for new project YES
Ga~eld FY07: land Durchase
.... ~ 16 which ;;'!!! crc:: c,v~: thc W~!!cmc.".c R!'.'cr, .'"rc,".k!!,c $2,750,000 $9 $9 OTI.". FY04 project
$25,026,560 i $54,289,989 $18,582,020 i $64,065,15~ $3,508,100 i $19,911,90~
TOTALS FY05:i $79,316,549 FY06:i $82,647,17~ FY07:i $23,420,00~