Loading...
HomeMy WebLinkAboutItem 6 - Assess.Santa Clara AveEUGENE CITY COUNCIL AGENDA ITEM SUMMARY Action: An Ordinance Levying Assessments for Constructing Sidewalks, Curbs, Gutters, Conduit, and Storm Drainage System on Santa Clara Avenue from River Road to Approximately 600 Feet West; and Providing an Immediate Effective Date (Contract #2005-10) (Job #4108) Meeting Date: January 24, 2005 Agenda Item Number: 6 Department: Public Works-Engineering Staff Contact: Paul Klope www. cl. eugene, or. us Contact Telephone Number: 682-5246 ISSUE STATEMENT This item is to approve the Hearings Official's Findings and Recommendations of January 13, 2005, and adopt an ordinance levying assessments for constructing sidewalks, curbs, gutters, conduit, and storm drainage system on Santa Clara Avenue from River Road to approximately 600 feet west. Please note: An immediate effective date is requested with this ordinance since the assessment calculations are based on the Council action of January 24, 2005. An immediate effective date requires a 2/3 majority or 6 affirmative votes from the Council to enact. Ordinances without an immediate effective date do not take effect for 30 days. Without an immediate effective date, an additional 30 days of interest will accrue. BACKGROUND The project was initiated by three Irrevocable Petitions received by the City, and City Engineer initiated the preparation of plans and specifications, pursuant to Section 7.160(8) of the Eugene Code, 1971. The bids were opened on July 1, 2004, with Brown Contracting, Inc. as the low bidder. The City Council formed the Local Improvement District (LID) on August 12, 2004. This item relates to the Council Goal of"Safe Community - A safe community where people feel secure and respected." Improvements to Santa Clara Avenue advances to goal "to improve street safety" by bringing Santa Clara Avenue up to full City standards and meets the current and future pedestrian, bicycle and vehicular needs in this developing area of the community. Financial and/or Resource Considerations Assessment costs are calculated based on the actual cost of the project. Below are the final unit assessable costs: L:\CMO\2005 Council Agendas\M050124\S0501246.doc Sidewalk (per square foot) $ 7.56 Curbs and Gutters (per from foot) $ 54.08 Direct Charges assessed $ 36,013.45 Total Assessable Cost $115,188.80 Total City Cost $ 5,525.27 Total Project Cost $120,714.07 The City will pick up the cost for non-assessable curb and gutter, sidewalks, and storm drainage system as identified by City Code, Chapter 7. The non-assessable City share for this project will be funded from the Transportation SDC Fund, Stormwater SDC Fund, and Transportation Utility Fund (for a small section of pavement repair). Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by City Code, Chapter 7. None of the property owners qualify for the low-to-moderate income subsidy program. Other Background Information Notices of the assessment and hearing were sent out ten days prior to the assessment hearing. A hearing was scheduled for January 5, 2005, however, with none of the property owners wanting to attend, the hearing was cancelled. Timing All the necessary steps have bee completed as prescribed by the Eugene Code for levying assessments. An immediate effective date is requested with this ordinance since the assessment calculations are based on the Council action of January 24, 2005. An immediate effective date requires a 2/3 majority or 6 affirmative votes from the Council to enact. Ordinances without an immediate effective date do not take effect for 30 days. Without an immediate effective date, an additional 30-days of interest will accrue. RELATED CITY POLICIES Not applicable. The assessment costs will be distributed as outlined in the Council adopted Hearing Official's Findings and Recommendations and Resolution forming the LID. COUNCIL OPTIONS Special assessment provisions adopted as part of an LID resolution cannot be modified during the final assessment process if they result in increased costs to the property owners. The final assessment hearing is to review the calculations to assure conformance with the requirements stated in the LID resolution and the municipal code. Per Section 7.187, the City Council can take the following actions: 1. Adopt of the ordinance levying assessments. 2. If, after review of the proposed assessment a determination is made that the assessment should be modified, staff would be directed to publish a new notice and a public hearing must be conducted. New findings would then be prepared for City Council adoption. L:\CMO\2005 Council Agendas\M050124\S0501246.doc CITY MANAGER'S RECOMMENDATION Staff recommends approval of the Findings and Recommendations of the Hearings Official and adoption of the ordinance levying assessments. SUGGESTED MOTION The council is asked to approve two motions: 1. Move to approve the Findings and Recommendations of the Hearings Official of January 13, 2005. 2. Move to adopt the ordinance levying assessments. ATTACHMENTS A. Ordinance, including Hearings Official's Findings and Recommendations FOR MORE INFORMATION Staff Contact: Paul Klope Telephone: 682-5246 Staff E-Mail: paul.w.klope~ci.eugene.or.us L:\CMO\2005 Council Agendas\M050124\S0501246.doc ATTACHMENT A ORDINANCE NO. AN ORDINANCE LEVYING ASSESSMENTS FOR CONSTRUCTING SIDEWALKS, CURBS, GUTTERS, CONDUIT, AND STORM DRAINAGE SYSTEM ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 600 FEET WEST; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE. (CONTRACT 2005-10) (JOB #4108) The City Council of the City of Eugene finds that: On the 20th day of February, 2004, based on the findings issued by the City Engineer, pursuant to Section 7.160(8) of the Eugene Code, 1971, the City Engineer initiated the proposed local improvements consisting of constructing sidewalks, curbs, gutters, and storm drainage system on Santa Clara Avenue from River Road to approximately 600 feet west. After due notice and a public hearing before the hearing official on July 19, 2004, the City Council formed the Local Improvement District and authorized construction of the local improve- ment on the 9th day of August 2004. The actual cost of the local improvement is ascertained to be $120,714.07, and the amounts to be assessed to, and borne by, the specially benefitted property, and to be borne by the City or others, have been determined in accordance with applicable provisions of the Eugene Code, 1971 CE.C.") and as set forth in Exhibit A attached hereto and incorporated herein by reference. The City Council has established the method of calculating local improvement assessments in E.C. 7.170 and 7.175. A public hearing on the ordinance, as required by Section 28(2) of the Eugene Charter of 2002, was scheduled before the hearing official as authorized by Section 2.007(4) of the Eugene Code, 1971, on January 24, 2005. Anotice containing the information required by E.C. 7.185 was Ordinance- 1 Q:kPROJECTSkPROJ-8\4108\CORRESPONDENCE\COUNCIL\ORDINANCE.DOC posted on a public bulletin board at City Hall and given by certified mail to the owners of the parcels of real property subject to the assessment more than ten days prior to the scheduled public hearing before the hearing official. At the time and place specified therein, the hearings official considered the assessment report of the City Engineer and Finance Officer and the testimony and evidence presented at the hearing. At least ten working days prior to the Council meeting, notice of the Council's consideration of this Ordinance was published in the Register Guard, and the Ordinance was posted on the City's web site on the same date, as required by Section 28(1) of the Eugene Charter of 2002. The Council has reviewed and considered the assessment report of the City Engineer and Finance Officer and the hearings official's findings and summary, and based thereon, THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The hearings official's summary is hereby made a part of the Council's record in these proceedings, and the hearings official's findings, including those regarding compliance with E.C. 7.160 to 7.190, attached hereto as Exhibit B and incorporated herein by reference, are hereby adopted. Section 2. The actual assessable cost of the local improvement comprised of constructing sidewalks, curbs, gutters, and storm drainage system on Santa Clara Avenue from River Road to approximately 600 feet west is $115,188.80 which is hereby assessed against the parcels of property hereinafter described in the amounts set opposite, respectively. Section 3. The City Council does hereby determine and assess each lot and part of lot within the described local improvement district as set forth on the assessment roll attached as Exhibit C hereto and incorporated herein by reference. Ordinance - 2 Q:LPROJECTS~PROJ-8\4108\CORRESPONDENCE\COUNCIL\ORDINANCE.DOC Section 4. The City Council does hereby determine that each parcel of land or lot herein above described is specially benefitted to the extent of the assessment set forth. The Finance Officer shall give notice of the assessments to the owners of the assessed parcels advising them the assessment may be paid in full, without interest, within ten days of the effective date of this ordinance. Assessments that remain unpaid after the ten day period are declared to be liens upon the respective lots, parts of lots or parcels of land against which said several amounts are assessed, and may be paid, with interest on the unpaid principal amount commencing ten days after the effective date of this ordinance: 4.1 In up to twenty semi-annual installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024. 4.2 If the property owner so elects, in 120 monthly installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024 plus a service charge determined by the City Manager as provided in E.C. 2.020. Section 5. The City Recorder is directed to enter in the docket of City Liens a statement in connection with each unpaid assessment containing the following: 5.1 A description of each lot, part of lot or acreage specially benefitted by the local improvement; 5.2 The name of the owner or reputed owner thereof, or that the name of the owner is unknown; and 5.3 The sum assessed upon said property, the amount and date from which interest accrues, and the date of entering the same in the docket of City Liens. Section 6. Upon enactment of this ordinance, the City Finance Officer shall send notice of Ordinance - 3 Q:~PROJECTS~PROJ-8\4108\CORRESPONDENC E\COUNCIL~ORD1NANCE.DOC the assessments by first class mail to the owners of the assessed parcels containing the information required by E.C. 7.190 and enclose therewith an application for paying the assessment in installments according to the terms set forth in Section 4 of this ordinance. Section 7. Any assessment remaining unpaid and for which no application for installment payments has been received may be foreclosed as provided by law. The proceeds from the payment or foreclosure of assessments levied by this ordinance shall be deposited to the city funds which advanced the cost of construction, engineering and related expenses or which are used to retire any indebtedness incurred by the City for this improvement. Section 8. An immediate effective date of this Ordinance is necessary to allow the City to begin immediate collection of the assessments that will be used to pay the obligations the City has incurred for this project. Enabling the City to begin collecting assessments will avoid increased interest costs and conserve limited City resources. Therefore, this Ordinance shall become effective immediately upon its passage by the City Council and approval by the Mayor, retention by the Mayor for more than ten days, or readoption over a Mayoral veto by two-thirds of all members of the City Council. Passed by the City Council this Approved by the Mayor this __ day of ,2005. day of ,2005. City Recorder Mayor Ordinance - 4 Q:h°ROJECTSh°ROJ-8~ 108\CORRESPONDENCE\COUNCIL\ORDINANCE.DOC REPORT ID: RPT250SP CITY OF EUGENE Exhibit A SPECIAL ASSESSMENT SYSTEM ASSESSMENT DISTRIBUTION PROJEcT NAME: SANTA CLARA AVE; RIVER RD TO 450' WEST CONTRACT NUMBER: 2005-00010 JOB NUMBER: 93004108 ASSESSABLE: 6 PROPERTIES AT THIS TIME $1Z5,Z88.80 0 PROPERTIES A]{E ON,OLD $0.00 TOTA~ ASSEBBMEHT FOR 6 PROPERTIES CITY SHARE: $115,188.80 CZTY ~AVXNG $3,137.82 CITY STORM $2,387.45 TOTAL CITY SHARE: $S,S25.27 TOTAL COST OF PROJECT: $120,7~4.07 JBLBC'~XON CRXTRR~A ~OB lqOJ 93004108 Exhibit B FINDINGS AND RECOMMENDATIONS SUBJECT: PROPOSED FINAL ASSESSMENT FOR CONSTRUCTION OF SIDEWALKS, CURBS, GUTTERS, AND STORM DRAINAGE SYSTEM ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 600 FEET WEST (JOB 4108) (CONTRACT 2005-10) BACKGROUND Santa Clara Avenue runs west from River Road between Beltline and Irving Road. Prior to this project Santa Clara Avenue was paved, but not completely developed to City standards. The area around Santa Clara Avenue continues to develop. St. Vincent de Paul is constructing a 60 unit low income residential development on Santa Clara Avenue, just west of the area to be improved. The City of Eugene's Fire Station #11 is under construction along the portion of Santa Clara Avenue included in this project. In 2003, Lane County finished street improvements to the portion of Santa Clara Avenue just west of the Local Improvement District. The City of Eugene received irrevocable petitions for this project in September and October 1989. The petitions included an area representing more than 81 percent of the assessable area of the Local Improvement District. After the County finished their improvements to Santa Clara Avenue, and in light of the ongoing developments in the area, the Eugene City Engineer initiated preparation of plans and bid specifications on February 20, 2004. Bids were solicited and the Council acted to form the Local Improvement District (LID) on August 12, 2004. The project has been completed, and final assessment costs have been calculated. The property owners were notified of the pending assessment hearing ten (10) days prior to the date of the scheduled hearing. PROJECT x The project brings this portion of Santa Clara Avenue up to city standards. The improvements are designed to meet the cra'rent and future pedestrian, bicycle and vehicular travel needs along Santa Clara Avenue. The improvements include constructing curbs, gutters sidewalks and storm drainage on the north and south sides of Santa Clara from River Road to 600 feet west. ASSESSMENTS Chapter 7 of the Eugene Code provides that the cost of~ublic improvement projects such as the improvements to Santa Clara Avenue should be spread among the benefiting property owners, with the City of Eugene absorbing a share of the costs. The City's share of costs includes costs that the City has decided are necessary, but which do not provide as large and direct a benefit as other costs which are assessed to property owners. PROPOSED FINAL ASSESSMENT FOR CURBS AND GUTTERS, SIDEWALKS, AND STORM DRAINAGE ON SANTA CLARA AVENUE Page 1 The distribution of costs is specified in Eugene Code section 7.75. The anticipated distribution of costs was described in the Council adopted hearings official recommendations upon creation of the LID. The non-assessable City share for this project will be funded from the Transportation SDC Fund, Stormwater SDC Fund, and Transportation Utility Fund (for a small section of pavement repair). Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district. None of the property owners qualify for the City's low- to moderate income subsidy program. The final unit assessable costs are: Sidewalk (per square foot of assessable property) $ 7.56 Curbs and Gutters (per front foot) $ 54.08 Direct Charges assessed $ 36,013.45 Total Assessable Cost $115,188.80 Total City Cost $ 5,525.27 Total Project Cost $120,714.07 Estimated Assessment At the time the LID was formed, the City Engineer developed a prediction concerning the cost of the LID. Based on the bid received, the estimated assessments were: Sidewalks (per square foot) $ 8.31 Curbs and Gutters (per front foot) $ 58.61 Direct Charges $ 42,706.00 Total Assessable Cost $129,166.10 Total City Cost $ 16,010.66 Total Project Cost $145,176.70 PUBLIC INVOLVEMENT This project was started because of property owner petitions. Notice of the proposed assessment and proposed public hearing was sent to all property owners in the LID. No persons requested an opportunity to have a public hearing on the proposed assessments, so no hearing was held. FINDINGS AND RECOMMENDATION Appropriate notice was given of the public hearing and the availability of the proposed ordinance for LID assessment, as required by the Eugene Charter and Code. Letters informing property PROPOSED FINAL ASSESSMENT FOR CURBS AND GUTTERS, SIDEWALKS, AND STORM DRAINAGE ON SANTA CLARA AVENUE Page 2 owners of the hearing and notification to property owners of the intent of the City to characterize the assessment as an assessment, not a tax, as required by ORS 305.583(5), were mailed to the property owners. The overall cost of the project was less than estimated, and the assessments proposed are, as a result, smaller than originally estimated. The Hearings Officer finds that the project is one for which the assessments are for local improvements as set forth in ORS 310.410 because 1. The assessments do not exceed actual costs; 2. The assessments are imposed for a capital construction project that provides a specific benefit for a specific property or rectifies a problem caused by a specific property 3. The assessments are imposed in a single assessment upon completion of the project; and 4. The assessments allow the property owners to elect to pay the assessment with interest over at least ten (10) years. The Hearings Official also finds that the proposed final assessment, calculated and recommended by the City Engineer is reasonable and consistent with the Eugene Code. The Hearings Official recommends that the Council act in accord with the City Engineer's recommendations, adopting the ordinance prepared for the public hearing, levying the assessment as set forth by the City Engineer. Respectfully subrpitted, '"'.'5 ..~2 '/ /l~iilo Mech;~ Hemngs Official Dated: January 13, 2005 PROPOSED FINAL ASSESSMENT FOR CURBS AND GUTTERS, SIDEWALKS, AND STORM DRAINAGE ON SANTA CLARA AVENUE Page 3 MEMORANDUM DATE: January 5, 2005 FROM: Mark Schoening, City Engineer TO: Hearings Official SUBJECT: PROPOSED FINAL ASSESSMENT FOR CONSTRUCTION OF SIDEWALKS, CURBS, GUTTERS, AND STORM DRAINAGE SYSTEM ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 600 FEET WEST (JOB 4108) (CONTRACT 2005-10) BACKGROUND The project was petitioned by three Irrevocable Petitions received by the City, in October 1989 and September 1989. These petitions represent 81.13 % of the assessable frontage within the boundaries of the Local Improvement District (LID). St. Vincent DePaul is constructing a 60 unit low income residential development just west of the improvement project. In addition, City of Eugene Fire Station # 11 is currently under construction on a parcel representing 16.82% of the frontage in the LID. Prior to this improvement project being completed there were no sidewalks, curb or gutter on the south side of the street and no sidewalk on a portion of the north side of the street. The City Engineer initiated the preparation of plans and specifications, pursuant to Section 7.160(8) of the Eugene Code, 1971 on February 20, 2004. The project has bought Santa Clara Avenue up to full City standards and meets the current and future pedestrian, bicycle and vehicular needs in this developing area of the community. Bids were opened on July 1, 2004, with Brown Contracting, Inc. as the low bidder. The City Council formed the Local Improvement District (LID) on August 12, 2004. The project has been completed, and final assessment costs have been calculated. The property owners were notified of the pending assessment hearing ten (10) days prior to the hearing as required by Municipal Code. The intent of the final assessment hearing that is scheduled for January 5, 2005, is to review the final project cost, consider comments on the proposed assessments, and to provide evidence to be included in the ordinance levying the assessments by the City Council. CORRESPONDENCE Since the mailing of the Notice of Proposed Assessment, City staff has not received any phone calls or written correspondence expressing concerns or questions regarding the cost of the improvements. PROJECT DESCRIPTION The street improvements include constructing curbs, gutters, sidewalks, and storm drainage on the north and south sides of Santa Clara Avenue from River Road to 600 feet west. ASSESSMENT Costs are distributed per City Code 7.175, and as outlined in the Council adopted Hearings Official findings and recommendations, and the resolution forming the LID. Hearing Memo - Santa Clara Avenue January 5, 2005 Page 2 The non-assessable City share for this project will be funded from the Transportation SDC Fund, Stormwater SDC Fund, and Transportation Utility Fund (for a small section of pavement repair). Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by City Code, Chapter 7. None of the property owners qualify for the low-to moderate income subsidy program. Below are the final unit assessable costs: Sidewalk (per square foot) $ 7.56 Curbs and Gutters (per front foot) $ 54.08 Direct Charges assessed $ 36,013.45 Total Assessable Cost $115,188.80 Total City Cost $ 5,525.27 Total Project Cost $120,714.07 The City will pick up the cost for non-assessable curb and gutter, sidewalks, and storm drainage system as identified by City Code, Chapter 7. Costs listed below are the estimated assessment costs calculated at the time of the formation of the LID. A contingency was included in the estimate. Sidewalks (per square foot) $ 8.31 Curbs and Gutters (per front foot) $ 58.61 Total Assessable Cost $129,166.10 Total City Cost $ 16,010.66 Direct Charges $ 42,706.00 Total Project Cost $145,176.76 RECOMMENDATION The final total assessable costs are lower than quoted at the time of the formation of the LID. Costs are distributed in accordance with Eugene Code. Staff recommends approval of the assessments as calculated and that the Council levy the final assessments. REPORT ID: RPT240SP CITY OF EUGENE pAGE: 1 SPECIAL ASSESSMENT SYSTEM Exhibit C ' ASSESSMENT ROLL FROM SPA (FINAL) MASTER PROJECT #: 2005-00010 CONTRACT #: 2005 00010 JOB #: 93004108 SEQ #: 0010 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAXLOT ACCOUNT STATUS OWNER 17041143 00801 000 PENDING SANTA CLARA LIMITED PTNRSNP 705 SENECA EUGENE OR 97402 PROPERTY DESCRIPTION: DEED 2004-050882 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $755.74 TOTAL ACCOUNT IMPROVEMENT: $755.74 MASTER PROJECT #: 2005-00010 CONTRACT #: 2005 00010 JOB #: 93004108 SEQ #: 0020 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAXLOT ACCODl%'T STATUS OW1TER 17041144 02601 000 PENDING SANTA CLARA INVEST GROUP P 0 BOX 40453 EUGENE OR 97404 PROPERTY DESCRIPTION: PCL1 PIu%T 2003-P1656 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $9,688.61 TOTAL ACCOUNT IMPROVEMENT: $9,688.61 MASTER PROJECT #: 2005-00010 CONTRACT #: 2005 00010 JOB #: 93004108 SEQ #: 0030 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAX~OT ACCOUNT STATUS OWNER 17041144 02602 000 PENDING LOXODONTA LLC 90912 KIRK RD JUNCTION CITY OR 97448 · PROPERTY DESCRIPTION: PCL2 PLAT 2003-P1656 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $5,i84.39 TOTAL ACCOUNT IMPROVEMENT: $5,184.39 REPORT ID: RPT240SP CITY OF EUGENE PAGE: 2 SPECIAL ASSESSMENT SYSTEM ASSESSMENT ROLL FROM SPA (FINAL) MASTER PROJECT #: 2005-00010 CONTRACT #: 2005 00010 JOB #: 93004108 SEQ #: 0040 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAXLOT ACCOUNT STATUS OWNER 17041144 02700 000 PENDING FACILITIES MGMT EUGENE CITY OF 210 CHESHIRE ST EUGENE OR 97401 PROPERTY DESCRIPTION: PCL1-A 2004-06785 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $4,217.04 DIRECT CHARGES-OTHER $16,058.94 STREET IMPROVEMENTS $5,532.26 TOTAL ACCOUNT IMPROVEMENT: $25,808.24 MASTER PROJECT #: 2005-00010 CONTRACT ~: 2005 00010 JOB ~: 93004108 SEQ #: 0050 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAXLOT ACCOUITT STATUS OWNER 17041144 02800 000 PENDING FACILITIES MGMT EUGENE CITY OF 210 CHESHIRE ST EUGENE OR 97401 PROPERTY DESCRIPTION: PCL2 2004-06785 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $3,000.29 DIRECT CHARGES-OTHER $16,058.94 STREET IMPROVEMENTS $4,055.91 TOTAL ACCOUNT IMPROVEMENT: $23,115.1% REPORT ID: RPT240SP CITY OF EUGENE PAGE: 3 SPECIAL ASSESSMENT SYSTEM ASSESSMENT ROLL FROM SPA (FINAL) MASTER PROJECT #: 2005-00010 CONTRACT #: 2005 00010 JOB #: 93004108 SEQ #: 0060 PROJECT LEGAL DESCRIPTION IMPROVEMENTS ON SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 450 FEET WEST TAXLOT ACCOIIRT STATUS OWNER 17041144 06000 000 PENDING PEACEHEALTH P O BOX 10905 EUGENE OR 97440 PROPERTY DESCRIPTION~ DECI~%/~ATION R 2568 99060602 IMPROVEMENTS AMOUNT SIDEWALK/DRIVE APRON $19,354.54 DIRECT CHARGES-OTHER $3,895.57 STREET IMPROVEMENTS $27,386.57 TOTAL ACCO~RT IMPROVE~NT: $50r636.68 SIIMMARY OF IMPROVEMENTS: SIDEWALK/DRIVE APRON $42,200.61 DIRECT CHARGES-OTHER $36,013.45 STREET IMPROVEMENTS $36,974.74 TOTAL $115~188.80