Work Session: Railroad Quiet Zone
Meeting Date: February 25, 2008 Agenda Item Number: C
Department: Public Works Maintenance Staff Contact: Tom Larsen
www.eugene-or.gov Contact Telephone Number: 682-4959
ISSUE STATEMENT
Following council direction, staff has engaged in extensive public involvement and analysis of
requirements, costs and public support for various options related to establishing a railroad quiet zone in
which the routine sounding of train horns at specific railroad crossings would cease. Analysis and input
was focused on specific supplemental safety measures designed to reduce risk levels sufficiently to
obtain a quiet zone designation from the Federal Rail Administration (FRA). Among the measures
considered were closing streets, converting two-way streets to one-way operation, constructing quad
gates and installing other apparatus to warn people of approaching trains and/or keep them off the
tracks. This work session is an opportunity for council to review the analysis and input and provide
additional direction.
BACKGROUND
The City Council held a railroad quiet zone work session on July 20, 2005. At that session, staff
presented information about a new Federal Railroad Administration rule allowing local jurisdictions to
obtain a quiet zone designation. Quiet zones are considered a local quality of life issue and no federal
funding is available specifically for obtaining one. At that session, the council directed the City
Manager to further refine cost estimates for specific construction of several of the supplemental safety
measures required to obtain a quiet zone and to monitor the quiet zone process and evaluate the progress
made by other jurisdictions.
On June 26, 2006, the council held another railroad quiet zone work session. At that work session, the
council directed the City Manager to study the necessary steps to close up to four railroad crossings and
convert streets to one-way at railroad crossings in order to obtain federal Title 23 Section 130 funding
for crossing safety improvements. These funds are administered by Oregon Department of
Transportation Rail Division (ODOT Rail). The council also directed that no closings or conversions
will be constructed until a public process has been completed and the council has given final approval.
Analysis of Supplemental Safety Measures
Risk-mitigation supplemental safety measures (SSMs) were considered for 10 at-grade railroad
crossings in the downtown area, from Hilyard Street (near the EWEB entrance on Eighth Avenue) on
the east to Van Buren Street on the west. A map of the area is included as Attachment A. Potential risk-
management strategies included closing streets to all forms of through traffic, installing quad gates,
F:\CMO\2008 Council Agendas\M080225\S080225C.doc
constructing median barriers, converting two-way streets to one-way traffic, and leaving some crossings
unchanged. Each potential strategy at each specific at-grade crossing was evaluated based on a number
of criteria, including ability to reduce risk based on a “risk index” used by the FRA, costs (initial capital
costs and on-going maintenance costs), engineering feasibility, public acceptance, and conformance with
traffic safety standards and other policies related to the local transportation system.
Closing at-grade rail crossings is the safety measure most preferred by the FRA, ODOT Rail and the
Union Pacific Railroad, which owns and operates the rail lines that run through the downtown area.
Closing redundant or unsafe railroad crossings is a goal of the U.S. Department of Transportation. The
likelihood of obtaining non-City funding from these agencies increases with the number of at-grade
crossings that are closed. However, closing at-grade rail crossings is the safety measure least supported
by the public. The FRA process to obtain a quiet zone requires ODOT Rail, Union Pacific and the City
to all agree on the SSMs proposed. None of the parties can force a quiet zone or other changes to
railroad crossings without the consent of the others.
Based on analyses of the federal criteria necessary to obtain a quiet zone and a sense of public
acceptance, staff has developed a conceptual design that would likely result in a quiet zone. The
scenario displayed in Table 1 describes the different supplemental safety measures needed to reduce the
risk index from the current level of 17,689 to 11,029. Guidelines stipulate that implementation of a
quiet zone shall result in a reduction of the risk index for the segment under consideration.
Table 1
Crossing Location Treatment
Van Buren Median
Monroe None
Madison Close
Jefferson One-way
Washington One-way
Lawrence Median
Lincoln None
Pearl None
High Quad gates
8th and Hilyard Quad gates
Risk Index 11,029
Estimated Cost $1,350,000
This scenario assumes only one street closure and is likely to qualify for only $50,000 of ODOT Rail-
administered Section 130 funds. If the City decides to pursue more street closures to increase the
likelihood of non-City funding, staff considered five potential closures: Monroe, Madison, Jefferson,
Lawrence and Lincoln streets. Given the lack of public support for multiple street closures in this area,
staff did not fully analyze a scenario involving multiple closures, other than to determine that there
would be significant impacts to business access, neighborhood connectivity, bicycle and pedestrian
routes and emergency response.
In 2007 the FRA updated its risk index calculator to take into account a train-pedestrian crash at the
Eighth and Hilyard crossing. The risk index at that crossing increased almost five-fold, and the average
F:\CMO\2008 Council Agendas\M080225\S080225C.doc
risk index for the 10 crossings in the potential quiet zone went from about 14,000 to over 17,000. In
previous alternative analyses and as presented at several public forums, staff proposed no changes at
Eighth and Hilyard. However, to reduce the overall risk index to quiet zone levels it is likely that quad
gates must be added at this crossing, increasing the cost of a quiet zone by approximately $400,000 over
any of the previous scenarios.
Results of Public Input Process
During the summer and fall of 2007, Public Works staff completed a comprehensive public outreach
process to gather input on the implications of creating a railroad quiet zone in Eugene. In total, four
public forums were held. Additional comments were sought using an online survey hosted on the City’s
web portal. The public involvement process began with a widely advertised public forum that attracted
participants with various levels of interest in the quiet zone study. The second forum was targeted at
commercial property and business owners in the general vicinity of the study area, but was also open to
the general public. The third forum was held at the Ya-Po-Ah Terrace to reach a less mobile, yet very
interested group of nearby residents. The final public forum was attended by a variety of interested
participants including neighborhood residents, property and business owners, residents from outside the
study area, and staff from the railroad. The final forum provided staff an opportunity to report back on
comments and input gathered previously while also collecting any final input and detailing the next
steps of moving forward with an official quiet zone.
As directed by the council, staff set out to study public support for closing up to four railroad crossings
to obtain federal funding to implement safety improvements that would result in a quiet zone. At each
of the public forums, staff presented a range of potential scenarios that could feasibly result in a quiet
zone; these scenarios ranged from closing zero to five of the 10 at-grade crossings. Throughout the
public process, staff heard general community support for the concept of a quiet zone. Although
participants favored implementing a quiet zone, virtually none were in favor of closing crossings as a
prerequisite. Staff found that when provided a scenario with one closure, participants were more
supportive. There was minimal support for multiple closures as a means of obtaining outside funding.
Any opposition to the concept of a quiet zone was rare and more focused on being against spending City
resources to implement a quiet zone. When potential funding mechanisms were discussed, staff found
opposition for special assessment districts, particularly in the Whiteaker neighborhood. Many
participants suggested implementing a quiet zone even if it cost the City millions of dollars because of
the positive effect it would have on the local quality of life.
A summary of comments received at the public forums and through the online survey is included as
Attachment B.
Cost Estimates
The scenario detailed on page 2 of the memo would cost approximately $1.4 million. In addition, the
annual maintenance for quad gates, which would likely become a City financial liability, is estimated to
cost approximately $10,000 for each quad gate ($20,000 a year for the two quad gates in the scenario).
In recent discussions, ODOT Rail has reiterated its policy on state-administered federal Section 130
funding. Currently, to be eligible for Section 130 funding, half (five) of the 10 crossings in the proposed
quiet zone would need to be closed in order for ODOT Rail to fully participate in safety improvements
to the remaining five crossings at a level necessary for the City to obtain a quiet zone designation. If
less than half of the crossings are closed, ODOT Rail has offered $50,000 per closure to be applied
F:\CMO\2008 Council Agendas\M080225\S080225C.doc
towards safety improvements at other crossings within the proposed quiet zone. In other words, if the
City closed one crossing, we could expect ODOT Rail to put $50,000 toward the total cost of the
supplemental safety measures necessary to obtain a quiet zone designation.
No local funding source has been identified or programmed for construction of SSMs to obtain a quiet
zone. Potential sources of local funding include the General Fund, Community Development Block
Grants, urban renewal funds, and assessments levied through a local improvement district. Staff is not
aware of any non-local sources of funding that could pay for creation of a quiet zone.
RELATED CITY POLICIES
2007-2008 City Council Goal - Neighborhood Empowerment:
?Redesign the neighborhood initiative to support the neighborhoods which includes public
participation in the livability and protection of neighborhoods and identifies specific
redevelopment strategies that preserves the integrity of residential uses, including design
standards, site review, down-zoning, infill regulation, and bolstering and empowering
neighborhood associations to get more involvement.
Adopted Growth Management Policies:
?Policy 1: Support the existing Eugene Urban Growth Boundary by taking actions to
increase density and use existing vacant land and under-used land within the boundary
more efficiently.
COUNCIL OPTIONS
Staff has identified four options for the council to consider in providing direction on this issue:
Option 1: Appropriate $60,000 from the council contingency to retain a consultant that would
finalize the design of the quiet zone through negotiations with appropriate regulatory
agencies. This assumes a commitment of local funding at the conclusion of the
negotiation process.
Option 2: Continue to monitor the evolving practice of creating quiet zones in the United States. If
there are considerable changes to current practice including non-local sources of funding,
staff will provide this information to the council.
Option 3: Indicate council support for closing up to five at-grade crossings, and proceed to
negotiate for a quiet zone with no expenditure of local funds.
Option 4: Cease the study of implementing a railroad quiet zone in Eugene.
F:\CMO\2008 Council Agendas\M080225\S080225C.doc
CITY MANAGER’S RECOMMENDATION
Direct the City Manager to continue to monitor the evolving practice of creating quiet zones in the
United States. The City Manager does not recommend moving forward with quiet zone implementation
at this time because of the impacts to programs that are dependent on the local sources of funding that
would be required to create a quiet zone.
SUGGESTED MOTION
Move to direct the City Manager to continue to monitor the evolving practice of creating quiet zones in
the United States.
ATTACHMENTS
A. Map of study area
B. Summary of public involvement process
FOR MORE INFORMATION
Staff Contact: Tom Larsen
Telephone: 682-4959
Staff E-Mail: tom.c.larsen@ci.eugene.or.us
F:\CMO\2008 Council Agendas\M080225\S080225C.doc
RRQZ AIS 2/25/08
ATTACHMENT B
Eugene Railroad Quiet Zone Study
Public Input Report
January 31, 2008
Background
As directed by City Council in the fall of 2006, City staff developed and completed a
public involvement process to measure community support for closing up to four at-
grade rail crossings to obtain funding for a railroad quiet zone in Eugene. The 1.5 mile
th
study area includes ten crossings at 8 and Hilyard, High, Pearl, Lincoln, Lawrence,
Washington, Jefferson, Monroe, Madison, and Van Buren Streets. In addition to four
advertised public forums, input was gathered through an online survey on the project
website, emailed comments, and several telephone calls to City staff. The input process
began in August of 2007 and was completed following the last public forum on October
16, 2007.
Not unlike other projects of a particularly narrow geographic scope, gathering
representative public input on the implications of establishing a railroad quiet zone in
Eugene presents a challenge. Regardless of their sentiment or leanings, most
participants in the public involvement process reported living, working, or owning a
business within fairly close proximity to the rail tracks. Staff used a process to allow for
all interested parties to comment or provide feedback whether through public forums, an
online survey, or vie email or telephone. The public meeting schedule follows:
Public Meeting #1 – August 28, 2007
Campbell Center, 155 High Street, Eugene
7:00 to 9:00 pm
60+ Attendees
Facilitators: Tom Larsen and Rob Inerfeld
Other City Staff present: Eric Jones, David Roth and Lindsay Selser
Business Meeting – September 6, 2007
Eugene Public Library – Bascom/Tykeson Room
3:00 to 5:00 pm
30+ Attendees
Facilitators: Tom Larsen and Rob Inerfeld
Other City Staff present: Lindsay Selser
Ya-Po-Ah Terrace Meeting – September 24, 2007
350 Pearl St, Eugene
3:00 to 4:30 pm
50+ Attendees
Facilitator: David Roth
Other City Staff present: Eric Jones, Lindsay Selser and Tom Larsen
Public Meeting #2 – October 16, 2007
Campbell Center, 155 High Street, Eugene
7:00 to 9:00 pm
30+ Attendees
Facilitator: Tom Larsen and Rob Inerfeld
Railroad Quiet Zone Public Input Report Page 1
RRQZ AIS 2/25/08
Other City Staff present: David Roth and Lindsay Selser
Process Summary
City of Eugene staff hosted four public forums to discuss and solicit input on the
feasibility of establishing a Railroad Quiet Zone in the Downtown and Whiteaker areas.
The involvement process was designed to provide residents and business owners near
the rail tracks and members of the community living outside of the study area with
opportunities to comment on the implications of creating a quiet zone in Eugene.
The first three meetings included background information about railroad quiet zones and
a presentation on various alternatives and options. These alternatives and options were
refined after each meeting as we obtained further public input. Presentations were
typically followed by staff facilitated break-out sessions and focused discussions to
capture and synthesize issues important to participants. Goals for the meetings included
1) information sharing to the public, and; 2) collecting and recording feedback and
concerns about on implementing a quiet zone in Eugene.
The final public meeting included a review of the public involvement process and the
input that had been received to date. The primary purpose of the final meeting was to
obtain final comments and opinions and to report back on the most widely accepted
scenario for establishing a quiet zone. City Traffic Engineer Tom Larsen and
Transportation Planning Manager Rob Inerfeld presented at the final meeting.
Advertisement
Advertisement for the workshops included the following:
A postcard invitation was mailed on August 22 to more than 4300 residents,
?
property owners and business owners in the area surrounding the Railroad
tracks from Hilyard to Van Buren Streets.
Personal invitations were mailed to other interested parties and stakeholders.
?
An article on quiet zone study-related events was included in the August 16
?
edition of the Council Newsletter.
A news release was distributed on August 20.
?
An advertisement was run in the Register Guard on August 25.
?
An article titled "Public input sought on railroad quiet zones" appeared in the R-G
?
on Aug. 27, 2007.
City staff attended the Whiteaker Community Council meeting on July 11, to give
?
updates on the project and to provide notice of the upcoming meeting.
th
Prior to the September 6 business meeting reminder leaflets were distributed to
?
the businesses along the railroad corridor.
th
Prior to the final meeting on October 16 reminder emails were sent out to all the
?
.
stakeholders and interested parties
Railroad Quiet Zone Public Input Report Page 2
RRQZ AIS 2/25/08
Input Summary
This section provides a summary of the responses received during public forums and
through the online survey.
Public Meeting #1 – August 28, 2007
Should existing conditions be maintained (No railroad quiet zone in Eugene)?
?
Participants indicated near unanimous support for implementing a quiet zone in Eugene.
Many cited quality of life issues with some concerned about the negative consequences
of closing at-grade crossings.
Would you support spending local funds to establish a railroad quiet zone?
?
Most participants indicated support for spending some amount of local funds to establish
a quiet zone. Although staff did not ask for particular dollar figures, some participants
suggesting spending whatever necessary, while others took a more conservative stance
suggesting paying up to 25% of the total cost with local funds.
Indicate your support for complete closure of 5 streets (50% of crossings in the
?
study area) to establish a railroad quiet zone.
There was near unanimous rejection of the concept of closing 5 rail crossings within the
study area. Many suggested that no streets should be closed to implement a quiet zone.
Indicate your support for complete closure of 1 to 3 streets to establish a railroad
?
quiet zone.
When asked for their level of support in closing 1 to 3 crossings, participants provided a
mix of responses. Those who supported this concept generally did so because of the
increased potential availability of Section 130 funds. Those who were opposed to this
concept noted the potential negative effects of decreased connectivity and spillover
traffic onto neighborhood streets.
Indicate your support for converting two-way streets to one-way street couplets to
?
establish a railroad quiet zone.
While few respondents indicated support for this option (citing connectivity issues), the
majority were supportive of converting existing two-way streets to one-way streets to
facilitate a quiet zone. Jefferson and Washington Streets were most frequently cited as
the two streets to convert to a one-way couplet.
Provide any other input or comments
?
When prompted for additional comments, participants noted a variety of related issues
included frustration with federal rail regulations, interest in seeing above or below grade
crossing solutions and many alternative suggestions.
Railroad Quiet Zone Public Input Report Page 3
RRQZ AIS 2/25/08
Business Meeting – September 6, 2007
City staff asked participants at the business/commercial property meeting for their input
on a number of potential at-grade rail crossing configurations that may lead to an official
railroad quiet zone in Eugene. A summary of the comments received follows.
Should existing conditions be maintained (No railroad quiet zone in Eugene)?
?
Participants suggested collecting additional data before moving forward with a railroad
quiet zone. One participant noted that a quiet zone was “long overdue.” Comments
made during the meeting indicated a fairly even divide between those in favor of
implementing a quiet zone and those opposed to it.
Implement quiet zone with no closures.
?
Participants expressed mixed opinions on implementing a quiet zone without closing any
streets. Each of the individual crossing treatments necessary to implement a quiet zone
would still affect surrounding properties and nearby neighborhoods. Some participants
indicated opposition to creating additional one-way streets due to the forced rerouting of
patron traffic. Business and commercial owners were particularly concerned about
changing the existing ingress and egress points to their properties. One participant
noted that one-way configurations could potentially negatively effect the new Monroe-
Friendly Bikeway.
Implement quiet zone with 2 street closures (Madison and Lincoln).
?
Respondents favored this option over other, more extreme closure scenarios. One
participant noted the potential positive effect this scenario would have on their business
operations. Some noted concerns about shifting traffic from closed streets to
neighboring streets. Business owners located on Lincoln expressed dissatisfaction with
the negative impacts associated with a reduction in access through crossing closures.
Implement a quiet zone with 3 street closures (Madison, Jefferson and Lincoln).
?
Respondents provided similar responses to the 2 street closure option. Positive
responses cited the increased probability of receiving State administered funding. Other
participants noted that closing three crossings would be too disruptive.
Implement a quiet zone with 5 street closures (Monroe, Madison, Jefferson,
?
Lawrence, and Lincoln)
This option was universally opposed.
Implement a quiet zone using quad gates at all crossings.
?
Most respondents indicated conditional support for this option. Participants noted
support for quad gates because of their minimal impact to existing conditions, however
those in favor also suggested this option was too expensive.
Railroad Quiet Zone Public Input Report Page 4
RRQZ AIS 2/25/08
Implement a quiet zone using wayside horns at all crossings.
?
Participants rejected this option because it does not eliminate train horn noise.
Provide any other input or comments.
?
Those who provided additional comments suggested installing quad gates at all
crossings, maintaining the traditional street grid pattern without closing any streets and
examining potential funding options such as a special assessment district to fund the
quiet zone.
Ya-Po-Ah Terrace Meeting – September 24, 2007
Should existing conditions be maintained (No railroad quiet zone in Eugene)?
?
Participants indicated unanimous support for implementing a quiet zone in Eugene.
Residents at Ya-Po-Ah Terrace were particularly concerned about the level and duration
of noise coming from the train horns.
Would you support spending local funds to establish a railroad quiet zone?
?
While participants were universally supportive of establishing a quiet zone to improve
local quality of life, those who commented on this question suggested that funding come
from the railroad corporations. The few residents answering this question were
unsupportive of spending local funds to establish a quiet zone.
Indicate your support for complete closure of 5 streets (50% of crossings in the
?
study area) to establish a railroad quiet zone.
Received only one comment suggesting to leave the streets as they were.
Indicate your support for complete closure of 1 to 3 streets to establish a railroad
?
quiet zone.
Received only one comment suggesting to leave the streets as they were.
Indicate your support for converting two-way streets to one-way street couplets to
?
establish a railroad quiet zone.
Received only one comment suggesting to leave the streets as they were.
Provide any other input or comments
?
Of the three comments received, one suggested doing nothing, another suggested
under-grounding the railroad, and the third provided a description of the horn patterns.
Public Meeting #2 – October 16, 2007
Railroad Quiet Zone Public Input Report Page 5
RRQZ AIS 2/25/08
Staff distributed a survey with more refined options for proceeding with a railroad quiet
zone at this meeting. The survey options were developed taking into account feedback
and comments received at the previous three meetings and through the online survey.
Options to close more than two crossings were eliminated at this stage due to near
universal opposition. The three options included in the survey and a summary of
responses follow:
Establish a quiet zone, but close zero crossings
?
Consistent with earlier input during the study, this option proved to be the most popular
option for participants at the final public forum. Concerned citizens desire a quiet zone,
yet are not willing to compromise by closing existing crossings to facilitate the process.
Close one crossing (indicate Madison or Lincoln as your preferred closure)
?
After the first option of closing no crossings, this was the second most popular choice.
The majority of respondents selected Madison as the preferred crossing to close to
facilitate a railroad quiet zone.
Close two crossings (Lincoln & Madison)
?
This was the least popular option with respondents. Those who selected this option
commented that the City should pursue a quiet zone at any cost because of the
disruptive nature of the train horns.
As any option to pursue a railroad quiet zone will require some amount of public
?
investment, please provide your funding suggestions.
A bulleted list of suggestions follows:
Matching grants from the state Negotiate with FRA and UP
??
Special assessment district(s) Local property tax assessment
??
Share costs with railroad(s) Transportation bonds
??
Earmark from DeFazio Local improvement district
??
Business tax or other payment LID for residents within 5 blocks
??
system of railroad
Bond Entire city should pay
??
Gas Tax
?
Additional Comments
?
While the majority of respondents expressed interest in seeing a railroad quiet zone
implemented in Eugene, several suggested that it was not a high priority especially if it
required spending local funds. Those in support often cited community livability and
quality of life issues as being the driving factor in their support of the concept.
Railroad Quiet Zone Public Input Report Page 6
RRQZ AIS 2/25/08
Online Survey Responses – August 15, 2007 to October 16, 2007
To reach a broader audience, staff posted an online survey on the Railroad Quiet Zone
project website; responses were accepted during a three-month period from August 15
to October 16, 2007. Questions from the survey and summaries of the responses follow.
Maintain existing conditions, do not establish a railroad quiet zone.
?
In general, respondents indicated a fairly even split between support and opposition to
the concept of a railroad quiet zone in Eugene. Those who were opposed to the concept
cited safety concerns, narrow geographic impact of train horns and nostalgia about train
horns as reasons to do nothing. Those in favor cited improving neighborhood and
community livability and quiet nights as reasons to implement a quiet zone.
Would you support using local funds to establish a railroad quiet zone?
?
The majority or respondents were opposed to spending local funds to implement a quiet
zone. Those who were in favor suggested capping the amount to a percentage of the
entire cost and suggested the railroads or ODOT pay for a portion.
Indicate your support for complete closure of 5 streets (50% of crossings in the
?
study area) to establish a railroad quiet zone.
There was near universal opposition to closing five crossings to implement a quiet zone.
Indicate your support for complete closure of 1 to 3 streets to establish a railroad
?
quiet zone.
Similar to the previous question, respondents were nearly universally opposed to closing
one to three streets to implement a quiet zone.
Indicate your support for converting two-way streets to one-way street couplets to
?
establish a railroad quiet zone.
While approximately half of the respondents were opposed to one-way conversions, the
other half were primarily unsure of the consequences and indicated having no opinion on
the matter.
Please enter any other railroad quiet zone-related comments or ideas.
?
Other input was mostly a rehashing of previous comments and fell in line with those
either strongly in favor of the project or strongly opposed to the project. Few
respondents were on the fence.
Railroad Quiet Zone Public Input Report Page 7