HomeMy WebLinkAboutItem 7: Ordinance Levying Assessments for River Avenue ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Action: Approval of Minutes, Findings and Recommendations from the Hearings Official and Adoption of an Ordinance Levying Assessments for Paving and Constructing Curbs, Gutters, Sidewalks, Street Lights, Water Quality Bioswales, and Stormwater Drainage on River Avenue from 200 feet East of River Road to 100 feet West of Beltline Highway; and Providing an Immediate Effective Date (Contract 2007-02)(Job #3693) Meeting Date: March 10, 2008 Agenda Item Number: 7 Department: Public Works-Engineering Staff Contact: Michelle Cahill www.eugene-or.gov Contact Telephone Number: 682-6855 ISSUE STATEMENT The City Council is being asked to approve the Hearing Official’s Minutes, Finding and Recommendations dated February 29, 2008, and adopt an ordinance levying assessments for paving and constructing curbs, gutters, sidewalks, street lights, water quality bioswales, and stormwater drainage on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway. This item has an immediate effective date. An immediate effective date requires a two-thirds majority or six affirmative votes from the council to enact. Ordinances without an immediate effective date do not take effect for 30 days. Without an immediate effective date, an additional 30 days of interest expense will accrue. BACKGROUND The improvement project was included in the adopted Metropolitan Transportation Plan first adopted in 1986 and subsequently updated and adopted. The project was initiated by council action on June 26, 2000, by adoption of the 2001 Capital Budget and pursuant to Section 7.160(5) of the Eugene Code (EC), 1971. On February 9, 2005, Lane County Board of County Commissioners issued Board Order 05-3-9-5, concurring that nine properties that were outside the city limits be included in the Local Improvement District. An initial hearing, in the spring of 2005, regarding the formation of the Local Improvement District indicated lack of support for the project. Additional work was done to create a design for the transportation improvements that the property owners and community organizations supported. The City Council approved the revised conceptual design December, 2005. Bids were opened on May 25, 2006, with Delta Construction dba Delta Concrete as the apparent low bidder. Property owners were notified of a public hearing regarding formation of the proposed Local Improvement District (LID) and F:\CMO\2008 Council Agendas\M080310\S0803107.doc a hearing was held on June 7, 2006. The City Council formed the Local Improvement District for this project on June 26, 2006. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. The property owners were notified of the proposed assessments and the pending assessment hearing ten (10) days prior to the hearing as required by Eugene Code. The final assessment hearing was held on February 20, 2007, to review the final project cost, consider comments on the proposed final assessments, and to provide evidence to be included in the ordinance levying the assessments by the City Council. One property owner attended the hearing (see Hearings Official Minutes). Project River Avenue is a major collector located on the north side of Eugene, running parallel to, and then connecting to, Beltline Road. River Avenue also connects to River Road, Division Avenue, Ross Lane and Beaver Street, and is one of only three ways to cross Beltline Road between the Northwest Expressway and the River. In addition, from River Avenue there are two connection points to the Ruth Bascom Riverbank Trail System. These factors combined created a need to accommodate a variety of transportation users, including bicyclists, bus riders, pedestrians, and motorists for current and future needs. The land use is primarily commercial, government (MWMC Water Pollution Control Facility, US Post Office and Veteran’s Clinic) and multi-family residential. The street improvements consisted of 34- to 44-foot wide paving. The improvements included westbound and eastbound travel lanes with a continuous two way left turn lane, curbs and gutters, sidewalks, and storm water drainage system with water quality bioswales and water quality structure, on street bike-lanes for the westerly 1,300 feet and a multi-use path along the south side of the road for the easterly 3,100 feet. The project addressed the deteriorating roadway, increasing volumes of traffic and provided for pedestrian safety and alternate modes. Assessments Costs were distributed per Eugene Code 7.175, and outlined in the council-adopted Hearings Official findings and recommendations, and resolution forming the LID. final (2008) assessable unit Below are the costs: Paving 10-foot (per front foot) $ 114.77 Paving 7-foot (per front foot) $ 85.34 Sidewalk and drive aprons (per square foot) $ 6.26 Direct assessed stormwater (2 lots) $4,562.02 final project costs A breakdown of the by assessment and City share includes: Total Assessable Cost $1,127,258.29 Total City Cost $2,085,990.85 Total Project Cost $3,213,249.14 Per Eugene Code, property owners on a major collector street are assessed for a portion of the width of the street based on zoning. The City pays for the remaining street and non-assessable storm drainage costs. The non-assessable City share for this project will be funded from Transportation SDC, F:\CMO\2008 Council Agendas\M080310\S0803107.doc Stormwater SDC and Stormwater and Wastewater Utility Funds. The utility funds are utilized for maintenance work done under the construction contract. Additionally, by code, the costs are spread to every benefiting property. However, one lot is owned by the Federal Government and the Courts have ruled local jurisdictions cannot levy assessments against the Federal Government. So the total assessable costs include the $34,670.88 that is the Federal Post Office share of assessments. The City will pay that portion of the assessable amount from Transportation System Development Charge Funds. Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by Eugene Code, Chapter 7. estimated assessment Based on the low bid received, the costs listed below are the costs plus at the time of the formation of the LID contingency calculated (June 2006): Paving 10-foot (per front foot) $ 122.78 Paving 7-foot (per front foot) $ 91.38 Sidewalk and drive aprons (per square foot) $ 6.48 Direct assessed Stormwater (2 lots) $4,958.38 Total Assessable Cost $1,236,289.69 Total City Cost $2,053,097.94 Total Project Cost $3,289,387.63 Following the mailing of the proposed assessment notices, staff received new information that some of the property owner’s assessments should be adjusted. The engineer’s report to the Hearings Official and the ordinance posted on the web reflect that sixteen accounts would be adjusted lower, however, upon further review, one account should remain as was indicated in the Notice of Proposed Final Assessment. The Hearings Official was notified of the change and the ordinance attached reflects the 15 accounts lowered. For fifteen properties, courtesy notices of the proposed lower assessments have been mailed. Further detail is included in the report to the hearings official. Also, different in the attached ordinance from the ordinance posted on the web, is the dollar amount of the Total Project Cost and the Total City Cost. The dollar amounts on the web ordinance reflected an administrative fee that the City does not pay in the project costs. This change does not modify the Proposed Assessments. Ten potential residential property owners were notified of the Low-to-Moderate Income Street Improvement Subsidy program. The subsidy program is available to property owners who occupy a single-family dwelling or duplex and meet other program criteria. Owners were sent fact sheets which describe the household size and income levels for the subsidy program which is based on the current Lane County Median Family Income. Property owners were given until February 4, 2008, to return their application forms to determine eligibility. Of the ten property owners, none of the owners have indicated they qualify for the program. RELATED CITY POLICIES The assessment costs were distributed as outlined in the council-adopted Hearings Official’s Findings and Recommendations and Resolution forming the LID. F:\CMO\2008 Council Agendas\M080310\S0803107.doc COUNCIL OPTIONS Special assessment provisions adopted as part of the LID resolution cannot be modified during the final assessment process if they result in increased costs to the property owners. The final assessment hearing was to review the calculations to assure conformance with the requirements stated in the LID resolution and the Eugene Code. Per Section 7.187, the City Council can take the following actions: 1.Approve the Minutes, Findings and Recommendations of the Hearings Official of February 29, 2008, and adopt the ordinance levying assessments. 2. If after the review of the proposed assessment, the City Council determines that the assessments should be modified, staff would be directed to publish a new notice and a public hearing must be conducted. New findings would then be prepared for City Council adoption. CITY MANAGER’S RECOMMENDATION The City Manager recommends approval of the Minutes, Findings and Recommendations of the Hearings Official and adoption of the ordinance levying assessments. SUGGESTED MOTION 1.Move to approve the Minutes, Findings and Recommendations of the Hearings Official of February 29, 2008. 2.Move to adopt an ordinance levying assessments for paving, constructing curbs, gutters, sidewalks, street lights, water quality bioswales, and stormwater drainage on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway; and providing an immediate effective date. ATTACHMENTS A.Ordinance - includes Hearings Official’s Minutes, Findings and Recommendations FOR MORE INFORMATION Staff Contact: Michelle Cahill Telephone: 682-6855 Staff E-Mail: michelle.r.cahill.@ci.eugene.or.us F:\CMO\2008 Council Agendas\M080310\S0803107.doc