Work Session: Street Assessment Policy
Meeting Date: June 17, 2008 Agenda Item Number: B
Department: Public Works Staff Contact: Mark Schoening
www.eugene-or.gov Contact Telephone Number: 682-5243
ISSUE STATEMENT
This work session will provide an overview of the City’s street assessment policy and some of the issues
associated with street assessment projects (local improvement districts).
BACKGROUND
Unimproved Streets
There are approximately 75 miles of unimproved streets in the City of Eugene, or about 14% of the total
538 miles of streets in Eugene. Approximately 63 miles are unimproved local streets and 12 miles are
unimproved arterial and collector streets. These are streets with soil, gravel, or asphalt mat surfaces.
These streets typically have not been structurally designed; have few drainage facilities; and lack curbs,
gutters and sidewalks. The cost of bringing all the unimproved streets in Eugene up to City standards is
estimated to be in excess of $90 million. The City bears a portion of the street improvement costs
including storm drainage improvements, intersection costs, some corner lot costs, individual lot frontage
costs in excess of 100 feet, and other related costs that historically have been almost equivalent to the
property owner assessments.
Local Improvement District Process
The formation of a local improvement district (LID) provides a method of financing public
infrastructure in which the cost of the infrastructure is assessed to the benefiting properties. The
majority of Eugene’s street system has been financed through assessments to benefiting properties.
LIDs can be initiated by the City Council or by the City Engineer. The City Council can initiate an LID
by the adoption of the annual capital budget or by a council motion. River Avenue and Shelton
McMurphey Boulevard are examples of LIDs initiated by the council with the adoption of the annual
capital budget. The West University Neighborhood alley improvement project is an example of an LID
initiated by a council motion. The City Engineer may initiate an LID after receiving a petition poll from
property owners representing properties that will bear over 50 percent of the cost of the improvement.
The Sixth Alley currently under construction is an example of a LID initiated by the City Engineer.
Upon initiation of a LID the City proceeds with the design and bidding of a project.
After a project is bid and prior to awarding a construction contract, a public hearing is held before a
hearings official to determine whether or not the City should proceed with the improvement project.
After considering the findings of the hearings official the City Council forms the LID by resolution.
Z:\CMO\2008 Council Agendas\M080623\S080623B.doc
However, if property owners representing properties that will bear over 50 percent of the cost of the
improvement remonstrate against the project, the hearing before the hearings official is continued to the
City Council. It then requires that two-thirds of all councilors vote in support of a resolution for a LID
to be formed.
Once a LID is formed, the City proceeds with construction of the improvement project. Upon
completion of construction a second public hearing is held before a hearings official. The purpose of the
second public hearing is to determine if the assessments to the benefiting properties were determined
appropriately. After considering the findings of the hearings official the council adopts an ordinance
levying the assessments against the benefiting property owners.
After adoption of the ordinance levying assessments, property owners have 10 days to pay the
assessment in full or to finance the assessment through the City over a 10-year period. City financing is
available to all property owners as long as the value of the property is greater than the amount of the
assessment. Assessments financed through the City may be paid off early without any penalty.
There are several financial assistance programs available to property owners. Both the City and the
State have deferral programs that are based on age and income. In addition, the City has a subsidy
program based on income with subsidies ranging from 1/3 to 5/6 of the total assessment.
Council Ad Hoc Committee on Street Improvement Funding
Beginning in 1999 and continuing over the course of several years a Council Ad Hoc Committee on
Street Improvement Funding reviewed the assessment policies for all functional street classifications.
The goal of the subcommittee was to more equitably and fairly allocate the cost of street improvements
to the benefiting properties. Based upon the work of the subcommittee, in October 2000, the council
adopted an ordinance that substantially changed the assessment methods for arterial and collector streets
(See Attachment A). A year later in November 2001, the council adopted an ordinance that substantially
changed the assessment method for local streets (See Attachment B). The major changes addressed
partially developed and vacant property, location of the primary access to a property, corner lots, and
assessable width for different classifications of streets. In May 2004, the assessment method for alleys
was changed to assess 100 percent of the costs associated with an alley improvement to the benefiting
property owners.
The changes to the assessment methods for arterial, collector, and local (including unclassified) streets
have met the goal of more equitably and fairly allocating the cost of street improvements to the
benefiting properties. However, the changes resulted in a much more complex methodology and shifted
costs from property owners to the City. While staff have worked through the complexity of the changes
in managing specific projects, explaining the assessment methodology and how much an individual
property may pay for an improvement project has proved problematic.
Numerous arterial and collector streets have been improved under the revised assessment methodology.
Recently completed projects include River Avenue and Shelton McMurphey Boulevard. Projects that
have been initiated, but where an LID has not yet been formed, include Maple and Elmira Streets and
Chad Drive (Old Coburg Road). For arterial and collector streets the majority of assessment projects are
initiated by the City Council with the adoption of the annual capital budget. Transportation system
development charges have been used to fund the City’s share of assessment projects on arterial and
collector streets.
Z:\CMO\2008 Council Agendas\M080623\S080623B.doc
Very few local streets have been improved under the revised assessment methodology. For local streets
the City Council generally does not initiate assessment projects through either adoption of the annual
capital budget or by council motion. The petition poll process is the method that the City has relied
upon to initiate assessment projects on local streets. This process is time consuming and expensive
because property owners want to know what the street improvement will look like and how much their
assessment will be before signing a petition poll. It is rarely successful because it requires property
owners bearing over 50 percent of the cost to sign the petition poll. In addition, there is not a viable
funding source to fund the City’s share of assessment projects for local streets.
In 2001, the Agenda Item Summary for the ordinance amending the Eugene Code for local streets
included the following information – In the past 20 years, approximately 3.31 miles of substandard local
streets have been improved to City standards, representing a street improvement rate of 0.17 miles per
year. At this rate, it would take 280 years to bring all of the 48 miles of currently existing substandard
local streets up to standards.
RELATED CITY POLICIES
Chapter 223 of the Oregon Revised Statutes prescribes the right and responsibilities of cities to levy
assessments for local improvements. The Municipal Charter, Chapter IX – Public Improvements
provides the regulatory framework for public improvement procedures and assessments. The Eugene
Code, Chapter 7 – Public Improvements prescribes the process for initiation of an assessment project,
formation of a local improvement district, and computation and allocation of assessments to benefiting
properties.
COUNCIL OPTIONS
There are two issues impeding the improvement of local streets through the LID process that the council
may wish to consider. The first issue is that the petition poll process is time consuming and costly and
rarely results in a successful poll. The options to consider include:
1.Maintain the current petition poll process for assessment projects for local streets
2.Include local street improvement projects in the Six Year Capital Improvement Program and initiate
local street assessment projects by council adoption of the annual capital budget.
The second issue is the lack of a viable funding source for the City’s share of costs for local street
assessment projects. The options to consider include:
1.Identify an existing source of funds such as the General Fund for local street assessment projects.
2.Identify a portion of the proposed General Obligation Bond for Street Maintenance for the City’s
share of costs for improving unimproved local streets.
3.Identify a portion of the proposed General Obligation Bond for Street Maintenance for the City’s
$1.6 million share of the Crest Drive, Storey Boulevard and Friendly Street improvements.
4.Amend the Eugene Code to assess all of the costs associated with unimproved local street
improvement projects to the benefiting property owners.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that the council direct the City Manager to include unimproved local
streets in the draft FY 2010 – 2015 Capital Improvement Program and the FY 2010 Proposed Budget.
Z:\CMO\2008 Council Agendas\M080623\S080623B.doc
The City Manager also recommends that the council direct the City Manager to identify a portion of the
proposed General Obligation Bond for Street Maintenance for the City’s $1.6 million share of the Crest
Drive, Storey Boulevard and Friendly Street improvements. The proposed improvements have been
developed through a context sensitive solutions process and the design has been approved by the City
Council.
SUGGESTED MOTION
Move to direct the City Manager to:
A.Include unimproved local streets in the draft FY 2010 – 2015 Capital Improvement Program and the
FY 2010 Proposed Budget.
B.Identify a portion of the proposed General Obligation Bond for Street Maintenance for the City’s
$1.6 million share of the Crest Drive, Storey Boulevard and Friendly Street improvements.
ATTACHMENTS
A. New Assessment Policy for Arterial and Collector Streets
B. New Assessment Policy for Local Streets
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 682-5243
Staff E-Mail: mark.a.schoening@ci.eugene.or.us
Z:\CMO\2008 Council Agendas\M080623\S080623B.doc
öûùè
ìÇÚÐÓÙåÍÊÑÉ
éô÷÷è
÷ÎÕÓÎ××ÊÓÎÕ
ùÓÈÃÍÖ÷ÇÕ×Î×
ì×ÛÊÐéÈ
÷ÇÕ×Î×íê
ÙÍÎÈÓÎÇרÍÎÎ×ÄÈÌÛÕ×
öíêïíê÷
óîöíêïûèóíî
öûùè
ìÇÚÐÓÙåÍÊÑÉ
éô÷÷è
÷ÎÕÓÎ××ÊÓÎÕ
ùÓÈÃÍÖ÷ÇÕ×Î×
î×ÅûÉÉ×ÉÉÏ×ÎÈìÍÐÓÙÃÖÍÊóÏÌÊÍÆ×Ï×ÎÈÉ
ÈÍðÍÙÛÐéÈÊ××ÈÉ
ÙÍÎÈÓÎÇרÍÎÎ×ÄÈÌÛÕ×
öíêïíê÷
óîöíêïûèóíî