HomeMy WebLinkAboutResolution No. 5164
COUNCIL RESOLUTION NO. 5164
A RESOLUTION ANNEXING LAND TO THE CITY OF EUGENE
17-03-08-31, TAX
LOTS3600, 3700, 3800 AND 3900).
PASSED: 8:0
REJECTED:
OPPOSED:
ABSENT:
CONSIDERED: July 25, 2016
RESOLUTION NO. 5164
A RESOLUTION ANNEXING LAND TO THE CITY OF EUGENE
17-03-08-31, TAX LOTS
3600, 3700, 3800 AND 3900).
The City Council of the City of Eugene finds that:
A.
An annexation application was submitted by Daniel and Christine Kersey on May
4, 2016, in accordance with the provisions of Section 9.7810(2)
for annexation to the City of Eugene of the property identified as 17-03-08-31,
Tax Lots 3600, 3700, 3800 and 3900.
B.
The territory proposed to be annexed is depicted on the map attached as Exhibit A
to this Resolution. The legal description of the property described is attached to this Resolution
as Exhibit B.
C.
has submitted a written recommendation that the
application be approved based on the criteria of EC 9.7825.
Recommendation is attached as Exhibit C.
D.
On June 24, 2016, a notice containing the street address and ass
lot number, a description of the land proposed to be annexed, and
preliminary recommendation was mailed to the applicants, owners and occupants of property
within 500 feet of the subject property, and the Northeast Neighbors. The notice advised that the
full recommendation on the proposed
annexation on July 25, 2016.
E.
that the application should be approved.
NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a
Municipal Corporation of the State of Oregon, as follows:
Section 1
Findings and
Recommendation attached as Exhibit C which are adopted in support of this Resolution, it is
ordered that the land identified as 17-03-08-31, Tax Lots 3600, 3700, 3800 and
3900 on the map attached as Exhibit A, and described in the attached Exhibit B, is annexed to the
City of Eugene.
Resolution - Page 1 of 2
Exhibit A
Exhibit B
Exhibit C
Planning Director's Findings and Recommendation
Annexation Request for Kersey
(City File A 16-3)
Application Submitted: May 4, 2016
Applicant: Daniel and Chris Kersey
Property Location: Between Gilham Road and Walton Lane, north of Ayers Road (3445 and 3463 Gilham Road)
Property Included in Annexation Request: Tax Lots 3600, 3700, 3800 and 3900 17-03-08-31
Zoning: AG/UL with Agriculture and Urbanizable Lands Overlay
Representative: Ryan Erickson, EGR & Associates, 2535 B Prairie View Rd., Eugene OR 97402; 541-688-8322
Lead City Staff: Nicholas Gioello, City of Eugene Planning Division, 541-682-5453
EVALULATION:
Based on the information provided by the applicant, the City has determined that this request complies with
Eugene Code (EC) Section 9.7805 Annexation - Applicability. As such, it is subject to review and approval in
accordance with the requirements, application criteria and procedures of EC 9.7800 through 9.7835. The applicable
approval criteria are presented below in bold typeface with findings and conclusions following each.
EC 9.7825(1)
(a) Contiguous to the city limits; or
(b) Separated from the city only by a public right of way or a stream, bay, lake or other body of
water.
Complies Findings: The annexation area is within the City's urban growth boundary (UGB), and is contiguous
to the City limits, consistent with subsection (a). As shown in the application materials and
confirmed by City staff, the City limits are contiguous with the subject area of land along the
YES NO
northern, southern, eastern, and western boundaries.
EC 9.7825(2) The proposed annexation is consistent with applicable policies in the Metro Plan and in any
applicable refinement plans.
Complies Findings: Several policies from the Metro Plan provide support for this annexation by encouraging
compact urban growth to achieve efficient use of land and urban service provisions within the UGB,
including the following policies from the Growth Management section (in italic text):
YES NO
Policy 8. Land within the UGB may be converted from urbanizable to urban only through
annexation to a city when it is found that:
a.A minimum level of key urban facilities and services can be provided to the area in
an orderly and efficient manner.
b.There will be a logical area and time within which to deliver urban services and
facilities. Conversion of urbanizable land to urban shall also be consistent with the
Metro Plan. (page II-C-4)
Policy 10. Annexation to a city through normal processes shall continue to be the highest
priority. (page II-C-5).
Policy 15. Ultimately, land within the UGB shall be annexed to a city and provided with the
required minimum level of urban facilities and services. While the time frame for
annexation may vary, annexation should occur as land transitions from urbanizable to
Kersey (A 16-3) July, 2016 Page 1
urban. (page II-C-5)
As addressed below under subsection (3), and consistent with these policies, a minimum level of
key urban facilities and services can be provided to the area in an orderly and efficient manner.
The Metro Plan designates the annexation area as appropriate for Low Density Residential use. The
current zoning of AG is intended to allow agricultural uses within the UGB until land is converted to
urban use. Agricultural uses are considered interim uses until public facilities and services can be
provided. In order for this property to further develop as residential property in the future, a zone
change to R-1 Low Density Residential will be necessary.
The Willakenzie Area Plan (WAP) is the adopted refinement plan for the subject property. The
subject property is located within the Unincorporated Subarea of the WAP. None of the general
"Residential Land Use Policies" appear to be directly applicable to the subject request. The "Public
Facilities and Services Element" policies of the WAP are directed at local government; however, the
premise of these policies (regarding the provision of urban services) is the assumption that the
properties within the UGB will be annexed.
As discussed in this subsection, and further detailed under subsection (3) below, the proposed
annexation is consistent with the Metro Plan growth management policies and can be served by
the minimum level of key urban services. The annexation procedures beginning at EC 9.7800 are
consistent with State law and therefore, as found throughout this report, the annexation is
consistent with State law.
Therefore, based on the findings above, the proposal is consistent with the applicable policies of
the Metro Plan.
EC 9.7825(3) The proposed annexation will result in a boundary in which the minimum level of key urban
facilities and services, as defined in the Metro Plan, can be provided in an orderly, efficient, and
timely manner.
Complies Findings: Consistent with this criterion, the proposed annexation will result in a boundary in which
the minimum level of key urban facilities and services can be provided in an orderly, efficient, and
timely manner as detailed below:
YES NO
Wastewater
Public wastewater is available within Gilham Road. The existing structures do not appear to be
connected to the piped public system, as there are no sewer connection records available for these
properties. There are no liens or assessments of record due.
Stormwater
Public stormwater systems are not available to serve this property. The soil classification is Type B,
which typically indicates that good infiltration rates can be expected. Future development
proposals must demonstrate consistency with flood control standards; on-site retention is a
feasible option for this site. Compliance with applicable stormwater development standards will be
ensured at the time of development.
Transportation
The property abuts Gilham Road, a Lane County Road, and Walton Lane, a City of Eugene Street.
Eugene Public Works defers to Lane County Transportation Planning referral comments with
regards to Gilham Road. Compliance with applicable street standards will be ensured at the time of
development.
Kersey (A 16-3) July, 2016 Page 2
Lane County Public Works
Gilham Road is a Lane County road functionally classified as an urban Local Road having a minimum
right-of-way width of 60 feet for development setback purposes, per LC 15.070(1)(c)(i)(ff)).
Solid Waste
Collection service is provided by private firms. Regional disposal sites and the Short Mountain
Landfill are operated by Lane County.
Water and Electric
EWEB Water staff and Electric staff state no objection to the proposed annexation. Water and
electric services can be extended in accordance with EWEB policies and procedures.
Public Safety
Police protection can be extended to this site upon annexation consistent with service provision
through the City. Fire protection will be provided by the City of Eugene Fire Department.
Emergency medical services are currently provided on a regional basis by the cities of Eugene and
Springfield to central Lane County and will continue in the same manner upon annexation.
Parks and Recreation
A minimum level of park services can be provided to the proposal area as prescribed in the Metro
Plan.
Planning and Development Services
Planning and building permit services are provided for all properties located within the urban
growth boundary by the City of Eugene. The Eugene Code, Chapter 9, will provide the required land
use controls for future development of the subject property upon annexation.
Communications
A variety of other telecommunications providers offer communications services throughout the
Eugene/Springfield area.
Public Schools
The subject property is within the Eugene School District boundary and Gilham Elementary School,
Cal Young Middle School, and Sheldon High School.
CONCLUSION:
Based on the above findings, information submitted to date, and the criteria set forth in EC 9.7825, the proposed
annexation is consistent with the applicable approval criteria. A map and legal description showing the area subject
to annexation are included in the application file for reference. The effective date is set in accordance with state
law.
INFORMATION:
Upon approval of the annexation, the base zoning of AG Agricultural will remain; however, the /UL
Urbanizable Lands overlay will be automatically removed from the annexation area. City review is
required before development can occur on this lot. Please contact the Permit Information Center,
Planner-on-Duty at 541-682-5377 for more information.
Kersey (A 16-3) July, 2016 Page 3
In accordance with Lane Code 15.205(1), a Facility Permit shall be required for placement of facilities
within the right-of-way of County roads. Facilities and development includes, but is not limited to, road
improvements, sidewalks, new or reconstructed driveway or road approach intersections, utility
placements, excavation, clearing, grading, culvert placement or replacement, storm water facilities, or
any other facility, thing, or appurtenance. A Facility Permit is required if an existing approach to a
County road is used, in order to verify that the portion of the approach that is within the County right-of-
way meets current County standards \[LC 15.205(3)\]. Please contact 541-682-6902 or visit this link for
information regarding facility permits:
http://www.lanecounty.org/Departments/PW/Engr/RightofWay/Pages/rowpermits.aspx
For informational purposes, Lane County staff notes that because Gilham Road is a County road, future
development of property connecting to Gilham Road is subject to the applicable requirements of Lane
Code Chapter 15, including, but not limited to, the following:
LC 15.135 General Access Requirements
(5) When an existing County Road is used to provide access to a vacant lot or parcel where
development is proposed:
(a) the approach for the driveway or private access easement serving the property shall meet
the access management requirements and spacing and sizing requirements of LC 15.137
through LC 15.139; and
(b) the County may require dedications of right-of-way or easements and improvements
pursuant to LC 15.105; and
(c) all work within the County Road right-of-way shall comply with the facility permit
requirements of LC 15.205 through LC 15.210.
In accordance with Lane Manual 15.515, storm water runoff from private property shall not be directed
to the Lane County road right-of-way, or into any Lane County drainage facility, including roadside
ditches. Ditches adjacent to County roads are designed solely to accommodate roadway storm water
runoff.
For information regarding EWEB requirements at the time of development, please contact Bill Johnson,
EWEB Water, at 541-685-7377; Jon Thomas, EWEB Electric, at 541-685-7472; and Lori Price EWEB Right-
of-Way, at 541-685-7366.
Approval of this annexation does not relieve the applicant from complying with applicable codes and
statutory requirements.
Kersey (A 16-3) July, 2016 Page 4