HomeMy WebLinkAboutItem 3: Resolution on GO Bond for Streets
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Action: Resolution 4953 Calling a City Election on November 4, 2008 for the Purpose of
Referring to the Legal Electors of the City of Eugene a Measure Authorizing the Issuance
of a Maximum of $81.1 or $35.9 Million of General Obligation Bonds to Fund Street
Preservation Projects
Meeting Date: July 28, 2008 Agenda Item Number: 3
Department: Central Services Staff Contact: Sue Cutsogeorge
www.eugene-or.gov Contact Telephone Number: 682-5589
ISSUE STATEMENT
The council will consider placing a General Obligation (GO) bond measure for street preservation
projects on the November 2008 ballot.
BACKGROUND
Council Action History
Over the past several years, the council has worked on ways to adequately fund a large and growing
pavement preservation project backlog. Some highlights from the history of this effort are included in
Attachment A.
Most recently, on July 16, the council continued discussions about the GO bond measure. At that
meeting, the council directed the City Manager to bring back two bond resolutions, one for $35.9
million for projects to be completed over five years and one for $81.1 million for projects to be
completed over ten years. The council directed that the measure for a five-year period should not
include any provision for future councils to remove projects from the list, but should allow bond funds
to be used for additional projects, with a majority vote by council, for the next highest priority street
preservation projects once all the other projects on the bond list are complete. The council directed that
the 10-year measure should, in the final year of the measure, allow for removals from the project list
upon an affirmative vote by at least six councilors, and additions to the list by a majority vote of the
council, upon completion of all the projects on the list.
The City Manager’s Street Maintenance Task Force met on Friday, July 18, and received results from a
survey conducted in July. The Task Force discussed the survey results and made recommendations to
the City Manager, which have been taken into account in developing the bond resolutions presented in
this material.
Bond Options
Two options are presented for council consideration, in accordance with direction provided at the July
16 meeting. For each option, there are attachments that show the project list, a project map, and a bond
resolution. A summary of the two options is included in the following chart.
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
Miles of Off-
# of Street Street Bike & Average Tax Average
Ped Path Total Cost to
Preservation Rate Annual Cost
Projects/# of Preservation (Per $1000 of to Average Average
Bond Size Projects Taxpayer
Miles AV) Taxpayer
32 projects / $495 over 5
$35.9 Million 3+ miles $0.59 $99 per year
70 miles years
86 projects / $1,070 over 10
$81.1 Million
7+ miles $0.59 $107 per year
150+ miles years
It should be noted that both measures would have the same estimated tax rate. The lower cost for the
five-year measure is due to the fact that assessed values for homes are expected to rise over the period of
the bond measure, and the first five years will have lower assessed values than the last five years.
Attachment H includes a map comparing the $35.9 million and $81.1 million project lists. In develop-
ing the five-year project list, staff took into account geographic equity and the “visibility” of projects.
Having a higher portion of the $35.9 million bond measure dedicated to the more visible, highly traveled
streets means that the smaller measure has a greater share dedicated to reconstruction projects. Because
reconstructions tend to be significantly more costly than overlay treatments, the five-year list represents
less than half of the projects, both by number and lane miles, than the ten-year list.
The bond resolutions for the two measures are otherwise the same, with the exception of the language
that grants council the authority to add or delete projects from the bond list.
?
As the council directed, the $35.9 million resolution does not allow for any projects to be removed
from the bond list. It does, however, allow council to add projects, once all the other projects on the
bond list are complete, upon a majority vote of council. Councilor Bettman asked for a footnote to
be added to the resolution that provides for council approval to allocate the balance of bond proceeds
to the next highest priority street preservation project in the event all the projects are completed and
there is a remaining balance in the bond authorization. The resolution included in Attachment D
contains language to accomplish this in Section 4, although it is not in the form of a footnote.
?
The $81.1 million resolution allows the council to remove projects from the list, upon the approval
th
of at least six councilors, but only in 2018 (the 10 year of spending). It also allows additions to the
project list, with a majority council vote, but again, only in 2018.
In addition, based on successful measures in other areas, the City Manager is recommending a street
repair review panel for the bond measure. This review panel would produce an annual report that
evaluates how well the City has implemented the bond measure project list. This provision has been
added to both resolutions in Recital I. In order to promote accountability in the use of bond proceeds,
staff is continuing to recommend that an outside auditor be periodically engaged to review and prepare a
publicly-issued report on the use of the bond monies for the purposes authorized by the bond measure
and within the restrictions established by the council.
There were questions at the July 16 meeting about ways to allow projects that are no longer feasible to
come off the list “automatically.” The difficulty in automatic removal stems from the council’s desire to
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
limit bond spending to only those projects on the list. If the list were illustrative, but not binding, this
would not be an issue. The only methods to take projects off the list are either to create a process or
develop objective criteria. If objective criteria could be developed that were comprehensive enough to
cover every potential future situation, then there could be an “automatic” deletion of projects from the
list. Because the criteria would have to be developed to cover situations that are not known today,
however, it is unlikely that any set of criteria developed today would be the specific criteria needed to
cover an actual future situation. Therefore, it is much more practical to specify a process to allow for
deletions from the project list under appropriate circumstances. That is what is proposed for the $81.1
million bond measure. This proposal is just one potential process that could be used, and the council
could develop another process if desired.
As was discussed at the July 16 council meeting, the choice between an $81.1 million and a $35.9
million bond measure is a difficult one and there are many factors to consider. Some of the factors
mentioned at the meeting were: building trust with the voters; the current economic climate; the time
and effort required to place a measure on the ballot and campaign for it; the effort to educate citizens
about the issues and this specific measure; the results of recent surveys; and the need to solve the street
preservation and maintenance funding issue as soon as possible. Weighing all those factors, as well as
information from the Street Maintenance Task Force and from the recent survey, staff recommends that
a $35.9 million bond measure for five years of projects be placed on the November 2008 ballot.
Communications Plan
Attachment I contains a revised communications plan, based on comments from the July 16 meeting and
other edits. As mentioned earlier, this is a dynamic document that will be updated as circumstances
change.
Questions from July 16 Meeting
A question was asked about survey results that might provide information to assist the council in
determining the impact of bond measure size on voter approval of a measure. As part of the City
Manager’s Street Maintenance Task Force work, a survey was conducted on various financing
mechanisms to pay for street maintenance. The survey results will be presented at a work session on
July 28.
Three other surveys have been conducted by the City in the past two years. The street funding survey
prepared in January 2008 asked two questions about a property tax measure for street repairs:
?
Would you be willing to pay an additional $110 per year in property taxes to go toward repairing
Eugene's streets?
Yes – 56.33% Don’t Know – 4.47%
No – 38.96% No Answer – 0.25%
?
Question asked of only those people who said NO, DON’T KNOW, or NO ANSWER to the
previous question: Would you be willing to pay an additional $90 per year in property taxes to go
toward repairing Eugene's streets? (Percentages are of the entire survey population, not just the
people that said NO, DON’T KNOW or NO ANSWER to the first question.)
Yes – 5.96% Don’t Know – 2.48%
No – 34.49% No Answer – 0.74%
Adding the results of the two questions together, 62% of those surveyed said they would be willing to
support a property tax measure for street repairs that cost the average taxpayer $90 per year.
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
Two surveys were completed during 2007 for the City Hall project. Excerpts from the presentations to
the council on these surveys are included in Attachment J.
Voters’ Pamphlet
Immediately following this item on the council agenda is an item that requests funding for a voters’
pamphlet and assignment of councilors to serve on the proponent committee.
Information Tabloid
The City has prepared neutral information tabloids for some of the previous bond measures, such as the
parks and open space bonds. Staff proposes preparing a tabloid for this measure that would include the
project list and map, along with other neutral information that is approved by the City Attorney. The
tabloid would be distributed by mail to all Eugene households, probably in early October 2008. The
estimated cost of printing and mailing the tabloid is $25,000, and staff is requesting council General
Fund contingency be used to provide the necessary budget appropriation to cover this cost.
Timing
The council’s last opportunity to pass a resolution placing the measure on the ballot is August 5. Once
the council passes a resolution placing the measure on the ballot, the City Attorney will create a ballot
title (caption, question and summary) within five business days, which will be published in the Register-
Guard. Citizens will have an opportunity to challenge the ballot title language by filing a petition with
the Lane County Circuit Court within seven business days of the date that the City Attorney files the
ballot title with the City Recorder.
RELATED CITY POLICIES
The council’s goals for 2007 include “Transportation Initiative: Develop mechanisms to adequately
fund our transportation system for cars, trucks, bikes and pedestrians including maintenance and
preservation and capital reconstruction.”
COUNCIL OPTIONS
There are two decisions related to the bond measure before the council at this meeting. The first
decision would determine the dollar amount and terms of the bond measure to go to the voters, with the
following two options:
?
$35.9 million bond measure to fund street and off-street bike and pedestrian preservation projects
over five years. Attachments B, C and D include the project list, the project map and resolution for
this measure.
?
$81.1 million bond measure to fund street and off-street bike and pedestrian preservation projects
over ten years. Attachments E, F and G include the project list, the project map and resolution for
this measure.
Additionally, staff requests authorization to prepare a neutral information tabloid for distribution to all
households in the City. The council could decide to approve or not to approve this request.
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that the council approve a resolution placing a $35.9 million General
Obligation bond measure on the November 2008 ballot for the purpose of funding street preservation
projects, as set out in the resolution in Attachment D. Furthermore, the Manager recommends that staff
be authorized to prepare a neutral information tabloid to explain the measure to voters, and that council
allocate $25,000 from General Fund contingency to pay for the tabloid.
SUGGESTED MOTIONS
Move to adopt Resolution 4953 calling a City election on November 4, 2008, for the purpose of
referring to the legal electors of the City of Eugene a measure authorizing the issuance of a maximum of
$35.9 million of General Obligation Bonds to fund street preservation projects.
Move to authorize the expenditure of $25,000 from the General Fund contingency account to produce a
neutral information tabloid to be sent to all households in the City.
ATTACHMENTS
A.Pavement Preservation Funding Action History
B.$35.9 Million Bond Measure Project List
C.$35.9 Million Bond Measure Project Map
D.$35.9 Million Bond Measure Resolution
E.$81.1 Million Bond Measure Project List
F.$81.1 Million Bond Measure Project Map
G.$81.1 Million Bond Measure Resolution
H.Map Comparing $81.1 Million and $35.9 Million Project Lists
I.Updated Communications Plan
J.Excerpt of Data from Prior Bond Measure Surveys
K.July 24 Memo from Jon Ruiz on Task Force Recommendation
FOR MORE INFORMATION
Contact: Sue Cutsogeorge, Financial Analysis Manager
Telephone: 682-5589
Staff E-Mail: Sue.L.Cutsogeorge@ci.eugene.or.us
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
ATTACHMENT A
Pavement Preservation Funding Action History
The City’s current 5-cent local gas tax, together with other dedicated pavement preservation funding,
has allowed the City to complete nearly $18.6 million in street preservation project work since 2002,
which has repaired 153 lane miles with slurry seals, overlays and reconstructions. Recent projects
include overlay of portions of 18th Avenue, Chambers Street and Bailey Hill Road. Projects planned for
th
2008 include portions of East 13 Avenue, Barger Drive, Chambers Street and Roosevelt Boulevard.
In spite of these accomplishments, the backlog of needed repair work continues to grow in the face of
rapidly rising construction costs and insufficient revenues. In late 2001, the City was facing an
estimated $67 million backlog in pavement preservation work. By spring 2008, the estimated cost of
that backlog had grown to $173 million and, with no new funding, was projected to grow to over $280
million within the next 10 years.
In January 2007, council formed a Council Subcommittee on Transportation Funding Solutions (the
“subcommittee”) to study transportation funding options and bring back creative solutions for ade-
quately funding Eugene’s transportation system for cars, trucks, bicycles and pedestrians in ways that
collect funds proportionately (or equally) from residents and non-residents who use the roads, are more
consistent with sustainability goals, have direct connection to use of the roads, and give incentives to
those who do not have a car or use one very little.
This proposal for a bond measure for street repairs is an integral component in a package strategy
recommended by the subcommittee, and approved by council, to adequately and equitably fund
Eugene’s transportation system for a variety of users. The package of proposed solutions included a
street user fee, a street and bike/pedestrian path lighting fee, and an increase in the local motor vehicle
fuel tax. The council also took action to extend the local fuel tax sunset provision by three additional
years, leaving the fuel tax at five cents per gallon until February 28, 2011.
In the course of its work, the subcommittee learned that, to completely eliminate the pavement repair
backlog within the next 10 years, an estimated $27 million in pavement preservation funding would be
needed per year. The subcommittee deemed this revenue target to be too aggressive and, instead,
recommended additional annual funding of $13 million to $14 million, bringing total pavement
preservation funding up to $18 million per year. While this additional funding would not eliminate the
backlog within 10 years, it was projected that it would stabilize the cost-effective annual overlay
program and begin to reduce the reconstruction backlog.
The subcommittee recommended that the transportation funding package include a capital local option
levy generating approximately $6 million net revenues annually to fund pavement capital preservation
projects. Council subsequently decided to allocate another $0.5 million to the capital local option levy
instead of allocating this amount to a solid waste collection surcharge. In addition, the subcommittee
recommended and the council agreed that $350,000 of that amount should be allocated each year for
bike and pedestrian path capital preservation.
On December 10, 2007, council discussed a property tax approach to funding pavement capital preser-
vation. Staff presented an approach using a short-term General Obligation (GO) bond. Council directed
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
the City Manager to “bring a proposal to a future council work session for a GO Bond measure to fund
$81 million of pavement capital preservation projects over 10 years within an appropriate timeframe to
place the question on the May 2008 ballot. The proposal should include ballot measure language that
provides for both a list of high priority pavement capital preservation projects and appropriate flexibility
for planning activities and changing pavement capital preservation project priorities.”
On January 28, council continued discussions of an approach to use General Obligation bonds for street
preservation projects. Council directed the City Manager to “bring a resolution forward placing an $81
million General Obligation bond measure to be used for preservation only, no system capacity
enhancements, on the November 2008 ballot.” A friendly amendment was added to provide a complete
project list as part of the ballot measure. The $81 million bond measure will provide for $6.5 million of
overlays and reconstruction activities each year, factoring in the cost of inflation over a 10-year period.
On June 9, council continued discussions about using General Obligation bonds for street preservation
projects. At that meeting, council directed the City Manager to bring back a resolution placing an $81.1
million GO bond measure on the November 2008 ballot, consistent with the initial project list and the
draft resolution provided at that meeting. There remained, however, significant questions about how to
provide assurance to voters as to which specific street repair projects would be accomplished as a result
of approval of the bonds, what the appropriate timing of the bond measure should be, and how citizens
will be informed about the need for the bond measure.
On June 23, council discussed street assessment policies. At that meeting, several councilors requested
information about including an element in this bond measure to fund the City’s share of assessment
project costs.
On July 16, council continued discussions about the GO bond measure. At that meeting, council
directed the City Manager to bring back two bond resolutions, one for $35.9 million of projects over 5
years and one for $81.1 million of projects over 10 years. The measure for five years should not include
any provision to remove projects from the list, but should allow bond funds to be used for additional
projects, upon a council vote, for the next highest street preservation projects on the city’s list once all
the other projects are complete. The ten year measure should allow for changes in the project list, upon
th
an affirmative vote by at least 6 councilors, in the 10 year of the measure.
Z:\CMO\2008 Council Agendas\M080728\S0807283andattA.doc
ttachment B
A
Project List for $35.9 Million Bond Measure
MAP#STREET NAMEFROMTO
18TH AVE510' EAST OF CHAMBERSCITY VIEW
1
218TH AVEHILYARDWASHINGTON
23RD AVEHILYARDPATTERSON
3
24TH AVEJEFFERSONCHAMBERS
4
ALDERBROADWAY18TH AVE
5
BAILEY HILL RD18TH AVEBERTELSEN
6
BLAIR BLVD2ND AVEMONROE
7
BREWERGILHAMNORKENZIE
8
COBURG RDCRESCENTSOUTH ONRAMP BELTLINE
9
COBURG RD850' NORTH OF CALYOUNG450' NORTH OF I-105 OFF RAMP
10
CONGER ST7TH AVE11TH AVE
11
CURTIS AVE550' EAST OF NORKENZIENORKENZIE
12
GILHAM RDHONEYWOOD STCRESCENT
13
GOODPASTURE IS RDNORKENZIE RDDELTA HWY BRIDGE
14
GOODPASTURE IS RDBRIDGE OVER SLOUGH1250' NORTH OF VALLEY RIVER DR
15
HARLOW RDI-5 COBURG
16
HILYARD STE 24TH AVE34TH AVE
17
PATTERSONE 13TH AVE23RD AVE
18
PEARL4TH AVE200' NORTH OF BROADWAY
19
RAILROAD BLVDVAN BURENCHAMBERS
20
RIVER RDHORN LNRAILROAD
21
RIVERVIEW STSYLVAN16TH AVE
22
RIVERVIEW STFRANKLIN OFF RAMP247' SOUTH OF FRANKLIN OFF RAMP
23
ROYAL AVEHWY 99100' EAST OF WAITE ST
24
SILVER LNRIVER RDGROVE
25
TERRY ST1100' NORTH OF AVALON STROYAL
26
27VAN BURENRR CROSSINGBLAIR BLVD
WARREN STBAILEY HILLTIMBERLINE DR
28
WILLAMETTE ST306' NORTH OF 29TH AVE180' SOUTH OF SPENCERS CREST
29
WILSON STW 5TH AVEW 7TH AVE
30
AUGUSTA16TH AVE26TH AVE
31
TANEY STBARGERMARSHALL
32
7/22/2008
߬¬¿½¸³»²¬Ý
Û«¹»²»Í¬®»»¬Ð®»»®ª¿¬·±²Ð®±¶»½¬
üíëòçÓ·´´·±²Þ±²¼Ó»¿«®»Ð®±¶»½¬Ó¿°
ïí
îë
ç
ïî
è
íî
ïì
ïë
îê
ïð
îï
îì
ïê
îð
îé
íð
ïç
é
ïï
îî
ë
îí
ïè
î
ï
í
îè
ê
íï
ì
ïé
îç
Ô»¹»²¼
îç
Í»»¿½½±³°¿²§·²¹·²¼»¨º±®°»½·º·½°®±¶»½¬·²º±®³¿¬·±²
ÙÑÞ±²¼Ð®±¶»½¬
Ý·¬§Í¬®»»¬
Ý·¬§Ô·³·¬
Û«¹»²»ËÙÞ
ððòîëðòëïÓ·´»
Ю±¼«½»¼¾§Ý·¬§±ºÛ«¹»²»ÐÉÛ²¹×²º±Ì»¿³ôÖ«´§ïèîððèøÎ»ºýðéðèóïëéê÷
Attachment D
RESOLUTION NO. ________
A RESOLUTION CALLING A CITY ELECTION ON NOVEMBER 4,
2008, FOR THE PURPOSE OF REFERRING TO THE LEGAL
ELECTORS OF THE CITY OF EUGENE A MEASURE AUTHORIZING
THE ISSUANCE OF A MAXIMUM OF $35,900,000 OF GENERAL
OBLIGATION BONDS TO FUND STREET PRESERVATION
PROJECTS.
The City Council of the City of Eugene finds that:
A.
Using the City’s current 5-cent per gallon local gas tax and other dedicated
pavement preservation funding, the City has completed nearly $18.6 million in street
preservation work since 2002, including contracts in progress. Since 2002, the City has repaired
153 lane miles of streets through overlay, reconstruction and slurry seal treatments. Projects in
progress for 2008 include portions of 27th Avenue, Barger Drive, Chambers Street and
Roosevelt Boulevard.
B.
The amount of funding for street maintenance and reconstruction has been
insufficient to keep up with deteriorating street conditions. The backlog of needed repair work
continues to grow in the face of rapidly rising construction costs and is currently $173 million.
Streets that have failed to the point of reconstruction create safety problems and cause vehicle
repair problems, make walking, biking or driving on the streets uncomfortable, interfere with
economic activity and diminish the quality of life.
C.
In order to address the funding shortfalls with the City’s street maintenance and
preservation program, the City Council determined that a General Obligation Bond measure
generating approximately $6.5 million in net revenues annually should be referred to voters. Of
that amount, the Council determined that $350,000 should be allocated each year for off-street
bike and pedestrian path preservation and repair.
D.
The bond proceeds will be used to overlay or reconstruct the driving surface of
streets, as well as to preserve existing integral elements of the street such as curbs, gutters,
sidewalks, on-street bike lanes, traffic signals, street lights, medians, traffic calming devices, and
other integral parts of a street preservation project. These preservation efforts will be undertaken
only to preserve existing elements, not to expand the capacity of the street system. In addition,
the City will annually allocate not less than $350,000 of the bond proceeds to fund the overlay
and reconstruction of existing off-street bicycle and pedestrian paths.
E
. A general obligation bond measure of $35.9 million would fund specific street
preservation projects over a period of five years. This amount represents 32 different projects
that would repair an estimated 70 lane miles of roads and approximately 3 miles of off-street
bike and pedestrian paths. The $35.9 million figure accounts for $6.5 million per year for five
years at an inflation factor of 4.8%.
F.
The measure is expected to cost an average of $0.59 per $1000 of assessed value
each year for ten years. For an average homeowner in Eugene, this would be about $99 per year.
G.
The criteria for choosing bond projects included: a) citizen input with respect to
prioritizing major streets in need of reconstruction; b) scientific information about needed street
rehabilitation and reconstruction from the pavement management system; and c) geographic
distribution throughout the community to ensure all areas of the City receive a benefit from the
bond proceeds.Bond proceeds will only be used for street preservation projects included in the
list of projects attached as Exhibit A to this Resolution. If all of the projects listed in Exhibit A
are completed and there are bond proceeds remaining, the Council may add other street
preservation projects to the list.
H.
In order to promote accountability in the use of bond proceeds, the City Manager
will contract with an outside auditor to prepare a written report on the use of the bond proceeds
on a regular basis. The auditor will ascertain and report on whether the bond proceeds were used
for the authorized purposes and in compliance with the restrictions set forth above. The City
Manager will provide the report to the Council and make the report publicly available.
I.
To further promote accountability and citizen involvement in street preservation
projects, the City Manager has advised that he intends to create a street repair review panel. The
street repair review panel will prepare a report, separate and distinct from the report prepared by
the outside auditor, documenting the City’s use of the bond proceeds and noting whether the
bond proceeds were used in compliance with the terms of this Resolution. The City Manager
will provide the street repair review panel’s report to the Council and make the report publicly
available.
NOW, THEREFORE, based upon the above findings,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a
Municipal Corporation of the State of Oregon, as follows:
Section 1.
A city election is called for the purpose of submitting to the qualified electors
of the City a Measure authorizing the issuance of a maximum of $35,900,000 of General
Obligation bonds to fund street preservation projects and off-street bicycle and pedestrian path
preservation projects.
Section 2.
The City Council orders this City election to be held in the City of Eugene,
th
Oregon, concurrently with the general election on the 4 day of November, 2008, in accordance
with the provisions of Chapter 254 of the Oregon Revised Statutes, and the ballots shall be
counted and tabulated and the results certified as provided by law.
Section 3.
The City Recorder is directed to give not less than ten days’ notice of the City
election by publication of one notice in the Register Guard, a newspaper published in the City
and of general circulation within the City.
Section 4.
If approved by the electors, the proceeds from the sale of the bonds will be
used only for costs related to street preservation projects, off-street bicycle and pedestrian path
preservation projects and payment of bond issuance costs. The use of bond proceeds for street
Resolution - 2
preservation projects will be limited to projects included in Exhibit A to this Resolution unless
upon completion of all the projects listed in Exhibit A to this Resolution the Council adds other
street preservation projects to the list in order to utilize unspent bond proceeds.
Section 5.
This Resolution shall become effective immediately upon its adoption.
The foregoing Resolution adopted the ____ day of ______________, 2008.
_____________________________________
City Recorder
00202753.DOC;1
Resolution - 3
Exhibit A
Project List for $35.9 Million Bond Measure
MAP#STREET NAMEFROMTO
18TH AVE510' EAST OF CHAMBERSCITY VIEW
1
18TH AVEHILYARDWASHINGTON
2
323RD AVEHILYARDPATTERSON
24TH AVEJEFFERSONCHAMBERS
4
ALDERBROADWAY18TH AVE
5
BAILEY HILL RD18TH AVEBERTELSEN
6
BLAIR BLVD2ND AVEMONROE
7
BREWERGILHAMNORKENZIE
8
COBURG RDCRESCENTSOUTH ONRAMP BELTLINE
9
COBURG RD850' NORTH OF CALYOUNG450' NORTH OF I-105 OFF RAMP
10
CONGER ST7TH AVE11TH AVE
11
CURTIS AVE550' EAST OF NORKENZIENORKENZIE
12
GILHAM RDHONEYWOOD STCRESCENT
13
GOODPASTURE IS RDNORKENZIE RDDELTA HWY BRIDGE
14
GOODPASTURE IS RDBRIDGE OVER SLOUGH1250' NORTH OF VALLEY RIVER DR
15
HARLOW RDI-5 COBURG
16
HILYARD STE 24TH AVE34TH AVE
17
PATTERSONE 13TH AVE23RD AVE
18
PEARL4TH AVE200' NORTH OF BROADWAY
19
RAILROAD BLVDVAN BURENCHAMBERS
20
RIVER RDHORN LNRAILROAD
21
RIVERVIEW STSYLVAN16TH AVE
22
RIVERVIEW STFRANKLIN OFF RAMP247' SOUTH OF FRANKLIN OFF RAMP
23
ROYAL AVEHWY 99100' EAST OF WAITE ST
24
SILVER LNRIVER RDGROVE
25
TERRY ST1100' NORTH OF AVALON STROYAL
26
VAN BURENRR CROSSINGBLAIR BLVD
27
WARREN STBAILEY HILLTIMBERLINE DR
28
WILLAMETTE ST306' NORTH OF 29TH AVE180' SOUTH OF SPENCERS CREST
29
WILSON STW 5TH AVEW 7TH AVE
30
AUGUSTA16TH AVE26TH AVE
31
TANEY STBARGERMARSHALL
32
7/22/2008
Attachment E
Eugene Street Preservation 10-YearProject List
(To Be Funded by General Obligation Bonds)
Map #Street nameFromTo
04TH AVECOBURGPEARL
1
05TH AVEHIGHTAYLOR
2
05TH AVEBERTELSEN250' WEST OF COMMERCIAL ST
3
07TH AVEBERTLESENOSCAR
4
07TH PLSENECABAILEY HILL
5
08TH AVEPEARLOAK
6
08TH AVECHAMBERSGARFIELD
7
10TH AVEOLIVEWASHINGTON
8
13TH AVEKINCAIDMONROE
9
13TH AVECHAMBERSGARFIELD
10
18TH AVE510' EAST OF CHAMBERSCITY VIEW
11
18TH AVEHILYARDWASHINGTON
12
18TH AVE102' EAST OF JOSH STBERTELSEN
13
23RD AVEHILYARDPATTERSON
14
24TH AVEJEFFERSONCHAMBERS
15
25TH AVEHAWKINS LNBRITTANY
16
28TH AVEWASHINGTONFRIENDLY
17
29TH AVEOAKWILLAMETTE
18
39TH AVEWILLAMETTE100' EAST OF DENSMORE RD
19
40TH AVEHILYARDDONALD
20
AGATE STFRANKLIN13TH AVE
21
ALDERBROADWAY18TH AVE
22
BAILEY HILL RD7TH AVE11TH AVE
23
BAILEY HILL RD18TH AVEBERTELSEN
24
BAILEY LNBOGART LNCOBURG RD
25
BARGER DRALTAMONTPRIMROSE
26
BLAIR BLVD2ND AVEMONROE
27
BRAE BURN ST39TH AVEWILLAMETTE
28
BREWERGILHAMNORKENZIE
29
BRITTANY STW 18TH AVEW 25TH AVE
30
CAPITAL DRSPRINGCRESTA DE RUTA ST
31
CHAMBERS ST11TH AVE24TH AVE
32
CHARNELTONW 4TH AVEW 11TH AVE
33
CITY VIEW STW 18TH AVEPANORAMA
34
COBURG RDCRESCENTSOUTH ONRAMP BELTLINE
35
COBURG RD850' NORTH OF CALYOUNG450' NORTH OF I-105 OFF RAMP
36
CONGER ST7TH AVE11TH AVE
37
CURTIS AVE550' EAST OF NORKENZIENORKENZIE
38
EAST AMAZON DRHILYARDDILLARD
39
FAIRFIELDHWY 99ROYAL
40
GILHAM RDHONEYWOOD STCRESCENT
41
GOODPASTURE IS RDNORKENZIE RDDELTA HWY BRIDGE
42
GOODPASTURE IS RDBRIDGE OVER SLOUGH1250' NORTH OF VALLEY RIVER DR
43
GOODPASTURE LPGOODPASTURE IS RD1100' NORTH OF GP IS RD
44
GREEN ACRES RDAPPLEWOODDELTA HWY
45
HARLOW RDI-5COBURG
46
HIGH ST3RD AVEE 17TH AVE
47
HILYARD STE 24TH AVE34TH AVE
48
HILYARD STE BROADWAYE 11TH AVE
49
LINCOLN STW 5TH AVEW 13TH AVE
50
LYNNBROOK DR250' EAST OF TORRINGTON AVELANCASTER
51
1Eugene Street Preservation Project List7/8/2008
MADISON STW 5TH AVEW 8TH AVE
52
ML KING JR BLVDI-5CENTENNIAL LOOP
53
NORTH SHASTA LPFIRLANDE 43RD AVE
54
OAKMONT WAYCOBURG RDOAKWAY RD
55
OLIVE STW 10TH AVEW 11TH AVE
56
PATTERSONE 13TH AVE23RD AVE
57
PEARL4TH AVE200' NORTH OF BROADWAY
58
POLK STW 6TH AVEW 7TH AVE
59
POLK STW 18TH AVEW 24TH AVE
60
RAILROAD BLVDVAN BURENCHAMBERS
61
RIVER RDHORN LNRAILROAD
62
RIVERVIEW STSYLVAN16TH AVE
63
RIVERVIEW STFRANKLIN OFF RAMP250' SOUTH OF FRANKLIN OFF RAMP
64
ROYAL AVEHWY 99100' EAST OF WAITE ST
65
SILVER LNRIVER RDGROVE
66
SPRING BLVDFAIRMOUNTWOODLAWN AVE
67
TERRY ST1100' NORTH OF AVALON STROYAL
68
TIMBERLINE DR200' NORTH OF TIMBERLINE DRWINTERCREEK
69
VAN BURENRR CROSSINGBLAIR BLVD
70
WARREN STBAILEY HILLTIMBERLINE DR
71
WASHINGTONW 1ST AVEW 6TH AVE
72
WEST AMAZON DRHILYARDFOX HOLLOW
73
WILLAMETTE STE 10TH AVEE 11TH AVE
74
WILLAMETTE STE 20TH AVE350' SOUTH OF E 24TH AVE
75
WILLAMETTE ST306' NORTH OF 29TH AVE180' SOUTH OF SPENCERS CREST
76
WILSON STW 5TH AVEW 7TH AVE
77
02ND AVEBLAIR BLVDGARFIELD
78
33RD AVEHILYARDWILLAMETTE
79
AUGUSTA16TH AVE26TH AVE
80
DONALD ST46TH AVEFOX HOLLOW
81
GARFIELDROOSEVELTW 11TH AVE
82
HARRIS18TH AVE28TH AVE
83
HAWKINS LNW 18TH AVE100' SOUTH OF VIDERA
84
MINDAGILHAMNORKENZIE
85
TANEY STBARGERMARSHALL
86
2Eugene Street Preservation Project List7/8/2008
߬¬¿½¸³»²¬ Ú
Û«¹»²» ͬ®»»¬ Ю»»®ª¿¬·±² Ю±¶»½¬
̱ Þ» Ú«²¼»¼ É·¬¸ ïðóÇ»¿®ÙÑ Þ±²¼
ëï
ìï
êê
ìë
íë
íè
ìì
îê
îç
èê
ìî
èë
ìí
êèîë
ìð
íê
êî
êë
ëë
ìê
êï
éî
éè
í
éð
éé
ï
î
ï
ëí
èî
ë
ëç
ëî
ëè
îé
íí
ì
é
ê
îí
íé
ëð
éì
ìç
è
îï
ìé
ëê
ïð
ç
íî
êí
îî
êì
ëé
ïî
ïï
ïí
êð
íð
èí
íì
éë
éï
îì
ïì
èì
êé
èð
ïë
ïê
íï
ïé
ïè
êç
ìè
éê
éç
éí
Í»» ¿½½±³°¿²§·²¹ ·²¼»¨ º±® °»½·º·½ °®±¶»½¬ ·²º±®³¿¬·±²
ïç
îð
ëì
îè
íç
ÙÑ Þ±²¼ Ю±¶»½¬
éê
Ý·¬§ ͬ®»»¬
Ý·¬§ Ô·³·¬
Û«¹»²» ËÙÞ
èï
ððòîëðòëïÓ·´»
Ю±¼«½»¼ ¾§ Ý·¬§ ±º Û«¹»²» ÐÉ Û²¹ ײº± Ì»¿³ô Ö«´§ èô îððè øÎ»ºý ðéðèóïëéê÷
Attachment G
RESOLUTION NO. _________
A RESOLUTION CALLING A CITY ELECTION ON NOVEMBER 4,
2008, FOR THE PURPOSE OF REFERRING TO THE LEGAL
ELECTORS OF THE CITY OF EUGENE A MEASURE AUTHORIZING
THE ISSUANCE OF A MAXIMUM OF $81,100,000 OF GENERAL
OBLIGATION BONDS TO FUND STREET PRESERVATION
PROJECTS.
The City Council of the City of Eugene finds that:
A.
Using the City’s current 5-cent per gallon local gas tax and other dedicated
pavement preservation funding, the City has completed nearly $18.6 million in street
preservation work since 2002, including contracts in progress. Since 2002, the City has repaired
153 lane miles of streets through overlay, reconstruction and slurry seal treatments. Projects in
progress for 2008 include portions of 27th Avenue, Barger Drive, Chambers Street and
Roosevelt Boulevard.
B.
The amount of funding for street maintenance and reconstruction has been
insufficient to keep up with deteriorating street conditions. The backlog of needed repair work
continues to grow in the face of rapidly rising construction costs and is currently $173 million.
Streets that have failed to the point of reconstruction create safety problems and cause vehicle
repair problems, make walking, biking or driving on the streets uncomfortable, interfere with
economic activity and diminish the quality of life.
C.
In order to address the funding shortfalls with the City’s street maintenance and
preservation program, the City Council determined that a General Obligation Bond measure
generating approximately $6.5 million in net revenues annually should be referred to voters. Of
that amount, the Council determined that $350,000 should be allocated each year for off-street
bike and pedestrian path preservation and repair.
D.
The bond proceeds will be used to overlay or reconstruct the driving surface of
streets, as well as to preserve existing integral elements of the street such as curbs, gutters,
sidewalks, on-street bike lanes, traffic signals, street lights, medians, traffic calming devices, and
other integral parts of a street preservation project. These preservation efforts will be undertaken
only to preserve existing elements, not to expand the capacity of the street system. In addition,
the City will annually allocate not less than $350,000 of the bond proceeds to fund the overlay
and reconstruction of existing off-street bicycle and pedestrian paths.
E.
A general obligation bond measure of $81.1 million would fund specific street
preservation projects over a period of 10 years. This amount represents 86 different projects that
would repair an estimated 150 lane miles of roads and approximately 7 miles of off-street bike
and pedestrian paths. The $81.1 million figure accounts for $6.5 million per year for ten years at
an inflation factor of 4.8%.
F.
The measure is expected to cost an average of $0.59 per $1000 of assessed value
each year for ten years. For an average homeowner in Eugene, this would be about $107 per
year.
G.
The criteria for choosing these projects included: a) citizen input with respect to
prioritizing major streets in need of reconstruction; b) scientific information about needed street
rehabilitation and reconstruction from the pavement management system; and c) geographic
distribution throughout the community to ensure all areas of the City receive a benefit from the
bond proceeds. Bond proceeds will only be used for the street preservation projects included in
the list attached as Exhibit A to this Resolution. However, if at least six city councilors
determine that one or more of the projects listed in Exhibit A has become impractical to
undertake, the project(s) may be removed from the list. If all the projects on the list are
completed and there are bond proceeds remaining, the Council may add other street preservation
projects to the list. The Council may only add projects to the list or delete projects from the list
after January 1, 2018.
H.
In order to promote accountability in the use of bond proceeds, the City Manager
will contract with an outside auditor to prepare a written report on the use of the bond proceeds
on a regular basis. The auditor will ascertain and report on whether the bond proceeds were used
for the authorized purposes and in compliance with the restrictions set forth above. The City
Manager will provide the report to the Council and make the report publicly available.
I.
To further promote accountability and citizen involvement in street preservation
projects, the City Manager has advised that he intends to create a street repair review panel. The
street repair review panel will prepare a report, separate and distinct from the report prepared by
the outside auditor, documenting the City’s use of the bond proceeds and noting whether the
bond proceeds were used in compliance with the terms of this Resolution. The City Manager
will provide the street repair review panel’s report to the Council and make the report publicly
available.
NOW, THEREFORE, based upon the above findings,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a
Municipal Corporation of the State of Oregon, as follows:
Section 1.
A city election is called for the purpose of submitting to the qualified electors
of the City a Measure authorizing the issuance of a maximum of $81,100,000 of General
Obligation bonds to fund street preservation projects and off-street bicycle and pedestrian path
preservation projects.
Section 2.
The City Council orders this City election to be held in the City of Eugene,
th
Oregon, concurrently with the general election on the 4 day of November, 2008, in accordance
with the provisions of Chapter 254 of the Oregon Revised Statutes, and the ballots shall be
counted and tabulated and the results certified as provided by law.
Resolution - 2
Section 3.
The City Recorder is directed to give not less than ten days’ notice of the City
election by publication of one notice in the Register Guard, a newspaper published in the City
and of general circulation within the City.
Section 4.
If approved by the electors, the proceeds from the sale of the bonds will be
used only for costs related to street preservation projects, off-street bicycle and pedestrian path
preservation projects and payment of bond issuance costs. The use of bond proceeds for street
preservation projects will be limited to projects included in Exhibit A to this Resolution unless
upon completion of all the projects listed in Exhibit A to this Resolution the Council adds other
street preservation projects to the list in order to utilize unspent bond proceeds. If at least six city
councilors determine that one or more of the projects listed in Exhibit A to this Resolution has
become impractical to undertake, the project(s) may be removed from the list. The Council may
not add projects to, or remove projects from, the list attached as Exhibit A to this Resolution
except after January 1, 2018.
Section 5.
This Resolution shall become effective immediately upon its adoption.
The foregoing Resolution adopted the ____ day of ______________, 2008.
_____________________________________
City Recorder
00202754.DOC;1
Resolution - 3
Exhibit A
Eugene Street Preservation 10-YearProject List
(To Be Funded by General Obligation Bonds)
Map #Street nameFromTo
04TH AVECOBURGPEARL
1
05TH AVEHIGHTAYLOR
2
05TH AVEBERTELSEN250' WEST OF COMMERCIAL ST
3
07TH AVEBERTLESENOSCAR
4
07TH PLSENECABAILEY HILL
5
08TH AVEPEARLOAK
6
08TH AVECHAMBERSGARFIELD
7
10TH AVEOLIVEWASHINGTON
8
13TH AVEKINCAIDMONROE
9
13TH AVECHAMBERSGARFIELD
10
18TH AVE510' EAST OF CHAMBERSCITY VIEW
11
18TH AVEHILYARDWASHINGTON
12
18TH AVE102' EAST OF JOSH STBERTELSEN
13
23RD AVEHILYARDPATTERSON
14
24TH AVEJEFFERSONCHAMBERS
15
25TH AVEHAWKINS LNBRITTANY
16
28TH AVEWASHINGTONFRIENDLY
17
29TH AVEOAKWILLAMETTE
18
39TH AVEWILLAMETTE100' EAST OF DENSMORE RD
19
40TH AVEHILYARDDONALD
20
AGATE STFRANKLIN13TH AVE
21
ALDERBROADWAY18TH AVE
22
BAILEY HILL RD7TH AVE11TH AVE
23
BAILEY HILL RD18TH AVEBERTELSEN
24
BAILEY LNBOGART LNCOBURG RD
25
BARGER DRALTAMONTPRIMROSE
26
BLAIR BLVD2ND AVEMONROE
27
BRAE BURN ST39TH AVEWILLAMETTE
28
BREWERGILHAMNORKENZIE
29
BRITTANY STW 18TH AVEW 25TH AVE
30
CAPITAL DRSPRINGCRESTA DE RUTA ST
31
CHAMBERS ST11TH AVE24TH AVE
32
CHARNELTONW 4TH AVEW 11TH AVE
33
CITY VIEW STW 18TH AVEPANORAMA
34
COBURG RDCRESCENTSOUTH ONRAMP BELTLINE
35
COBURG RD850' NORTH OF CALYOUNG450' NORTH OF I-105 OFF RAMP
36
CONGER ST7TH AVE11TH AVE
37
CURTIS AVE550' EAST OF NORKENZIENORKENZIE
38
EAST AMAZON DRHILYARDDILLARD
39
FAIRFIELDHWY 99ROYAL
40
GILHAM RDHONEYWOOD STCRESCENT
41
GOODPASTURE IS RDNORKENZIE RDDELTA HWY BRIDGE
42
GOODPASTURE IS RDBRIDGE OVER SLOUGH1250' NORTH OF VALLEY RIVER DR
43
GOODPASTURE LPGOODPASTURE IS RD1100' NORTH OF GP IS RD
44
GREEN ACRES RDAPPLEWOODDELTA HWY
45
HARLOW RDI-5COBURG
46
HIGH ST3RD AVEE 17TH AVE
47
HILYARD STE 24TH AVE34TH AVE
48
HILYARD STE BROADWAYE 11TH AVE
49
LINCOLN STW 5TH AVEW 13TH AVE
50
LYNNBROOK DR250' EAST OF TORRINGTON AVELANCASTER
51
1Eugene Street Preservation Project List7/8/2008
MADISON STW 5TH AVEW 8TH AVE
52
ML KING JR BLVDI-5CENTENNIAL LOOP
53
NORTH SHASTA LPFIRLANDE 43RD AVE
54
OAKMONT WAYCOBURG RDOAKWAY RD
55
OLIVE STW 10TH AVEW 11TH AVE
56
PATTERSONE 13TH AVE23RD AVE
57
PEARL4TH AVE200' NORTH OF BROADWAY
58
POLK STW 6TH AVEW 7TH AVE
59
POLK STW 18TH AVEW 24TH AVE
60
RAILROAD BLVDVAN BURENCHAMBERS
61
RIVER RDHORN LNRAILROAD
62
RIVERVIEW STSYLVAN16TH AVE
63
RIVERVIEW STFRANKLIN OFF RAMP250' SOUTH OF FRANKLIN OFF RAMP
64
ROYAL AVEHWY 99100' EAST OF WAITE ST
65
SILVER LNRIVER RDGROVE
66
SPRING BLVDFAIRMOUNTWOODLAWN AVE
67
TERRY ST1100' NORTH OF AVALON STROYAL
68
TIMBERLINE DR200' NORTH OF TIMBERLINE DRWINTERCREEK
69
VAN BURENRR CROSSINGBLAIR BLVD
70
WARREN STBAILEY HILLTIMBERLINE DR
71
WASHINGTONW 1ST AVEW 6TH AVE
72
WEST AMAZON DRHILYARDFOX HOLLOW
73
WILLAMETTE STE 10TH AVEE 11TH AVE
74
WILLAMETTE STE 20TH AVE350' SOUTH OF E 24TH AVE
75
WILLAMETTE ST306' NORTH OF 29TH AVE180' SOUTH OF SPENCERS CREST
76
WILSON STW 5TH AVEW 7TH AVE
77
02ND AVEBLAIR BLVDGARFIELD
78
33RD AVEHILYARDWILLAMETTE
79
AUGUSTA16TH AVE26TH AVE
80
DONALD ST46TH AVEFOX HOLLOW
81
GARFIELDROOSEVELTW 11TH AVE
82
HARRIS18TH AVE28TH AVE
83
HAWKINS LNW 18TH AVE100' SOUTH OF VIDERA
84
MINDAGILHAMNORKENZIE
85
TANEY STBARGERMARSHALL
86
2Eugene Street Preservation Project List7/8/2008
߬¬¿½¸³»²¬Ø
Û«¹»²»Í¬®»»¬Ð®»»®ª¿¬·±²Ð®±¶»½¬
Ó¿°Ý±³°¿®·²¹üèïòïÓ·´´·±²¿²¼üíëòçÓ·´´·±²Ð®±¶»½¬Ô·¬
ìï
êê
íë
íè
îç
èê
ìî
ìí
êè
íê
êî
êë
ìê
êï
éð
éé
ëè
îé
íé
êí
îî
êì
ëé
ïî
ïï
ïì
éï
îì
èð
ïë
ìè
éê
Ô»¹»²¼
éê
Í»»ïð󧻿®·²¼»¨º±®°»½·º·½°®±¶»½¬·²º±®³¿¬·±²
Þ±²¼Ð®±¶»½¬±²ë󧻿®´·¬
Þ±²¼Ð®±¶»½¬±²ïð󧻿®´·¬
ø¬¸¿¬¿®»²±¬·²½´«¼»¼±²ë󧻿®´·¬÷
Ý·¬§Í¬®»»¬
Ý·¬§Ô·³·¬
Û«¹»²»ËÙÞ
ððòîëðòëïÓ·´»
Ю±¼«½»¼¾§Ý·¬§±ºÛ«¹»²»ÐÉÛ²¹×²º±Ì»¿³ôÖ«´§ïèîððèøÎ»ºýðéðèóïëéê÷
Attachment I
TRANSPORTATION FUNDING COMMUNICATION PLAN (Updated July 22, 2008)
Goals and Objectives:
Effectively communicate the value of locally controlled, sustainable and equitable
transportation funding solutions in ways that people see benefit for themselves and their
neighborhoods
Generate adequate support to implement the solutions, built on the fact that street maintenance is
a core value for Eugene residents
Citizens, staff and elected officials trust Public Works and the City of Eugene to make good
decisions about local transportation services and how they are delivered and funded
Key Audiences:
City Council
Eugene voters
Taxpayers
Business community (including Chamber of Commerce)
Local opinion leaders (including key media, neighborhood group leaders)
Public Works employees and all City employees
Other public agencies
Strategies:
Find and use benefit statements for every constituency/key audience
Build community support through constituent/opinion leaders (e.g., members of the Street
Maintenance Task Force)
Simplify benefit statement/messages (e.g., “street repairs” and “fixing the potholes” rather than
“pavement preservation”) whenever possible
Recognize the communication value of “official” documents (agenda item summaries,
resolutions, ballot titles, etc.)
Separate issues (e.g., property tax measure, gas tax sunset) to manage the amount of information
key audiences need to have at any particular moment in time
Find opportunities to talk about “big picture” in ways that clearly describe what each component
of the package would do and how individual components work together as a balanced package
Enlist mayor and councilors as spokespersons for the issue
Look for groups invested in solutions as message partners
Develop an implementation schedule early on to coordinate communications on various solution
components
Ensure communication tactics are consistent with and support election laws and other procedural
requirements
Build on successes of pavement preservation program, and tell the street maintenance “story”
Use Final Report of the Transportation Subcommittee (2007), LOC “Investing in a Neglected
Asset” report, and PMS report (2008) and other source documents to support communications
Use a range of outreach tactics (e.g., meetings/presentations, internet, newsletter) to reach
targeted audiences as well as the general public
Address state and county relationships in a positive way; look for opportunities to liaison with
and coordinate our interests with those of our regional partners (including Springfield, Lane
County, ODOT and EWEB)
Develop a strong internal communications to inform employees, using supervisors to
communicate key messages and promote understanding through the City organization
Use surveys (specifically, the January 2008 NSDS survey and the July 2008 SRI survey) and
focus groups to test methodologies and key messages
Make effective use of consultant resources (e.g., Barry Pack, Steve Johnson, Gary Manross) in
developing plans and implementing strategies
Communication Constraints (Specific to Bond Measure):
As with any tax measure, the complexity of the issue and the need to couch language in terms that
satisfy legal requirements don’t always allow for easy-to-understand explanations.
Placing the bond measure in the context of a larger package, some elements of which haven’t yet
been fully worked out, is a significant communications challenge.
Voters will need to understand why the measure doesn’t focus solely on the worst streets (i.e.,
why preserving streets from further deterioration is a good investment). Including a number of
reconstruction projects in the bond measure will help voters see obvious benefit.
Voters have trouble distinguishing between improved and unimproved streets. The message
needs to be clear why they’re not funded by the bond measure and what strategies the City has to
address those streets (including increased funding for pothole repairs).
The “list” of repair projects to be funded by the bond measure is a subset of a larger list of
projects to be funded from multiple sources of road repair funding, including current existing
sources of revenue. Voters may be confused if they don’t see beneficial projects that aren’t on the
bond list because they are scheduled to receive some other type of funding.
As with all election issues, the City must avoid advocacy and provide only neutral information.
To the extent that it’s important to communicate benefits, the council and any citizen groups that
come forward must carry those messages.
Key Messages
Bond Measure for Street Repairs
Voters in November will be asked to approve a $35.9 million levy dedicated to local street repairs
The levy is estimated to cost the average homeowner $99 per year for five years
A five-year levy will deliver on a promise to work on improving a core service and allow the
community to rebuild trust in solutions for a more robust street repair program in the future
A list of high-priority projects has been developed to indicate exactly which streets would be
repaired with bond funds. The list includes 32 projects covering 70 miles of city streets.
The project list will include overlay projects (to preserve streets from further deterioration) and
reconstruction projects (to fix streets that have fallen apart and need to be rebuilt)
Accountability will be provided, bond expenditures will be monitored and annual reports will be
given to the council and the community.
The bond measure is not the complete and final answer, either for the full street repair backlog or
the immediate need for additional funding for ongoing street operations and maintenance.
Overall Package of Transportation Funding Solutions
Eugene is faced with a $173 million backlog of street repair projects. The backlog could reach
$280 million over the next decade if more funds are not invested in local street repairs.
To bring the backlog under control, at least $18 million per year needs to be invested in local
street repairs. Currently Eugene is investing about $5 million a year in major street repairs.
To truly address the need, a package of revenue solutions is needed.
Package elements could include some combination of a general obligation bond measure, local
fuel tax, monthly street repair fee, street lighting fee, garbage fee surcharge, countywide vehicle
registration fee and/or countywide fuel tax, and/or reallocation of existing general fund revenue.
Any package, in total, needs to provide achievable, balanced and sustainable solutions to
adequately fund Eugene’s transportation system for cars, trucks, bicycles and pedestrians
A good package element is one that collects funds proportionately (or equally) from residents and
non-residents who use our roads, is consistent with our sustainability goals, has direct connection
to the use of the roads, and give incentives to those who do not have a car or use one very little.
Since 2002 (including the 2008 construction season), the City has invested $18.6 million in
pavement preservation projects. Since 2002 (including the 2008 construction season), the City has
repaired 153 lane miles of streets through overlay, reconstruction and slurry seal treatments.
Local Fuel Tax
Eugene’s gas tax is 5 cents per gallon (it has been at 5 cents a gallon since January 2005)
2 cents of that is subject to a sunset provision; the sunset has been extended to 2011 to allow
more time to see if alternate sources of revenue can be found (examples: increasing the state gas
tax to replace the money that currently comes from the local gas tax, or a county vehicle
registration fee)
Each penny of the local fuel tax generates about $650,000 per year; therefore, the current 5-cent
local fuel tax generates about $3.2 million per year for street repairs
The local motor vehicle fuel tax is closely tied to the use of the transportation system: the more
you drive, the more wear and tear you put on the streets, and the more you pay through a gas tax.
Currently, Eugene's pavement preservation program is funded primarily by the local motor
vehicle fuel tax.
More information is available on the City’s web site (go to www.eugene-or.gov/pw and click on
the street funding link.
Reallocation of General Fund Revenue
Council allocated $1.5 million for capital pavement repairs in FY07. These funds were used to
overlay streets that otherwise would have deteriorated to the point of needing reconstruction (at a
cost of five times the cost of an overlay)
As part of a cooperative funding agreement with Lane County, Council made available $4.5
million from the general fund (facility reserve) for capital road repairs beginning July 1, 2008.
Council approved $1 million from the general fund for “pothole patching” in FY09 and another
$1 million in FY10. Work efforts to be funded include a dedicated “pothole patrol,” maintenance
overlays primarily on unimproved streets, and repairs to a number of badly rutted and potholed
intersections around town.
All these allocations are in addition to the funds currently dedicated to street repairs in the City’s
O&M road fund (which comes primarily from state gas taxes) and capital pavement preservation
program fund (which comes primarily from local gas taxes).
Street Fee
Recommended as part of Council Subcommittee “package”; still in the conceptual stages
The best fee is one that is easy to understand and inexpensive to bill and collect (so that more
money goes to street repairs and less to fee administration)
Intended to generate annual net revenue of approximately $6.5 million, with $150,000 per year
dedicated to funding traffic calming measures
Estimated to cost the average household about $5 per month
Street Lighting Fee
Recommended as part of Council Subcommittee “package”; still in the conceptual stages
Intended to generate approximately $800,000 to operate and maintain and provide for reasonable
expansion of Eugene’s street and bike/pedestrian path lighting system
Estimated to cost the average household $1.50 per month
Other Potential Sources of Funding
Garbage surcharge (recommended as part of Council Subcommittee “package”) could raise $1
million to $2 million per year
County vehicle registration fee (could raise up to $9 million per year countywide; revenue to
Eugene not currently determined)
Countywide gas tax (could raise $1.5 million per penny per year countywide; revenue to Eugene
not currently determined)
State solutions, including an increase in the state’s gas tax
Attachment J
Excerpt of Data from Prior Bond Measure Surveys
June 2007 Survey Report - Support Drops Below A Majority When the Cost
to a Household Exceeds $100 Per Year
December 2007 Survey Report – A Bare Majority of Voters Favors A
Property Tax Levy to Improve the Roads and Streets In Eugene
ATTACHMENT K
City Manager’s Office
City of Eugene
777 Pearl Street Room 105
M
Eugene, Oregon 97401-2793
EMORANDUM
(541) 682-5010
(541) 682-5414 FAX
www.eugene-or.gov
Date:
July 24, 2008
To:
Mayor Piercy and City Council
From:
Jon R. Ruiz, City Manager
682-5510
Subject:
City Manager’s Street Maintenance Task Force Recommendation for G.O. Bond Proposal
On Friday, July 18, the Street Maintenance Task Force met with consultant Dr. Gary Manross to review
the community polling data and to continue previous discussions on developing a long-term proposal for
street maintenance. Based on this information, the task force came to consensus on recommending the
following strategy:
?
Place a 5-year, $35.9 million general obligation bond on the November 2008 ballot.
?
Include a street repair review panel and an auditor as part of the bond resolution. The review
panel will produce an annual “Promises Made, Promises Kept” report and the auditor will
ascertain and report on whether the bond funds were used in compliance with the bond measure.
?
Include a specific list of projects that cannot be altered except to add projects if funds remain
after all other projects are completed.
?
Do not move forward at this time with other local street funding mechanisms, but recognize that
the property tax measure is not the complete and final answer either for the backlog of repair
projects or the immediate need for additional funding for ongoing operations and maintenance of
the transportation system.
I fully and strongly support this recommendation and encourage the Council to unanimously support it as
well.
Discussion
The above recommendation is not where I initially wanted to be. I preferred a more comprehensive
approach that would completely resolve the backlog issues; however, the polling data overwhelmingly
supports this recommendation as the best choice to move forward at this time. The basic issue that
continuously comes out in the polling data is a need to strengthen the trust between the community and
the City. Delivery on a smaller, shorter term bond measure is step to build that trust.
Based on the data, the consultant’s initial recommendation was to not pursue a bond (the polling tested
the $81 million version) in November but to wait until next year. After much discussion, he believes a
$35.9 million bond is doable, but will take work to get passed, particularly with the uncertainty of the
economy over the next many months. He emphasized that the expected large turnout of voters in
November does not help our situation, but given the double majority requirement in off years, this
November remains the best timing.
Data from the polling:
?
Street maintenance is very high on the community’s radar, is a very important core value, and is a
top spending priority for City programs and services.
?
66% of voters support a potential tax increase for street maintenance.
?
22% support avoiding additional taxes by either making cutbacks in street maintenance or other
City services.
?
50% are willing to pay up to $20 per month in additional taxes to maintain the streets.
?
47% are likely to support a 10-year G.O. bond. (Likely support is a more robust predictor of
success than a simple combination of “definite” and “probable” intent to support, because it takes
into account the fact that only a portion of respondents who say they will probably vote in favor
of a measure actually do so). The consultant stated that with appropriate support it is possible to
move this number to 50%—perhaps more so with a 5-year bond.
?
Voters likely to support an increase in the stormwater fee to fund street maintenance, garbage fee,
or vehicle registration fee are 37.5%, 43%, and 41.5% respectively. However, combining
strategies does not appear to be popular; when any of these approaches are combined with a G.O.
bond, the likely support decreases.
?
Including an independent auditor significantly increases voter support.
Trust is a significant issue impacting voters’ support for various street funding proposals. By starting
with a smaller 5-year bond only, and delivering on the promise, the task force believes that trust can be
rebuilt, which will allow the success of a more robust program in the future. It will also be important to
continually tell the “street maintenance” story, including the eventual need for $15 to $18 million per
year, to ensure the long-term maintenance of our street network.
The July 28 work session will include a presentation by the polling consultant.
Cc: Executive Team
Manager’s Street Maintenance Task Force