HomeMy WebLinkAbout10-10-16 Agenda Packet
EUGENE CITY COUNCIL AGENDA
October 10, 2016
5:30p.m.CITYCOUNCILWORKSESSION
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
7:30p.m.CITYCOUNCILMEETING
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
MeetingofOctober10,2016;
HerHonorMayorKittyPiercyPresiding
Councilors
5:30p.m.CITYCOUNCILWORKSESSION
HarrisHall,125East8Avenue
th
A.WORKSESSION
SouthWillametteNextSteps
J:\\CMO\\2016 Council Agendas\\M161010\\A161010S.doc
7:30p.m.MEETINGOFTHEEUGENECITYCOUNCIL
HarrisHall,125East8Avenue
th
1.CEREMONIALMATTERS
2.PUBLICFORUM
- ¸®±Ȁ ThePublicForumisanopportunityforindividualstospeaktotheCity
Councilonanycityrelatedissuesexceptforthoseitemswhichhavealreadybeen
heardbyaHearingsOfficialorareon³®¨¦§³Ȍ²agendaasapublichearing.
Eachpersonwillhavethreeminutestospeak.Whenyoucometothepodium,
pleasegiveyourname,cityofresidence,and,forEugeneresidents,yourwardif
known.Thetimerandlightsindicatethetimeyouhavetospeak.Theredlight
indicatestheendofthreeminutes.
- ¸®±¢«®²¤²³§¤0´¡«¨¢&®±´¬ £ ²ª²¥®±¢®¬¬¤³²¥±®¬³§¤#¨³¸#®´¢¨«ȁ
3.CONSENTCALENDAR
(Note:Timepermitting,actionontheConsentCalendarmaybetakenatthe5:30
p.m.worksession.)
A.ApprovalofCityCouncilMinutes
B.ApprovalofTentativeWorkingAgenda
C.ApprovalofHOMEFundingforTransitionalHousingforHomelessHigh
SchoolStudents
#¨³¸#®´¢¨«0±¤²¨£¤³Ȁ ImovetoapprovetheitemsontheConsentCalendar.
# ««¥®±µ®³¤ȁ
Adjourn.
J:\\CMO\\2016 Council Agendas\\M161010\\A161010S.doc
¶¶¶ȁ¤´¦¤¤®±ȁ¦®µȁ
J:\\CMO\\2016 Council Agendas\\M161010\\A161010S.doc
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
BACKGROUND
J:\\CMO\\2016 Council Agendas\\M161010\\S161010A.docx
NEXTSTEPS
COUNCILOPTIONS
CITY-!.!'%2Ȍ3RECOMMENDATION
SUGGESTEDMOTIONS
ATTACHMENTS
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S161010A.docx
ATTACHMENTA
·
·
·
·
·
·
·
·
·
·
·
·
·
o
o
o
·
·
·
·
·
·
·
·
·
o
o
o
ATTACHMENTB
Collaborative Community Objective Setting
Frequently Asked Questions
WHAT'S CHANGED?
This document may be considered "notes," capturing the status of the discussion
regarding this idea. As more individuals and groups have the opportunity to weigh in,
elements will evolve. For easy reference, this section will highlight any elements that
have changed based on continued community input, after 9/27/16. If you have
thoughts, feedback, concerns, suggestions, please let us know!
10/2/16
Changed name to "Collaborative Community Objective Setting" to
o
further clarify the distinction between the broad Envision Eugene Goals
and Pillars, and the more detailed objectives that would be an outcome
of this process.
Based on community conversation, simplified the proposed outcomes of
o
the process- moved specific area determinations and infrastructure needs
into localized planning phase, and separated the lexicon into a separate
process, leaving the two expected outcomes for the CCOS process as
identifying the share of homeless/low-income sites for each area, and
determining the parameters of growth in each area.
Added section on what comes after CCOS. Added more information on
o
Team selection and composition. Added more information on the
proposed timeline. Added more information on who is considered
"affected." Added information on the lexicon.
WHAT IS COLLABORATIVE COMMUNITY OBJECTIVE SETTING?
"Collaborative Community Objective Setting" (CCOS) is a community process that
provides a bridge between the broad Envision Eugene Pillars and goals, and the
specific, on-the-ground strategies that will be developed in localized planning efforts,
such as refinement plans or area plans. It would provide a common understanding of
terms and concepts across neighborhoods and other interested parties, and would
provide enough specific information to ensure that the benefits and burdens of growth
are distributed among different areas fairly. It would also help different areas are able
to work collaboratively towards city-wide and cross-neighborhood goals, while also
providing flexibility for them to develop specific, localized solutions and policies that
meet their neighborhood needs.
WHY IS THIS BEING SUGGESTED?
For some time now, our city has struggled with how to conduct constructive, positive
discussions that lead to plans that achieve broad support within our community, and
lead to tangible actions to achieve the widely-supported goals. This difficulty has
become most obvious recently with the controversy surrounding the South Willamette
Special Area Zone. A key lesson learned from the proposed SWSAZ and associated
process is that the City of Eugene needs to back up and develop a bridge between
Envision Eugene’s broad goals and objectives, and the more specific plans and
complex zoning needed to achieve those goals. Without such a community-supported
bridging process, and without clarity regarding common goals, concepts and
terminology, neighborhood residents living in affected areas will feel left out and
threatened, will lack information needed for productive informed engagement, and
will likely strongly oppose proposed changes. The result, as we have seen, will be
continued stalemate and a loss of public trust. Through Collaborative Community
Objective Setting, we hop to ensure neighborhood livability and economic vibrancy
while also accomplishing broader city-wide goals, thus maintaining the integrity of
Envision Eugene’s seven pillars.
WHAT WOULD THE OUTCOMES BE?
The outcome of the Collaborative Community Objective Setting process would be a
specific recommendation to City Council, for City Council to vote on, from the
community Team that answers the following two questions:
1.For each of the six key transit corridors and downtown, what are the parameters
of new development of each type (multi-family, single family, missing middle,
etc.) that reflects each area's "share" to accomplish broader community goals
and appropriately manage growth?
2.How many sites for homeless and very-low-income housing are needed in each
region to ensure that these needed facilities are distributed fairly and not
concentrated in one area.
WHO WOULD PARTICIPATE?
The specific details will still need to be determined, as part of an ongoing
discussion. However, several different types of groups would have roles in the
process:
City Council and the Planning Commission
will have their established
governmental roles-- City Council will both initiate the process and be the final
decision making body. The Planning Commission to review citizen
involvement processes, review the Team's recommendation, and vote on
whether to forward that recommendation to City Council.
The Team
is made up of citizens of various backgrounds, charged with
working collaborative and constructively to create a recommendation to City
Council that answer the above questions. The Team is also responsible for both
soliciting and incorporating feedback from citizens into their thinking, and for
explaining the rationale for their decisions to citizens. The Team will be large
enough to represent diverse interests, yet small enough to allow for productive,
collaborative discussion and true multi-directional conversation While the
specific configuration and selection process of the Team still need to be
determined, participants could include:
Representatives from relevant neighborhood associations
o
Residents (including both homeowners and renters) from the relevant
o
areas
Property owners and landlords from the relevant areas
o
Business owners and employees who work in the relevant areas
o
Representatives of local development and real estate interests
o
Representatives of transportation interests
o
Experts in relevant topic areas (climate recovery, architecture, services
o
to low-income individuals, etc.)
Representatives of city commissions, including Planning, Human Rights,
o
and Sustainability
Representatives of other key stakeholders (for example, the University)
o
Representatives from the city- staff and council
o
All citizens
will be able to provide input to members of the Team, staff,
Planning Commission, and Council, and a wide variety of tools will be used to
ensure that any interested citizen is able to have clear information and provide
feedback.
A facilitator
--a neutral expert in collaborative decision making and land use
processes without a specific interest in the outcome of the discussions--will
have a responsibility to ensure that a code of conduct and civility is being
followed by members of the Team, will assist with logistics (times and
locations for meeting, coordinating between Team and City Staff, ensuring that
requested data is gathered and presented clearly), will keep the conversation
stays on track towards achieving the goal, will ensure that all decisions reflect
the collaboration of the entire Team, and the Team's discussion is balanced so
that no particular interests or points of view are drowned out.
City Staff
provide technical expertise, supply information/data and context, do
the technical work to translate of translating the decisions into official language
(including checking back with the Team to ensure the decision was captured
correctly), shepherd the recommendation through the official approval process,
and in conjunction with the Team, facilitator, and City Council, conducts public
outreach.
HOW IS THE TEAM SELECTED?
The specifics of how the team would be selected is an area that still needs substantial
discussion, to ensure that different interests and areas are represented fairly. Simply
selecting one representative from each of the potential interests above would not only
clearly create a team that is too large for productive discussion, but would also not
necessarily create a balanced team-- for example, just asking that each neighborhood
association appoint one member to the team would not take into account the fact that
the Bethel neighborhood includes a population similar in size to the FAN, SEN,
SHiNA, and Amazon neighborhoods combined, nor that not all neighborhoods have
functioning or robust neighborhood associations. As the community conversation
regarding CCOS continues, identifying a constructive solution to this tricky topic will
need to be a key focus.
HOW DOES THIS CONNECT TO OTHER PROCESSES THAT HAVE
BEEN RECOMMENDED, SUCH AS REFINEMENT PLANS?
Collaborative Community Objective Setting is a complementary process that would
precede, but not replace, localized planning efforts such as refinement plans or area
plans. Areas and neighborhoods should still to work to create a refinement plan or
other localized plans. Since all refinement plans must be consistent with the city-wide
plan, the Collaborative Community Objective Setting process helps to ensure that
refinement plans are successfully aligned and help achieve both local and city-wide
goals. The process can also help resolve conflicting interests or needs among
different neighborhoods.
After Collaborative Community Objective Setting and localized/refinement planning,
there will need to be a third step of implementation, where projects and initiatives
identified in the localized planning efforts are scoped and added to the work plans of
relevant departments and refinement plan policies are translated into code language
and added to the City land use code.
HOW DOES THIS CONNECT TO ENVISION EUGENE?
The Collaborative Community Objective Setting process is not a reworking of
Envision Eugene. The Seven Pillars of Envision Eugene, including concepts such as
focusing growth along key transit corridors and promoting twenty minute
neighborhoods, are widely supported by the community. Collaborative Community
Objective Setting is a process to involve citizens in implementing the vision Envision
Eugene outlines.
HOW ARE CITIZENS INVOLVED IN THIS PROCESS?
Citizens in Eugene are involved in many ways. First, all citizens will have multiple
opportunities at all stages of the process to become informed about what is being
recommended and provide input and feedback. Outreach will occur throughout the
Team's work to develop their recommendation, and upon release of the
recommendation before it goes to the Planning Commission. The Team will share the
reasoning behind the recommendation and incorporate additional comments. Once
the recommendation is presented to the Planning Commission, public notification and
opportunity for public comment would follow established city procedures (i.e.
Hearings and comment sessions prior to both Planning Commission and City Council
decisions.)
WHAT ARE THE STEPS THAT NEED TO HAPPEN?
After City Council approves the CCOS concept as the next step, they will need to
select a facilitator, a method for appointing the Team determined and the Team
appointed, and begin initial citizen outreach. The Team would meet multiple times
over several months to develop consensus recommendations and develop the
lexicon. After the recommendation has been drafted, there would be additional public
outreach and revision in order to verify the recommendation captures the community
consensus. Finally, the recommendation would go through the established Planning
Commission and City Council approval processes. This would probably take about a
year to a year and a half. Once the Collaborative Community Objective Setting
Process has been completed, individual areas could create their own localized plans,
such as refinement plans.
WHAT HAPPENS AFTER CCOS?
After the City Council has approved the outcomes of the CCOS, more work still needs
to be done. Individual areas would need to do localized planning to determine what
specific locations along the key transit corridors should be the focus of initial
planning, what kind of infrastructure investments (parks, transportation, incentives,
etc.) are necessary in that area to create true 20-minute neighborhoods, how to
coordinate with other areas on decisions or recommendations that have a broader
impact, and the specifics of how to balance changes with preserving neighborhood
character. This would involve refinement planning or another localized planning
process for the individual areas.
After the localized planning has been completed, the plans would need to be
implemented. This would include both modifying city land use code and
comprehensive plan designations as needed to reflect the outcomes of the process, and
as well identifying, prioritizing and incorporating into city workplans the projects
necessary to accomplish identified infrastructure improvements and other changes.
HOW LONG WILL THIS TAKE?
The expectation is that the actual meetings of the Team to develop the
recommendation would take approximately two months. However, prior to the Team
meeting, there would need to be some time devoted to gathering information and data,
communicating with the larger community, and selecting a facilitator and Team
members. After the Team has produced a recommendation, there would need to be
some additional time devoted to community discussion and outreach. Ideally, the full
time from the time Council initiates the process until a recommendation is ready to go
through the established approval processes through the Planning Commission and
City Council would be approximately six months.
By clarifying the objectives of local plans and creating a more robust framework for
localized planning, the localized planning that would follow would be able to be
accomplished more efficiently.
HOW ARE NEIGHBORHOOD ASSOCIATIONS INVOLVED?
For those neighborhoods that have active Neighborhood Associations, the
Neighborhood Association would play an important part in helping to provide a forum
for gathering input and discussion with the community at large. The specifics of how
the Team is selected still require work, but given that this is a city-wide process, the
method would have to be fair and equitable for both citizens who are well represented
by their Neighborhood Associations as well as those who live in places where
neighborhood associations don't exist or don't have the resources to provide
representation.
WHO IS "AFFECTED"?
Oregon's Goal One for Citizen Involvement in Land Use Planning indicates that
planning shall include a "cross-section of affected citizens." In addition, citizen is
defined broadly, to include not just residents or homeowners, but also businesses,
non-profits, property owners, and others who would be impacted by the decisions.
The CCOS process continues the Envision Eugene goal to focus growth along key
transit corridors, but recognizes that it is not just properties that directly front the key
road that are affected. The current thinking is that for the broader objected setting
process, "affected" areas would include both the road itself and areas within half a
mile of the road itself, barring major features (such as the river) that would prevent
access to the key road. As half a mile is the typical distance that someone can walk in
10 minutes, this would mean that those who are part of the "20-minute neighborhood"
centered on the corridors would be represented in the initial process.
This does not mean that zoning or land use would necessarily change for that entire
area; the later localized processes would need to examine the specific characteristics
of each corridor to help determine what kind of growth makes sense in each area.
WHAT IS THE "LEXICON" AND HOW IS IT CONNECTED TO THIS
PROCESS?
In addition to clearer objectives, another area that has been identified as important to
support successful localized planning efforts is greater consistency and understanding
of terms and concepts related to the topics under consideration. Some concepts have
specific meaning in Eugene code, but these are not well-understood or always used
consistently. Other concepts and terms are frequently used as part of the discussion,
but are not well defined or understood the same way between different individuals and
groups. Examples include both concepts like "affordability," "low-income housing,"
and "workforce housing," as well as specific terms for housing types and concepts--
for example, when we discuss missing middle housing, what are we talking about?
Creating a lexicon, so that concepts and terms are more clearly defined and used
consistently between different plans and groups, as well as allowing reporting on
outcomes (for example, reports from the permitting department on units added) would
be a key tool to help ensure both the success of localized planning efforts and a clear
ability to determine if the plans created are successful at accomplishing their
goals. However, the process for creating the lexicon may need to be different than
that for determining the community objectives, given the different nature of the task.
HOW WAS THIS PROCESS CREATED?
Removing the South Willamette Special Area Zone from consideration lead to the
question "what comes next?" Discussions among many groups and individuals--
those who opposed the SWSAZ, those who supported it, and those who had no strong
opinion about the SWSAZ but cared about the broader community goals-- indicated
that a step had been missed between the broad Envision Eugene process and the
specific South Willamette process. The concept of Collaborative Community
Objective Setting was developed in active collaboration with many different groups
and individuals, reflecting a multitude of perspectives and interests. What they shared
was a desire for a solution that would move us towards a truly community supported
outcome.
rd
*Pulledfromwww.wecaneugene.orgonOctober3,2016
ATTACHMENTC
/ƚǒƓĭźƌƚƩ.ƩƚǞƓƭ{ƷğƷĻƒĻƓƷƚƓğ{ƚǒƷŷźƌƌğƒĻƷƷĻtƌğƓƓźƓŭtƩƚĭĻƭƭ
wĻğķƚƓ{ĻƦƷĻƒĬĻƩЋЏ Ʒŷ ͲЋЉЊЏΛaƚƷźƚƓƓƚƷƒğķĻΜ
TheCityManagerisdirectedtoprepare,inconsultationwiththeappropriateCitystaffandtheelected
boardsofthefourCitycharteredsouthEugeneneighborsFriendlyAreaNeighbors(FAN),Southwest
HillsNeighborhoodAssociation(SHiNA),SoutheastNeighbors(SEN)andAmazonNeighborhood
Association(Amazon),aproposalforaplanningprocessthatisbasedontheSouthWillametteStreet
Initiative(AttachmentAofSeptember26,2016worksessionAIS).
TheCityManager'sproposalshallembodythebasicstructureandelementsoftheSouthWillamette
Initiative;however,theproposalmaymakelimitedadjustmentstothegeographicboundaries,the
compositionoftheplanningteamandotherdetails.Theproposalmayalsoincluderecommendations
foradditionalguidelinesfortherefinementplanprocesstobeestablishedbyCityCouncil.
ApreliminarydraftproposalshallbepresentedforCouncilandpublicreviewnolaterthanNovember1,
2016.
AfinaldraftproposalshallbepresentedforCouncilandpublicreviewnolaterthanDecember1,2016.
Council'sinitialdiscussionandfurtherdirectiontotheCityManagerontheproposalshallbescheduled
fortheDecember14,2016Councilworksession.
Council'sdeliberationandactionontheproposalshallbescheduledassoonaspracticablefollowing
swearinginofthenewCouncil.
ATTACHMENTD
Memorandum
1.Currentplansandzoninginplace
2.Planningoptionsforthefuture
/ƚƒƦğƩźƭƚƓƚŅbĻźŭŷĬƚƩŷƚƚķtƌğƓƭ
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
BACKGROUND
CITY-!.!'%2Ȍ3RECOMMENDATION
ATTACHMENTS
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610101.doc
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
SUGGESTEDMOTION
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610102.doc
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
SUGGESTEDMOTION
ATTACHMENTS
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103A.doc
ATTACHMENTA
MINUTES
EugeneCityCouncil
SouthEugeneHighSchoolCafeteria
400East19Avenue
th
Eugene,Oregon97401
September19,2016
6:00p.m.
CouncilorsPresent:
CouncilorsAbsent:
1.PublicForumonSouthWillamettePlanning
MINUTES – Eugene City Council September 19, 2016 Page 1
Public Forum
MINUTES – Eugene City Council September 19, 2016 Page 2
Public Forum
ATTACHMENTB
MINUTES
EugeneCityCouncil
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
September21,2016
12:00p.m.
CouncilorsPresent:
CouncilorsAbsent:
1.EXECUTIVESESSION:PursuanttoORS192.660(2)(i)
2.WORKSESSION:PoliceAuditorAnnualPerformanceReview
MOTIONANDVOTE:
PASSED6:1,
MINUTES – Eugene City Council September 21, 2016 Page 1
Work Session
3.WORKSESSION:CityHallProjectUpdate
MINUTES – Eugene City Council September 21, 2016 Page 2
Work Session
ATTACHMENTC
MINUTES
EugeneCityCouncil
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
September26,2016
5:30p.m.
CouncilorsPresent:-¨ª¤#« ±ªµ¨ ¯§®¤
CouncilorsAbsent:
WORK SESSION: South Willamette Public Forum Next Steps
1.
Council discussion:
Proposed motion will affirm a community planning team with ultimate goal of a refinement plan.
Need a good sense of what types of plans are out there, impacts, and interactions of each plan.
Forming a community planning team is just the first step.
Would like to know when the other area refinement plans were last updated and cost to do it again.
If a refinement plan is initiated, equal representation of people affected within area needed.
This a good example of how public process should work.
Certain areas in our community are likely places for development and will need a plan.
It’s time to dedicate resources to land use planning in Bethel area, especially considering its
recent growth.
Build on the work staff has already done and incorporate into new efforts moving forward.
One size does not fit all for refinement plans; important to involve neighbors.
More clarity, certainty, and consistency is needed on what the process is and who it affects.
MINUTES – Eugene City Council September 26, 2016 Page 1
Work Session and Meeting
MINUTES
EugeneCityCouncil
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
September26,2016
7:30p.m.
CouncilorsPresent:-¨ª¤#« ±ªµ¨ ¯§®¤
CouncilorsAbsent:
1. PUBLIC FORUM:
1. Jennifer Frenzer-Knowlton – conveyed HRC support for resolution opposing Dakota Access Pipeline.
2. Laurie Powell – Supported the climate recovery ordinance and a community wide plan.
3. Jim Neu – Supported climate recovery ordinance; concerned about rail cars and hazardous materials.
4. Ellen Wischnowski – Supported an updated pedestrian-traffic plan for Roosevelt school area.
th
5. Phil Schoenherr – Said property at 7 Avenue and Monroe Street needs to be condemned.
6. David Lemmon – Concerned about inappropriate and illegal behaviors in parks.
7. Lisa Vertulfo – Said water polo is important for community; supported more year-round pools.
8. Sophia Lauf - Supported increasing access to pools year-round including a cover for Amazon Pool.
9. Lottie Rae Steward – Supported increasing access to more pools and more aquatic activities.
10. Richard Sundt – Supported the Brown-Clark initiative for the South Willamette area plan.
11. Vic Hariton – Supported protecting homeowners; encouraged by work on South Willamette.
12. Christine Sundt – Supported neighborhood refinement plan and Brown-Clark proposal.
13. Sandra Shotridge – Supported resolution supporting the Standing Rock Tribe against the DAPL.
14. Sue Sierralupé – Gave an update on Occupy Medical and new building they will have access to.
15. Ada Ball – Supported resolution supporting the Standing Rock Tribe against the DAPL.
16. Leslie Robnett – Supported more resources and a shelter for the homeless.
17. Jenette Kime – Supported bringing back the Eugene Celebration Parade with support from the City.
18. Cindy Allen – Supported neighborhood-led refinement plans.
19. Jane Coverdell – Supported resolution supporting the Standing Rock Tribe against the DAPL.
Council discussion:
Concerned about traffic safety issues surrounding new Roosevelt Middle School.
Fire department is notified when hazardous or flammable materials are transported by rail
through Eugene.
2. CONSENT CALENDAR
MOTION AND VOTE:
Councilor Evans, seconded by Councilor Taylor, moved to approve the items
. PASSED 6:0
on the consent calendar
MINUTES – Eugene City Council September 26, 2016 Page 2
Work Session and Meeting
3. ACTION: A Resolution Annexing Land to the City of Eugene (Cowan, Doug; A 16-6)
MOTION AND VOTE:
Councilor Evans, seconded by Councilor Taylor, moved to adopt Resolution
5168, which approves the proposed annexation request consistent with the applicable approval criteria.
PASSED 6:0
4. ACTION: An Ordinance Extending the Rental Housing Code Sunset Date and Providing for an
Effective Date
MOTION AND VOTE:
Councilor Evans, seconded by Councilor Taylor, moved to adopt Council Bill
PASSED 6:0
5158, and ordinance extending the Rental Housing Code sunset date.
Council discussion:
More information/options on reducing $10 fee and other recommendations requested.
5. ACTION: A Resolution Authorizing the Institution of Proceedings in Eminent Domain for the
Acquisition of Property Interests for the Commerce Street Connector Path and Bridges Project
MOTION AND VOTE:
Councilor Evans, seconded by Councilor Taylor, moved to adopt Resolution
5170, authorizing the institution of proceedings in eminent domain for the acquisition of property
interests for the Commerce Street Connector Path and Bridge project.
PASSED 5:1
Councilor Clark opposed.
Council discussion:
Support project; however, grant timeline is driving this action.
Timing is real critical on this.
Willing sellers; money is fair and reasonable; only condemning a fraction of property.
6. ACTION: A Resolution Declaring the City of Eugene’s Support of the Standing Rock Sioux Tribe’s
Opposition to the Construction of the Dakota Access Pipeline
MOTION AND VOTE:
Councilor Brown, seconded by Councilor Evans, moved to adopt Resolution
5171, declaring the City of Eugene’s support of the Standing Rock Sioux Tribe’s opposition to the
PASSED 6:0
construction of the Dakota Access Pipeline.
Council discussion:
Definition of pipeline leaks is ambiguous; crossing sacred tribal grounds is offensive.
In favor of generating domestic energy sources, but not at expense of tribal rights.
7. WORK SESSION: Use of Marijuana Tax Funds and Retail Cannabis Regulations
City Attorney Kathryn Brotherton led the council in a discussion on use of marijuana tax funds and retail
cannabis regulations.
Council discussion:
MINUTES – Eugene City Council September 26, 2016 Page 3
Work Session and Meeting
The funds generated by the tax should be directed to human services, housing, community courts,
and park safety.
Would like to keep the list simple and straight forward.
Community is supportive of maintenance and security of parks.
Money for human services should be used within Eugene.
Should not earmark money for specific things; money should go into the General Fund.
MOTION AND VOTE:
Councilor Pryor, seconded by Councilor Poling, moved that if the marijuana
tax passes, the money be dedicated for use in the community courts, the Human Services Commission
in such a way as we have done in the past that we insure services delivered with this money be
delivered to the city of Eugene, and increases in security and safety in our parks.
PASSED 4:2
Councilors Taylor and Clark opposed.
MINUTES – Eugene City Council September 26, 2016 Page 4
Work Session and Meeting
ATTACHMENTD
MINUTES
EugeneCityCouncil
HarrisHall,125East8Avenue
th
Eugene,Oregon97401
September28,2016
12:00p.m.
CouncilorsPresent:
CouncilorsAbsent:
1.COMMITTEEREPORTSANDITEMSOFINTEREST
2.WORKSESSION:ZoneofBenefit/ReimbursementDistrictforPrivatelyFundedPublic
ImprovementsandEquivalentAssessmentsforStreetImprovements.
MINUTES – Eugene City Council September 28, 2016 Page 1
Work Session
3.WORKSESSION:DowntownHighSpeedFiberProjectUpdate
MOTIONANDVOTE:
PASSED6:0
MINUTES – Eugene City Council September 28, 2016 Page 2
Work Session
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
BACKGROUND
RELATEDCITYPOLICIES
COUNCILOPTIONS
CITY-!.!'%2Ȍ3RECOMMENDATION
SUGGESTEDMOTION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103B.doc
ATTACHMENTS
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103B.doc
ECC
UGENEITYOUNCIL
TWA
ENTATIVE ORKINGGENDA
October 6, 2016
OCTOBER 10 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. WS: South Willamette Next Steps PDD/Harding
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Ceremonial Matters (Oregon Urban and Community Forestry Award; Eugene Ems, Judge Mori)
2. Public Forum
3. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
c. Approval of Funding Low-Income Housing – Homeless High School Students PDD/Meyi-Galloway
OCTOBER 12 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. Executive Session – pursuant to ORS 192.660(2)(e)
B. WS: City Hall Update CS/Penwell
OCTOBER 17 MONDAY * NOTE: 5:30 P.M. WORK SESSION ADDED *
5:30 p.m. Council Work Session
Harris Hall Expected Absences: Poling
A. WS: Sustainability Commission Annual Report and Work Plan CS/Nelson
B. WS: Project for Public Spaces Update PDD/Braud
OCTOBER 19 WEDNESDAY
Noon Joint Work Session w/Lane County
Harris Hall Expected Absences:
A. JEO WS: Downtown Planning and Development
OCTOBER 24 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. WS: Envision Eugene 90 mins – PDD/Harding
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
c. Approval of Stadter Annexation, 4075 Gilham Rd (A 16-7) PDD/Berg-Johansen
3. PH: Ordinance Concerning Annual Maintenance of Land Use Code PDD/Hansen
4. Committee Reports and Items of Interest
OCTOBER 26 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS: OVE and Rest Stop Pilot Programs 90 mins – CS/Cariaga
A=action; PH=public hearing; WS=work session
J:\\CMO\\CC\\CCAGENDA.docx
ECC
UGENEITYOUNCIL
TWA
ENTATIVE ORKINGGENDA
October 6, 2016
NOVEMBER 9 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS: Downtown Update 90 mins – CS/Medary
NOVEMBER 14 MONDAY
5:30 p.m. Joint Work Session w/Lane County
Harris Hall Expected Absences:
A. JEO WS: Downtown Planning and Development 90 mins - CS
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Pledge of Allegiance to the Flag
2. Public Forum
3. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
4. PH and Action: Resolution on Measure 49 Claim PDD/CAO
5. Action: Ordinance Concerning Annual Maintenance of Land Use Code PDD/Hansen
6. WS: Human Rights Commission Annual Report and Work Plan 30 mins – CS/Vanderhaeghen
NOVEMBER 16 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences: Evans, Taylor
A. WS: City Hall Update 90 mins –CS/Penwell
NOVEMBER 21 MONDAY NOTE: 5:30 P.M. WORK SESSION ADDED *
5:30 p.m. Council Work Session
Harris Hall Expected Absences: Poling
A. WS:
B. WS
7:30 p.m. Council Public Hearing
Harris Hall Expected Absences:
1. PH: Enterprise Zone Revised Public Benefit Criteria PDD/Nobel
NOVEMBER 23 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS: Contracting Equity Program Update 45 mins – CS/Silvers
B. WS: Council Communications 45 mins – CS/Ruiz
NOVEMBER 28 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. WS: Downtown Update 45 mins – CS/Medary
B. WS: Parks and Recreation System Plan 45 mins – PW/Burke
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
A=action; PH=public hearing; WS=work session
J:\\CMO\\CC\\CCAGENDA.docx
ECC
UGENEITYOUNCIL
TWA
ENTATIVE ORKINGGENDA
October 6, 2016
NOVEMBER 30 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS: Fireworks Ban 45 mins – Fire
B. WS: Renter Protection 45 mins PDD/Jennings
DECEMBER 12 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. Committee Reports: PC, South Willamette EDC, LTD/EmX, OMPOC, McKenzie Watershed
B. WS: $15 Minimum Wage for City and Contract Employees 45 mins – CS/Hammitt
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
c. Adoption of Resolution Acknowledging Receipt of CAFR CS/Lauderbach
3. URA Action: Resolution Acknowledging Receipt of Annual Financial Report CS/Lauderbach
4. URA PH and Action: Supplemental Budget CS/Miller
5. PH and Action: Supplemental Budget CS/Miller
DECEMBER 14 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
COUNCIL BREAK: DECEMBER 15, 2016 – JANUARY 4, 2017
JANUARY 4 WEDNESDAY
5:30 p.m. State of the City
Hult Center Lobby Expected Absences:
A. State of the City
JANUARY 11 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. Election of 2017 Council Officers
B. WS:
C. WS:
JANUARY 17 TUESDAY
7:30 p.m. Council Public Hearing
Harris Hall Expected Absences:
1. PH:
JANUARY 18 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
A=action; PH=public hearing; WS=work session
J:\\CMO\\CC\\CCAGENDA.docx
ECC
UGENEITYOUNCIL
TWA
ENTATIVE ORKINGGENDA
October 6, 2016
JANUARY 23 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. Committee Reports and Items of Interest: HRC, SC, HSC, LCOG, MPC, PSCC 30 mins
B. WS:
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
JANUARY 25 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
FEBRUARY 8 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS: 45 mins –
B. WS: 45 mins –
FEBRUARY 13 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. Committee Reports and Items of Interest
B. WS:
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
FEBRUARY 15 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
FEBRUARY 21 TUESDAY
7:30 p.m. Council Public Hearing
Harris Hall Expected Absences:
1. PH:
FEBRUARY 22 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
A=action; PH=public hearing; WS=work session
J:\\CMO\\CC\\CCAGENDA.docx
ECC
UGENEITYOUNCIL
TWA
ENTATIVE ORKINGGENDA
October 6, 2016
FEBRUARY 27 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. Committee Reports and Items of Interest from Mayor, City Council and City Manager 30 mins
B. WS:
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
MARCH 8 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
MARCH 13 MONDAY
5:30 p.m. Council Work Session
Harris Hall Expected Absences:
A. Committee Reports: PC, South Willamette EDC, LTD/EmX, OMPOC, McKenzie Watershed
B. WS:
7:30 p.m. Council Meeting
Harris Hall Expected Absences:
1. Public Forum
2. Consent Calendar
a. Approval of City Council Minutes CS/Forrest
b. Approval of Tentative Working Agenda CS/Forrest
3. PH and Action: Capital Improvement Program CS/Streepey
MARCH 15 WEDNESDAY
Noon Council Work Session
Harris Hall Expected Absences:
A. WS:
B. WS:
COUNCIL BREAK: MARCH 16, 2017 – APRIL 10, 2017
ON THE RADAR
Work Session Polls/Council Requests Status
1. Inclusionary Zoning (Taylor) ............................................................................................................................. TBD
2. Commercial Setback Code Requirement (Zelenka) ......................................................................................... TBD
A=action; PH=public hearing; WS=work session
J:\\CMO\\CC\\CCAGENDA.docx
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
www.eugeneor.gov
ISSUESTATEMENT
BACKGROUND
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C
.docx
%µ «´ ³¨® £2¤¢®¬¬¤£ ³¨®
RELATEDCITYPOLICIES
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C.docx
COUNCILOPTIONS
CITY-!.!'%2Ȍ3RECOMMENDATION
SUGGESTEDMOTION
ATTACHMENTS
FORMOREINFORMATION
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C
.docx
ATTACHMENT A
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C
.docx
ATTACHMENT B
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C.docx
ATTACHMENT C
Summary of Approved Proposals from the 2016 Housing RFP
J:\\CMO\\2016 Council Agendas\\M161010\\S1610103C
.docx