Loading...
HomeMy WebLinkAbout10-12-16 Agenda Packet EUGENE CITY COUNCIL AGENDA October 12, 2016 12:00p.m.CITYCOUNCILWORKSESSION HarrisHall 125East8Avenue th Eugene,Oregon97401 MeetingofOctober12,2016; HerHonorMayorKittyPiercyPresiding Councilors 12:00p.m.CITYCOUNCILWORKSESSION HarrisHall,125East8Avenue th 1.EXECUTIVESESSION PursuanttoORS192.660(2)(e) - ¸®±Ȁ TheEugeneCityCouncilwillnowmeetinExecutiveSessiontonegotiate realpropertytransactions.TheExecutiveSessionisheldpursuanttoORS 192.660(2)(e). Representativesofthenewsmediaanddesignatedstaffshallbeallowedtoattend theexecutivesession.Allothermembersoftheaudienceareaskedtoleavethe room.Representativesofthenewsmediaarespecificallydirectednottoreport onanyofthedeliberationsduringtheexecutivesession,excepttostatethe generalsubjectofthesessionaspreviouslyannounced.Nodecisionmaybemade inexecutivesession.Attheendoftheexecutivesession,wewillreturntoopen sessionandwelcometheaudiencebackintotheroom. 2.WORKSESSION CityHallUpdate Adjourn. J:\\CMO\\2016 Council Agendas\\M161012\\A161012S.doc ¶¶¶ȁ¤´¦¤­¤®±ȁ¦®µȁ J:\\CMO\\2016 Council Agendas\\M161012\\A161012S.doc ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY www.eugeneor.gov ISSUESTATEMENT BACKGROUND J:\\CMO\\2016 Council Agendas\\M161012\\S161012B.docx RELATEDCITYPOLICIES CITY-!.!'%2Ȍ3RECOMMENDATION SUGGESTEDMOTION ATTACHMENTS FORMOREINFORMATION NOT PURSUED: DOES OPTION 1: CLARIFY,OPTION 2: SCOPE AND OPTION 3: MAJOR SYSTEM NOT MEET CITY PROJECT PERFORMANCE SIMPLIFY, RE-BID CHANGES - NOT REQUIREMENTS REDUCTIONS COMPATIBLE W/ SCHEDULE NOT PURSUED: DOES OPTION 1: CLARIFY,OPTION 2: SCOPE AND OPTION 3: MAJOR SYSTEM NOT MEET CITY PROJECT SIMPLIFY, RE-BIDPERFORMANCE CHANGES - NOT REQUIREMENTS REDUCTIONS COMPATIBLE W/ SCHEDULE NOT PURSUED: DOES OPTION 1: CLARIFY,OPTION 2: SCOPE AND OPTION 3: MAJOR SYSTEM NOT MEET CITY PROJECT PERFORMANCE SIMPLIFY, RE-BID CHANGES - NOT REQUIREMENTS REDUCTIONS COMPATIBLE W/ SCHEDULE retaining Civic Quality of Site. (Diagrammed this sheet) Strategy: Reduce project scope and program while 1. SUBSTITUTE CEMBRIT PANEL.2. ELIMINATE SECONDARY BACK UPCHANNEL AND ATTACH DIRECTLY 3/8"ALUMINUM TRIM REVISION 1. 3/8" GALVANIZED OR POWDEREQUITONE EXPOSED FASTENER1. PRECAST WITH 12' FORM LINER.2. PRECAST WITH SMOOTH ACIDINSULATION TO MATCH TYPICAL AT4. PORTLAND CEMENT STUCCORAIN SCREEN. WALL FRAMING,INSULATION TO MATCH TYPICAL AT 2. HEAVY GAGE SHEETMETAL BASE MATERIAL OPTIONS: ATTACHMENT TO DETAILED COST REDUCTION TO KNIGHT WALL SYSTEM. CEMENT PANEL CLADDING 3. BRICK - WALL FRAMING, DELETED WALL SURFACE MP-1 REVISION OPTIONS:1. GAGE METAL CLADDING -NORTH CLAD AL SERIES OR COATED STEEL. SIMILAR WEATHER BARRIER ANDWEATHER BARRIER AND 2. EQUITONE EXPOSED FASTENER CLADDING FCP-1, FCP-2, FCP-3: UPPER FLOORS.UPPER FLOORS.STRATEGIES DIAGRAM KEY 2016-09-01 ALUMINUM. CLADDING. OPTIONS: SIMILAR. WASH. 3. DELETE LOUVERS. REPLACE WITH BASE MATERIAL DELETE LADDER AND GATES DELETEELECTRICOPERATION DELETE DELETE DELETE DELETEDELETE CONSTRUCTION DOCUMENT MARKUPS DELETE COST REDUCTION STRATEGIES 1. SUBSTITUTE CEMBRIT PANEL.2. ELIMINATE SECONDARY BACK UPCHANNEL AND ATTACH DIRECTLY 3/8"ALUMINUM TRIM REVISION 1. 3/8" GALVANIZED OR POWDEREQUITONE EXPOSED FASTENER1. PRECAST WITH 12' FORM LINER.2. PRECAST WITH SMOOTH ACIDINSULATION TO MATCH TYPICAL AT4. PORTLAND CEMENT STUCCORAIN SCREEN. WALL FRAMING,INSULATION TO MATCH TYPICAL AT 2. HEAVY GAGE SHEETMETAL BASE MATERIAL OPTIONS: ATTACHMENT TO DETAILED COST REDUCTION TO KNIGHT WALL SYSTEM. CEMENT PANEL CLADDING 3. BRICK - WALL FRAMING, DELETED WALL SURFACE MP-1 REVISION OPTIONS:1. GAGE METAL CLADDING -NORTH CLAD AL SERIES OR COATED STEEL. SIMILAR WEATHER BARRIER ANDWEATHER BARRIER AND 2. EQUITONE EXPOSED FASTENER CLADDING FCP-1, FCP-2, FCP-3: UPPER FLOORS.UPPER FLOORS. STRATEGIES DIAGRAM KEY 2016-09-01 ALUMINUM. CLADDING. OPTIONS: SIMILAR. WASH. 3. ..... CONSTRUCTION DOCUMENT MARKUPS COST REDUCTION STRATEGIES