Loading...
HomeMy WebLinkAboutItem 2B - Res.on SDC AdjustmentEUGENE CITY COUNCIL AGENDA ITEM SUMMARY Adoption of Resolution 4827 Adopting an Inflationary Adjustment of Systems Development Charges for Local Wastewater System, Stormwater System, and Transportation System; Superseding Administrative Order 58-04-04-F; and Amending Resolution No. 4740 Meeting Date: March 7, 2005 Agenda Item Number: 2B Department: Public Works Staff Contact: Fred McVey www. cl. eugene, or. us Contact Telephone Number: 682-5216 ISSUE STATEMENT The City Council is asked to approve a resolution adopting an inflationary increase in Systems Development Charges (SDCs) for the local wastewater, stormwater and transportation systems. The proposed adjustment follows adopted policy for implementing periodic adjustments to SDCs based on an adopted cost index. BACKGROUND Council Action History_ On September 23, 2002, the council adopted the System Development Charges (SDC) Methodologies by Resolution No. 4740. The council has subsequently amended Resolution No. 4740 by adopting Resolution Nos. 4748, 4767, 4768, 4770, 4794 and 4795 implementing various updates to local wastewater, regional wastewater, stormwater, parks and transportation SDC methodologies and rates. On March 25, 2004, the council was notified of inflationary adjustments of Systems Development Charges for local wastewater, stormwater, and transportation systems adopted by Administrative Order No. 58-04-04-F, effective April 5, 2004. Most recently, the council approved Resolution Nos. 4794 and 4795 dated June 28, 2004, adopting amended MWMC Regional Wastewater SDC methodology and rates. This action is being placed on the Consent Calendar because the resolution adopts a standard periodic adjustment following policies and procedures previously adopted by the council. Financial Considerations SDCs provide a funding mechanism to account for the costs and value of infrastructure system capacity required by new development. The SDC Methodologies adopted by the council provide for periodic adjustments to SDCs to further account for changes in construction costs and system valuation. Periodic adjustments allow SDCs to more closely reflect current costs of providing system capacity to new development. L:\CMO\2005 Council Agendas\M050307\S0503072B.doc The proposed rate adjustment to three SDC systems is based on an adopted cost index, the 20-city national average construction cost index as published by the Engineering News-Record (ENR). The ENR for the period of February 2004 through December 2004 reflects an increase in average construction costs of 6.5%. The proposed 6.5% increase across the three systems translates to an increase in City of Eugene SDCs for a typical new single family residence of $152, from a current total of $4,740 to a proposed total of $4,892. Council Goals/Action Priorities This agenda item relates to City Council goals pertaining to Sustainable Community Development which successfully manages growth and change in the urban environment and Fair, Stable an Adequate Financial Resources which provide a fair and equitable system of revenue sources adequate to maintain and deliver municipal infrastructure services. Timing The transportation, local wastewater and stormwater SDC rates were last updated in April 2004, reflecting costs and rate factors current as of February 2004. The proposed adjustment to rates based on construction cost inflation for the period of February 2004 through December 2004 provides for timely update of rates. While the Eugene Code and Oregon SDC statutes do not require notice of adoption by resolution of inflationary adjustments based on a cost index, a notice has been provided as a courtesy to interested persons. The notice was published in the Register-Guard on February 15, 2005, and, along with the draft resolution and exhibit, posted at Eugene City Hall and the Public Works building lobby. This information has also been made available at the City's web site at www. ci.eugene.or.us/PW/SDC. The adjusted rates are proposed to go into effect on April 18, 2005. An adjustment to the parks SDC rate is not proposed at this time, pending results of a comprehensive review, the completion of which relies upon adoption of the Parks, Recreation and Open Space Comprehensive Plan. The parks SDC rates were last updated in October 2003, with the intent of that update to serve as an interim adjustment until the comprehensive review and update of the SDC is complete. It is anticipated that an updated parks SDC will be adopted approximately 90 days after adoption of the Parks, Recreation and Open Space Comprehensive Plan. RELATED CITY POLICIES Chapter 223 of the Oregon Revised Statutes prescribes the rights and responsibilities of local governments in developing and imposing SDCs, providing for adoption of a cost index as an administrative means for adjustments to SDCs. The Eugene Code, Chapter 7, prescribes the process for development, adoption and administration of SDCs, providing for adoption of methodologies related to SDCs. The council has adopted by resolution the SDC Methodologies which provide for periodic adjustment of Eugene's SDCs based on an adopted cost index. The council has adopted by resolution Growth Management Policy #14 which provides that development shall be required to pay the full cost of extending infrastructure and services. COUNCIL OPTIONS 1. Adopt the resolution providing an inflationary adjustment of SDC rates. 2. Take no action on the resolution. 3. Direct the City Manager to prepare other adjustments to SDC rates. L:\CMO\2005 Council Agendas\M050307\S0503072B.doc CITY MANAGER'S RECOMMENDATION The City Manager recommends adoption of the resolution providing an inflationary adjustment of SDC rates. SUGGESTED MOTION Move to adopt Resolution 4827 adopting an inflationary adjustment of Systems Development Charges for local wastewater system, stormwater system, and transportation system; superseding Administrative Order 58-04-04-F; and amending Resolution No. 4740. ATTACHMENTS A. Proposed Resolution and Exhibits FOR MORE INFORMATION Staff Contact: Fred McVey Telephone: 682-5216 Staff E-Mail: fred.mcvey~ci.eugene.or.us L:\CMO\2005 Council Agendas\M050307\S0503072B.doc ATTACHMENT A RESOLUTION NO. A RESOLUTION ADOPTING AN INFLATIONARY ADJUSTMENT OF SYSTEMS DEVELOPMENT CHARGES FOR LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND TRANSPORTATION SYSTEM; SUPERSEDING ADMINISTRATIVE ORDER $8-04-04-F; AND AMENDING RESOLUTION NO. 4740. The City Council of the City of Eugene finds as follows: A. On September 23, 2002, the System Development Charges (SDC) Methodologies were adopted by Resolution No. 4740. B. Resolution No. 4740 has subsequently been amended by Resolution Nos. 4748, 4767, 4768, 4770, 4794 and 4795. Resolution No. 4793 dated June 28, 2004, adopted the MWMC Facilities Plan 20-year project list. In addition, inflationary adjustments of Systems Development Charges for Local Wastewater System, Stormwater System, and Transportation System were adopted by Administrative Order No. 58-04-04-F, effective April 5, 2004. C. Based on the national 20-city average Construction Cost Index as published by the Engineering News-Record, it is necessary to amend portions of the Systems Development Charges by implementing a 6.5% inflationary increase for Local Wastewater System, the Stormwater System, and the Transportation System. Section 2.4 of the SDC Methodologies requires that revisions to fees by more than five percent shall be established by resolution of the Council. D. These inflationary adjustments to the Systems Development Charges are in conformity with applicable state law, authorized by EC 7.710(5) and Section 2.4 of the Methodologies, and should be implemented effective April 18, 2005. NOW, THEREFORE, based upon the above findings, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. Portions of the Systems Development Charges are amended by implementing a 6.5% inflationary increase to the Local Wastewater System, the Stormwater System, and the Transportation System, as set forth in Exhibit A attached hereto. Section 2. Administrative Order No. 58-04-04-F is superseded, and Resolution No. 4740 is amended as described in Section 1, as of the effective date of this Resolution. Section 3. The City Recorder is requested to append a copy of this Resolution to Resolution No. 4740 and a copy (without its attachments) to Administrative Order 58-04-04-F. Resolution - Page 1 ATTACHMENT A Section 4. This Resolution shall become effective on April 18, 2005. The foregoing Resolution adopted the __ day of ,2005. City Recorder Resolution - Page 2 EXHIBIT A CITY OF EUGENE ENGINEERING DIVISION o£ the PUBLIC WORKS DEPARTMENT Systems Development Charge Methodologies April 18, 2004 Superseding Administrative Order No. 58-04-04-F and Amending Resolution No. 4740 The July 12, 2004 SDC Methodologies document remains in effect except as amended by this document. TABLE 1 SUMMARY OF LOCAL SYSTEMS DEVELOPMENT CHARGES (See Appendix C-2 for information regarding the Regional Wastewater SDC Transportation Wastewater Local ICit~l Stormwater Parks Cost per Trip = $1,452.30 Cost per new residential units (e.g, Total stormwater unit cost per sqft Cost per Dwelling Unit = single-family, mobile home parks, of impervious surface Area = $1,344.65 duplexes, apartments/= a base $0.158. Charges are based on use. rate of $317.32 plus $0.0769 per 1-2 Family development under square foot of living area. 3,000 sq.ft have tiered rates based Residential additions will be on est. imp. surface areas. 1-2 ~ charged $0.0769 per square foot of Family over 3,000 sq.ft, and Multi- '~ increased living area. Family & Nonresidential are based o: Nonresidential uses = $2.4039 per on actual imp. surface area. gallon of daily flow/discharge. Charges for Mfg. Home Parks are based on est. imp. surface area per space plus actual impervious surface area of additional common area. Estimated costs of aderial/collector Estimated non-assessable cost of Estimated non-assessable cost of Unit costs for various components. Street system (non assessable existing system using costs from system-wide capacity from future cost per lane-mile, costs of "Gravity Sewer Lines System capacity-enhancing projects as '~ intersections, traffic signals, street Valuation Model" developed by contained in the Stormwater SDC ~ lights, structures) and off street CH2M Hill. Charges are net of all Project List and available existing ~ bicycle paths, federal grants and outstanding stormwater system capacity. o debt. Existing levels of service for Design flow standards currently Design standards currently used by Existing levels of service for ~ various components as established used by the city for various land the City to handle a Five-year various components, as by current City transportation use types. PFUs equivalents are storm. ~stablished in Eugene Parks & ~ design standards, determined per Oregon adopted Recreation Plan. o3 Plumbing Code. > Street Component: Reimbursement fee Reimbursement fee Improvement fee · -~ ~ ,· 40% Impr. Fee · 84% · 47% ~ ~ I1~ 60% Reim. Fee '~ o Bike Component: Improvement fee Improvement fee ~ "~ · 100% Impr. Fee · 16% · 53% 0 Charges for new or expanding New or expanding residential uses Charges for new (all) or expanding Charges are based on a fiat rate development are based on the cost are charged based on a per (Multi-family, Nonresidential) per dwelling unit for all types of per trip times the trip rate assigned dwelling unit cost plus a rate per development are based on residential development. There is for a specific development type square foot of living area. Non- estimated or actual impervious no charge for commercial ,- Limes the number of units of residential uses are charged based surface areas and the total development. o measurement proposed, on the number of PFUs at a rate stormwater unit cost per square ~ for the specific development type. foot, Stormwater impact not ~ Credit for past trunk sewer levy attributable to impervious surface _.e payments will be applied to the area will be charged based on ~- local charge, equivalent surface area and the -- total stormwater unit cost per square foot. Note: Administration costs are not included in the figures above, see section 2.3.1 for more information. TABLE 5 Transportation System Development Charge Analysis ~o ~ ~ ~ ~ ~' ~ ~ w: sJo~ell°3 I lelJelJ~O ~ ~ ~ TABLE 6 Local Wastewater System Development Charge Analysis 1. Analysis of System Value Total Replacement Cost - Pipe $442,201,138 Total Replacement Cost- Pumping Stations $16,880,988 City Cost of future projects within UGB $10,570,47~c Other Wastewater Components $3,464,93(; Total COSt of EXi~i~ WaSte~ter SYSte~ I ~73ill~iS~ 2. Analysis of Assessable Amount Size Total Cost 3-inch $10,047,301 B to 48-inch $334,334,053 ~otal ASsessa~i~ ~o~ i $3~i38~i3S~ 14. Calculation of Wastewater SDC Total System Valuation, existing and planned $473,117,534 Cost per unit of capacity per gallon $2.2572 5. Calculation of Reimbursement Percentage City System Capacity (EDUs)in mgd 49.0 100.00% Existing Use in mgd 21.4 43.7% Percent Available for New Development in mgd 27.6 56.3% Total Value of Reserve Capacity (value of system) $66,160,201 100.00%! ~ai? ~i i~ e~ed ~apaCi~ (coSt of fu{~ ProjeCts ~B ~tei PI~ ~a!ue of Reimb~a~{~ ~apa~ii~ TABLE 7 Local Wastewater Plumbing Fixture Unit Rates E~ ~0~i ~ 1F Single-Family / Duplex Housing $317.32 + (Sq Ft Living Area x $0.0769) 1X Mixed Use with Residential $317.32 + (Sq Ft Living Area x $0.0769) 11 Multi-Family Housing $317.32 + (Sq Ft Living Area x $0.0769) 12 A, B, & C Elderly Housing Attach, Detach, & Group/Retirement Home $317.32 + (Sq Ft Living Area x $0.0769) 13 Residential Hotel $317.32 + (Sq Ft Living Area x $0.0769) 14 Mobile Home Park $317.32 + (Sq Ft Living Area x $0.0769) 15 Hotels, Motels, Lodging 19.05 $45.79 21 Beverage/Food Mfg 39.87 $95.84 24 Wood Products 47.93i $115.22 2X Light Mfg./Printing 56.621 $136.11 3X Manufacturing 58.65 $140.99 4X Transportation & Utilities 18.22 $43.80 41 Fire Station 7.75i $18.63 51 Wholesale Trade 21.37 $51.37 54 Retail Trade / Grocery 55.46 $133.32 55 Retail Trade Automotive 7.83 $18.82 59 Retail Trade Other 39.91 $95.94 5A Restaurant - Fast Food 25.44 $61.16 5B Restaurant - Low to Med Turnover 62.47 $150.17 5C Restaurant - Higher Turnover 22.45 $53.97 5D Drinking Establishments 54.98 $132.17 5E Take/Bake & Pick Up/Delivery Establishments 26.49 $63.68 5X Retail Trade / Clothing & Dry Goods 12.35 $29.69 61 Financial Offices/Banks 16.99 $40.84 62 Other Services 28.51 $68.54 63 Rental/Storage Services 6.49 $15.60 64 Automotive & Other Repair Services 16.17 $38.87 65 Medical Services 28.75 $69.11 66 Construction Trade Services 13.69 $32.91 67 Government Services, Office/Business Parks Based on specific use of development 68 Education / Cultural 15.66 $37.65 69 Churches/Clubs/Organizations 15.70 $37.74 6A1 Laundry Services (Linen, Uniform) 538.96 $1,295.61 6A2 Laundry, Self-Service 299.64 $720.30 6A3 Dry Cleaning Service (with or w/out laundr7 services) 36.30 $87.26 6B Car Wash 264.54 $635.93 6X Professional/Real Estate/Insurance 67.76 $162.89 7X Entertainment, Recreation & Sports 88.42 $212.55 82 Veterinarian Service 24.79 $59.59 *The unit cost of capacity for the local wastewater system is $2.4039 per gallon per day. The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use. Land use types that do not fit into the above categories will receive a default flow assignment based on the sample average. The default flow is 47.93 gal/day x $2.4039 = a cost per PFU of $115.22. rate per PFU may be assigned by the City Engineer should a proposed use not be represented by one of the published SDC use codes and for which a default flow assignment is not representative of the proposed flow. In the case of those proposed developments that are determined to have a potential for exceptional water usage, the City Engineer may require that the Owner(s) enter into an agreement with the City to review water usage or wastewater discharge at such time the development is in full use or production as the final basis of the local wastewater SDC. A complete list of wastewater SDC/HUD BPR use codes is provided in Table 6. TABLE 9 Stormwater Drainage Systems Development Charge Analysis I1. Existing Stomlwater Drainage System Value & SDC-Eligible Costs (Reimbursement Fee)l Total Replacement Cost - Existing Pipe System $237,226,864 Total Replacement Cost - Existing Open Channel Systems $67,809,958 Percent of Existing Pipe System to be Used by New Development 4.27% Percent of Existing Open Channel system to Used by New Development 2.34% Total SDC-Eligible Cost- Existing Pipe* $10,129,588 Total SDC-Eligible Cost - Existing Open Channel Systems* $1,586,753 ~tal Sb~Eligibl~ ~ost ~i~ting SYst~ ~l! [2. Future S~rmwater System SDC-Eligible Project Costs (Improvement Fee , Future SYstem 3. Storm~ter System Calculation ~tails Single-Family Dwellin~ (SFD), estimated average imperious surface area Small Residential (building footprint ~1,000 sq. ff.) 1,800 sq. ff. Medium Residential (building footprint >1,000 sq. fl. and < 3,000 sq.ff.) 2,900 sq. ff. Mfg. Home Park Space, estimated average imperious sudace area 1,780 sq. ff. 4. Calculation of S~* Unit Cost per Square Foot, Improvement Fee [$12,900,968 / 155,770,560 $0.0828 (53%) Unit Cost per Square Foot, Reimbursement Fee [$~,716,341 / 155,770,560 $0.0752 (47%) Small Residential SDC (building footprint ~ 1,000 sq. ~.) [1,800 sq. ~. x $0.158 $284.40 Medium Residential SDC (building footprint >1,000 sq. ~. and < 3,000 sq.~.) [2,900 sq.~ x $0.158] $458.20 Small Duplex SDC (unit building footprints ~ 1,000 sq. ~.) [$284.40 x 2~ $568.80 Medium Duplex SDC (unit building footprints >1,000 sq. E. and < 3,000 sq.E.) [$458.20 x 2; $916.40 Mfg. Home Park SDC per Space (poKion of total charge) H,684 sq. ~. x $0.158] $266.07 *See Appendix F for complete rate schedule. TABLE 10 City of Eugene 2003 Stormwater SDC-Eligible Project List Martin Drive Pipe Improvements (02-07 CIP) $103,304 $103,304 rvlt. Cavalry Pipe Improvements $847,759 $206,212 Frederick Court Pipe Daylight $131,407 $60,447 ¢3rd Avenue Pipe Improvements $2,394,319 $786,182 Vlorse Park Ranch Park Pipe Improvements $1,171,334 $128,847 _aurelwood Flood Control Fac/Pipe Imps $2,230,920 $334,638 Jackson Street Pipe Improvements $85,975 $21,494 ~/indsor Circle Pipe Improvements $1,020,821 $656,242 ~/est Hawkins Lane Water Quality Facility $694,580 $562,279 Jell Avenue (Increase Pipe Sizes Along) $882,638 $406,013 --mpire Park Pond Retrofit $427,656 $85,531 Royal Node Stormwater Infrastructure $1,555,113 $1,555,113 3reenhill Tributary Storm Improvements Ph 2 $415,437 $141,626 Sreenhill Tributary Water Quality Facility $831,763 $249,529 :{oosevelt Channel- Culvert Improvement $150,957 $47,671 ~,-1 Main Channel Culvert & Open Waterway Improvements $571,837 $91,494 _ynnbrook Drive Open Waterway & Culvery Improvements $535,847 $160,754 Spring Creek Bridge Construction & Waterway Improvements $154,734 $35,589 Sanders Street Water Quality Facility $830,097 $41,505 Spring Creek Drive Water Quality Facility $262,814 $52,563 ~irsten Street Pipe Improvements $425,434 $123,376 -lunsacker - Open Channel Improvements (02-07 CIP) $442,096 $265,480 _enox/Salty - Culvert Replacement (02-07 CIP) $191,057 $114,412 -lunsacker Culvert Replacement (02-07 CIP) $28,881 $17,773 ~)ivision Avenue Tip-Up Pipe Replacement $12,108 $2,785 Irvington Drive Water Quality Facility $726,237 $101,673 St. Peter School Culvert Replacement $60,650 $18,195 :~iver Point Pond Outlet Channel $414,660 $170,011 Gilham Road System Culvert Replacement $29,991 $29,991 Gilham Road System Water Quality Facility $726,349 $72,635 ~,scot Park Open Waterway Modification $80,200 $52,932 3rd-4th Connector Stormwater Improvements (02-07 CIP) $133,295 $133,295 ~eaver St & Hunsaker Ln Stormwater Improvements $55,540 $55,540 Greenhill Rd Stormwater Improvements $111,080 $111,080 Irvington Drive - Stormwater (02-07 CIP) $111,080 $111,080 ~inney Park Flow Diversion & Restoration $668,693 $509,633 :{iver Road - Stormwater (02-07 CIP) $55,540 $55,540 :~oyal Ave., Terry to Greenhill $111,080 $111,080 Services for New Development ($100,000/year) $3,776,703 $3,776,703 Streambank Stabilization ($ varies/year) $5,442,896 $1,360,724 : 28;922;882 ; 2i90~8 Appendix F Local System Formulas & General Fee Schedule 1.0 Formula and Calculation Details 1.1 General Rate Setting, Cost of Service Formula SDC eligible costs = SDC per unit of service Impact measurement 1.2 Transportation System Cost of Service consists of non-assessable arterial and collector street system cost of service plus off-street bicycle cost of service. 1.2.1 Non-Assessable Arterial & Collector Street System Cost of Service General Formula Non-Assessable Cost per Lane Mile X Lane Miles per trip = Cost per trip Calculation Street System Cost per Trip Reimbursement: $906,694 X (0.8888/675) -- $1,193.88 = Cost per Trip Improvement: $1,079,256 X (0.8888 / 675) = $1,421.10 = Cost per Trip Total Allocated Cost per Trip = $1,193.88 (0.4) + $1,421.10 (0.6) = $1,330.21 1.2.2 Off-Street Bicycle path Cost of Service General Formulas Miles of bicycle paths per person X Cost per miles = Cost per person Cost per person, Bi cycle Paths = Cost per trip # of Trips per person Calculations Path Lighting + Path Section ($14.18) + ($95.09) = $109.27 (per person) $109.27 = $122.09 (per trip) 0.895 1.3 Wastewater System Cost of Service: 1.3.1 Local Wastewater System Cost of Service Determination of Flow Estimation FormUla for Residential Development Graphical comparison of water consumption per month to square foot of living area results in a slope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 gallons per month. 8000 7000 6000 5000 Ga/Ions per Month 4000 3000 2000 1000 0 :,--1;:95 9;77 I 370 1 2780 I 4000 0 816 1585 2382 3280 Total Area Living Space Projected · Sampled Actual Data Base Flow Intercept, 3,946 Slope 0.951 gal/mo/sq ft GaL / Month Gal./Day (GPD) 132 Days per Month 30 --30 day month-- Cost per Gal/Day $2.4039 Slope / 3O Days 0.032 Base Charge = $317.32 Cost per Gal/Day $2.4039 GPD x Cost per Gal. Cost per sq ft = Daily usage factor x Cost per $0.0769 Gal. The implementation of this rate structure results in each new single family dwelling being charged a local wastewater SDC that is comprised of a base rate of $317.32 plus an additional charge of $0.0769 applied to the total proposed living space area of the dwelling. Formulas for Non-Res idential Development Non-Assessable System Valuation (Value of existinq + Value of planned) -- Cost per unit of capacity Build-out capacity (mgd) Per unit of capacity X flow per PFU for development type X number of PFUs for development = SDC for development Calculations for Non-Residential Development $107,220M + 10,570M = $2.4039 per gallon per day 49.0 mgd $2.4039 X Gallon per PFU (varies by development type) X Number of PFUs = SDC for development 1.4 Stormwater System Cost of Service: General Fo rmulas SDC eligible costs = Unit cost per square foot of Total additional impervious impervious surface area surface area within UGB (sq. ft) Reimbursement: $11,716,341 = $0.0752 per sq. ft. 155,770,560 sq. ft. impervious surface area Improvement: $12,900,968 = $0.0828 per sq. ft. 155,770,560 sq. ft. impervious surface area Total Unit Cost per Sq. Ft. Impervious Surface Area = (Reimbursement + Improvement) = $0.0828 + $0.0752 = $0.158 1.5 Parks System Cost of Service: General Formula: Cost per person X Persons per household = Cost per EDU Calculatio n: $584.63 X 2.3 = $1,344.65 (per EDU) 2.0 Adopted SDC Fee Schedule: Current Rates 2.1 Transportation System: Cost per trip $1,452.30 2.2 Local Wastewater System: Residential dwelling unit base fee $317.32 Residential dwelling unit total living a~ea multiplication factor $0.0769 Non-Residential rate per gal/day per land use type per PFU Varies 2.3 Regional (MWMC) Wastewater System: Residential dwelling unit $947.34 Non~Residenti al rate per gal/day per land use type per FEU Varies Unit Cost by Component Average Daily Flow (per gallon) $0.449 Peak Wet Weather Flow (per gallon) $0.467 Biochemical Oxygen Demand (per pound) $876.610 Suspended Solids (per pound) $665.753 2.4 Stormwater System: Small Residential (building footprint _< 1,000 sq. ft.) $284.40 Medium Residential (building footprint > 1,000 sq.ft, and < 3,000 sq. ft.)$458.20 Small Duplex (unit building footprints _< 1,000 sq. ft.) $568.80 Medium Duplex (unit building footprints >1,000 sq. ft. and < 3,000 sq. ft.) $916.40 Manufactured Home Park Per space (assumes 1,684 sq. ft. per space) $266.07 plus Per sq. ft. actual impervious surface area, addt'l common areas $0.158 All Other Development Per sq.ft, actual impervious surface area and/or equivalent $0.158 2.5 Parks System: Total charge per person $584.63 Total charge per Dwelling Unit (2.3 persons x $584.63) $1,344.65 2.6 Administration Fees: City of Eugene if based on percentage 5.0% City of Eugene if based on flat rate $60.00 MWMC per permit application $10.00 2.7 Appeal Fee: City of Eugene per SDC appeal $100.00