HomeMy WebLinkAboutResolution No. 4827 COUNCIL ~SOLUTION NO. 4827 A RESOLUTION ADOPTING AN INFLATIONARY ADJUSTMENT OF SYSTEMS DEVELOPMENT CHARGES FOR LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND TRANSPORTATION SYSTEM; S[IPERSEDING ADMINI[STRATIVE ORDER 58- 04-04-F; AND AMENDING RESOLUTION NO. 4740. PASSED: 8~ REJECTED: OPPOSED: ABSENT: CONSIDERED: ~larch 7, 2005 RESOLUTION NO. 4827 A RESOLUTION ADOPTING AN INFLATIONARY ADJUSTMENT OF SYSTEMS DEVELOPMENT CHARGES FOR LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM~ AND TRANSPORTATION SYSTEM; SUPERSEDING ADMINISTRATIVE ORDER 58-04-04-F; AND AMENDING RESOLUTION NO. 4740. The City Council of the City of Eugene finds as follows: On September 23, 2002, the System Development Charges (SDC) Methodologies were adopted by Resolution No. 4740. B. Resolution No. 4740 has subsequently been amended by Resolution Nos. 4748, 4767, 4768, 4770, 4794 and 4795. Resolution No. 4793 dated June 28, 2004, adopted the MWMC Facilities Plan 20-year project list. In addition, inflationary adjustments of Systems Development Charges for Local Wastewater System, Stormwater System, and Transportation System were adopted by Administrative Order No. 58-04-04-F, effective April 5, 2004. C. Based on the national 20-city average Construction Cost index as published by the Engineering News-Record, it is necessary to amend portions of the Systems Development Charges by implementing a 6.5% inflationary increase for Local Wastewater System, the Stormwater System, and the Transportation System. Section 2.4 of the SDC Methodologies requires that revisions to fees by more than five percent shall be established by resolution of the Council. D. These inflationary adjustments to the Systems Development Charges are in conformity with applicable state law, authorized by EC 7.710(5) and Section 2.4 of the Methodologies, and should be implemented effective April 18, 2005. NOW, THEREFORE, based upon the above findings~ BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. Portions of the Systems Development Charges are mnended by implementing a 6.5% inflationary increase to the Local Wastewater System, the Stormwater System~ and the Transportation System, as set forth in Exhibit A attached hereto. Section 2. Administrative Order No. 58-04-04-F is superseded, and Resolution No~ 4740 is amended as described in Section 1, as of the effective date of this Resolution. Section 3. The City Recorder is requested to append a copy of this Resolution to Resolution No. 4740 and a copy (without its attachments) to Administrative Order 58-04-04-F. Resolution No 4827 - Page 1 Section 4. This Resolution shall become effective on April 18~ 2005. The foregoing Resolution adopted the 7th day of March~ 2005~ City Record~er Resolution No 4827 - Page 2 EXHIBIT A CITY OF EUGENE ENGINEERING DIVISION o£ the ?UBLIC WORKS DEPARTMENT Systems Development Charge Methodologies April 18, 2004 Superseding Admimstrative Order No. 58-04-04-I: and Amending Resolution No. 4740 The Jul), 12, 2004 SDC Methodologies document remains m effect except as art, ended by this document TABLE i SUMMARY OF LOCAL SYSTEMS DEVELOPMENT CHARGES (See Appendix C-2 for information regarding the Regional Wastewater SDC) Transportation Wastevcater Local (City) Stormwater Parks Cost per Tnp = $1,452 30 Cost per new resldenbal umts (e g, Total stormwater unit cost per sq fl Cost per Dwelhng Unit = smgle-famdy, mobile home parks, of ~mperv~ous surface Area = $1,344 65 duplexes apartments) = a base $0 158 Charges are based on use rate of $317 32 plus $0 0769 per 1-2 Famdy development under square foot of hvmg area 3,000 sq ft have t~ered rates based Residential add*tlons wdl be on est imp surface areas 1-2 charged $0 0769 per square foot of Famdy over 3,000 sq ft and Mulb- ~ncreased hwng area Famdy & Nonres~denbal are based Nonresidential uses = $2 4039 per on actual ~mp surface area gallon of daily flow/d~scharge Charges for Mfg Home Parks are based on est ~mp surface area per space plus actual ~mperv~ous surface area of additional common area Estimated costs of arterial/collector Estimated non-assessable cost of Estimated non-assessable cost of Umt costs for various components Street system (non assessable ex~stmg system using costs from system-wide capacity from future cost per lane-m~le, costs of "Gravity Sewer L~nes System capacity-enhancing projects as mtersecbons, traffic s~gnals, street Valuation Model" developed by contained m the Stormwater SDC hghts, structures) and off street CH2M H~ll Charges are net of all Project List and available e×~stmg b~cycle paths federal grants and outstanding stormwater system capacity debt Existing levels of service for Design flow standards currently Design standards currently used by Existing levels of serwce for vanous components as established used by the city for various land the City to handle a F~ve-year various components, as by current C~ty transportabon use types PFUs equivalents are storm estabhshed m Eugene Parks & design standards determined per Oregon adopted Recreation Plan Plumbing Code Street Component Reimbursement fee Reimbursement fee Improvement fee ~ ~ I~ 40%,mpr Fee ~ 84% ~- 47% 1~ 60% Relm Fee B~ke Component Improvement fee Improvement fee I~ 100% Impr Fee i~ 16% ~,' 53% Charges for new or expanding New or expanding resldenbal uses Charges for new (all) or expanding Charges are based on a flat rate development are based on the cost are charged based on a per (Mulb-famdy, Nonresidential} per dwelling umt for all types of per tnp t~mes the trip rate assigned dwelhng umt cost plus a rate per development are based on residential development There ~s for a specific development type square foot of hwng area Non- estimated or actual ~mperv~ous no charge for commercial t~mes the number of umts of res~denbal uses are charged based surface areas and the total development measurement proposed on the number of PFUs at a rate stormwater umt cost per square for the specific development type foot Stormwater ~mpact not Credit for past trunk sewer levy attnbutable to impervious surface payments wdl be apphed to the area will be charged based on local charge equivalent surface area and the total stormwater umt cost per square foot Note Administration costs are not included in the figures above, see section 2 3 1 for more information TABLE 5 Transportation System Development Charge Analysis + TABLE 6 Loca~ Wastewater System Development Charge Analysis I1. Analysis of System Va~ue Total Replacement Cost - P,pe $442,201,138 Total Replacement Cost w Pumping Stations $16,880,966 C~ty Cost of future projects within UGB $10,570,479 Other Wastewater Components $3.464.930 12. Analysis of Assessable Amount Size Total Cost 6-inch $10,047,301 8 to 48-inch $334,334,053 Total Assessab~l~ Cost ,, ' .... I "$ ,:~4,t~8't,3S3 3. Capacity Information Tota~ City system capacity , , t4. Calculation of Wastewater SDC Total System Valuation, existing and planned $473,117,534 Cost per unit of capacity per 9allon $2.2572 Res. Mentiat Rate Structure .......... $317,32 per RDU,+,$0.0769 per. NomRes~dentia~ Rate Structure J See Table 7 15. Calculation of Reimbursement Percentage City System Capacity (EDUs) in mgd 49 0 100 00% Existing Use in mgd 21.4 43.7% Percent Available for New Development in mgd 27 6 56.3% Total Value of Reserve Capacity (value of system) $66,160.201 100 00% Va~u,e of, increased ,Capacity (cost of flJtu,r,e, projects UGB- Master Plar~) $I 0,570,357; ,. 15.98% Va~ue of Reimbursable Capacity (previously paid value-existing users) $55,589,842- 84.02% TABLE 7 Local Wastewater Plumbing Fi×tare Unit Rates ~ne Loca~ Cos~ per PF{J Wastewater SDC Descfipt~or~ Average D~y Ftow per _ (F{ow per PF[J x Use Code* PFU $2,4039'} I'F SinCe-Family / Duplex Hous'mg $317 32 + (Sq Ft Living Area x $0 0769) 1× Mixed Use w~th Residential $3'~7 32 + (Sq Ft Living, Area x $0 0769) 11 Mulb-Fam~ly Housln9 $317 32 + (Sq Ft Living Area x $0 0769) 12 A, B, & C Elderly Housing Attach, Detach, & Group/Ret, rement Home $317 32 + (Sq Ft Lwln9 Area x $0 0769) 13 Residential Hotel $317 32 + (Sq Ft L~vin9 Area x $0 0769) 14 Mobile Home Park $317 32 + (Sq Ft L~vmg Area x $0 0769) 15 Hotels, Motels, Lodgm9 19 05 $45 79 21 Beverage/Food Mf9 39 87 $95 84 24 Wood Products 47 93 $115 22 2X Light Mfg/Printing 56 62 $136 11 3X Manufacturing 58 65 $140 99 4X Transportation & U~lilt~es 18 22 $43 80 41 F~re Station 7 75 $18 63 51 Wholesale Trade 21 37 $51.37 54 Retail Trade / Grocery 55 46 $133 32 55 Retail Trade Automotive 7 83 $18 82 59 Retail Trade Other 39 91 $95.94 5A Restaurant - Fast Food 25 44 $61 16 5B Restaurant - Low to Med Turnover 62 47 $150 17 5C Restaurant - H~gher Turnover 22 45 $53 97 5D Dnnkmg Establishments 54 98 $132 17 5E Take/Bake & Pick Up/Delivery Establishments 26 49 $63 68 5X Retail Trade / Clothing & Dry Goods 12 35 $29 69 61 Financial Offices / Banks 16 99 $40 84 62 Other Services 28 51 $68 54 63 Rental/Storage Serv,ces 6 49 $15 60 64 Automobve & Other Repair Services 16 17 $38.87 65 Medical Services 28 75 $69 11 66 Construcbon Trade Serwces 13 69 $32 91 67 Government Services, Office/Business Parks Based on specific use of development 68 Education / Cultural 15 66 $37 65 69 Churches/Ctubs/Orgamzations 15 70 $37 74 6A1 Laundry Services (Linen, Umform) 538 96 $1,295 61 6A2 Laundry, Self-Service 299 64 $720 30 6A3 Dry Cleaning Serwce (w,th or w/out laundry services) 36 30 $87.26 6B Car Wash 264 54 $635 93 6X Professional/Real Estate/insurance 67 76 $162 89 7X Entertainment, Recreation & Sports 88 42 $212 55 82 Veterinarian Service 24 79 $59 59 *The unit cost of capacity for the local wastewater system is $2.4039 per gallon per day. The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use Land use types that do not fit into the above categories wdl receive a default flow assignment based on the sample average The default flow ~s 47.93 gal/day x $2 4039 = a cost per PFU of $115 22 rate per PFU may be assigned by the C~ty Engineer should a proposed use not be represented by one of the pubhshed SDC use codes and for which a default flow assignment is not representative of the proposed flow In the case of those proposed developments that are determined to have a potential for exceptional water usage, the C~ty Engineer may require that the Owner(s) enter into an agreement w~th the City to review water usage or wastewater discharge at such time the development is ~n full use or producbon as the final basis of the local wastewater SDC A complete hst of wastewater SDC/HUD BPR use codes is prowded ~n Table 8 TABLE 9 Stormwater Drainage Systems Development Charge Analysis 11~ E×istir~g Stormwater Drainage System Value & SDC-El~gib~e Costs (Re~mb~rseme~ Fee)~ Total Replacement Cost - Ex~sting P~pe System $237,226,864 Total Replacement Cost - Existing Open Channel Systems $67,809,958 To~I Replacement Cost~ ~x~sting (Replacement C~t N~) $305,~36,822 Percent of Existing Pipe System to be Used by New Development 4~27% Percent of Existing Open Channel system to Used by New Development 2 34% Total SDC-Ehgible Cost- Exlsbng P~pe* $10,129,588 Total SDC-Eligible Cost- Ex~sting Open Channel Systems* $1,586,753 To~I SDC-Etigible C~t, Existing System 2, Future S~ormwater System SDC-El~gible Project Costs (Improvement Fee}~ Total Est. Cos~ Future System (8DC-Eiicble Project) {From Tab~ ~3} $28,92~882 ~3. Stormwater System Calculation Details ~ Single-Family Dwelhng (SFD), estimated average impervious sudace area Small Residential ~bu~ldmg footpnnt %1,000 sq ff ) 1,800 sq ~. Medium Residential (building footpnnt >1,000 sq ~ and < 3,000 sq ff ) 2,900 sq ~. Mfg, Home Park Space, estimated average ~mpervious sudace area 1,780 sq. ~ ~4. Calculation of SDC* ~ Unit Cost per Square Foot, improvement Fee [$12,900,968 / I55,770,560J $0 0828 (53%) Unit Cost per Square Foot, Reimbursement Fee [$~ 1,716,341 / 155 770,560] $0 0752 (47%) Small Residential SDC (bu~tdmg footprint ~ 1,000 sq ff ) [1,800 sq. ~ x $0 158] $284 40 Medium Residential SDC (budding footpnnt>l,000sq ff and <3,000sqff) [2,900sqffx$0 158] $458.20 Small Duplex SDC (umt building footprints % 1,000 sq ff ) [$284.40 x 2] $568 80 Medium Duplex SDC (unit building footpnnts >1,000 sq ff and < 3,000 sq ~ ) [$458 20 x 2] $916.40 Mfg. Home Park SDC per Space (potion of total charge) [1,684 sq ff x $0.158] $266 07 *See Appendix F for complete rate schedule TABLE 10 City of Eugene 2003 Stormwater SDC-Eligible Project List P~'oject Name Estimated P~oject Cost To~a~ SDC.Eli§~b~ Cost Martin Drive Pipe improvements (02-07 CIP) $103,304 $103,304 Mt Cavalry Pipe Improvements $847,759 $206,212 Frederick Court Pipe Daylight $131,407 $80,447 43rd Avenue Pipe Improvements $2,394,319 $766,182 Morse Park Ranch Park P~pe Improvements $1,171,334 $128,847 Laurelwood Flood Control Fac/P~pe Imps $2,230,920 $334,638 Jackson Street P~pe Improvements $85,975 $21,494 Windsor Circle Pipe Improvements $1,020,821 $656,242 West Hawkins Lane Water Quality Facility $694,580 $562,279 Bell Avenue (increase Pipe Sizes Along) $882,638 $406,013 Empire Park Pond Retrofit $427,656 $85,531 Royal Node Stormwater Infras[ructure $1,555,113 $1,555,113 Greenhl[I Tributary Storm Improvements Ph 2 $4t 5,437 $141,626 Greenhill Tributary Water Quality Fac~hty $831,763 $249,529 Roosevelt Chanr~el- Culvert Improvement $150,957 $47,671 A~1 Mare Channel Culvert & Open Waterway Improvements $571,837 $91,494 Lynnbrook Drive Open Waterway & Culvery Improvements $535 847 $160,754 Spring Creek Bridge Construction & Waterway Improvements $154,734 $35,589 Sanders Street Water Quality Facility $830,097 $41,505 Spring Creek Drive Water Quality Fac~hty $262,814 $52,563 Kirsten Street Pipe Improvements $425,434 $123,376 Hunsacker - Open Channel Improvements (02-07 ClP) $442 096 $265,480 Lenox/Salty - Culvert Replacement (02-07 CIP) $191,057 $114,412 Hunsacker Culvert Replacement (02-07 CIP) $28,881 $17,773 Div~sion Avenue Tip-Up Pipe Replacement $12 108 $2,785 lrwngton Drive Water Quality Facility $726 237 $101 673 St Peter School Culvert Replacement $60,650 $18,195 River Point Pond Outlet Channel $414,660 $170,011 GiIham Road System Culvert Replacement $29,991 $29,991 Gllham Road System Water Quality Facl[~ty $726,349 $72,635 Ascot Park Open Waterway Mod~ficabon $80.200 $52,932 3rd-4th Connector Stormwater improvements (02-07 CIP) $133,295 $133,295 Beaver St & Hunsaker Ln Stormwater Improvements $55,540 $55,540 Greenhdl Rd Stormwater Improvements $111.080 $111,080 Irvtngton Dr~ve - Stormwater (02-07 CIP) $111,080 $111,080 Kinney Park Flow Diversion & Restoration $688,693 $509,633 R~ver Road - Stormwater (02-07 CIP) $55 540 $55,540 Royal Ave, Terry to Greenhill $111,080 $111,080 Services for New Development ($100,000/year) $3,776,703 $3,776,703 Streambank Stabilization ($ vanes/year) $5,442,898 $1,360,724 Appendix F Local System Formulas & General Fee Schedule Formula and Calculation Detai~s General Rate Setting, Cost of Service Formula SDC eligible costs = SDC per unit of service Impact measurement Transportation System Cost of Service consists of non-assessable arterial and collector street system cost of service plus off-street bicycle cost of service '~.2.~ Non-Assessable Arterial & Collector Street System Cost of Service Genera~ Formula Non-Assessable Cost per Lane Mile X Lane Miles per trip = Cost per trip Calculation Street System Cost per Trip Reimbursement: $906,694 X (0.8888/675) = $1,193~88 = Cost per Trip Improvement. $1,079,256 X (0.8888/675) = $1,421.10 = Cost per Trip Total Allocated Cost per Trip = $1,193 88 (0.4) + $1,421.10 (0.6) = $1,330 21 1,2.2 Off-Street Bicycle path Cost of Service Genera~ Form[~ias Miles of bicycle paths per person X Cost per miles = Cost per person Cost per person, Bicycle Paths = Cost per trip # of Trips per person Calculations Path Lighting + Path Section ($14.18) + ($95,09) = $109.27 (per person) $109.27 = $122.09 (per trip) 0,895 1.3 Wastewater System Cost of Service: 1.3.1 Loca~ Wastewater System Cost of Service Determination of F~ow Estimation Formula for Residential Development Graphical comparison of water consumption per month to square foot of living area resutts in a s~ope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 9aliens per month. 8000 ~/ 6000 5000 Gaflons per Month 4000 3000 2OO0 1000 7 370 1195 1977 2780 4000 0 816 1585 2382 3280 Total Area Liwng Space Prolected Sampled Actual Data Base Flow I. tercept, 3,946 Slope 0.951 gal/motsq ft GaL / Month GaL / Day (GPD) 132 Days per IVIonth 30 --30 day Cost per Gal~Day $2,4039 Slope / 30 Days 0.032 Base Charge = $317.32 Cost per Gal/Day $2~4039 GPD x Cost per Gal, Cost per sq Dally usage ~ctor x Cost per $0.0769 GaL The implementation of this rate structure results in each new single family dwelling being charged a local wastewater SDC that is comprised of a base rate of $3t7.32 plus an additional charge of $0.0769 applied to the total proposed living space area of the dwelling, Formulas for Non-Residentia~ Development Non-Assessable System Valuation (Value of existinq + Value of planned) = Cost per unit of capacity Build-out capacity (mgd) Per unit of capacity X flow per PFU for development type X number of PFUs for development = SDC for development Calculations for Non-Residential Development $107,220M + 10,570M = $2,4039 per gallon per day 49.0 mgd $2.4039 X Gallon per PFU (varies by development type) X Number of PFUs = SDC for development 1,4 Stormwater System Cost of Service: General Formulas SDC eligible costs = Unit cost per square foot of Total additional impervious impervious surface area surface area within UGB (sq. ft) Reimbursement: $11,716,341 = $0.0752 persq, ff. 155,770,560 sq. ff. impervious sur~ce area improvement; $12,900,968 = $0.0828 per sq. ft. 155,770,560 sq. ft. impervious surface area Total Unit Cost per Sq. Ft. Impervious Surface Area = (Reimbursement + improvement) = $0.0828 + $0~0752 = $0.t58 1.5 Parks System Cost of Service: General Formula: Cost per person × Persons per household = Cost per EDU Calculation: $584.63 X 2.3 = $1,344.65 (per EDU) Adopted SDC Fee Schedule: Current Rates 2.1 Transportation System: Cost per trip $1,452.30 2.2 Loca~ Wastewater System: Residential dwelling unit base fee $317.32 Residential dwelling unit total living area multiplication factor $0.0769 Non-Residential rate per gal/day per ~and use type per PFU Varies 2.3 Regional (MWNIC) Wastewater System: Residential dwelling unit $947.34 Non-Residential rate per gal/day per land use type per FEU Varies Unit Cost by Component Average Daily Flow (per gallon) $0,449 Peak Wet Weather Flow (per gallon) $0.467 Biochemical Oxygen Demand (per pound) $876.610 Suspended So~ids (per pound) $665.753 2,4 Stormwater System: Small Residential (building footprint _< 1,000 sq ft ) $284.40 Medium Residential (building footprint > 1,000 sq ft. and < 3,000 sq. ft,) $458.20 Smalt Duplex (unit building footprints _< 1,000 sq, ft ) $568.80 Medium Duplex (unit building footprints >1,000 sq. ft and < 3,000 sq ft ) $916.40 Manufactured Home Park Per space (assumes 1,684 sq ft per space) $266.07 Per sq. ft. actual impervious surface area, addt'l common areas $0.158 All Other Development Per sq.ft, actual impervious surface area and/or equivalent $0.158 2,5 Parks System: Total charge per person $584,63 Total charge per Dwelling Unit (2 3 persons x $584 63) $1,344.65 Administration Fees: City of Eugene if based on percentage 5.0% City of Eugene if based on flat rate $60.00 MWMC per permit application $10.00 2.7 Appea~ Fee: City of Eugene per SDC appeal $100.00