HomeMy WebLinkAboutOrdinance No. 20570
COUNCIL ORDINANCENO. 20570
COUNCIL BILL 5160
AN ORDINANCE CONCERNING EROSION PREVENTION
AND AMENDING SECTIONS 6.406, 6.625, 6.630, 6.635, AND
6.640 OF THE EUGENE CODE, 1971.
ADOPTED:December 12, 2016
SIGNED:December 19, 2016
PASSED:8:0
REJECTED:
OPPOSED:
ABSENT:
EFFECTIVE: January 19, 2017
ORDINANCE NO. 20570
AN ORDINANCE CONCERNING EROSION PREVENTION AND
AMENDING SECTIONS 6.406, 6.625, 6.630, 6.635, AND 6.640 OF THE
EUGENE CODE, 1971.
THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS:
Section 1.
The following definitions in Section 6.406 of the Eugene Code, 1971,
are amended to provide as follows:
6.406 Definitions
. For purposes of sections 6.401 through 6.645, unless the
context requires otherwise words and phrases shall have the meaning
ascribed to them. In interpreting the meaning of words in a definition, other
definitions of that word in this Code may be considered:
City stormwater system
. Those stormwater facilities located on city-owned
property, city right-of-way, city easements and any stormwater facility the city
is contractually or legally obligated to operate and maintain, including but not
limited to:
(a) An open drainage way, headwater stream, creek, wetland, spring, or
pond, including those not maintained by the city which drain onto city-
owned property or into city maintained facilities;
(b) A pipe or sewer and its related appurtenances that convey stormwater
and have been designed and constructed expressly for use by the
general public and accepted by the city;
(c) Streets, curbs and gutters and other surfaces in the public way which
are designed to carry stormwater, roadside drainage ditches along
unimproved city streets but not access drive culverts; and
(d) Flood control and stormwater quality facilities (levees, dikes, overflow
channels, conveyance swales, infiltration facilities, stormwater facilities,
water quality facilities, detention basins, retention basins, dams, pump
stations, groundwater recharge basins, sediment basins, vegetated
buffers, wetlands, etc.) that have been designated, and constructed
expressly for use by the general public and accepted by the city.
Construction related materials
. Potential water quality pollutants that are
used or created during construction activities including, but not limited to, off-
site deposits of sediments by vehicles (e.g., tracking, spilling), building
material wastes (e.g., scrap metals, rubber, plastic, glass, masonry, wood;
paints and thinners; packaging materials; insulation, plaster grout);
hazardous substances (e.g., petroleum products, cleaning solvents, chemical
Ordinance - Page 1 of 7
additives, concrete curing compounds, acids for cleaning masonry surfaces,
paints, thinners); and concrete washout.
Construction site management plan (CSMP)
.A set of maps, data,
drawings, specifications and narrative that describes expected runoff from
new construction sites, and establishes best management practices or
equivalent measures to be taken for preventing erosion and controlling
sediments, surface runoff and other pollutants from construction activities.
For purposes of sections 6.401 through 6.645, the CSMP serves as the City
(ESCP) required by the Oregon Department of Environmental Quality and
the Stormwater Pollution Prevention Plan (SWPPP) required by the United
Stated Environmental Protection Agency.
Dewatering
. The removal and disposal of surface water or groundwater
during construction or for the purpose of facilitating construction.
Jurisdictional wetland
. An area that is inundated or saturated by surface or
ground water at a frequency and duration sufficient to support, and which
under normal circumstances does support, a prevalence of vegetation
typically adapted for life in saturated soil conditions. Wetlands include
swamps, marshes, bogs and similar areas. Any parcel or portion of a parcel
which meets the state or federal definition of wetlands that are under the
jurisdiction of state or federal laws. Synonymous with "wetland."
Minor recurring activities
. Repetitive minor construction, maintenance and
operational activities on existing infrastructure that are performed as part of
an overall work plan or program when no individual disturbance exceeds
more than 500 square feet of land area and 50 cubic yards of fill or
excavated material. Examples include, but are not limited to, connections
and extensions of utility service, repair of utility and infrastructure facilities,
Stormwater facilities.
Any structure or configuration of the ground that is
used or by its location becomes a place where stormwater flows or is
accumulated including but not limited to pipes, sewers, curbs, gutters,
manholes, catch basins, ponds, open drainage ways, runoff control facilities,
water quality facilities, wetlands and their appurtenances.
Stormwater related natural resource areas
. Areas located within or
adjacent to the city's stormwater system, such as waterways, wetlands,
conservation zones or easements and riparian areas, which, due to their
location, topography, vegetation, or other factors provide one or more of the
following stormwater functions: flood control, streambank stabilization and
water quality treatment, including pollutant removal, shading and temperature
stabilization.
Ordinance - Page 2 of 7
Wetland
. An area that is inundated or saturated by surface or ground water
at a frequency and duration sufficient to support, and which under normal
circumstances does support, a prevalence of vegetation typically adapted for
life in saturated soil conditions. Wetlands include swamps, marshes, bogs
and similar areas. Any parcel or portion of a parcel which meets state or
federal definition of wetlands that are under the jurisdiction of state or federal
laws. Synonymous with "jurisdictional wetland."
Section 2.
Section 6.625 of the Eugene Code, 1971, is amended to provide as
follows:
6.625 Erosion Prevention - Purpose
. Sections 6.625 to 6.645, and the rules
issued thereunder, are intended to restrict the discharge of sediments or
other construction related materials, including hazardous substances as
defined in section 6.340, into the city's stormwater system in order to:
(a)
Prevent or minimize, to the maximum extent practicable, negative
impacts to adjacent properties, water quality, and stormwater related
natural resource areas resulting from construction activities; and
(b)
Maintain the capacity of the city's stormwater system by minimizing
sedimentation.
Section 3.
Section 6.630 of the Eugene Code, 1971, is amended to provide as
follows:
6.630 Erosion Prevention - Applicability and Compliance
.
(1)
Scope. The provisions of sections 6.625 to 6.645, and the rules issued
thereunder, apply to all construction activities that result in any one or
all of the following:
(a) Land disturbance, including, but not limited to clearing, grading,
grubbing, logging, excavating, filling, and storing of materials;
(b) Structural development or demolition, including, but not limited to
buildings, bridges, roads, and other infrastructure;
(c) Impervious surfaces, including, but not limited to parking lots,
driveways, walkways, and patios; or
(d) Dewatering.
Notwithstanding the foregoing, the following activities shall be exempt
from the provisions of sections 6.625 to 6.645: (I) actions by a public
utility, the city, or any other governmental agency to remove or alleviate
an emergency condition, restore utility service, or reopen a public
thoroughfare to traffic; or (ii) actions by any other person when the city
determines, and documents in writing, that the actions are necessary to
Ordinance - Page 3 of 7
remove or alleviate an emergency condition, restore utility service, or
reopen a public thoroughfare to traffic.
(2)
Compliance. Regardless of whether a permit is required under section
6.635, no person shall engage in any construction activity covered by
subsection (1) in a manner that can potentially impact water quality,
adjacent properties or stormwater related natural resource areas except
as allowed by this code. All persons shall implement erosion
prevention and sediment control measures designed to meet the
outcomes established in administrative rules promulgated by the city
manager. Failure to meet those outcomes shall subject the person to
the same enforcement provisions as those applicable to a permit holder
under section 6.640.
Section 4.
Section 6.635 of the Eugene Code, 1971, is amended to provide as
follows:
6.635 Erosion Prevention - Permits
.
(1)
Erosion Prevention Permit.
(a) Permit required. Except as otherwise provided in subsection (3)
below, no person shall commence any construction activity
without first obtaining from the city one of the erosion prevention
permits listed in subparagraph (b) if the construction activity:
1. Disturbs one or more acres of land by one or more phases of
development, and the disturbance is located on the same
parcel of land or on contiguous parcels of land under the
same ownership;
2. Is located in a sensitive area. The criteria for classifying
sites, and the classification of such sites as sensitive areas
shall be established in administrative rules issued by the city
manager; or
3. Disturbs more than 5,000 cubic feet of material during one or
more phases of development.
(b) Permit classifications. The city manager may issue the following
types of permits, either of which will meet the requirements of
subsection (a) of this section:
1. Individual permit. A person, property owner or easement
holder of record may obtain an individual permit for each
construction activity on the same development site (as
defined at EC 9.0500), or for multiple construction activities
proposed in connection with a development project on the
same development site, including utility work, public
improvements, private infrastructure, structures, and other
site improvements.
Ordinance - Page 4 of 7
2. Annual permit. A person, property owner or easement
holder of record may obtain an annual permit for minor
recurring activities occurring on one or more development
sites.
(c) Application. The application for an erosion prevention permit shall
be accompanied by:
1. Fee. A fee established by the city manager pursuant to
section 2.020 of this code in an amount sufficient to recover
the city's administrative costs.
2. Construction site management plan for individual permits. A
construction site management plan prepared by a certified
professional(s) designated by the manager in rules adopted
hereunder. The construction site management plan need
not be prepared by a certified professional if the
development is one (1) single family dwelling or one (1)
duplex dwelling. The approved construction site
management plan shall be kept at the construction site and
available for on-site inspection purposes. The construction
site management plan shall identify: potential water quality
impacts associated with the proposed construction activities;
techniques and methods to be used to prevent and control
erosion, sedimentation, and other pollutants associated with
construction activity; and the location, design, and
construction schedule for all erosion, sedimentation, and
other construction site management control measures to be
implemented and maintained.
3. Work, scope and practices for annual permit. No
construction site management plan shall be required for an
annual permit. Instead, the applicant shall provide a
narrative description of the scope of work to be performed
and the practices employed for meeting the requirements of
sections 6.625 to 6.645 of this code. A copy of the annual
permit and narrative shall be kept at the site and available
for on-site inspection purposes.
(d) Review and Issuance. The application for the erosion prevention
permit shall be reviewed by the city and approved, approved with
conditions, or denied, based on criteria set forth in rules adopted
by the city manager. The criteria to be adopted shall be designed
to achieve the objectives listed in section 6.625. Issuance of an
erosion prevention permit may be subject to conditions imposed
by the city including, but not limited to, specific erosion and
sedimentation prevention measures and schedules.
(e) Permit Duration.
1. An individual erosion prevention permit shall remain in effect
for the full period of the construction activity. The manager
may extend the duration of the permit for a period of up to,
Ordinance - Page 5 of 7
but not to exceed, two years after completion of the
construction activity if the manager determines the extension
is necessary to ensure that the construction activity has
stabilized in accordance with the outcomes identified in the
administrative rules.
2. Annual permits may be issued for a full calendar year, and
shall expire on or before December 31 of the year issued.
Annual permits may not be extended.
(2)
Appeal. Within the time and in the manner prescribed in section 2.021
of this code, the owner or applicant for a permit may appeal:
(a) The denial of a permit;
(b) Any conditions imposed on a permit;
(c) The determination that the property is located in a sensitive area;
or
(d) The denial of an extension of the duration of an individual permit
under section 6.635(1)(e).
(3)
Waiver of Erosion Prevention Permit. Notwithstanding any other
provisions of this section, the following activities shall not require an
erosion prevention permit:
(a) Construction activities involving the disturbance of less than 500
square feet of land surface area, or which consist of the
excavation and/or fill of less than 20 cubic yards of material;
(b) Issuance of permits and/or approvals for land divisions, interior
improvements to an existing structure, or other approvals for
which there is no physical disturbance to the surface of the land;
and
(c) Annual landscape maintenance activities on fully developed
properties, necessary to maintain the existing developed
landscape.
This waiver applies only to the requirement to obtain an erosion
prevention permit and shall not be construed as an exemption from any
of the erosion prevention requirements of the Eugene Code, including
but not limited to erosion prevention and sediment control measures
designed to meet the outcomes established in administrative rules
promulgated by the city manager.
Section 5.
Section 6.640 of the Eugene Code, 1971, is amended to provide as
follows:
6.640 Erosion Prevention - Enforcement
.
(1)
Enforcement Policy. The primary focus of sections 6.625 to 6.645 is to
implement measures for preventing erosion and minimizing stormwater
impact that will meet the outcomes established in administrative rules
promulgated by the city manager, and the city will use the amount of
Ordinance - Page 6 of 7