EUGENE CITY COUNCIL
AGENDA ITEM SUMMARY
c
Action: Transfer of Water Pollution Control Facility Property from the City of Eugene to
the Metropolitan Wastewater Management Commission
Meeting Date: July 10, 2006
Department: Public Works
www.eugene-or.gov
Agenda Item Number: 4
Staff Contact: Peter Ruffier
Contact Telephone Number: 682-8606
ISSUE STATEMENT
The City Council is requested to approve the transfer of95.56 acres of City-titled property to the
Metropolitan Wastewater Management Commission.
BACKGROUND
The City of Eugene, City of Springfield, and Lane County entered into an agreement in 1977 for the
purposes of establishing the Metropolitan Wastewater Management Commission (MWMC). The
MWMC was established as an intergovernmental entity to "construct, operate, and maintain the
Regional Sewerage Facilities." MWMC provides regional wastewater collection and treatment to the
Eugene/Springfield metropolitan area.
The Regional Sewerage Facilities are located on the site of the original wastewater treatment plant
owned by the City of Eugene, which covered 62.5 acres. Additional acreage, primarily to the east of the
original site was required for the construction of the larger MWMC facilities, and these properties were
procured by the City of Eugene using regional wastewater funds under agreement with the MWMC.
During the procurement process, title to the property obtained for the regional wastewater facilities
vested in the City of Eugene. The titles to the original wastewater treatment plant property and the
additional purchased parcels within the boundaries of the current Eugene/Springfield Regional Water
Pollution Control Facility have never been formally transferred to the MWMC, which is the equitable
owner of the site, as evidenced by the history and funding of its acquisition and the funding of the
facility and as recognized in the underlying Intergovernmental Agreement updated by the cities and
Lane County last year. The full 95.56 acres of the site was considered in the original conditional use
permit (CUP) for the regional sewerage facility. The property includes the outfall to the Willamette
River in part of this area. The full area provides open space and access to the river as well as buffering
for the treatment plant. These will be factors considered in the modification of the CUP anticipated to
be reviewed later this year.
In May 2005, the council, by ordinance, approved a revised intergovernmental agreement (IGA) creating
the Metropolitan Wastewater Management Commission as an Intergovernmental Entity and defining the
duties and powers of the commission and the three parties to the IGA. The revised IGA provides, in
Section 3(b), that the parties will: "Facilitate the completion of the process of transferring ownership to
the Commission of the Existing Sewerage Facilities as defined in Appendix "A" Section VI. The
transfer of ownership process shall proceed in a timely manner as determined by the mutual agreement
LICMOl2006 Council Agendas1M0607101S0607104.doc
of the Commission and the Cities of Eugene and Springfield. The Transfer of ownership shall include
consideration of the following factors:
1. Original source of the funds for acquisitions, construction, maintenance, equipment replacement,
and major rehabilitation; and
2. Achieving equity among the regional sewer users within the Urban Growth Boundary."
Appendix A to the intergovernmental agreement specifies the Regional Sewerage Facilities as
including the Eugene/Springfield Regional Water Pollution Control Facility (WPCF) located at
410 River Avenue in Eugene.
At various times since 1978, staffs of the governmental partners to the MWMC have met to discuss the
process of transferring ownership to MWMC and address the considerations listed above. Ultimately, it
was concluded that equity could be achieved by the straightforward transfer of property titles to the
MWMC from both Eugene and Springfield, without fund transfers between the parties. This conclusion
is based upon the distribution of wastewater ratepayers between the two communities (approximately
2/3 from Eugene and 1/3 from Springfield), and that Springfield decommissioned its original wastewater
treatment plant and committed its 37 acres to the regionalization program. Therefore, compensation
from MWMC to the two cities for their property dedicated to the regional wastewater program would
involve wastewater rate revenues from both communities' ratepayers in the proportions stated above,
with roughly a zero net financial gain for either city.
The proposal for transfer of property has not come before the council previously because there has not
been a significant impact on the administration or operations of the regional wastewater program from
the status quo of ownership. Staff is recommending that the transfer of this property occur at this time in
order to facilitate the River Avenue Transportation Improvement project and related potential
assessments, as well as to provide clarity of ownership in support of the MWMC issuing bonds for
financing the approved wastewater Capital Improvement Program. Proposals to transfer title to the site
of the Springfield treatment plant and other regional facilities will follow as a package to complete the
property transfers described in the IGA.
The River Avenue project requires acquisition of additional right-of-way (ROW) for the transportation
improvements, and that cost is properly spread over the entire project, as is the cost of other right-of-
way acquisition for the project. The assessments would be levied to owners of property abutting the
improved portions of River Avenue, including the wastewater treatment plant. If the WPCF site is
transferred to MWMC at this time, the City will pay MWMC $184,250 for the additional right-of-way
needed for the project on the south side of River Avenue, and MWMC will then be assessed
approximately $465,000 (estimate) for its proportionate share of the project costs as the clear owner of
the treatment plant property. The intent of the property transfer and subsequent buy-back of the ROW
and easements is to relieve the City of the assessment associated with the portion of the road upgrade
project that abuts the wastewater treatment plant property. While the transfer of only the property
needed for right-of-way could occur prior to the transfer of title to the rest of the property, a piecemeal
transfer process would create a complex and potentially confusing record of ownership. In addition, the
intent of the 1977 IGA and subsequent updates was that MWMC will be the fee title owner of the entire
site.
The MWMC has programmed the anticipated assessment charges into future expenditures and the
transfer of road right-of-way in the future improvement planning. The project has allocated the expense
LICMOl2006 Council Agendas1M0607101S0607104.doc
of right-of-way into the project budget. If the council authorizes the transfer of the property to MWMC,
the dedication of street right-of-way would occur immediately thereafter. Additionally, the City will
retain easements for City facilities on the regional treatment plant site such as the bike path system and
the local River Avenue pump station.
RELATED CITY POLICIES
The Eugene Code states "the council may dispose of real property to any governmental entity without
hearing or notice" (EC 2.868).
COUNCIL OPTIONS
The City Council may:
1. Approve the transfer of95.56 acres of property to the Metropolitan Wastewater Management
Commission (MWMC) by Bargain and Sale Deed, contingent upon MWMC's agreement to convey
to the City the right-of-way needed to complete the improvements abutting the MWMC site on River
Avenue as well as easements necessary to support and maintain the bike path network within the
Willamette greenway; or
2. Approve the transfer of95.56 acres of property to the Metropolitan Wastewater Management
Commission (MWMC) by Bargain and Sale Deed, contingent upon MWMC's agreement to convey
to the City the right-of-way needed to complete the improvements abutting the MWMC site on River
Avenue and contingent upon the transfer of property by the City of Springfield to the MWMC
consistent with the intergovernmental agreement; or
3. Approve the transfer of approximately 1.5 acres of property associated with the River Avenue
Transportation Improvement project to the Metropolitan Wastewater Management Commission
(MWMC) by Bargain and Sale Deed, contingent upon MWMC' s agreement to convey to the City the
right-of-way needed to complete the improvements abutting the MWMC site on River Avenue; or
4. Re-open the intergovernmental agreement for the Metropolitan Wastewater Management
Commission and seek agreement with the other parties to the agreement to change the commitments
related to the transfer of property.
5. Direct staff to modify the property transfer to the MWMC.
CITY MANAGER'S RECOMMENDATION
The City Manager recommends that the council approve the transfer of approximately 95.56 acres of
property to the MWMC consistent with the Restated and Amended Agreement for the Metropolitan
Wastewater Management Commission and contingent upon the MWMC simultaneously executing street
deeds and easements conveying the right-of-way and easement rights needed for the River Avenue
Improvement Project.
SUGGESTED MOTION
Move to direct the City Manager to take the necessary steps to proceed with the transfer of
approximately 95.56 acres of City owned land to the Metropolitan Wastewater Management
Commission, contingent upon MWMC's agreement to convey to the City the right-of-way needed to
complete the improvements abutting the MWMC site on River Avenue.
LICMOl2006 Council Agendas1M0607101S0607104.doc
ATTACHMENTS
A. Aerial map illustrating the area of the proposed property transfer
B. Restated and Amended Agreement for the Metropolitan Wastewater Management Commission
C. Listing of tax lots to be transferred
FOR MORE INFORMATION
Staff Contact: Peter Ruffier
Telephone: 682-8606
Staff E-Mail: Peter.J.Ruffier@ci.eugene.or.us
LICMOl2006 Council Agendas1M0607101S0607104.doc
<:(
\-
eD
~
><
lLJ
.. .Ii
11
RESTATED AND AMENDED AGREEMENT
METROPOLITAN WASTEWATER MANAGEMENT COMMISSION
THIS RESTATED AND AMENDED AGREEMENT was entered into the 5'{.~ day of
J(,l(~, 2005 by the City of SPRINGFIELD and the City of EUGENE, municipal
corporatie'ns of the State of Oregon, and LANE COUNTY, a political subdivision of the
State of Oregon, herein referred to as Governing Bodies. The original Agreement dated
February 9, 1977, was previously amended January 4, 1978, February 16, 1982, July
19, 1991 and April 3, 1998 which amendments have been incorporated herein.
RECITALS:
1. The Governing Bodies have adopted the plan of land use development known as
the Eugene/Springfield Metropolitan Area General Plan and have designated in the plan
an Urban Growth Boundary within which urban services may be provided. The Urban
Growth Boundary includes the two Cities (urban lands) and certain unincorporated
areas surrounding the Cities which lies entirely within the County (urbanizable land).
2. The area within the Urban Growth Boundary, as now or hereafter designated, is a
metropolitan area because of its urban character and the close interrelationship
between the two Cities and all parts of the area. .
3. The urban character of the area makes high quality sewage treatment necessary.
4. Federal funding policy requires sewage treatment and disposal within the Urban
Growth Boundary to be provided on a unified, metropolitan basis.
5. In order to plan for sewerage on a unified basis within the Urban Growth Boundary,
the Cities and the County entered into an agreement January 8, 1974, establishing the
Metropolitan Sewer Advisory Commission.
6. The Cities have the authority under their charters to provide for all aspects of
sewerage, are providing it presently for parties within their respective boundaries, and
are concerned that it be provided adequately in their environs so as to prevent health
hazards.
7. The County, while not presently providing sewerage, has the authority under its
charter to do so, has extensive duties under state laws regarding public sanitation, and
is concerned about hazards to public health that arise from inadequate sewerage in the
area.
8. Under their Charters and the Oregon Revised Statutes, the Cities and County may
cooperate in providing sewerage and may enter into contracts to carry on that function
jointly or by transferring the function to one of the governmental units.
9. The Cities and the County are determined to provide sewerage on a unified basis
within the Urban Growth Boundary.
Restated and Amended Agreement- Page 1 of 9
June, 2005 (doc.102151)
10. In the parties' opinions, it is not convenient or desirable for anyone of them singly
to assume or be granted the responsibility for providing sewerage within the Urban
Growth Boundary. The parties do believe that a separate commission should be
established for that purpose.
11. The parties adopt this Agreement in compliance with ORS 190.010 and 190.085 to
create an intergovernmental entity with the powers described in ORS 190.080.
DEFINITIONS:
1. Bonds. Bonds, notes, loans and other borrowings of the Commission that assist
the Commission in carrying out the Facilities Plan.
2. CIP. The list of capital improvement projects that is included in the Commission's
annual budget and approved annually by the Governing Bodies.
3. Facilities Plan. The Commission's 2004 Facilities Plan as periodically updated
pursuant to Section 3.n of this Agreement.
4. Financial Plan. The Commission's 2003 Financial Plan as periodically updated
pursuant to Section 3.f of this Agreement.
5. Local Seweraae Facilities. All other publicly owned sewerage facilities within the
Urban Growth Boundary.
6. Metro Plan. The Eugene/Springfield Metropolitan Area General Plan as amended
from time-to-time.
7. Reaional Seweraae Facilities. That part of the sewerage system, as defined in
Appendix "A" of this Agreement, as it may subsequently be modified with the
concurrence of the Governing Bodies. The Commission has responsibility for the
Regional Sewerage Facilities.
8. Sewaae: The contents of a sewer.
9. Sewer. A conduit to carry off water and wastewater.
10. Seweraae. All or part of a system used for the collection, transmission, treatment
and disposal of sewage.
11. Urban Growth Boundarv. The Urban Growth Boundary is the projected geographic
area within which a full range of urban services will need to be extended or provided to
accommodate urban development as set forth in the Metro Plan.
AGREEMENTS:
1. Commission: The Metropolitan Wastewater Management Commission, herein
referred to as Commission, is hereby established as an intergovernmental entity
pursuant to ORS 190.010, 190.080 and 190.085 to function under the authority of this
Restated and Amended Agreement- Page 2 of 9
June, 2005 (doc.1 02151)
Agreement. The Commission replaced the Metropolitan Sewer Advisory Commission
effective February 9, 1977.
2. General Function: The Commission shall construct, operate and maintain the
Regional Sewerage Facilities. The Commission shall finance these facilities in
accordance with the Commission's Financial Plan. The Commission shall have all the
powers allowed to an intergovernmental entity under ORS Chapter 190, as it may be
amended from time to time, and any other statute that grants powers to such
intergovernmental entities for purposes of carrying out the Specific Functions set forth in
Section 3 of this Agreement.
3. Specific Functions: The specific functions of the Commission shall be to:
a. Construct, maintain and operate the Regional Sewerage Facilities.
b. Facilitate the completion of the process of transferring ownership to the
Commission of the Existing Sewerage Facilities as defined in Appendix "AU Section VI.
The transfer of ownership process shall proceed in a timely manner as determined by
the mutual agreement of the Commission and the Cities of Eugene and Springfield.
The transfer of ownership process shall include consideration of the following factors:
1. Original source of funds for acquisitions, construction, maintenance,
equipment replacement, and major rehabilitation; and
2. Achieving equity among regional sewer users within the Urban Growth
Boundary.
c. Salvage abandoned sewerage facilities.
d. Implement the Financial Plan and annual budget for the regional sewerage
facilities.
e. Recommend to the Governing bodies a schedule of sewer user charges and
system development charges for regional sewer services. The Commission's
recommendation shall separately set forth:
1. The rates and amounts that the Commission reasonably determines
are necessary to meet Bond covenants, and to achieve and maintain an unenhanced
credit rating of A for the Commission's Bonds from at least one nationally recognized
rating agency; and
2. Such additional rates and amounts that the Commission determines
are appropriate to adequately fund the actions necessary to perform the Commission's
functions under this Agreement.
Restated and Amended Agreement- Page 3 of 9
June,2005 (doc.102151)
,!
I
i
@
I
I
~
w
i
R.
1~:
f. Update the Financial Plan, as necessary from time to time, so as to provide
guidance for the generation of revenue sufficient for the Commission to fulfill its
functions under the Agreement. Any update of the Financial Plan shall be designed to
promote the following objectives:
1. Establishing revenue adequacy to provide for long-term health and
stability of the regional sewerage facilities through a program of monthly sewer user
charges, and system development charges that are imposed uniformly throughout the
service area to achieve full cost recovery;
2. Fully funding the needs for equipment replacement and major
rehabilitation to address the long-term preservation of the Regional Sewerage Facilities
capital assets;
3. Fully funding a program of capital improvements to address capacity,
regulatory and efficiency/effectiveness needs;
4. Ensuring equity between newly connected and previously connected
users for their total contributions toward the Regional Sewerage Facilities;
5. Ensuring equity between various classes of users based on the
volume, strength and flow rate characteristics of their discharges together with any other
relevant factors identified bv the Commission;
6. Ensuring efficient and cost-effective financial administration of the
Regional Sewerage Facilities; and
7. Complying with applicable laws and regulations including those
governing the establishment of user charges and the establishment of system
development charges pursuant to ORS 223.297 et seq.
g. Establish billing and collection systems, if necessary, in locations where such
systems are not provided by others.
h. Contract with the Governing Bodies as appropriate for operation and
maintenance of the Regional Sewerage Facilities, administrative services for the
Commission and for other services as necessary.
i. Contract for consultant services.
j. Provide service only to the Governing Bodies.
k. Comply with state and federal standards.
L Adopt minimum uniform standards for pretreatment requirements for industrial
and other wastes as necessary.,
m. Adopt minimum standards for construction and maintenance of local sewage
collection systems.
Restated and Amended Agreement- Page 4 of 9
June, 2005 (doc. 1 02151)
I
I
i.
I
I:..
~.
t
~
[I
11
n. Improve the Regional Sewerage Facilities pursuant to the Commission's
Facilities Plan. Changes in the Facilities Plan made by the Commission that result from
what are.described as the Partial or Comprehensive updates scheduled for 2010,2015,
2020 and 2025 in the 20-Year Project List, will be submitted to the Governing Bodies for
review and approval. The scheduled updates shall be submitted at least 6 months in
advance of the anticipated approval date and shall be accompanied by an estimate of
the effect the update may have on sewer user charges and system development
charges. All other changes to the Facilities Plan may be made by the Commission
without referral to the Governing Bodies unless the Commission estimates that they will
increase either sewer user charges or system development charges by 50/0 or more. In
that event, the proposed change to the Facilities Plan shall be submitted to the
Governing Bodies for review and approval in accordance with the above procedure for
scheduled updates except that the proposed change shall be submitted at least 90 days
in advance of the anticipated approval date.
o. Take any action necessary or convenient to perform the above functions or
other duties as specified elsewhere in this Agreement. No powers or duties related to
local annexation or growth policies are granted to the Commission.
p. Issue Bonds as provided in ORS 190.080 or as otherwise allowed under state
law, and enter into covenants regarding the operation of the Regional Sewerage
Facilities and the imposition of sewer user charges and system development charges
that are intended to secure favorable interest rates and other terms for the Bonds.
4. Membership: The Commission shall consist of seven (7) voting members:
a. Each Governing Body shall appoint to the Commission one (1) elected official
of that Governing Body.
b. The City Council of Eugene, shall appoint two (2) additional members to the
Commission. The City Council of Springfield and the Lane County Commissioners shall
each appoint one additional member to the Commission.
c. Members of the Commission shall serve for the term set by the Commission in
its bylaws and at the pleasure of the Governing Body appointing that member.
d. A quorum of the Commission shall be five (5) members providing at least one
member appointed by each Governing Body is present. Decisions of the Commission
shall require a majority vote of the entire membership unless otherwise provided in this
Agreement.
5. Bvlaws: The Commission shall adopt a set of bylaws governing its conduct. The
bylaws shall:
8. Establish times and places of meetings.
b. Establish a central office for the Commission which shall have a mailing
address, a telephone and a complete set of records of the Commission, be the main
place where information about the Commission can be obtain~d, and be under the
charge of the designated agent of the Commission.
Restated and Amended Agreement- Page 5 of 9
June,2005 (doc.102151)
i
I
I
I
M
~.
c. Prescribe officers of the Commission, including president and other officers to
be elected by the Commission from among its members. The president shall see that
meetings of the Commission are conducted in accordance with the bylaws.
6. Meetinas: Meetings of the Commission shall be held regularly at times and places
designated in the bylaws.
7. Functions of Governina Bodies: The Governing Bodies shall continue to perform
the following functions:
a. Billing and collection of sewer user charges and system development charges.
User charges will be billed and collected monthly. System development charges will be
billed and collected by Eugene and Springfield in accordance with state law.
b. Provide local sewage collection (sewers beyond those specified in Appendix
"An.)
c. Provide customer contact.
d. Establish local annexation and growth policies.
8. Obliaations of Governina Bodies: The Governing Bodies shall assume the
following obligations:
a. Each month remit to the Commission all revenues that are collected by the
Governing Body on behalf of the Commission. Efforts to collect delinquent accounts will
be consistent with the policies and practices for the collection of delinquent accounts for
other utility charges due to the Eugene Water and Electric Board for such revenues
collected by Eugene and the Springfield Utility Board for such revenues collected by
Springfield. If Lane County collects revenue on behalf of the Commission, Lane County
will use delinquent account collection policies and practices that are similar to those
used by the Eugene Water and Electric Board and the Springfield Utility Board.
b. Adopt, as a minimum, the Commission's standards for construction and
maintenance of sewage collection systems and for pretreatment requirements for
industrial and other wastes.
c. Adopt sewer user charges and system development charges and impose those
charges on behalf of the Commission at the rates and in the amounts recommended by
the Commission pursuant to Section 3.e.1. Any objection to the rates or amounts of
such sewer user charges or system development charges recommended by the
Commission pursuant to Section 3.e.1 shall be resolved pursuant to the third paragraph
of Section 16 of this Agreement. If the Commission recommends additional rates and
amounts pursuant to Section 3.e.2, those additional sewer user charges and system
development charges shall only be adopted if they are approved by the Governing
Bodies.
Restated and Amended Agreement- Page 6 of 9
June, 2005 (doc.102151)
I
I
1m
[
~..
K
i
I
ii
d. Provide the Commission with regular periodic reports of revenues and
expenses related to Regional Sewerage Facilities.
e. Establish service area boundaries and provide for adjustment thereto as
necessary to ensure that service is provided only to areas within the city limits of
Eugene and Springfield (City Limits); to users currently being served or to whom
contractual service commitments have been made who are outside the City Limits; and
to any other areas outside the City Limits to which service may be extended in
conformity with the Growth Management provisions in Chapter II of the Metro Plan and
the Public Facilities and Services Element provisions in Chapter III of the Metro Plan, as
amended.
f. The Governing Bodies will make commitments necessary to assist the
Commission in obtaining favorable interest rates and other terms for Bonds approved by
the Governing Bodies under ORS 190.080(1).
9. Commission's Liabilities: The Governing Bodies shall be obligated to impose,
collect and remit to the Commission sewer user charges and system development
charges and to comply with the obligations specifically imposed on the Governing
Bodies by this Agreement. Except as provided in the preceding sentence, the
Governing Bodies shall not be liable for the debts, liabilities or obligations of the
Commission.
10. Grants and Bonds: The Commission shall apply for grants and issue Bonds to
achieve the objectives of this Agreement and to carry out an adequate program of
sewerage within the Urban Growth Boundary.
11. Contracts: The Commission may enter into contracts for technical assistance and
for construction of facilities to achieve the objectives of this Agreement and to provide
necessary sewerage in the area.
12. Hearinas: The Commission may conduct hearings on complaints from any rate
payer who is aggrieved by rules of the Commission, by sewerage rules, regulations,
policies, or practices of the Governing Bodies, or by any aspect of the sewerage
operations of the Governing Bodies. "Rate payer" means any person or entity
responsible for the payment of any charge or fee imposed on behalf of the Commission.
The Commission shall provide in its bylaws for advance notice and for conduct of the
hearings. After the hearing, the Commission shall submit to the Governing Bodies and
to the complainant its findings and recommendations regarding the complaint.
13. Annual Budaet and Caoitallmorovement Proaram: The Commission shall prepare
an annual and any necessary supplemental budgets and CIP in accordance with its
bylaws. The Commission may make expenditures or incur obligations only within limits
set by the budget and CIP. Except for expenditures that the Commission reasonably
determines are necessary to meet Bond covenants and achieve and maintain an
unenhanced credit rating of A for the Commission's Bonds from at least one nationally
recognized rating agency, the Commission shall not make any expenditures until the
Commission's budget and CIP have been ratified by the Governing Bodies. The
Commission shall deliver its recommended budget and CI P, together with its estimate of
the rates and amounts that are necessary to fund the recommended budget and CIP, to
the Governing Bodies by May 1 of each year. If one of the Governing Bodies objects to
Restated and Amended Agreement- Page 7 of 9
June, 2005 (doc.102151)
I
if
~.
I
I
i,',
g.~
11
I
I
rr
the recommended budget, CIP or the rates necessary to fund them, the Governing
Body shall make every reasonable attempt to use the reconsideration and mediation
process set forth in Section 16 in sufficient time to assure that the Commission has an
approved budget by July 1.
14. Recommendations: Upon recommendation of the Commission, the Governing
Bodies shall:
a. Establish sewerage policies.
b. Provide the personnel and services necessary for the operation and
maintenance of the regional sewerage system at the expense of the Commission.
c. Adopt a system of sewer user charges and system development charges as
required by Section 8.c of this Agreement.
d. Levy and collect the charges.
e. Apportion funds that the Governing Body receives for sewerage between the
Governing Body and the Commission in direct proportion to the total charges that are
imposed by the Governing Body for sewerage on behalf of the Commission and the
Governing Body.
15. Modification and Termination: This Agreement shall continue until modified by
unanimous consent of the Governing Bodies. A Governing Body may terminate its
participation in the Agreement by providing one year's advance notice of termination to
the other Governing Bodies. If the parties are unable to 'agree on the division of assets
and liabilities between the parties, the dispute shall be referred to a board of arbitration
for its decision concerning the division. The board shall have five members: a judge of
the Circuit Court of Lane County to be selected by the chief judge of the Court, a
representative of the State Department of Environmental Quality to be selected by the
director of the Department, and one representative who has not served on the
Commission from each Governing Body to be selected by the respective Governing
Bodies. Notwithstanding the preceding language in this Section, a Governing Body that
is obligated to collect revenue on behalf of the Commission may not terminate its
participation in this Agreement unless all Bonds have been paid or defeased.
16. Reconsideration and Mediation: If one or more of the Governing Bodies objects to
any action proposed or taken by the Commission, including any action taken to update
or implement the Financial Plan or the Facilities Plan, the Governing Body objecting to
the action shall request that the Commission reconsider such action by delivering a
written request therefor to the Commission. The Commission shall put such action on its
agenda for reconsideration at any Commission meeting within 45 days after receipt of
the request for reconsideration. Except as provided below, if a Governing Body objects
to the Commission's action after reconsideration by the Commission, the Governing
Body may refer the matter to the General Membership of the Metropolitan Policy
Committee (MPC) for mediation in accordance with any procedure adopted by MPC.
Restated and Amended Agreement- Page 8 of 9
June, 2005 (doc.1 02151)
If a resolution of the matter has not been reached previously, MPC shall, within 45 days
after referral of the matter to MPC, make a written recommendation for resolution of the
matter to the Governing Bodies for their consideration. MPC's recommendation shall be
advisory only and shall not be binding on the Governing Bodies. Except as provided
below, the Commission's action shall take effect only after all Governing Bodies are in
agreement.
If the action objected to is the Commission's determination of rates and amounts
pursuant to Section 3.e.1, the recourse of an objecting Governing Body is limited to
submitting the matter to the Commission for reconsideration within 30 days after the
Commission's recommendation is made. The Commission's decision on reconsideration
of those rates and amounts shall be final.
IN WITNESS WHEREOF, the undersigned, by authority of their respective
Governing Bodies, have executed the within Agreement.
1/~ (tJ S
CITY OF SPRINGFIELD, a Municipal
B ~pqration of th~ State of or~
Title: Cit~na~
DA TE:
,('20 I 0<"
DA TE:
By:
Title:
(3 / :g I 0 S--
LANE COUNTY, a Political Subdivision
Of the State of Oregon
By: ~~ ____
Title: County Administration
DATE:
REVIEWED & APPROVEP
.j;~~ TO FO .M ~,.' .
~. ~/ ~
ATE. ,,-.
OFF\CE OF C TY Af fOR EY
AS TO FORM
"6
f~n1) county
/~
~~ COUNSEl.
Restated and Amended Agreement- Page 9 of 9
June, 2005 (doc. 1 02151)
APPENDIX "A"
EUGENE-SPRINGFIELD REGIONAL
SEWERAGE FACILITIES DEFINITION
I. Background.
This Appendix defines the regional sewerage facilities necessary to provide for the
shared wastewater transportation, treatment and disposal needs of the Eugene-
Springfield metropolitan area.
Service shall be provided only within the Urban Growth Boundary. Facilities shall
be designed and constructed to that end, but may be constructed either inside or
outside the Urban Growth Boundary.
The Regional Sewerage Facilities shall be integrated with the Eugene and
Springfield local collection and transportation systems. The combination of regional and
local sewerage facilities, including associated real property comprises the entire
sewerage system for the Eugene-Springfield metropolitan area. The Regional
Sewerage Facilities consist of permanent facilities and temporarily shared facilities.
Permanent Regional Facilities generally support the transportation, treatment, re-use,
and disposa'l of wastewater and biosolids generated in areas served by Eugene and
Springfield. Temporary Regional Facilities are those which do not meet the definition
for Permanent Regional Facilities (Section II.A below), and were funded, in part, by
Federal construction grant funds. Effective July 1,2005, the Temporary Regional
Facilities will be owned and operated by the municipality which has planning authority
for the area in which they are located. The ownership interest in such facilities will
remain subject to the security interest of the Federal Government until it expires by its
terms on December 31,2006.
II. Regional Sewerage Facilities.
The Regional Sewerage Facilities include the following:
A. Permanent Regional Facilities.
1. The Eugene-Springfield Regional Water Pollution Control Facilities
(WPCF) that are located at: 410 River Avenue, Eugene, Oregon,and the wet
weather control facility located immediately southwest of the intersection of Walnut
and Aspen Streets, Springfield, Oregon.
2. The Eugene-Springfield Regional Siosolids Management Facil.ities
(BMF) that are located at 29689 Awbrey La~e, Eugene, Oregon.
3~ The Seasonal Industrial Waste Facilities (SIWF) that are located at
91199 Prairie Road, Junction City, Oregon.
Appendix A - Page 1 of 3
June, 2005 (doc.94093)
4. The Biocycle Farm Facilities (BFF) that are located at 29689 Awbrey
Lane adjacent to BMF.
5. All sewers, regardless of size or type which, as of the Effective Date,
are required to transport wastewater to the WPCF, BMF, BFF or SIWF from the
points at which wastewater flows are combined from areas served by Eugene and
Springfield together with:
a. The entire "East Bank Interceptor".
b. The Glenwood River Crossing and the portions of the Glenwood
collection system that convey combined wastewater flows from Eugene and
Springfield service areas.
6. Major pump stations, pressure mains and other facilities associated with
the Regional Sewerage Facilities described in Sections II.A 1-5 above, including,
but not limited to:.
8. The Willakenzie Pump Station -located at 3050 Goodpasture Lakes
Loop, Eugene.
b. The Old Springfield plant Pump Station -located at Aspen & Walnut,
Springfield.
c. The Glenwood Pump Station -located at 3580 Franklin Blvd., Eugene.
d. The Irvington Pump Station -located at 1248 Irvington Drive, Eugene.
e. The pressure main from the WPCF to the BMF.
f. The pressure main from the BMF to the Irvington Pump Station.
g. The pressure main from its current point of origin approximately 250
feet north of Eighth Avenue on Mill Street in Eugene to the SIWF.
h. The pressure main from the WPCF to the BFF.
7. All other sewerage facilities that are not Temporary Regional Facilities
and which, before or after the Effective Date, have been or are acquired or
constructed and maintained by the Metropolitan Wastewater Management
Commission for the purposes of conveying, treating, reusing or disposing
wastewater or wastewater treatment byproducts for sewer users within the Urban
Growth Boundary.
B. Temporary Regional Sewerage Facilities.
Appendix A - Page 2 of 3
June, 2005 (doc.94093)
... ' " ~
The pump stations, pressure mains and gravity sewers, together with other
facilities directly related thereto consisting of:
1. The Beverly Park -- Don Street relief interceptor, Springfield.
2. The Terry Street Pump Station -located at 5190 Barger Drive, Eugene.
3. The West Irwin Pump Station -located at 2525 West Irwin Way, Eugene.
4. The Filmore Pump Station - located at 1405 E. Briarcliff Lane, Eugene.
III. Conveyance of Ownership of Temporary Regional Facilities.
Promptly after the Effective Date, the Temporary Regional Facilities shall be
transferred to the local jurisdiction in which they are located.
IV. Effective Date.
The definition of regional sewerage facilities set forth herein shall be effective on
July 1, 2005.
V. No Change Without Redesignation.
Permanent Regional Sewerage Facilities shall remain regional sewerage facilities
notwithstanding any change in their function or purpose unless and until MWMC, in
coordination with the affected Governing Body, redesignates them, in whole or part, as
nonregional sewerage facilities. The need therefor shall be reviewed by MWMC
annually in conjunction with the preparation of the MWMC budget.
VI. Original Definition of Existing Sewer Facilities.
A. The existing sewage treatment facilities owned by the Cities of Eugene and
Springfield.
B. The existing gravity sewers, pump stations, pressure mains and other
appurtenances owned by the Cities of Eugene and Springfield, from the points at which
the sewer lines first become 24 inches or larger in diameter to the existing treatment
facilities described in Section VI A above.
Appendix A - Page 3 of 3
June, 2005 (doc.94093)
Tax map no, 17-04-13
Lots 203
300
301
302
400
500
600
800
801
900
901
Tax map no, 17-04-13-13
Lots 100
200
300
400
Tax map no, 17-04-13-21
Lots 1100
1200
1300
1400
Tax map no, 17-04-13-24
Lots 100
City of Eugene to MWMC
Land Transfer June 2006
Tax Lot Listing
ATTACHMENT C