Loading...
HomeMy WebLinkAboutItem A: City Hall Complex Priority IssueECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Work Session: City Hall Complex Priority Issue Meeting Date: July 19, 2006 Agenda Item Number: A Department: Central Services Staff Contact: Mike Penwell www.eugene-or.gov Contact Telephone Number: 682-5547 ISSUE STATEMENT The purpose of the July 19, 2006, work session is to narrow the “Renovate,” “Hybrid,” and “New” design options for use in future studies such as site selection and concept design. BACKGROUND Decision-making criteria were developed with the council to assist in evaluating the options, illuminating different viewpoints, and promoting consensus when discussing the options. The criteria are listed below. The second of four community forums was held Thursday, May 25, 2006, from 6–8:30 p.m. at the First United Methodist Church. Nearly 100 people participated. The program included an introductory presentation regarding two renovation options, two hybrid options, and two new options, as well as information relating the options to the three values ranked highest at the first community forum: fiscal responsibility, environmental stewardship, and planning for the future. After the presentation, attendees participated in small group exercises, large group discussions, and indicated their preferences regarding each option. The forum was videotaped and copies have been made available at Eugene’s three libraries. A copy of the Community Forum #2 Summary Report was provided in the June 22, 2006, City Council packet. Refer to Attachment A for a public involvement update. Criteria for the Renovate, Hybrid, New Decision Sustainable Design ? - Incorporate green building features Accommodation of Employee Needs ? - Includes ergonomics, good lighting, security, parking, and structural integrity User-Friendly ? - Physically, visually, and symbolically receptive and accessible; well lit and secure; ability to transact business in one location and with one visit; easy and close access to parking and multiple transportation modes, and flexible space for a variety of uses Plan for the Future ? - Capacity for future expansion, structural integrity, flexibility, and longevity of design Accommodation of Space Needs and Overall Efficiency ? - Appropriate allocation of space and flexibility for the public, staff, and council; efficiencies related to consolidation, and building organization and design Architectural Significance ? - Includes architectural preservation, architectural value, and aesthetics L:\CMO\2006 Council Agendas\M060719\S060719A.doc Impact on Overall Project Financing ? - Capacity to result in a passing bond measure, capacity to receive other funding through revenues or grants Cost ? - Initial construction, life-cycle, project-related costs, savings from consolidation (both staff efficiencies and energy/maintenance costs of multiple buildings) Results from the Indication of Preferences at Community Forum: In a small group format, community members discussed the six options and were asked to consider the pros and cons of each. After small and large group discussions, attendees indicated their preferences using remote control technology (refer to Attachment B for images of the six options). The results are: Option Explore option further Eliminate this option Renovate Option 1 17 people 57 people Renovate Option 2 16 people 59 people Hybrid Option 1 23 people 52 people Hybrid Option 2 35 people 39 people New Option 1 58 people 16 people New Option 2 32 people 44 people The question “How would you rate your emotional attachment to our current City Hall facility?” was also asked, with the following results: No sense of attachment: 41 people ? Some sense of attachment: 19 people ? Great sense of attachment: 15 people ? Additional Cost Information: The council requested the design team to provide additional cost information such as land, demolition, relocation, and life cycle costs (utilities and maintenance) for each option. The following costs include the initial project costs and all of the above items. Life cycle costs include 50 years of utilities and maintenance shown in 2006 dollars (refer to Attachment C for an expanded summary of costs): Renovation Option 1: $189,623,600 Renovation Option 2: $198,935,900 Hybrid Option 1: $183,146,400 Hybrid Option 2: $174,749,400 New Option 1: $169,707,300 New Option 2: $174,243,800 Sustainability: Options were studied in relation to sustainable design features, energy use, and recycling/reuse. General findings include: New options provide maximum flexibility and thus the greatest potential to incorporate ? sustainable design features such as daylighting, passive ventilation, ground water heat recovery, and stormwater management. L:\CMO\2006 Council Agendas\M060719\S060719A.doc Renovation options use the most energy because they include a companion building to ? accommodate the total area required and multiple buildings increase energy use. New options are estimated to use the least energy because of their greater potential to incorporate sustainable design features. Building higher density on a small site results in more efficient land use, but larger (full- ? block) sites provide the most flexibility and best potential for incorporating sustainable design features. Demolishing an existing building, whether the existing City Hall or a building on an alternate ? site, creates both waste and some opportunities for salvage and recycling. Due to the extent of work required to provide a safe, efficient, and sustainable building, in the renovation and hybrid options all but a portion of the existing structural elements—and in some cases parking—is replaced. If the council wishes to preserve the existing building, the best method is to move the City ? Hall function to a different location and offer the building to an alternate use. Planning for the Future: Options were studied in relation to their opportunity to accommodate space needs and future expansion. General findings include: All options can accommodate the space needs. ? Site selection has a great impact on future expansion. Preserving some space on a full block ? or purchasing an adjacent parcel provides an opportunity for horizontal expansion. For “Renovation” options, the site selection and configuration of the companion building will ? determine the opportunity for future expansion. For “Hybrid” options, future expansion can be accommodated by building additional space, but not preserving open space within the block. For “New” options, site selection and configuration will determine the opportunity for future expansion. RELATED CITY POLICIES The City Hall Complex master planning and public participation process relates to the council goals of an effective, accountable municipal government, a safe community, and sustainable community growth and change. COUNCIL OPTIONS The council may decide to narrow the Renovate, Hybrid, and New options for use in future planning studies. CITY MANAGER’S RECOMMENDATION The City Manager recommends that the project team eliminate Renovation and Hybrid options, and continue using New construction options when considering site selection and concept design. SUGGESTED MOTION Move to eliminate the “Renovation” and “Hybrid” options and adopt “New” construction options for use in future planning studies until the council is prepared to adopt a single option in relation to an overall development plan. L:\CMO\2006 Council Agendas\M060719\S060719A.doc ATTACHMENTS A. Public Involvement Update April – June 2006 B. Renovation, Hybrid, and New options C. Additional Cost Summary FOR MORE INFORMATION Staff Contact: Mike Penwell Telephone: 682-5547 Staff E-Mail: michael.j.penwell@ci.eugene.or.us L:\CMO\2006 Council Agendas\M060719\S060719A.doc ATTACHMENT A Eugene City Hall Complex Master Plan Public Involvement Update April-June, 2006 This is an update of design team activities to inform and engage Eugene’s public in the Devel- opment Plan phase of City Hall Complex Master Planning. Community forums are the main mechanism for timely and specific public input to city council, but efforts are ongoing to expand the pool of those aware of and involved in the master planning issues. In the first half of 2006 the design team has had productive discussions with hundreds of resi- dents. This has informed us of a lack of awareness of why the city is engaged in master plan- ning. While continuing the involvement efforts initially planned, we are adapting to address this by adding tours of city hall, developing fact sheets about the major issues and disseminating the information through community and media networks. We are also adding three focus groups (multiculturalism, youth, and accessibility) to gather specific community input for conceptual design. Community Forums The design team has completed the second of four Community Forums slated for 2006. Like the th first forum held in March, the May 25 forum was attended by approximately 100 people. 36 participants attended both forums. The forums are designed to gather specific and timely com- munity feedback for the City Council, foster dialogue between the community and the project team, and expand awareness of the ongoing master planning process. Forum content is designed with the IAP2 Guideline #6 in mind: “Public participation provides participants with the infor- mation they need to participate in a meaningful way.” Initial recruitment for the Community Forums was based on the list of names submitted by coun- cilors in January. Though almost all of those recommended were available for small group in- In late July the design terviews in February, that group is less well represented at the forums. team will give each Councilor a list of the names you submitted to us and request that you th personally invite those whom you recommended to the August 24 Forum. Another cornerstone of recruitment was outreach to Neighborhood Associations. Slightly more than 20% of forum participants are affiliated with their Neighborhood Association and we are working to expand this contact using neighborhood newsletters and e-mail lists for communica- tion, as well as attending General Meetings. The City’s Neighborhood Association staff has helped immensely in this accomplishment. With the support of the Human Rights Commission we have been working to make the Commu- nity Forums a model of accessible public process. We have been able to provide hearing assis- tance technology and the Power Point presentations in Braille. We have also received many thankful comments for providing childcare. Racial diversity needs a lot of improvement. We will focus on this through other means addressed later in this update, and welcome all sugges- tions and support. To begin to address zip code imbalances in forum participation, the design team focused poster efforts in the Bethel and River Road commercial districts. Recruiting at summer community events may help as well. We want the pool of participants to grow and so we are working on Dedicated sections at our 3 libraries ways for newcomers to get up to speed. and the project website are good ways to catch up on background. The design team writes to those who give us input in accordance with the IAP2 Guideline #7, “Public participation communicates to participants how their input affected the decision.” For th example, we will report your decisions on July 19 to all those who submitted input through us on the issue of renovate, hybrid, or new. We have 382 people signed up in our database to receive information on the City Hall Complex Master Planning process. Note that though most people do have internet access, more than 50 people require conventional mail communication. Neighborhood Associations The design team is beginning a second round of outreach to Neighborhood Associations. On June 7, 2006, the Downtown Neighborhood Association sponsored a meeting devoted to this issue. We coordinated to invite Downtown Eugene, Inc. members to attend as well. (Please see the end of this update for their input on the issue of renovate, hybrid or new.) Usually, Neighborhood Asso- ciation General Meetings will not afford sufficient time to go into the background necessary for meaningful, informed input to Council. It is more likely that we attend general meetings and make a short presentation for the purpose of exposure to the project and recruitment to the forums. th City Project Manager, Mike Penwell, attended the Crest Drive Citizens meeting on June 20and had an opportunity to speak with about 20 association members in this more typical setting. Neighborhood Association newsletters provide a unique opportunity to reach residents and we are learning to use this more effectively. Speaking Engagements Chamber of Commerce, Government Affairs (Please see end of this update.) nd All City Employee Meetings, June 1 and 2 2 Neighborhood Association General Meetings and DEI Events Community events are a good way to have conversations and reach out to different populations. At We are Bethel on June 3, we signed up 25 for forums and to receive more information. We are scheduled for several more community events in 2006. The next three community events we plan to attend are: ? Whiteaker Neighborhood River Festival 7/21 ? Multicultural Festival at Sheldon Community Center 8/11 ? Eugene Celebration 9/9-10 Website As a central source of information, the www.eugencityhall.com website supports the City Hall public outreach process with meeting notices, reports, background materials, photos, and ways to contact project staff. From April – June, the website has had a total of 1,987 page views. web casts Working with Metro TV, we will promote the of related City Council workshops and work sessions. Comment line This phone line provides a way to leave comments regarding the project, RSVP for upcoming events, and contact project staff. It also announces dates and times of upcoming community forums. Three residents have used this dedicated line to submit their comments regarding the project, while the majority of callers use it to RSVP for community forums. The project is util- izing the Eugene Public Library’s TTY line for the hearing impaired. Media Media is an important tool to get the word out about the project. We use print ads and press re- leases to announce the forums, and made a concerted effort to use additional media for outreach to the May Forum. Design Team Project Manager, Dana Crawford, did interviews at three TV stations and five radio stations in advance of the May forum. City Project Manager, Mike Pen- well, and local Public Involvement Manager, Ellen Teninty, did a half hour interview on In the Public Interest on Public Access TV. Print media has had fairly consistent coverage in both The Register-Guard and Eugene Weekly. Mayor Piercy had a Guest Viewpoint published prior to the forum that extended an invitation for participation. Working with City community relations staff, more media is planned for the sec- ond half of 2006 in an effort to inform and interest Eugene residents in city hall master planning. Newsletters We are building a growing list of organizational newsletters that allow us to insert information and updates about the city hall complex project. This expanding inventory reflects suggestions from forum participants, citizen interviews, events, and presentations. Display The consulting staff is developing a standing display for use at community festivals and speaking engagements to illustrate key facts and events relevant to the Eugene City Hall Master Plan. Tours To give the community direct experience, the consulting team will lead a series of tours of City Hall in late summer and autumn that will focus on the dominant issues driving master planning. video Thus far, over 60 community members have signed up for a tour. We will also produce a tour of City Hall to be available through the website and for use at civic events. 2006 Focus Groups In an effort to reach traditionally under-represented populations and to gain their input into the concept design process, the design team will organize three focus groups this fall on: ? Multiculturalism ? Youth ? Accessibility Latino outreach We are working on specific outreach strategies for this growing portion of Eugene’s population. This spring was a particularly challenging time to gain attention for city hall master planning as there were pressing issues about immigration law pertinent to the Latino community. We have been looking for opportunities that allow for in-depth contact so that there is time for education about the issues and meaningful input to the process. Possibilities identified for further investi- gation include Birth to Three, LCC ESL classes funded through Civics grants, and specific church services held in Spanish. Resources have been earmarked to pursue this throughout the year. FAQ’s We are developing fact sheets about the reasons for master planning and answers to Frequently Asked Questions. Mainly, people were unaware of the issues with city hall and need background on why the council has begun master planning. Feedback from venues other than Community Forum Chamber of Commerce Government Affairs Committee May 19, 2006 Fill the potholes before you try to move this issue!!! (Emphasis intended.) 1) 2)It is disingenuous to say that “Do nothing” is an option. Tell us what the minimum option is. 3)Sustainability is the only saleable point. 4)Want to see: Operational costs, functional efficiency savings, and what properties can we sell 5)Explanation was given by Michael Roberts about why public buildings cost more than private projects due to different requirements. 6)Public spaces should be nice. Office building should be nice—not great. 7)Want to explore the concept of private building leased by city. 8)Want to see the System Development Charges attached to project. 9)I like the mural. Get rid of the rest. Downtown Neighborhood Meeting 6/7/06 1) How would you rate your emotional attachment to our current City Hall facility? A. No sense of attachment 8 B. Some sense of attachment 4 C. Great sense of attachment 1 2) Renovate Option #1 A. Explore this option further 3 B. Eliminate this option 10 3) Renovate Option #2 A. Explore this option further 2 B. Eliminate this option 11 4) Hybrid Option #1 A. Explore this option further 3 B. Eliminate this option 11 5) Hybrid Option #2 A. Explore this option further 4 B. Eliminate this option 9 6) New Option #1 A. Explore this option further 12 B. Eliminate this option 1 7) New Option #2 A. Explore this option further 9 B. Eliminate this option 4 DNA/ DEI Comments 1.Thank you for your excellent presentation. 2.The city leaders have done such an incredibly poor job; you do not deserve a new build- ing. You must do your job first; then ask us for something. 3.It is difficult to evaluate the six options without knowing how the different departments interact. The most important element of sustainability is longevity of a building. The building should be loved by users and public. If the existing building in its essential lay- out has exceeded its longevity, then renovating it and investing further into it would be a huge mistake. 4.New half block Option 2 if used in conjunction with half block of open space. 5.Good luck! R1R2 ENOVATION OPTION ENOVATION OPTION EXISTING CITY HALL WITH ADDITIONAL VOLUME EXISTING CITY HALL VOLUMEADDITIONAL VOLUME NEEDED ADDITIONAL VOLUMENEEDED 84,000 GSF216,000 GSF 84,000 GSF EXISTING AND 52,000 GSF 169,000 GSF Existing Secure Secure Existing and Non- Parking Secure Secure and Secure Parking Non-Secure Fleet Park- Fleet Parking H1H2 ybrid OPTION ybrid OPTION Secure Police Secure Police Parking Parking Non-Secure Non-Secure Fleet Parking Fleet Parking Secure Police Parking Secure Police Parking Non-Secure Fleet Non-Secure Parking Fleet Parking N1N2 ew OPTION ew OPTION Secure Police Secure Police Parking Parking Non-Secure Non-Secure Fleet Parking Fleet Parking OPTIONS LEGEND Existing City Hall New Police Functions Other New City Hall Functions Parking ATTACHMENT C Eugene City Hall Complex Master Plan Additional Cost Summary This following cost summary shows initial project costs, utilities and maintenance costs for 50 years, average land costs within downtown Eugene, demolition costs for the existing building (demolition for other sites depends on the site selected), and relocation costs. Additional infor- mation on the composition of the utility and maintenance costs follows this table. Table 1. Summary of Total Costs. Option Project Cost (a) Utilities Maintenance Land (d) Demo (e) Relocate (f) Total Cost 50 years (b) 50 years (c) R 1 $128,193,300 $8,216,000 $49,440,000 $1,681,800 Unknown $2,092,500 $189,623,600 R 2 $134,962,200 $8,433,400 $50,486,000 $1,681,800 $1,000,000 $2,372,500 $198,935,900 H 1 $122,066,600 $7,947,300 $50,180,000 $0 $ 300,000 $2,652,500 $183,146,400 H 2 $112,944,600 $7,548,300 $50,044,000 $0 $1,000,000 $3,212,500 $174,749,400 N 1 $110,209,500 $6,934,100 $48,682,700 $3,363,500 Unknown $ 517,500 $169,707,300 N 2 $114,487,800 $7,521,700 $50,035,000 $1,681,800 Unknown $ 517,500 $174,243,800 Assumptions All options accommodate 300,000 gross square feet of building area. (a) Project costs include initial construction cost and 1.35 soft cost multiplier. (b) Includes energy, water, and sewer costs for 50 years adjusted to 2006 dollars. Renovation options include energy, water, and sewer costs for the renovation and a companion building. (c) Includes building operations and major maintenance costs for 50 years. Renovation options include operations and major maintenance costs for the renovation and a companion building. (d) Market value for downtown land ranges from $30-38 per square foot. Values above reflect average cost of $35 per square foot. Renovation options include a half block to accommodate companion building; New 1 option assumes purchasing a full block; New 2 option assumes purchasing a half block. Hybrid and New options are not offset by potential sale of existing building and/or site. (e) Demolition costs will depend on the existing improvements and constraints surrounding the selected site. Sites that have substantial existing structures or have adjacent buildings on mul- tiple sides will have higher demolition costs. Renovation options may require demolition costs for the companion building site; Hybrid options will require the demolition of some or most of the existing building; New options will be site dependent. (f) All options will require at least one move. Renovation and Hybrid options will require two moves (to a temporary location during construction and back when the project is complete). Relocation costs include $2.50/square foot for moving and $2/square foot/month to lease space for 18 months. Total costs for options N1 and N2 do not include multiple relocation costs. If the existing City Hall site is used for new construction, total costs would increase by $2,695,000. Utilities and Maintenance Cost Summary The estimated life cycle costs associated with energy, water, sewer, and ongoing building mainte- nance are presented in Table 2 for each of the six primary options. Estimated average initial pro- ject cost is also shown, in order to provide an order-of-magnitude comparison between the life cycle operating costs and anticipated first cost. In general, the new options are expected to exhibit the lowest operating costs while the hybrid options exhibit the highest. Total operating costs are expected to vary by about 12% from most expensive to least expensive. Utilities costs, while not a Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 2 large component of operating costs, are expected to have greater variation (about 18%) from most expensive option to least expensive. Table 2. Summary of Project, Utilities, and Maintenance Costs. Project Cost, Utilities Cost, Maint. Cost, Total Cost, 2006$ [a] 2006$ [b] 2006$ [c] 2006$ Option Renovation 1 128,193,300 8,331,513 50,251,300 186,776,113 Renovation 2 134,962,200 8,433,365 50,485,698 193,881,263 Hybrid 1 122,066,550 8,046,084 56,007,571 186,120,206 Hybrid 2 112,944,600 7,705,557 51,622,528 172,272,684 New 1 110,209,500 7,049,626 49,494,015 166,753,140 New 2 114,486,750 7,647,028 50,868,848 173,002,627 [a] Total construction cost (average) and 1.35 multiplier for soft costs, 2006$. [b] The value of 50 years worth of utilities costs (energy, water, and sewer) in 2006$. [c] The value of 50 years worth of building operations and major maintenance costs, in 2006$. 250,000,000 200,000,000 Total Cost, 2006$ 150,000,000 100,000,000 50,000,000 0 R1R2H1H2N1N2 Option Total First CostEnergy and WaterMaintenance and Repair Figure 1. Summary of Total Costs. Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 3 Background Research and Documentation Energy Costs. Current annual energy costs have been collected and analyzed for the existing City Hall complex, Eugene Public Library, and the Public Works office at 858 Pearl. These are summarized below (Table 3) in the form of energy cost index in $/SF. These costs, in combination with an extensive database and experience base of energy costs associated with similar new pro- jects throughout the Pacific Northwest, are used to develop expected energy cost targets. Projec- tions of energy costs associated with the six primary options have been developed based on three “construction cases”, as summarized in Tables 4 and 5. Table 3. Summary of Existing Building Energy Costs. Energy Cost Facility Index, $/SF Source Eugene City Hall $2.32 Last 2 years of utility bills (steam and electricity) 858 Pearl (PW) $0.89 Last year of utility bills (steam and electricity) Eugene Public Library $0.94 Last 3 years of utility bills (gas and electricity) Review of the primary options resulted in the establishment of three construction cases where energy costs could logically be considered to differ. All cases are assumed to strive for maximum energy and water efficiency. Differences between the cases are summarized briefly in the list below. ? New construction with maximum design flexibility: New construction located on larger sites (such as the full block site) was considered to have the highest degree of flexibility in design, orientation, massing, and other considerations that are key to achieving the lowest practical energy use within a new high performance building. ? New construction with some limitations on design flexibility: In general, new construction is anticipated to create the possibility of maximum practical energy efficiency in design. Some new construction options are located on smaller sites (1/2 block) where building orientation, massing, height, footprint dimensions, and other basic parameters will have to respond to the site in ways that may restrict design options to a degree. For these cases, it is logical to assume that the maximum energy and water efficiency performance may be compromised somewhat, relative to new construction on larger, more flexible sites. ? Major renovation: Major renovation of existing buildings is expected to present the greatest set of limitations to flexibility in design of high performance buildings. Design considerations such as building orientation, footprint, floor-to-floor height, as well as other parameters will be more or less fixed by the existing conditions. While it is expected that such renovation will result in a significant reduction to the existing City Hall energy cost index, this case is anticipated to rep- resent the highest energy cost index case. Table 4 summarizes the energy cost indices that are assigned to each of the construction cases. Table 4. Energy Cost Targets for Three Construction Cases. Construction Case Energy Cost Notes Index, $/SF New construction, maximum flexibility in $0.67 Assume at 60% energy of public works/library inflated design and siting by 5%. New construction, with some limits to design $0.71 Assume midway between new unlimited and major and flexibility renovation (closer to unlimited than major renovation) Major renovation of existing City Hall $1.11 Assume similar to public works/library inflated by 5% Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 4 Energy costs and energy cost indices were estimated for each option, by performing simple weighted averages using the construction case costs (listed above) and the area break-downs summarized in Table 5 below. Table 5. Summary of Anticipated Energy Costs per Option. Options Renovated New area New area Energy Cost, Energy Cost area, SF (unlimited), SF (limited), SF 2006$ Index, $/SF Renovation 1 84000 221000 0 $ 241,353 $ 0.80 Renovation 2 84000 169000 52000 $ 243,671 $ 0.81 Hybrid 1 30000 0 275000 $ 229,542 $ 0.77 Hybrid 2 4400 0 300600 $ 219,273 $ 0.73 New 1 0 305000 0 $ 203,913 $ 0.68 New 2 0 0 305000 $ 217,508 $ 0.73 Life Cycle Costs. Life cycle costs were calculated using a 50 year study period, and assuming an average annual energy cost escalation rate of 3%. A discount rate of 5% was also used, to com- pute net present cost of the entire 50 year set of energy costs. Table 6 summarizes the cash flows and life cycle cost calculations. Table 6. Life Cycle Cash Flow for Energy Costs. Year Renovation 1 Renovation 1 Hybrid 1 Hybrid 2 New 1 New 2 0 1 $ 248,594 $ 250,981 $ 236,428 $ 225,851 $ 210,031 $ 224,033 2 $ 256,052 $ 258,510 $ 243,521 $ 232,626 $ 216,332 $ 230,754 3 $ 263,733 $ 266,266 $ 250,826 $ 239,605 $ 222,822 $ 237,676 4 $ 271,645 $ 274,254 $ 258,351 $ 246,793 $ 229,506 $ 244,807 5 $ 279,794 $ 282,481 $ 266,102 $ 254,197 $ 236,391 $ 252,151 6 $ 288,188 $ 290,956 $ 274,085 $ 261,823 $ 243,483 $ 259,715 7 $ 296,834 $ 299,684 $ 282,307 $ 269,678 $ 250,788 $ 267,507 8 $ 305,739 $ 308,675 $ 290,777 $ 277,768 $ 258,311 $ 275,532 9 $ 314,911 $ 317,935 $ 299,500 $ 286,101 $ 266,061 $ 283,798 10 $ 324,358 $ 327,473 $ 308,485 $ 294,684 $ 274,042 $ 292,312 11 $ 334,089 $ 337,297 $ 317,739 $ 303,525 $ 282,264 $ 301,081 12 $ 344,112 $ 347,416 $ 327,272 $ 312,630 $ 290,732 $ 310,114 13 $ 354,435 $ 357,839 $ 337,090 $ 322,009 $ 299,454 $ 319,417 14 $ 365,068 $ 368,574 $ 347,203 $ 331,669 $ 308,437 $ 329,000 15 $ 376,020 $ 379,631 $ 357,619 $ 341,620 $ 317,690 $ 338,870 16 $ 387,301 $ 391,020 $ 368,347 $ 351,868 $ 327,221 $ 349,036 17 $ 398,920 $ 402,751 $ 379,398 $ 362,424 $ 337,038 $ 359,507 18 $ 410,888 $ 414,833 $ 390,779 $ 373,297 $ 347,149 $ 370,292 19 $ 423,214 $ 427,278 $ 402,503 $ 384,496 $ 357,563 $ 381,401 20 $ 435,911 $ 440,097 $ 414,578 $ 396,031 $ 368,290 $ 392,843 21 $ 448,988 $ 453,300 $ 427,015 $ 407,912 $ 379,339 $ 404,628 22 $ 462,458 $ 466,899 $ 439,826 $ 420,149 $ 390,719 $ 416,767 23 $ 476,331 $ 480,905 $ 453,021 $ 432,753 $ 402,441 $ 429,270 24 $ 490,621 $ 495,333 $ 466,611 $ 445,736 $ 414,514 $ 442,148 25 $ 505,340 $ 510,193 $ 480,609 $ 459,108 $ 426,949 $ 455,412 26 $ 520,500 $ 525,498 $ 495,028 $ 472,881 $ 439,758 $ 469,075 27 $ 536,115 $ 541,263 $ 509,879 $ 487,068 $ 452,950 $ 483,147 28 $ 552,199 $ 557,501 $ 525,175 $ 501,680 $ 466,539 $ 497,642 Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 5 29 $ 568,764 $ 574,226 $ 540,930 $ 516,730 $ 480,535 $ 512,571 30 $ 585,827 $ 591,453 $ 557,158 $ 532,232 $ 494,951 $ 527,948 31 $ 603,402 $ 609,197 $ 573,873 $ 548,199 $ 509,800 $ 543,786 32 $ 621,504 $ 627,473 $ 591,089 $ 564,645 $ 525,094 $ 560,100 33 $ 640,149 $ 646,297 $ 608,822 $ 581,584 $ 540,846 $ 576,903 34 $ 659,354 $ 665,686 $ 627,086 $ 599,032 $ 557,072 $ 594,210 35 $ 679,135 $ 685,656 $ 645,899 $ 617,003 $ 573,784 $ 612,036 36 $ 699,509 $ 706,226 $ 665,276 $ 635,513 $ 590,998 $ 630,397 37 $ 720,494 $ 727,413 $ 685,234 $ 654,578 $ 608,727 $ 649,309 38 $ 742,109 $ 749,235 $ 705,791 $ 674,216 $ 626,989 $ 668,789 39 $ 764,372 $ 771,712 $ 726,965 $ 694,442 $ 645,799 $ 688,852 40 $ 787,303 $ 794,863 $ 748,774 $ 715,275 $ 665,173 $ 709,518 41 $ 810,922 $ 818,709 $ 771,237 $ 736,734 $ 685,128 $ 730,803 42 $ 835,250 $ 843,271 $ 794,374 $ 758,836 $ 705,682 $ 752,727 43 $ 860,307 $ 868,569 $ 818,205 $ 781,601 $ 726,852 $ 775,309 44 $ 886,117 $ 894,626 $ 842,752 $ 805,049 $ 748,658 $ 798,569 45 $ 912,700 $ 921,465 $ 868,034 $ 829,200 $ 771,118 $ 822,526 46 $ 940,081 $ 949,109 $ 894,075 $ 854,076 $ 794,251 $ 847,201 47 $ 968,283 $ 977,582 $ 920,897 $ 879,698 $ 818,079 $ 872,617 48 $ 997,332 $ 1,006,909 $ 948,524 $ 906,089 $ 842,621 $ 898,796 49 $ 1,027,252 $ 1,037,117 $ 976,980 $ 933,272 $ 867,900 $ 925,760 50 $ 1,058,069 $ 1,068,230 $ 1,006,290 $ 961,270 $ 893,937 $ 953,533 Net Present $7,677,905 $7,751,636 $7,302,163 $6,975,480 $6,486,873 $6,919,331 Cost Other Utility Costs (Water, Sanitary Sewer, Storm Sewer). Current annual costs for water, sanitary sewer, and storm sewer service have been collected for the existing City Hall complex. These are summarized below (Table 7). Table 7. Summary of Existing Building Water and Sewer Costs. Water/Sewer Facility Cost Index, $/SF Source Eugene City Hall $0.11 Last 2 years of utility bills (water, sanitary, and storm) Projections of other utility costs associated with the six primary options have been developed in a manner similar to energy costs, based on three “construction cases.” The estimated costs and cost indices are shown in Table 8 and 9. Table 8. Water, Sewer, and Storm Sewer Cost Targets for Three Construction Cases. Water/Sewer Cost Index, Construction Case $/SF Notes New construction, unlimited flexibility in Assume at 50% of existing cost at existing City $0.058 design and siting Hall. New construction, with some limits to design Assume midway between new unlimited and major and flexibility $0.075 renovation Major renovation of existing City Hall $0.092 Assume at 80% of existing cost at existing City Hall Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 6 Table 9. Summary of Anticipated Water, Sewer, and Storm Sewer (WSSS) Costs per Option. Options Renovated New area New area WSSS Cost, WSSS Cost area, SF (unlimited), SF (limited), SF 2006$ Index, $/SF Renovation 1 84000 221000 0 $ 20,256 $ 0.068 Renovation 2 84000 169000 52000 $ 21,430 $ 0.071 Hybrid 1 30000 0 275000 $ 23,044 $ 0.077 Hybrid 2 4400 0 300600 $ 22,534 $ 0.075 New 1 0 305000 0 $ 17,400 $ 0.058 New 2 0 0 305000 $ 22,500 $ 0.075 Life Cycle Costs. Life cycle costs were calculated using a 50 year study period, and assuming an average annual cost escalation rate of 3%. A discount rate of 5% was also used, to compute net present cost of the entire 50 year set of water, sewer, and storm sewer costs. Table 10 summa- rizes the cash flows and life cycle cost calculations. Table 10. Life Cycle Cash Flow for WSSS Costs. Year Renovation 1 Renovation 1 Hybrid 1 Hybrid 2 New 1 New 2 0 1 $ 21,162 $ 22,073 $ 24,087 $ 23,638 $ 18,221 $ 23,561 2 $ 21,797 $ 22,735 $ 24,809 $ 24,347 $ 18,767 $ 24,268 3 $ 22,451 $ 23,417 $ 25,553 $ 25,078 $ 19,330 $ 24,996 4 $ 23,125 $ 24,120 $ 26,320 $ 25,830 $ 19,910 $ 25,746 5 $ 23,818 $ 24,843 $ 27,110 $ 26,605 $ 20,508 $ 26,518 6 $ 24,533 $ 25,589 $ 27,923 $ 27,403 $ 21,123 $ 27,314 7 $ 25,269 $ 26,356 $ 28,761 $ 28,225 $ 21,756 $ 28,133 8 $ 26,027 $ 27,147 $ 29,623 $ 29,072 $ 22,409 $ 28,977 9 $ 26,808 $ 27,961 $ 30,512 $ 29,944 $ 23,081 $ 29,847 10 $ 27,612 $ 28,800 $ 31,427 $ 30,843 $ 23,774 $ 30,742 11 $ 28,440 $ 29,664 $ 32,370 $ 31,768 $ 24,487 $ 31,664 12 $ 29,294 $ 30,554 $ 33,341 $ 32,721 $ 25,222 $ 32,614 13 $ 30,172 $ 31,471 $ 34,342 $ 33,703 $ 25,978 $ 33,593 14 $ 31,078 $ 32,415 $ 35,372 $ 34,714 $ 26,758 $ 34,600 15 $ 32,010 $ 33,387 $ 36,433 $ 35,755 $ 27,560 $ 35,639 16 $ 32,970 $ 34,389 $ 37,526 $ 36,828 $ 28,387 $ 36,708 17 $ 33,959 $ 35,421 $ 38,652 $ 37,933 $ 29,239 $ 37,809 18 $ 34,978 $ 36,483 $ 39,811 $ 39,070 $ 30,116 $ 38,943 19 $ 36,028 $ 37,578 $ 41,006 $ 40,243 $ 31,020 $ 40,111 20 $ 37,108 $ 38,705 $ 42,236 $ 41,450 $ 31,950 $ 41,315 21 $ 38,222 $ 39,866 $ 43,503 $ 42,693 $ 32,909 $ 42,554 22 $ 39,368 $ 41,062 $ 44,808 $ 43,974 $ 33,896 $ 43,831 23 $ 40,549 $ 42,294 $ 46,152 $ 45,293 $ 34,913 $ 45,146 24 $ 41,766 $ 43,563 $ 47,537 $ 46,652 $ 35,960 $ 46,500 25 $ 43,019 $ 44,870 $ 48,963 $ 48,052 $ 37,039 $ 47,895 26 $ 44,309 $ 46,216 $ 50,432 $ 49,493 $ 38,150 $ 49,332 27 $ 45,639 $ 47,602 $ 51,945 $ 50,978 $ 39,295 $ 50,812 28 $ 47,008 $ 49,030 $ 53,503 $ 52,507 $ 40,473 $ 52,336 29 $ 48,418 $ 50,501 $ 55,108 $ 54,083 $ 41,688 $ 53,906 30 $ 49,871 $ 52,016 $ 56,762 $ 55,705 $ 42,938 $ 55,524 31 $ 51,367 $ 53,577 $ 58,464 $ 57,376 $ 44,226 $ 57,189 Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 7 32 $ 52,908 $ 55,184 $ 60,218 $ 59,098 $ 45,553 $ 58,905 33 $ 54,495 $ 56,840 $ 62,025 $ 60,871 $ 46,920 $ 60,672 34 $ 56,130 $ 58,545 $ 63,886 $ 62,697 $ 48,327 $ 62,492 35 $ 57,814 $ 60,301 $ 65,802 $ 64,578 $ 49,777 $ 64,367 36 $ 59,548 $ 62,110 $ 67,776 $ 66,515 $ 51,271 $ 66,298 37 $ 61,334 $ 63,973 $ 69,810 $ 68,510 $ 52,809 $ 68,287 38 $ 63,175 $ 65,893 $ 71,904 $ 70,566 $ 54,393 $ 70,336 39 $ 65,070 $ 67,869 $ 74,061 $ 72,683 $ 56,025 $ 72,446 40 $ 67,022 $ 69,905 $ 76,283 $ 74,863 $ 57,705 $ 74,619 41 $ 69,032 $ 72,003 $ 78,571 $ 77,109 $ 59,437 $ 76,858 42 $ 71,103 $ 74,163 $ 80,928 $ 79,422 $ 61,220 $ 79,163 43 $ 73,237 $ 76,388 $ 83,356 $ 81,805 $ 63,056 $ 81,538 44 $ 75,434 $ 78,679 $ 85,857 $ 84,259 $ 64,948 $ 83,984 45 $ 77,697 $ 81,040 $ 88,433 $ 86,787 $ 66,896 $ 86,504 46 $ 80,028 $ 83,471 $ 91,086 $ 89,390 $ 68,903 $ 89,099 47 $ 82,428 $ 85,975 $ 93,818 $ 92,072 $ 70,970 $ 91,772 48 $ 84,901 $ 88,554 $ 96,633 $ 94,834 $ 73,100 $ 94,525 49 $ 87,448 $ 91,211 $ 99,532 $ 97,679 $ 75,293 $ 97,361 50 $ 90,072 $ 93,947 $ 102,518 $ 100,610 $ 77,551 $ 100,282 Net Present $653,608 $681,729 $743,922 $730,077 $562,753 $727,698 Cost Maintenance Costs In addition to the cost of utilities (primarily energy), the City of Eugene tracks other building main- tenance costs in three general areas for City space related to City Hall: ? Building operations costs, such as custodial service, window cleaning, security services, etc. ? Major maintenance costs, such as minor repair and ongoing preventive maintenance. ? Capital replacement costs, representing a “sinking fund” that can be applied toward ultimate renovation or replacement of existing City Hall space. (This budget category is unique for spaces that are targeted for ultimate inclusion in a new or renovated City Hall. Other City facili- ties, such as fire stations, are not set up with a capital replacement sinking fund). Historically, the City has maintained major maintenance budgets between 2% to 2.5% of the value of the building on an annual basis. Recently, those budgets have fallen slightly below 2%, which is also below the lower threshold for building maintenance budgeting as established in work by the National Research Council. Deferred maintenance represents accrued and accumulated major maintenance investments that have not been made. Deferred maintenance issues relating to the existing City Hall are discussed in three categories, sometimes resulting in different values of the deferred maintenance: ? Deferred maintenance: Major maintenance investment not made as of 2004. ? “Current” deferred maintenance: Major maintenance investment identified but not yet made for the period of 2004-06. ? Emerging maintenance: Anticipated major maintenance investment over the next 5 years (2006-11). Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 8 General discussion about maintenance costs associated with the existing City Hall have been dis- cussed with the City of Eugene’s Facility Management Division, followed by a focused review of maintenance budgets for fiscal year 2007. Based on the information collected in these activities, the maintenance cost categories indicated in Table 11, have been developed. Table 11. Summary of Existing Building Maintenance Costs. Annual Building Major Capital Deferred Operations Maintenance Maintenance Maintenance, Facility Costs, $/SF Costs, $/SF Budget, $/SF 2006 $ [1] Source Eugene City Hall $ 4.56 $2.50 $5.59 $8,800,000+ Glen Svendsen, personal interview and FY07 budgets 858 Pearl (PW) $4.41 $2.40 $7.04 -- FY07 budgets Eugene Public Library $8.99 $2.37 $3.35 -- FY07 budgets Atrium Building TBD [3] TBD [3] TBD [3] TBD [3] Eugene Hotel [2] TBD [3] TBD [3] TBD [3] TBD [3] City Prosecutor Office [2] TBD [3] TBD [3] TBD [3] TBD [3] Parcade [2] TBD [3] TBD [3] TBD [3] TBD [3] Average Existing Cost [4] $ 4.48 $2.45 N/A N/A [1] For existing City Hall, this includes deferred maintenance (pre-2004) and “current” deferred maintenance (2004-2006) of $5,000,000. Anticipated emerging maintenance for the next 5 years is projected to increase deferred maintenance to $28,900,000 by 2011. [2] City occupied space in larger building. [3] To be determined; Current WSSS use and cost information is being obtained for these buildings but has not yet been analyzed and converted to a cost index. [4] Based on the average of the Eugene City Hall and 858 Pearl costs. Similar to the analysis applied utilities cost, ongoing maintenance cost indices or target costs have been projected for each of three construction cases. The expectations for cost reductions were developed and discussed jointly by the design team and Facility Management Division representa- tives, and are based on the team’s mutual experience relating to maintenance of municipal build- ings. Table 12 summarizes the established maintenance cost targets. Table 13 summarizes the results of a weighted average calculation that results in estimated maintenance costs for each of the six options. Note that Annual Capital Maintenance and Deferred Maintenance are NOT included in the pro- jected life cycle cost associated with ongoing building maintenance. These categories of mainte- nance cost do not, in general, apply to newly constructed or renovated buildings, and are therefore not included in the following cost discussion. They do, however, have special meaning relative to the existing City Hall infrastructure. To the extent that Annual Capital Maintenance and/or Defer- red Maintenance is significant to any option, consideration of the cost impact can be based on costs presented in Table 11 above, and more detailed discussion with City Staff outside the scope and context of this document. Table 12. Maintenance Cost Targets for Three Construction Cases. Building Major Operations Maintenance Construction Case Cost, $/SF Costs, $/SF Notes New construction, maximum Assume 10% reduction of average cost for $4.03 $2.20 flexibility to integrate sustainability City Hall and 858 Pearl. New construction, with some limits Assume 7.5% reduction of average cost for $4.15 $2.26 to design and flexibility City Hall and 858 Pearl. Major renovation of existing City Assume 5% reduction of average cost for City $4.26 $2.33 Hall Hall and 858 Pearl. Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 9 Table 13. Summary of Maintenance Costs per Option. Total Maint. New area New area Building Cost Renovated (unlimited), (limited), Operations Major Maint. Total Maint. Index, area, SF SF SF Cost, 2006$ Cost, 2006$ Cost, 2006$ $/SF Options Renovation 1 84000 221000 0 $ 1,249,123 $ 682,161 $ 1,931,284 $ 6.33 Renovation 2 84000 169000 52000 $ 1,254,949 $ 685,343 $ 1,940,292 $ 6.36 Hybrid 1 30000 0 275000 $ 1,392,209 $ 760,302 $ 2,152,511 $ 7.06 Hybrid 2 4400 0 300600 $ 1,283,208 $ 700,775 $ 1,983,983 $ 6.50 New 1 0 305000 0 $ 1,230,298 $ 671,881 $ 1,902,179 $ 6.24 New 2 0 0 305000 $ 1,264,473 $ 690,544 $ 1,955,017 $ 6.41 Life Cycle Costs. Life cycle costs were calculated using a 50 year study period, and assuming an average annual cost escalation rate of 2%. A discount rate of 5% was also used, to compute net present cost of the entire 50 year set of maintenance costs. Table 14 summarizes the cash flows and life cycle cost calculations. Table 14. Life Cycle Cash Flow for Maintenance Costs. Year Renovation 1 Renovation 1 Hybrid 1 Hybrid 2 New 1 New 2 0 1 $ 1,969,909 $ 1,979,098 $ 2,195,562 $ 2,023,663 $ 1,940,223 $ 1,994,118 2 $ 2,009,307 $ 2,018,680 $ 2,239,473 $ 2,064,136 $ 1,979,027 $ 2,034,000 3 $ 2,049,494 $ 2,059,053 $ 2,284,262 $ 2,105,419 $ 2,018,608 $ 2,074,680 4 $ 2,090,483 $ 2,100,235 $ 2,329,948 $ 2,147,527 $ 2,058,980 $ 2,116,174 5 $ 2,132,293 $ 2,142,239 $ 2,376,547 $ 2,190,478 $ 2,100,159 $ 2,158,497 6 $ 2,174,939 $ 2,185,084 $ 2,424,078 $ 2,234,287 $ 2,142,163 $ 2,201,667 7 $ 2,218,438 $ 2,228,786 $ 2,472,559 $ 2,278,973 $ 2,185,006 $ 2,245,701 8 $ 2,262,806 $ 2,273,361 $ 2,522,010 $ 2,324,553 $ 2,228,706 $ 2,290,615 9 $ 2,308,063 $ 2,318,829 $ 2,572,450 $ 2,371,044 $ 2,273,280 $ 2,336,427 10 $ 2,354,224 $ 2,365,205 $ 2,623,899 $ 2,418,465 $ 2,318,746 $ 2,383,155 11 $ 2,401,308 $ 2,412,509 $ 2,676,377 $ 2,466,834 $ 2,365,121 $ 2,430,819 12 $ 2,449,335 $ 2,460,759 $ 2,729,905 $ 2,516,170 $ 2,412,423 $ 2,479,435 13 $ 2,498,321 $ 2,509,975 $ 2,784,503 $ 2,566,494 $ 2,460,672 $ 2,529,024 14 $ 2,548,288 $ 2,560,174 $ 2,840,193 $ 2,617,824 $ 2,509,885 $ 2,579,604 15 $ 2,599,253 $ 2,611,378 $ 2,896,997 $ 2,670,180 $ 2,560,083 $ 2,631,196 16 $ 2,651,238 $ 2,663,605 $ 2,954,937 $ 2,723,584 $ 2,611,284 $ 2,683,820 17 $ 2,704,263 $ 2,716,877 $ 3,014,036 $ 2,778,056 $ 2,663,510 $ 2,737,496 18 $ 2,758,348 $ 2,771,215 $ 3,074,316 $ 2,833,617 $ 2,716,780 $ 2,792,246 19 $ 2,813,515 $ 2,826,639 $ 3,135,803 $ 2,890,289 $ 2,771,116 $ 2,848,091 20 $ 2,869,786 $ 2,883,172 $ 3,198,519 $ 2,948,095 $ 2,826,538 $ 2,905,053 21 $ 2,927,181 $ 2,940,835 $ 3,262,489 $ 3,007,057 $ 2,883,069 $ 2,963,154 22 $ 2,985,725 $ 2,999,652 $ 3,327,739 $ 3,067,198 $ 2,940,730 $ 3,022,417 23 $ 3,045,440 $ 3,059,645 $ 3,394,294 $ 3,128,542 $ 2,999,545 $ 3,082,866 24 $ 3,106,348 $ 3,120,838 $ 3,462,180 $ 3,191,113 $ 3,059,536 $ 3,144,523 25 $ 3,168,475 $ 3,183,255 $ 3,531,423 $ 3,254,935 $ 3,120,727 $ 3,207,413 26 $ 3,231,845 $ 3,246,920 $ 3,602,052 $ 3,320,034 $ 3,183,141 $ 3,271,562 27 $ 3,296,482 $ 3,311,858 $ 3,674,093 $ 3,386,434 $ 3,246,804 $ 3,336,993 28 $ 3,362,411 $ 3,378,095 $ 3,747,575 $ 3,454,163 $ 3,311,740 $ 3,403,733 Eugene City Hall Master Planning Utility and Maintenance Costs June 29, 2006 Page 10 29 $ 3,429,660 $ 3,445,657 $ 3,822,526 $ 3,523,246 $ 3,377,975 $ 3,471,807 30 $ 3,498,253 $ 3,514,570 $ 3,898,977 $ 3,593,711 $ 3,445,534 $ 3,541,244 31 $ 3,568,218 $ 3,584,862 $ 3,976,956 $ 3,665,585 $ 3,514,445 $ 3,612,068 32 $ 3,639,582 $ 3,656,559 $ 4,056,495 $ 3,738,897 $ 3,584,734 $ 3,684,310 33 $ 3,712,374 $ 3,729,690 $ 4,137,625 $ 3,813,675 $ 3,656,429 $ 3,757,996 34 $ 3,786,621 $ 3,804,284 $ 4,220,378 $ 3,889,948 $ 3,729,557 $ 3,833,156 35 $ 3,862,354 $ 3,880,370 $ 4,304,785 $ 3,967,747 $ 3,804,148 $ 3,909,819 36 $ 3,939,601 $ 3,957,977 $ 4,390,881 $ 4,047,102 $ 3,880,231 $ 3,988,015 37 $ 4,018,393 $ 4,037,137 $ 4,478,699 $ 4,128,044 $ 3,957,836 $ 4,067,776 38 $ 4,098,761 $ 4,117,879 $ 4,568,273 $ 4,210,605 $ 4,036,993 $ 4,149,131 39 $ 4,180,736 $ 4,200,237 $ 4,659,638 $ 4,294,817 $ 4,117,732 $ 4,232,114 40 $ 4,264,351 $ 4,284,242 $ 4,752,831 $ 4,380,714 $ 4,200,087 $ 4,316,756 41 $ 4,349,638 $ 4,369,927 $ 4,847,887 $ 4,468,328 $ 4,284,089 $ 4,403,091 42 $ 4,436,630 $ 4,457,325 $ 4,944,845 $ 4,557,695 $ 4,369,771 $ 4,491,153 43 $ 4,525,363 $ 4,546,472 $ 5,043,742 $ 4,648,848 $ 4,457,166 $ 4,580,976 44 $ 4,615,870 $ 4,637,401 $ 5,144,617 $ 4,741,825 $ 4,546,309 $ 4,672,596 45 $ 4,708,188 $ 4,730,149 $ 5,247,509 $ 4,836,662 $ 4,637,235 $ 4,766,048 46 $ 4,802,351 $ 4,824,752 $ 5,352,459 $ 4,933,395 $ 4,729,980 $ 4,861,369 47 $ 4,898,398 $ 4,921,247 $ 5,459,509 $ 5,032,063 $ 4,824,580 $ 4,958,596 48 $ 4,996,366 $ 5,019,672 $ 5,568,699 $ 5,132,704 $ 4,921,071 $ 5,057,768 49 $ 5,096,294 $ 5,120,066 $ 5,680,073 $ 5,235,358 $ 5,019,493 $ 5,158,923 50 $ 5,198,220 $ 5,222,467 $ 5,793,674 $ 5,340,066 $ 5,119,883 $ 5,262,102 Net Present $50,251,300 $50,485,698 $56,007,571 $51,622,528 $49,494,015 $50,868,848 Cost