Loading...
HomeMy WebLinkAboutItem C: Transportation Priorities for North and West Eugene EUGENE CITY COUNCIL AGENDA ITEM SUMMARY c Work Session: Transportation Priorities for North and West Eugene Meeting Date: September 25,2006 Department: Public Works www.eugene-or.gov Agenda Item Number: C Staff Contact: Mark Schoening Contact Telephone Number: 682-5243 ISSUE STATEMENT A set of transportation priorities for West and North Eugene has been developed for consideration by the City Council. The priorities include capital improvements, transportation planning studies and regulatory changes. The capital improvements include the Beltline Corridor from Coburg Road to River Road and West 11th Avenue from Terry Street to Greenhill Road. The transportation planning studies include a transportation corridor study of West 11th and EmX corridor study of West 11th. The two studies would be integrated and conducted concurrently. The regulatory changes include the initiation of changes to the land use code and an associated administrative rule to implement access management for the City's arterial and collector street system. BACKGROUND Previous Council Direction At the City Council meeting held on July 12, 2006, the City Council passed a motion that: 1. Rescinds its May 24, 2006, motion regarding the MPC resolution; 2. Continues to support a collaborative process that includes ODOr, if ODOT should change its position; 3. Does not support the WEP in its current alignment or the recent FHW A proposed southern alignment. The southern alignment could only be considered along with a wide range of other projects in the collaborative process; 4. Supports adoption of the FY06-09 MTIP including all projects except the WEP; and 5. Directs staff to return with a proposed list of transportation priorities for North and West Eugene including projects on the Beltline corridor and West 1 fh, and calls for a work session this fall to consider how to advance these priorities. At the joint meeting of the City Council and Lane Transit District Board of Directors on June 12, 2006, the City Council passed a motion to: Direct the City Manager to coordinate the process with LTD and the Eugene Planning Commission to recommend a corridor for study, and that the Planning Commission's recommendation be brought back to the City Council and LTD Boardfor afinal decision. The Planning Commission is encouraged to include a public involvement component in its deliberations. LICMOl2006 Council AgendasIM060925IS060925C.doc Capital Improvements The three processes to move forward with the two capital projects, the Beltline Corridor from Coburg Road to River Road and West 11th from Terry Street to Greenhill Road are outlined in Attachment A. The three processes include updating the Regional Transportation Plan (RTP) and Transportation System Plan (Transplan), transportation project development, and project prioritization for the FY 2010 - 2013 State Transportation Improvement Program. Attachment B is "A Citizen's Primer - Oregon's Statewide Transportation Improvement Program." To remain in compliance with federal regulations, the Metropolitan Planning Organization (MPO) is in the process of updating the RTP. The updated RTP is scheduled for adoption by the Metropolitan Policy Committee (MPC) in March 2007. As part of this update, the West Eugene Parkway could be removed from the RTP and the financially constrained project list. This action would allow the Beltline Corridor from Coburg Road to River Road and West 11th from Terry Street to Greenhill Road projects to move from the illustrative project list to the financially constrained project list. Currently, the study of the Beltline Corridor from Coburg Road to River Road is included in the financially constrained project list and construction is included illustrative project list. An update to Transplan to ensure consistency with the RTP would occur within one year as required by the state Transportation Planning Rule (TPR). These steps are necessary before the projects can be included in the State Transportation Improvement Program. Later this year, the Oregon Department of Transportation (ODOT) plans to initiate the transportation system planning for the Beltline Corridor between Coburg Road and River Road. Transportation system planning is a process to identify a preferred alternative. It includes defining the transportation problem, conducting public outreach, identifying and evaluating alternatives, and identifying a preferred alternative. The development section (D-STIP) of the draft FY 2008 - 2011 STIP includes $2.5 million for the Beltline Corridor between Coburg Road and River Road. The funds would be used for the environmental documentation required under the National Environmental Policy Act (NEP A). The implementation of the preferred alternative would be dependent upon funding for construction in the construction section (C-STIP) of a future STIP. The development of a project for West 11th from Terry Street to Greenhill Road would follow a similar process. The corridor study discussed in subsequent paragraphs could constitute the transportation system planning for the project. The project would then have to be prioritized for funding in the last two years of the development section of the FY 2010 - FY 2013 STIP. The implementation of the preferred alternative would be dependent upon funding for construction in the construction section (C-STIP) of a future STIP. Transportation Plannin2: Studies The West 11th Transportation Corridor Study would extend from Lane Transit District's (LTD) Eugene Station to Greenhill Road. In addition to providing a comprehensive transportation study of the West 11 th corridor, the study would integrate two other regional planning study needs. The first study need is the EmX corridor study from the Eugene Station to Beltline. Attachment C is an Agenda Item Summary for the September 19, 2006, LTD Board of Directors' meeting regarding the West 11th Transportation Corridor Study and how it might integrate with an EmX corridor study on West 11th. The second study need is the transportation system planning for the West 11th from Terry Street to Greenhill Road project. LICMOl2006 Council AgendasIM060925IS060925C.doc The West 11th Transportation Corridor Study would be a collaborative process with L TD, Oregon Department of Transportation, Lane County and Lane Council of Governments. In addition, it is anticipated that the University of Oregon's School of Architecture and Allied Arts will be a study partner. Re2:ulation The FY 2007 work program for the Public Works Department includes the development of an access management policy. The goal of access management is to increase the safety and mobility of the City's arterial and collector street system. Access management involves managing the location, spacing and design of driveways, local streets, medians, median openings and traffic signals. An access management policy would be implemented through changes to the land use code and an associate administrative rule. The development of an ordinance amending the land use code will be guided by a Department Advisory Committee. It is anticipated that this effort will begin early in 2007. COUNCIL OPTIONS The council may: 1. Support the capital improvements, transportation studies and regulatory changes for West and North Eugene; 2. Support one or more of the capital improvements, transportation studies and regulatory changes for West and North Eugene; or 3. Not support any of the capital improvements, transportation studies and regulatory changes for West and North Eugene. CITY MANAGER'S RECOMMENDATION The City Manager recommends that the City Council pass a motion that: 1. Identifies the Beltline Corridor from River Road to Coburg Road as the City's top priority for funding in the State Transportation Improvement Program and West 11th from Terry Street to Greenhill Road as its second priority. 2. Identifies West 11th as its priority for the next EmX corridor study. 3. Supports a transportation corridor study of West 11th and the City's application for $150,000 of STP-U planning funds for the study. 4. Supports the initiation of regulatory changes to the Land Use Code and associated administrative rule that would implement access management on the City's arterial and collector street system. SUGGESTED MOTION Move to: 1. Identify the Beltline Corridor from River Road to Coburg Road as the City's top priority for funding in the State Transportation Improvement Program and West 11th from Terry Street to Greenhill Road as its second priority. 2. Identify West 11th as the City's priority for the next EmX corridor study. 3. Support a transportation corridor study of West lIth and the City's application for $150,000 of STP-U planning funds for the study. 4. Support the initiation of regulatory changes to the land use code and associated administrative rule that would implement access management on the City's arterial and collector street system. LICMOl2006 Council AgendasIM060925IS060925C.doc ATTACHMENTS A. Transportation Project Development and Funding B. LTD Agenda Item Summary for West Eugene Transportation Study C. A Citizen's Primer - Oregon's State Transportation Improvement Program FOR MORE INFORMATION Staff Contact: Mark Schoening Telephone: 682-5243 Staff E-Mail: mark.a.schoening@ci.eugene.or.us LICMOl2006 Council AgendasIM060925IS060925C.doc Capital Project Development ODOT and local partners conduct Transportation System Planning FY07 Beltline FY07 West 11 th Funding programmed in Development STI P for environmental documentation 2008-2011 DSTIP for Beltline Environment Studies conducted Alternatives considered Mitigation Developed Record of decision signed Regional Transportation Plan and Transportation System Plan (Transplan) Funding programmed in Construction STI P Amend Regional Transportation Plan (RTP) Amend Transportation System Plan (Transplan) within March 2007 ..... one year of amending RTP as required by the TPR -Remove WEP ..... -Remove WEP -Move W. 11 th and Beltline to -Move W. 11 th and Beltline to Financially Financially Constrained Project Constrained Project List List FY 2010-2013 State Transportation Improvement Program City Council establishes Transportation Modernization Priorities W. 11th and Beltline Metropolitan Policy ----. Committee considers council priorities and establishes priorities for the Metropolitan Planning Organization Lane County Board of Region 2 Area Commissioners ----. Commissions on considers MPC Transportation and priorities and rural Lane County Lane County priorities establish priorities and establishes for available priorities for Lane funding County Transportation Project Development & Funding Oregon Transportation Commission considers recommendations for Five ODOT regions and adopts the State Transportation Improvement Plan )> r-+- r-+- Q) (') :::J'" 3 CD ::J r-+- )> I AGENDA ITEM SUMMARY I DATE OF MEETING: September 19, 2006 ITEM TITLE: WEST EUGENE TRANSPORTATION STUDY PREPARED BY: Stefano Viggiano, Assistant General Manager ACTION REQUESTED: None. Information and discussion only. BACKGROUND: In the aftermath of the decision not to pursue the West Eugene Parkway, the Eugene City Council has directed city staff to develop a list of transportation priorities for North and West Eugene. The list will include a corridor study of West 11th Avenue. It is expected that Eugene will request planning funds through the Surface Transportation Program to pay for this study. The timing and scope of the study have not been fully determined. City staff are interested in incorporating transit options into the planning work and have asked L TO to participate in the study. L TO staff believe that transit should be incorporated into the study and that EmX is clearly an option that should be considered for this corridor. Recall that at the L TO Board and Eugene City Council agreed on a process for the selection of the third EmX corridor at a meeting on June 12, 2006. The possible consideration of EmX for West Eugene presents several choices for proceeding with the corridor selection: 1. The City Council and L TO Board select the West Eugene corridor to be the next EmX corridor to consider and decide not to go through a corridor selection process. 2. The City Council and L TO Board proceed with the EmX corridor selection process and, if the selected corridor is not West Eugene, pursue that corridor instead of West Eugene. 3. The City Council and L TO Board proceed with the EmX corridor selection process and, if the selected corridor is not West Eugene, pursue both that corridor and the West Eugene corridor. Note that this option is problematic from a staff resource and a capital funding standpoint. Clearly, this decision will need to be made in coordination with the City of Eugene. The City Council is scheduled to discuss West and North Eugene transportation issues on September 25, 2006. If the Board has position on this issue, it can be communicated to City staff prior to that meeting. ATTACHMENTS: None PROPOSED MOTION: None [~ ~Ln~ ~~~li ~ lrore9on .' Department of Transportation When does the state prepare the STIPt It takes about 21/2 years to prepare the STIP.The work begins in odd-numbered years. The STIP Clock below shows when the process starts and finishes. There also is a flow chart on pages 8-9 that shows is the Statewide Transportation (STIP)t The Statewide Transportation Improvement Program (STIP) is the funding and scheduling document for major road, highway, and transit projects in Oregon. It lists projects for the next four years What Improvement Program is a time when ODOT is working however, there is only one approved the process steps In odd-numbered years, there on three different STIP cycles; STIP in effect at any time. and state money cannot be listed in the STIPe It's the law! The STIP is important because federal spent on projects u Every state adopts nless they are its own STIPe Oregon Transportation Commission usually in August. The STIP is adopted by the (OTC) in odd-numbered years Projects are listed in the STIP based on where they are located and which program is paying for them. document that is used to listed in the STIP typically The STIP is not a plan; it schedule and fund projects come from local- and/or state-approved plans is a budget The proj ects 3 STIP CLOCK a four-year period, but projects in year four are information-funding is not obligated to them. The STIP covers included for You can learn more at the STIP web site. See the STIP Users' Guide or view the adopted STIP at: www.oreQ"on.Q"ov/ODOT/HWY/STIP 2 How can citizens participate effectively n the STIPt n the STIP processt While Oregon's STIP is adopted by the Oregon Transportation Commission (OTC), many groups are involved in the process Who participates is the STIP projects are chosen from adopted plans, so the most important way to affect the STIP is to get involved with the transportation planning for your community. Local plans that are used to prepare the STIP include: way into the STIP Getting involved before a project makes its most effective way to influence a project. The following list shows some of the agencies and interest groups involved with the STIP process on Transportation (ACTs) Area Commissions (TSPs) City and county transportation system plans Cities and counties Advisory Committee (FAC) agenCIes Federal Freight Indian metropolitan areas (RTPs) (TIPs) improvement plans Regional transportation plans for government transportation ODOT Transit agency plans Tribal (MPOs) governments Metropolitan Planning Organizations ODOT program advisory groups districts tribal facility plans Major highway projects are selected from local transportation plans and are prioritized by each of Oregon's five highway regions. To learn about highway planning projects in your region, go to: www.oreQ"on.Q"ov/O DOT /TD /TP / resourcelinks. sh tml port Metropolitan Planning Organizations (MPOs) are planning agencies that prepare and adopt transportation plans for large cities. Oregon's MPOs include: Bend, Central Lane, Corvallis, Portland Metro, Rogue Valley, and Salem/Keizer. Transit districts The process for selecting new construction projects in metropolitan areas is a cooperative process between the MPO and ODOT. Citizens in large urban areas should contact their MPO about their process. Go to www.oreQ"on.Q"ov/ODOT/TD/TP/resourcelinks.shtml for a Area Commissions on Transportation (ACTs) advise the OTC about transportation issues. Most highway regions have several ACTs and each ACT covers several counties. For information about the ACT 5 listing of MPOs and other transportation planning agencies live, go to on. Q"ov/ 0 DOT/CO MM/ act_main. shtml where you www.ore 4 What programs are funded through the STIP and how much money is nvolvedt is the STIP document organizedt How and how STIP cycle. shows the main ODOT programs through them during the current The pie chart below much money will flow The STIP is organized in four sections. The Introduction explains how ODOT prepares the STIPe It also describes the programs that pay for the projects listed in the STIPe IP Only) 2006-2009 ST lists all approved construction organized by highway region, and state's highway regions is on the (C-STIP) C-STIP is (for State Program SPECIAL PROGRAMS* $71 M A third section includes the "Development STIP" (D-STIP), which lists multi-year planning and engineering projects. This section also lists projects of statewide significance and federal "earmarks" approved by Congress. Earmarks are for special projects and the money may only be spent on that project. Projects in the D-STIP are not yet approved for construction; they are still getting ready for construction. The last section of the STIP lists adopted criteria that affect some there are criteria for selecting Bridge, For example, Preservation, programs Pavement OPERATIONS $82 M and Modernization projects Programs such as Pavement Preservation, Safety, Modernization, and Bicycle/Pedestrian are the building blocks for the STIPe The STIP process is all about deciding which projects to approve and which program(s) should pay for them. 7 Bicycle/Pedestrian, Transportation Enhancement, ncludes and other programs. * 6 STIP APPROVAL DRAFT STIPI PUBLIC REVIEW PROJECT SELECTION GOALS AND FUNDING ,/ I~ ,/ ,/ OTC Public review of draft STI P Regions and ACTs review public input and may modify the draft STIP Regions and ACTs identify and scope potential projects Regions prepare draft list of programs, projects and funding ODOT managers evaluate system goals and needs Highway Finance Office determines available funding STI P participants and comment on recommendations Governor approves MPO TIPs Final STIP submitted to federal funding agencies* Air quality modeling and conformity reviewed for affected areas ODOT Advisory Committees and MPOs comment on the draft STIP Fiscally constrained analysis to ensure STIP projects stay within available funds TI Ps added into final STI P ODOT staff and ACTs use systems and criteria to select projects and forward recom- mendations to the OTC review 9 (FTA) Federal Highway Administration (FHWA) Federal Transi Administration ODOT advisory committees and other stakeholders review final STI P Draft STIP available for public review approves program funding levels 8 Program data and management systems are used to monitor conditions on state highways and help managers prioritize needs The following table lists some of the important management systems and databases for the state's highway system. For some programs, the OTC adopts criteria that are used along with the management system to decide which projects to select. The Pavement Preservation and use OTC select listed Projects listed in the STIP come primarily from two sources: local transportation plans or program data and management systems. Where does ODOT find the projects n the STIPt projects adopted criteria to help Bridge programs the STIP, especially influence the Local transportation plans contribute projects to Modernization projects. OTC criteria and policies selection of projects from local plans. Plans may include USED FOR RESPONSIBLE DIVISION PROGRAM DATA AND MANAGEMENT SYSTEM Repair and replacement Highway - Bridge Bridge Management System CONTENTS 20 year plan-part of local land use plans PREPARED BY Cities and counties; ODOT participates PLAN TYPE Transportation System Plan monitor congested areas dentify and Transportation Congestion Management System 20 year plan-lists needs and funding sources Metropolitan Planning Organization (MPO) Regional Transportation Plan Highway res u rfaci ng Development - Planning Analysis Highway - Preservation Management Pavement System Long-term plans that identify needs Federal agencies, tribal governments, Land Management Agency Transportation Plans Crash-prone areas Highway - Traffic Safety Safety Management System Concept designs for specific locations state agencies ODOT, MPOs, local governments Refinement Plans/ Facility Plans Replace culverts and mprove fish habitat Highway - Hydrologist/ Fish Biologist Culverts/Fish Passage database Long-term plans for transit services Transit districts and agencies Transit Agency Strategic Plans Asset replacement and Highway - Region Traffic/ Operations umination II Signs, Signals, database Special reports like the Bridge Options Report or 1-5 Conditions Report studies and Special reports mprovements measures Preventive and repairs Highway - Geologist/ Region Traffic Manager Slides and Rockfalls database ODOT o project rocesst Where does the STIP fit into the What programs are in the STIPt development and construction p The STIP is one of the last steps in the project approval process. The sequence for most transportation improvement projects is as follows are some of ODOT's major programs. Some programs several funding sources that are managed separately. Listed below include more of the Klamath, PREPARED BY Local government MPOs Tribal governments, e.g. Umatilla, Warm Springs PLANNING PHASE - Projects are identified in one or ODOT of plans/systems SOURCE DOCUMENT Facility plans Regional transportation plans Transportation system plans following types Federal agencies, e.g.. BLM U.S. Forest Service STIP FUNDING/SCHEDULING PHASE - Projects are selected from plans and approved in the STIPe ODOT Tribal government plans Federal agency plans Oregon Transportation Management System PROGRAM NAME USED FOR Modernization Building/expanding roads and highways Public Transportation Multiple programs for capital purchases Programs and operations Pavement Preservation Resurfacing state highways State and Local Bridge Building/repairing bridges Highway Safety Improvements to reduce crashes and make highways safer Bicycle/Pedestrian Improvements for these users Transportation Projects that improve the appearance and Enhancement function of the transportation system Operations Multiple programs that affect highway operations (signals, rockfalls, signs, lighting) PROJECT DELIVERY PHASE - State highway projects are assigned to a project team in the region where the project is located for design and construction. To learn more about how projects get built, go to www.orel!on.l!ov/O DOT /HWY /0 PD /PD l!uidebook. shtml 3 There are other programs funded through the STIPe For more information, go to the STIP web site and browse through the Program Descriptions chapter of the STIP Users' Guide at: www.orel!on.l!ov/O DOT /HWY /STIP 2 know how far some examples Participation Tips To effectively advocate for a project, proponents must along the path to completion the project is. Here are like How would a typical project approval workt The example below outlines the typical approval process for a Modernization program project (i.e., a project that adds capacity, highway widening or new interchanges). process PROCESS STEP Local city or county Transportation System Plan or Highway Corridor Study (20-year plans) away) Development STIP (construction 4+ years Construction STI P (construction within 4 years) Project Delivery (project design and right-of- way issues) PROJECT STATUS Our town has congestion problem but we're not sure how to fix them The bridge doesn't seem to be meeting current traffic needs. Fixing the highway is in the local plan but the solution is not clear. We need an environmental study for a major project. The engineering design is complete and the local match is approved. The city is scheduling future utility work. MODERNIZATION PROGRAM PROJECT APPROVAL PROCESS Project identified in local, state, or regional transportation plan. Project refinement plan prepared using combined state/local funding. Project environmental impact study prepared; sometimes this is funded through the D-STI~ Project recommended to be in the STIP by the ACT and approved by the OTC (approval may require several attempts). After STIP approval, a project team designs the project and manages the construction process (for state system projects). II The project is funded, but how wi it affect my property? for projects funded through other STIP programs steps shown for a Modernization project. The approval process is similar to the Contacts ODOT Highway Region www.oregon.gov/ODOT/Hi Some programs, such as Bicycle/Pedestrian and Transportation Enhancement, have special application procedures. Other programs have their own advisory committees that review projects before they go into the STIP (e.g., Bike/Ped Advisory Committee, Transportation Enhancement Advisory Committee) ions.shtml Commissions on Transportation: www.oregon.gov/O DOT/CO MM/ act_main. sh tml Area information about the project approval process, see the Guide at: on.gov/ODOT/HWY/STIP For more STIP Users 5 Local government contacts www.bluebook.state.or.us/local/cities/cities.htm www.ore 4 ~=w~ . Klamath Falls ~ . Pendleton Baker City. ~ OREGON DEPARTMENT OF TRANSPORTATION 355 Capitol Street NE, Salem, OR 9730 I 888-275-6368 www.oregon.gov/ODOT