EUGENE CITY HALL
THINK BIG. START SMALL. MAKE IT HAPPEN.
City Council Update
Wednesday, April 27, 2016
EUGENE CITY HALL AGENDA
ENERGY PERFORMANCE
•
SEISMIC STANDARD
•
CIVIC IDENTITY
•
COST INFORMATION
•
PROPOSED FUNDING
•
COUNCIL DECISION POINTS
•
PROJECTOBJECTIVES
ENERGY PERFORMANCE
Current Design = LEED Gold
•
EUI of 30 kBtu/SF/year or Better
•
Path to NetZero Energy
•
Low Operating Costs
•
SEISMIC STANDARD
Risk Category IV Design
•
Preservation of Facility Following Cascadia Earthquake
•
CIVIC IDENTITY
Transparent, Accessible, Welcoming
•
Durable, Lasting, Meaningful, Connected to History
•
Public Space and Public Amenities
•
EUGENE CITY HALL ENERGY PERFORMANCE
130
Old City Hall
EUI
75
Typical Office Building
EUI
30
Proposed City Hall
EUI
= PATH TO NET ZERO
USING LESS ENERGY—EVERY DAY, EVERY YEAR.
EUGENE CITY HALL ENERGY PERFORMANCE
INTEGRATED DESIGN –BUILDING INFORMATION MODELING
EUGENE CITY HALL ENERGY PERFORMANCE
WHOLE BUILDING
ANNUAL ENERGY USE
Combined chart of one year‘s daily
energy profiles, showing how
Eugene City Hall’s total energy use
would vary by hour and season.
ENERGY MODELING -INTEGRATED BUILDING PERFORMANCE ANALYSIS
EUGENE CITY HALL ENERGY PERFORMANCE
ENERGY NOT USED
7530
TYPICAL OFFICE BUILDINGPROPOSED CITY HALL DESIGN
ENERGY USE INTENSITY (EUI)ENERGY USE INTENSITY (EUI)
EUGENE CITY HALL ENERGY PERFORMANCE
130
PREVIOUS CITY HALL
75
TYPICAL OFFICE BUILDING
57
EFFICIENT LIGHTING
IMPROVED GLAZING
IMPROVED WALLS
30
HEAT RECOVERY
LEED BASELINE
DOAS / SYSTEM
DAYLIGHTING
HEAT PUMP
GROUND
SOURCE
INCREMENTAL STEPS ADD UP.
EUGENE CITY HALL ENERGY PERFORMANCE
NORTH
WEST
EAST
SOUTH
SOLAR RESPONSE
A durable, well-insulated rainscreen
protects the north, east and west facades.
Ample windows to let in natural light from
the north, with fewer windows to the east
and west to reduce solar gain. Double-skin
façade with reclaimed cedar frame the
view to the south plaza.
BUILDING ENVELOPE –NORTH, EAST, WEST, SOUTH PERFORMANCE
EUGENE CITY HALL ENERGY PERFORMANCE
TYPICAL WALL: FOUR STEPS TO A DURABLE, EFFICIENT ENVELOPE
EUGENE CITY HALL ENERGY PERFORMANCE
RAIN
1
PROTECTION FROM WATER –DURABLE EXTERIOR MATERIALS
EUGENE CITY HALL ENERGY PERFORMANCE
WIND
WIND
2
PROTECTION FROM WIND –CONTINUOUS AIR BARRIER
EUGENE CITY HALL ENERGY PERFORMANCE
HEAT
3
REDUCED HEAT LOSS –CONTINUOUS EXTERIOR INSULATION
EUGENE CITY HALL ENERGY PERFORMANCE
INSULATED
STUD
WALL
4
STRUCTURE INSIDE THERMAL ENVELOPE –METAL STUDS + BATT
EUGENE CITY HALL ENERGY PERFORMANCE
EUGENE CITY HALL CURRENT DESIGN
UPDATE IN PROCESS
SEISMIC STANDARD CURRENT DESIGN
Designed to remain operational
•
following Cascadia Earthquake.
Influences design of structural
•
and other building systems.
One step above minimum code
•
requirements for assembly
occupancy.
Consistent with City initiative to
•
RISK CATEGORY IV DESIGN
upgrade other City facilities.
Aligned with Oregon Resilience
•
Plan recommendations for
public agencies to enhance
community resilience.
SEISMIC STANDARD BRACED FRAMES
Santa Clarita Seismic Retrofit
SEISMIC STANDARD ADDITIONAL BRACING
Seismic bracing of mechanical,
electrical and plumbing systems
EUGENE CITY HALL CURRENT DESIGN
EUGENE CITY HALL CURRENT DESIGN
EUGENE CITY HALL CIVIC IDENTITY
ENVIRONMENTALCULTURALINDUSTRIAL
EUGENE CITY HALL CIVIC IDENTITY
EUGENE CITY HALL CIVIC IDENTITY
EUGENE CITY HALL CIVIC IDENTITY
PROJECTVALUES GUIDING THE DESIGN
STEWARDSHIP
•
IDENTITY
•
PARTICIPATION
•
SIMPLICITY
•
EUGENE @ 200
•
EUGENE CITY HALL COST UPDATE
CurrentDesign
ProjectElementsCostEstimateCostEscalationFundingSource
RELATEDPROJECTCOSTS
ArchitecturalandEngineeringCapitalBudget/
$6.1M$1.5M
Fees,ProjectManagement,OneTimeSavings
PermitFees,Furnishings,Art,Etc.
DEMOLITION&SITEPREP$2M$1M CapitalBudget
BUILDINGCONSTRUCTIONCOST
BaseBuilding$11.4MΑυЊЊ͵ВaυЎЉЉYΑυЊa/ğƦźƷğƌBudget
SeismicImprovements$1M$1MRiskFund
EnergyEfficiencyImprovements$1M$1MCapitalBudget
CivicIdentity&Presence$1M$600KCapitalBudget
SITECONSTRUCTIONCOST Capital&PublicWorks
Plaza,WaterFeature,North$1.5MΑυЋaѡυЊaBudgets/Parking
ParkingLot,ROWImprovementsFund/Fundraising
SubtotalBuildingandSite
$16MΑυЊАaυЍaΑυЎa
ConstructionCosts
TotalProjectCosts$24MΑυЋЎaυЏaΑυАa
EUGENE CITY HALL COST COMPARISON
Olympia City HallEugene City Hall
Completed March 2011Completion December 2017
60,000 sf / $38.7M Construction32,000 sf / $16-17M Construction
$645/sf$500-530/sf
LEED Gold / 1.5 Seismic StandardLEED Gold / 1.5 Seismic Standard
EUGENE CITY HALL
POTENTIAL FUNDING SOURCES
FundingSourceRangeofPotentialFunding
CapitalBudgetAllocations$3.8ΑЌ͵Ќmillion
RiskFund$1.0ΑЊ͵Ўmillion
Fundraising$0.4ΑЉ͵Аmillion
PublicWorksFunds$0.5ΑЊ͵Љmillion
ParkingFees$0.1ΑЉ͵Ћmillion
OtherOneTimeFundingSources$0.2ΑЉ͵Ќmillion
Totals$6.0ΑА͵Љmillion
EUGENE CITY HALL
QUESTIONS FOR COUNCIL
1.Should the new City Hall be a LEED Gold
certified building?
2.Should the new City Hall have a seismic rating
of 1.5?
3.Should the new City Hall include dedicated
offices in the current phase of the project?
4.Should the new City Hall have the level of civic
quality included in the presented design?
EUGENE CITY HALL