Pilot Study and Improvements
Chris Henry, PE, Transportation Planning Engineer
City of Eugene
1/23/2017
Eugene City Council Work Session
Eugene City Council Work Session1/23/2017
OverviewPlanning Project & Analysis
Planning Project & Analysis
Pilot Study Implementation
Preliminary Study Results
Eugene City Council Work SessionEugene City Council Work Session1/23/20171/23/2017Eugene City Council Work SessionEugene City Council Work Session1/23/20171/23/2017
34
1
3/28/2017
Safe Access for EveryoneProject Background
PURPOSE:
Explore options for people to easily and safely
walk, bike, take the bus, or drive in an eight-block
study area from 24th to 32nd Avenues.
GOAL:
Help South Willamette Street become a vibrant
urban corridor accessible by bicycle, foot, car, and
bus.
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
56
City Project CoordinationStudy Corridor
South Willamette Pavement Preservation
•
~¾ Mile Segment
Pavement Preservation & Re-Striping Adjacent to Corridor (19thto
24th) ÏConstructed 2014
•
Mix of land uses
•
4 lanes north of 29 th Ave
South Willamette Street Improvement Plan
Street Design Concept for Capital Improvement Project Ï5 Year
•
5 lanes near 29 th Ave Intersection
Horizon (2018 Pavement Preservation, Re-Striping & Sidewalks)
•
3 lanes south of 29 th Ave
South Willamette Concept Plan
Land Use Planning for Compact Urban Development Ï20+ Year
Horizon
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
78
2
3/28/2017
Sidewalk EnvironmentPublic Involvement
Curbside sidewalks vary in
•
width & condition
Utility pole obstructions
•
Over 70 driveways
•
Two bus lines
•
Posted speed = 25 mph
•
85percentile speed = 30 mph
th
•
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
910
What We Heard
•
Fix the drainage
3-Lane with
•
Improve the sidewalk
environment (utilities, uneven
Bike Lanes
pavement)
•
Better bicycle access
•
Minimize negative impacts to
businesses (construction,
parking loss, traffic shift)
•
Make it safer (speeding, turn
conflicts, bikes on sidewalks)
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
1112
3
3/28/2017
Data & Analysis
Design Modification
Traffic Volume (~16,500 vpd)
th
at 29Ave
•
Collisions (5.2 crashes/mvmt > Statewide ave.of 2.9)
•
•
Maintain 2 Southbound
Origins & Destinations (~2/3 trips are local, ¼ thru)
•
through lanes through to 32 nd
Ave
Intersection Operations (29Avenue key intersection)
th
•
•
Minimize capacity reduction
Travel Time (3:00-3:30 with +30s delay expected)
•
at 29 th Ave for p.m. peak
Queuing (approx. double)
•
direction traffic (southbound)
Potential volume shift (100-500 vpdor ~1-3%)
•
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
1314
Corridor Case StudiesCase Study Outcomes Summary
Speeding Reduced
•
Examples of 4-lane conversions to 3-lane on
Safety Improved
•
•
similar roadways
Increased Bicycle/Pedestrian Volume
•
Little Traffic Volume Shift
•
No Significant Operational Issues Reported
•
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
1516
4
3/28/2017
Recommendation
Transportation Findings
•
Safety Improvement (expect 30% crash
reduction)
•
Improved Access for Bicycle and Pedestrian
Travel
•
Acceptable Impact to Motor Vehicle Mobility
•
Case Studies Indicate Successful Outcomes
•
Highest Ranking Alternative in Criteria
Screening Evaluation
•
Best Reflects Community Goals and Objectives
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
1718
Effects on Businesses
•
ECONorthwestliterature review of similar lane
reconfigurations.
Pilot Study Implementation
•
No direct evidence on business performance.
•
Modest traffic impacts for urban arterials with <20,000
ADT.
•
Commercial lease rates may change if ADT changes.
•
No link shown for reduction in business visits or revenues.
•
Increasing walk & bike trips associated with more frequent
business patronage but smaller per trip expenditures.
Eugene City Council Work Session1/23/2017Eugene City Council Work SessionEugene City Council Work Session1/23/20171/23/2017
19 20
5
3/28/2017
Pre-ConstructionConstruction & Monitoring
•
Right-of-way acquisition delays
Construction
•
Administrative Order for driveway closures
•
6 months (2/16-8/16)
•
Utility Relocation
•
$1.3M (~$750K Brown Const. +
•
Rebid project
Materials/Equipment + Inspection)
•
Initial bid response too high
•
Monitoring additional $150K
•
Re-scoped project, materials purchase,
timing of bid, and schedule
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
2122
Business AccessPavement Condition
Maintained access to businesses
•
Traffic control
•
Business open signs
Communication
•
Letters
•
In-person
Time of day
•
Signals & striping at night
•
Concrete hardscape in daytime
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
2324
6
3/28/2017
DrainageDriveway Lips
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
2526
Driveway LipsRoadway Widening
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
2728
7
3/28/2017
Roadway WideningBusiness Access
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
2930
Traffic SignalsTraffic Signals
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
3132
8
3/28/2017
Traffic SignalsTraffic Signals
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
3334
Traffic SignalsStriping
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
3536
9
3/28/2017
Transit StopBefore (signal improvement)
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
3738
After (signal improvement)Emergency Vehicles Access
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
3940
10
3/28/2017
Transit AccessLarge Vehicles
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
4142
Large VehiclesInclement Weather
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
4344
11
3/28/2017
Center Turn LaneBike Lanes
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
4546
Bike LanesFrom Concept to Reality
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
4748
12
3/28/2017
Collecting Data
•
Volume (hoses & microwave)
Preliminary Study Results
•
Speed (hoses & microwave)
•
Travel time (Bluetooth)
•
Crashes
•
Emergency response
•
MoreÈ
Eugene City Council Work SessionEugene City Council Work Session1/23/20171/23/2017Eugene City Council Work Session1/23/2017
49 50
MonitoringMonitoring
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
5152
13
3/28/2017
Traffic VolumesTraffic Volumes
Willamette Street Neighboring Streets
Jefferson StreetAmazon Parkway
11/4/14426611/4/148973
BeforeAfter
4/29/1542864/28/159184
5/14/13144377/13/1614136
10/12/16 4117 10/12/16 8810
11/18/14142458/3/1614849
Lincoln StreetHilyardStreet
3/4/15142598/17/1614692
11/4/14127811/18/1411206
4/29/1512935/5/1612163
2/3/16135619/7/1615394
10/10/16 1231 10/26/16 12391
thth
29Avenue (west)29Avenue (east)
4/29/15144464/29/159172
10/17/16 14367 10/18/16 9093
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
5354
Traffic SpeedTravel Time
PMPeak
BeforeAfterDifference
Filter:305:40s(>5mph)(1/25/162/7/16)(11/11/1611/17/16)
BeforeAfter
(11/2014)(9/2016)
Southbound
24thAvenueto32ndAvenue
NumberofTrips:231101
thth
50percentile:50percentile:
Mean/MedianSpeed(mph):12.5/13.613.2/15.20.7/1.6
Mean/Median TravelTime(s):209.3(3:29)/192(3:12)219(3:38)/190(3:10)9.7/2
24.9 mph22.3 mph
85thPercentileTravelTime(s):263(4:23)299(4:59)36
Northbound
32ndAvenueto24thAvenue
NumberofTrips:24692
thth
85percentile:85percentile:
Mean/MedianSpeed(mph):13.5/14.914.9/16.41.4/1.5
Mean/Median TravelTime(s):193(3:13)/175(2:55)195.5(3:15)/177.5(2:57)2.5/2.5
31.2 mph27.5 mph
85thPercentileTravelTime(s):228(3:48)226(3:46)2
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
5556
14
3/28/2017
Lessons LearnedCollaboration
•
Engage diverse stakeholders and
recognize their issues
•
Focus on facts and identify tradeoffs
•
Broad set of technical findings help to
address range of questions
•
Technical findings arenÔt enough
•
Keep discussions constructive
Eugene City Council Work Session1/23/2017Eugene City Council Work Session1/23/2017
5758
Project Team
Chris Henry, PE (project manager)
chris.c.henry@ci.eugene.or.us
541-682-8472
Chuck Mueller (construction manager)
Bret Jones (lead inspector)