HomeMy WebLinkAboutItem B - Res.on River Ave.LIDEUGENE CITY COUNCIL AGENDA ITEM SUMMARY Action: Resolution 4831 Forming a Local Improvement District for Paving, Constructing Curbs and Gutters, Sidewalks, Pedestrian Medians, Street Lights, and Stormwater Drainage on River Avenue from 200 feet East of River Road to 100 feet West of Beltline Highway Meeting Date: April 20, 2005 Agenda Item Number: B Department: Public Works Staff Contact: Michelle Cahill www. cl. eugene, or. us Contact Telephone Number: 682-6855 AGENDA ITEM SUMMARY The council shall consider adoption of a resolution forming a local improvement district (LID) for the River Avenue Transportation Improvements. The resolution forming a Local Improvement District for paving, constructing curbs and gutters, sidewalks, pedestrian medians, street lights, and stormwater drainage on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway and authorizing award of the construction contract is included as Attachment A. A schematic drawing of the River Avenue Transportation Improvements is included as Attachment B. BACKGROUND This project was initiated by City Council action on June 26, 2000, by adoption of the 2001 Capital Budget and pursuant to Section 7.160(5) of the Eugene Code (EC), 1971. This improvement project has been included in the adopted Metropolitan Transportation Plan first adopted in 1986 and subsequently updated and adopted. The Eugene Arterial and Collector Street Plan (AC SP) was adopted in1999 setting the classification, standards and guidelines for streets within the Eugene Urban Growth Boundary. The standards outlined in the ACSP for this street are the same as Lane County standards for an urban major collector, the classification identified for River Avenue. In July 2004, the Hearings Official, acting for City Council, held a hearing on the formation of the LID. The hearing was continued to the City Council because remonstrances were received from owners of property that would bear more than 50% of the proposed assessments. In September 2004, the council considered annexation of the ten unincorporated properties subsequent to the Lane County Board of Commissioners decision not to grant the City authority to include unincorporated properties in the LID. The council voted against pursuing an island annexation. In February 2005, the Lane County Board of Commissioners adopted a Board Order authorizing the City to include unincorporated properties in the LID and be assessed per Eugene Code. L:\CMO\2005 Council Agendas\M050420\S050420B.doc The City Council held a public hearing on April 11, 2005. The record was left open until 5 p.m. on Tuesday, April 12 and three additional documents were received and are included as Attachment C. After the hearing, the City Council requested responses to a number of questions and these are included as Attachment D. River Avenue is major collector located on the north side of Eugene, running parallel to and then connecting to Beltline Road. River Avenue also connects to River Road, Division Avenue, and Beaver Street, and is one of only three ways to cross Beltline Road between the Northwest Expressway and the river. As a result of increased use, the existing roadbed is deteriorating and needs to be upgraded. In addition, development in this general area and two connection points to the Ruth Bascom Riverbank Trail System is creating a need to accommodate a variety of transportation users, including bicyclists, bus riders, pedestrians, and motorists, for current and future needs. The land use is primarily commercial, government (MWMC Water Pollution Control Facility, US Post Office and Veteran's Clinic) and multi-family residential. The process for design included notifications to and one-on-one meetings with affected properties about many issues including survey work, right-of-way acquisition and design issues relating to acquisition, trees, driveways, parking, utilities and sidewalks. A public open house was held in April 2004 at the Water Pollution Control Facility on River Avenue. A public hearing was held in June 2004. Following the Board of County Commissioners authorization in February 2005 to include unincorporated properties in the LID, an informational letter was sent out. Open houses were held on April 5 and 7, 2005. The project is designed in accordance with the adopted Eugene Arterial and Collector Street Plan (ACSP). Parameters that guided design were the nature of existing development and consideration of future development and redevelopment based on zoning, the right-of-way widths and costs of acquisition for commercial properties, impacts to properties, utilities and trees. The standards for a major collector street include sidewalk and bike lanes on both sides of the street, travel lanes, street lights and street trees. The design has taken exception to three items in the ACSP: 1) the standard width for sidewalks on commercial properties is 10 feet wide and the design includes a narrower width due to the type of commercial development seen along River Avenue; 2) the standard setback sidewalks are mixed with curbside sidewalks to minimize right-of-way acquisition, utility conflicts, tree removal and impacts to private properties; and 3) an optional turn lane is included on the west end of the project due to the close proximity and number of driveways and the volume of traffic. Bids for the project were opened on July 7, 2004, with Babb Construction Co. (dba Delta Construction Co. and dba Delta Concrete) as the apparent low bidder. The contractor has agreed to extend time for consideration of the bid, keeping the 2004 contract prices, until May 2005. The total project cost is estimated at $2,269,502.16, and is funded from several sources in the following approximate amounts: Assessments $1,067,627.86 (47%) City of Eugene $1,201,874.31 (53%) The City of Eugene funding includes primarily transportation and stormwater systems development charge funds. A small portion of stormwater pipe maintenance is proposed with this contract and stormwater utility funds would be used for that work. L:\CMO\2005 Council Agendas\M050420\S050420B.doc If the resolution to form a LID is approved by the City Council, the improvement project is expected to commence this construction season and property owners will not be assessed until after the completion of the project, anticipated to be fall 2005. Following the levying of assessments, ten-year financing through the City of Eugene will be available for owners of properties being assessed for this local improvement. All necessary steps have been completed as prescribed by the Eugene Code for the initiation and formation of an LID. RELATED CITY POLICIES Improvement to River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway addresses the City Council goal of Safe Community by improving street safety for the current and future pedestrian, bicycle and vehicular needs along River Avenue. OPTIONS Per Section 7.166(3) of the Eugene Code, the City Council can take the following actions on April 20, 2005: 1. Adopt the resolution forming the LID 2. Substantially modify the improvements, re-bidding if necessary, and then conduct a hearing on the modified improvements. 3. Delay the approval not more than 15 days. 4. Abandon the improvements. CITY MANAGER'S RECOMMENDATION The City Manager recommends adoption of the minutes of the Hearings Official and adoption of the resolution forming the Local Improvement District as described. SUGGESTED MOTION Move to adopt the Hearings Official minutes of June 28, 2004. Move to adopt Resolution 4831 forming a Local Improvement District for paving and constructing sidewalks, curbs, gutters, pedestrian medians, street lights, and stormwater drainage on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway. ATTACHMENTS A. Resolution B. Schematic Drawing of Improvements C. Additional Testimony D. Staff Responses to Questions by Council L:\CMO\2005 Council Agendas\M050420\S050420B.doc FOR MORE INFORMATION Staff Contact: Michelle Cahill Telephone: 682-6855 Staff E-Mail: michelle.r.cahill~ci, eugene.or.us L:\CMO\2005 Council Agendas\M050420\S050420B.doc ATTACHMENT A RESOLUTION NO. A RESOLUTION FORMING A LOCAL IMPROVEMENT DISTRICT FOR PAVING, CONSTRUCTING CURBS AND GUTTERS, SIDEWALKS, PEDESTRIAN MEDIANS, STREET LIGHTS, AND STORMWATER DRAINAGE ON RIVER AVENUE FROM 200 FEET EAST OF RIVER ROAD TO 100 FEET WEST OF BELTLINE HIGHWAY. (JOB #3693) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. After proper notice of the hearings required by Sections 7.165 and 7.166 of the Eugene Code, 1971 (EC), and after receiving the hearings officer's minutes, and conducting a public hearing on April 11, 2005, the City Council hereby declares it is in the public interest to construct the local improvements described in Section 2 of this Resolution and assess part of the costs thereof to the specially benefited properties on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway, subject to the provisions of Section 4 of this Resolution. Section 2. The Council hereby orders the establishment of a local improvement district on River Avenue from 200 feet east of River Road to 100 feet west of Beltline Highway and in that district to pave, construct or install curbs and gutters, sidewalks, pedestrian medians, street lights, stormwater drainage and related improvements ("the Improvements'). Section 3. The costs of the Improvements shall be borne by and assessed to the properties in the district in accordance with EC 7.175 and Section 4 of this Resolution. Included in the cost shall be the overhead costs specified in EC 7.170 and whatever other special costs, such as acquisition of interests in real property, are necessary to make the Improvements. Upon completion of the Improvements, the final costs therefor will be calculated and the owners of benefitted property shall be notified and the property assessed as provided in E.C. 7.185 to 7.240. The assessments to be levied for the Improvements are hereby characterized for purposes of the property tax limitation in Section 1 lb, Art. XI of the Oregon Constitution as assessments for a local improvement, not subject to the constitutional limitation of $10 per thousand of real market value. Notice of the intent to so characterize the assessments was sent to the affected property owners prior to the adoption of this Resolution. Section 4. Several of the properties proposed for inclusion in the local improvement district are located outside the boundaries of the City. Under provisions of state law, the concurrence of the Lane County Board of Commissioners is required for inclusion of the properties in the local improvement district. On February 9, 2005, Lane County Board of Commissioners issued Board Order 05-2-9-5, concurring that the following properties be included in the local improvement district: Neely, Tax Lot #17041300 02900; Bimbo, Tax Lot #17041300 3000; Atkins, Tax Lot #17041300 03200; Eugene Bible, Tax Lot #17041300 03400; Slocum, Tax Lots #17041300 3500 Resolution- 1 L:\CMO\2005 Council Agendas\M050420\S050420B-attA. doc (vacant property, future equivalent assessment), #17041300 03501, and #17041300 03502; Store N Lock, Tax Lots #17041300 03600 and #17041300 03601; and Rucker, Tax Lot #17041322 00902. On March 30, 2005, the Lane County Board of Commissioners reconsidered and made no changes to Board Order 05-2-9-5. Section 5. The City Council hereby declares that the construction of the Improvements, as well as acquisition of rights-of-way or easements necessary for the construction, is for a public purpose, is necessary for the public welfare, is authorized under the laws of the State of Oregon and Charter and ordinances of the City of Eugene, and is directed by this Resolution. Section 6. The City of Eugene, Oregon expects to make expenditures from its available funds to pay for the costs of improvements to River Avenue from 200 feet east of River Road to 100 feet west of B eltline Highway (the "Project"). The City reasonably expects, and hereby declares its intent, to issue bonds or other obligations (the "Reimbursement Bonds") and to use the proceeds of the Reimbursement Bonds to reimburse the City for the expenditures made from the City's available funds for the Project. The City expects that the principal amount of the Reimbursement Bonds will not exceed $1,174,440.15, which represents the estimated assessment amount plus a margin of 10%. Section 7. Lines of credit and other evidence of indebtedness authorized by City Council Resolution No. 4807 may be issued to finance the construction of the Improvements. Section 8. Proceeds from unbonded assessments, improvement bonds, foreclosure of liens based on the Improvements and from other budgeted funds including ad valorem taxes, if levied, to pay the debt shall be deposited in the Short Term Debt Fund until the indebtedness issued to finance the Improvements is redeemed. Proceeds so deposited may be used only to pay the indebtedness issued to finance the Improvements. Section 9. The City Manager, or the person designated in writing by the City Manager to act under Resolution No. 4807 may sign the evidence of indebtedness issued to finance the construction of the Improvements. Section 10. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution adopted the 20th day of April, 2005. City Recorder Resolution - 2 L:\CMO\2005 Council Agendas\M050420\S050420B-attA. doc ~O?O~ED l~ivE~: AVENUE Im?~:OVEmENT~ '~ From 400' ea~l; of Roee Lane 1;o eh& of proJect, -. ............. range to ~elglin ~M~h 2005 A~e~ ~o Division Ave. CAHILL Michelle R From: ROSE Lynda L Sent: Tuesday, April 12, 2005 12:44 PM To: CAHILL Michelle R; SCHOENING Mark A Subject: FW: Residents deserve more say over River Ave. improvement project For the record... ..... Original Message ..... From: Becky Riley [mailto:briley@efn.org] Sent: Tuesday, April 12, 2005 12:46 PM To: mayorandcc@ci.eugene.or.us Subject: Residents deserve more say over River Ave. improvement project April 12, 2005 Dear Mayor and City Council, I am hoping that the record is still held open to receive this comment on the River Ave. Improvement project. I am writing to you as a River Road resident and bicyclist who appreciates your attention to the problems of River Avenue and the work that has gone in to trying to address those problems. The road is in terrible shape, and I feel that it is unsafe for pedestrians and cyclists. I would like to see something done to improve the situation, for the safety of all who travel along that road. I agree that it is a priority situation that I would hope could be addressed soon. However, I am also sympathetic to the concerns of those who feel current plans are "overkill", too costly, and perhaps not as well thought out as they need to be to make sense over the long term (especially relative to uncertain ODOT/Beltline plans for the on-ramp, and connectivity to the still-dangerous, but evidently not addressed, Beltline underpass and Willamette Greenway). And I was dismayed to hear that street trees have evidently already been cut down to make way for the project? I keep hoping that we can find ways to avoid doing that - along the lines of the Wilsonville model where an effort is made to spare every last mature tree - recognizing their immense aesthetic and functional value to our landscapes/streescapes. My own opinion is that I don't want the project - or at least, those parts truly needed for safety - to be needlessly delayed. However, our community feels that it has not had adequate input to the plans, and many people I've heard from are unhappy with the resulting design. Many also want more information - about whether speed limits will be increased on the road after improvements are made, etc. We want to know that this will not turn in to another Maxwell or River Road - the two most loathed streets in our neighborhood. Instead, we hope it might have the potential for a more sensitive design that minimizes pavement, maximizes trees and greenspace, and achieves important public safety goals without unintentionally creating massive paved areas and ugly landscapes with higher speed traffic that while intended to be safer for pedestrians - instead become pedestrian-repellant. I hope you will vote against establishing a local improvement district at this time, and will instead direct city staff to work with a committee of local residents to take more public input and ! CAHILL Michelle R From: Rob Handy [handyrob@hotmail.com] Sent: Tuesday, April 12, 2005 4:39 PM To: mayorandcc@ci.eugene.or.us Cc: Icbcccom@co.lane.or.us; dennis.m.taylor@ci.eugene.or.us; james.r.carlson@ci.eugene.or.us; susan.l.muir@ci.eugene.or.us; kurt.m.yeiter@ci.eugene.or.us; johnny.r.medlin@ci.eugene.or.us; michelle.r.cahill@ci.eugene.or.us; lynda.l.rose@ci.eugene.or.us; beth.l.forrest@ci.eugene.or.us; finiganm@comcast.net Subject: River Road Advisory: River Ave. LID To: Mayor Piercy and Eugene City Councilors Re: River Road Community Organization Board Advisory on River Ave. Local Improvement District(LID). We have reviewed the LID proposal. We are concerned about the lack of public process and also the design details of this project. We urge you to vote against authorization of the LID at this time. This is a sentinel project in River Road. It's important for the River Road community to have more input before the project moves forward. This project presents an opportunity to build trust between the City and our neighborhood. The current design needs more significant refinement. River Road wants to contribute design input that reflects the heritage values of our neighborhoods. River Avenue needs a context-sensitive design process, with significant neighborhood involvement, much like was used for the Irvington Road project. Thank you, Rob Handy, Chair on behalf of the board of the River Road Community Organization cc: LCBC City Manager Dennis Taylor Jim Carlson Susan Muir Kurt Yeiter Johnny Medlin Michelle Cahill Lynda Rose Santa Clara Community Organization CAHILL Michelle R From: ROSE Lynda L Sent: Tuesday, April 12, 2005 5:12 PM To: CAHILL Michelle R Subject: FW: River Ave. Project Here's another. ..... Original Message ..... From: Janell cobarrubias [mailto:jancobo@hotmail.com] Sent: Tuesday, April 12, 2005 4:21 PM To: mayorandcc@ci.eugene.or.us Cc: eugenepso@ci.eugene.or.us Subject: River Ave. Project City Council Members, We are writing in regards to the River Avenue project. This project, with having the estimated cost over $2,000,000. is absolutely too elaborate and certainly not cost effective. Having some improvements made to River Ave. are not out of line, but having sidewalks where it is almost all commercial is not needed at all and can not be said for the purpose of public safety. Having curbs, gutters, re-paving and possibly bike lanes are within the reasonable limits. However, having 25% of the costs of the project being engineering is absurd. The city has done much of the engineering already and even if that wasn't a consideration, 25% of the costs for engineering is ridiculous. Finally, this project needs to be scaled down to be reasonable and with a fiscal responsibility and conscience. Thank you very much for your time and consideration to the public's concerns. Sincerely, Mike & Janell Cobarrubias River Ave. property owners Don't just search. Find. Check out the new MSN Search! http://search.msn.click-url.com/go/onmOO200636ave/direct/O1/  P ublic Works Engineering City of Eugene 244 East Broadway MEMORANDUM Eugene, Oregon 97401 (541) 682-5560 (541) 682-8410 FAX www.ci.eugene.or, us/pw/engineering Date: April 13, 2005 To: Mayor Piercy and City Council From: Michelle Cahill 682-6855 Principal Civil Engineer, Public Works - Engineering Subject: Response to Councilors - River Avenue Transportation Improvements Job #3693 At the April 11, 2005 public hearing City Councilors asked numerous questions and requested that specific information be brought back to the April 20, 2005 meeting to consider the formation of a Local Improvement District for Transportation Improvements on River Avenue. Responses to these questions follow and are group by theme. REDUCING COSTS The first three questions relate to deleting elements of the improvements to reduce costs. Based on the Eugene Code, the assessable portion of the project is for the following elements - paving for the travel lanes, curb and gutter and sidewalks. In order to reduce property owner assessments while abiding by the current assessment policy, some combination of (1) reducing curb-to-curb width to something less than 20' since commercial properties are assessed for 10' of pavement; (2) eliminating curb and gutter; and/or (3) eliminating sidewalks would be required. All of the other costs are borne by the City so eliminating turning lanes, bike lanes, trees, street lights, pedestrian medians, and stormwater repair work would only reduce the City's cost. Costs are distributed to various categories, some directly, like the cost of asphalt to paving, and some prorated across many categories (like engineering distributed proportionately across 8 categories of improvements). The following estimates are based on previously calculated per square foot costs. This cost will change some with a different proration of some costs (i.e. more engineering will be picked up by property owners if most of the SDC funded categories are eliminated). The magnitude of the estimate is approximate and may be helpful. 1. What is the cost of the bike lanes? Using the low bid, expenses to date and estimated future costs the price per square foot of paving for the proposed design is approximately $10 per square foot. The 5' wide bike lanes on both sides of the street equal 41,250 square feet of paving so SDC funds allocated for the project could be reduced approximately $412,500. However, bike lanes on streets classified as major collectors are required by the Oregon Transportation Planning Rule. Page 1 of 1 2. What is the cost of the center turn lane? The area of the center mm lane is approximately 24,000 square feet. The estimated paving costs are $10 per square foot. Eliminating the center mm lane would result in a reduction of $240,000 in SDC funds allocated to the project. Without a center mm lane there would not be space for the pedestrian medians that protect individuals crossing the street in three distinct locations. 3. What is the cost of one sidewalk on one side of the street? The north side sidewalk totals approximately 23,568 square feet and the estimated cost is $5.30 per square foot for a total reduction in costs of approximately $125,000. Driveway aprons would still be constructed and assessed. DISTRIBUTION OF COSTS The project estimate of $2.27 million is distributed 47% to assessments and 53% primarily to SDCs. The questions regarding the distribution of costs follow. 4. Why isn't ODOT being assessed since their right of way abuts the project? The improvements stop short of ODOT right of way. By Eugene Code property owners that have frontage along an improvement receive a special benefit and pay a share of the cost for the improvement. No improvements are planned for the section within the ODOT right of way, and no special benefit is bestowed on the property so no cost sharing is anticipated. Stopping the improvements short of the interchange allows space for potential future modifications of the interchange. 5. Is MWMC or the City being assessed for the Water Pollution Control Facility property? MWMC will be assessed for the improvements based on the frontage along River Avenue of the Water Pollution Control Facility (WPCF). The funding for the assessment is in the proposed MWMC budget for FY 06. The WPCF property has approximately 3200 feet of frontage along River Avenue and the MWMC has anticipated the assessment for these improvements for a number of years. The estimated assessment to be paid by MWMC is approximately $397,000. 6. Who would pay if there was only one sidewalk? Eugene Code requires property abutting the sidewalk to pay a proportionate amount of the cost of the sidewalk based on the frontage of the property. Per Eugene Code, if the Council determines topography makes it unfeasible to construct sidewalks on both sides of the street the costs for a sidewalk on one side can be distributed to properties on both sides. 7. Why are stormwater utility fees being used to fund the project? There is approximately 124 feet of existing storm pipe that is in poor condition and it will be removed and replaced with this street project. This is maintenance work so this is an appropriate use of utility fee funds. The current budget allocates approximately $25,000 of the $1.2 million city share to come from the stormwater utility fund. 8. Does the federal government pay for the post office assessment? Local authority to levy assessments does not obligate the federal government to pay assessments or systems development charges. In lieu of paying the street assessment the post office constructed curb, gutter, sidewalk and some additional pavement in front of the River Avenue facility when the post office was built. The costs distributed to the property the post office is located on are reduced to account for prior construction of improvements to city standards and will be covered by the SDC fund. Page 2 of 2 9. Provide an accounting of the 23% engineering and 5% administrative costs. The 23% engineering cost is an estimate of the cost for Public Works Engineering staff to implement the project. The assessed amount will be 23% of the primary construction contract or actual costs whichever is less. The fee includes direct and overhead costs to implement the project from the early stages of scoping the project after a capital budget is authorized to the final assessment calculations and drawings of as-built plans. The fee is prorated across all types of improvements, those assessed and those paid for by City funds. The following table highlights some of the types of work and expenses to date. Preliminary planning and public outreach Includes assessment calculation $ 36,000 and coordination Design Includes utility coordination, $166,000 design, design research, legal description research & writing Survey* Topographical and construction $ 48,500 Inspection and construction management* Inspection, as-construct, pay $ 32,000 calculations, contract admin Final Assessment* Calculations, hearings, outreach $ 10,000 Right of Way acquisition coordination Property research, appraisals and $112,200 negotiations for 12 acquisitions *not completed, cost includes estimate to complete ESTIMATED TOTAL $404,700 The 5% administrative cost covers the services provided by the Finance Division of Central Services prior to the payment or financing of an assessment. The major component of the work is customer service, primarily conversations with customers regarding financial options. Other elements include reviewing low-to-moderate income subsidy applications for transportation projects, mailing the assessment hearing notice to property owners by certified mail and long term debt applications, initial account set-ups, and maintenance of assessment tracking computer software. DESIGN CONSIDERATIONS 10. Provide a staff evaluation of Mark Reed's off-street bike path proposal. Mark Reed suggested a separate off-street path be built instead of on-street bike lanes. The Oregon Bicycle and Pedestrian Plan does not recommend multi-use paths next to roadways because half of the bicycle traffic will ride against the normal flow of motor vehicle traffic, which is contrary to the rules of the road. The following are some consequences than can result from off-street paths next to roadways identified by the Oregon Bicycle and Pedestrian Plan and the Pedestrian and Bicycling Information Center: · When the path ends, bicyclists riding against traffic tend to continue to travel on the wrong side of the street, as do bicyclists getting to a path. Wrong-way travel by bicyclists is a major cause of bicycle/automobile crashes. · At intersections and driveways, motorists crossing the path often do not notice bicyclists coming from certain directions. · Cyclists using the path against the flow of traffic often cannot see the signs posted for traffic using the roadway without stopping and turning around. Page 3 of 3 · Bicyclists on the path are required to stop or yield at cross-streets and driveways. · Stopped motor vehicle traffic on a cross-street or driveway may block the path. · Some bicyclists will use the roadway instead of the bicycle path because they have found the roadway to be safer, more convenient, or better maintained. · Bicyclists using the roadway are often subjected to harassment by motorists who feel that in all cases bicyclists should be on the path instead. · Bicyclists may also prefer the road because they will have priority over cross traffic because they have the same right of way as motorists. Additionally, motorized scooters will be able to use the bike lanes on River Avenue but they would not be able to use the off-street path. Motorized scooters can not be legally used on River Avenue at present. 11. Why was on-street parking removed? Without curb and gutter there is not formal on-street parking on the existing street. Some property owners have paved parking adjacent to the street. Parking is not included in the project because it is a direct assessment to the abutting property and property owners didn't want the additional cost. One exception is parking on the east end of River Avenue on the south side of the street. In response to public input, the design included parking for users of the Ruth Bascom River Trail. The cost of this parking area is not being assessed to the abutting property owner. 12. Why is traffic calming not part of the project? Traffic calming is part of the project. The relatively narrow travel lanes, pedestrian medians, street trees, striping for bike lanes and sidewalks are elements of street design that encourage slower traffic. The travel lanes were specifically designed to be narrow to encourage traffic to slow down. Major Collector streets may have travel lanes as narrow as 10' but the higher volume of general traffic and the high level of truck traffic were factors considered when designing 11-foot travel lanes on the east end where there is also a 12-foot center turn lane and the 12-foot travel lane where there is not a center turn lane. 13. Will underpass of Beltline still exist if ODOT closes the access to Beltline? The Oregon Highway Plan requires local connectivity goals be met and it is anticipated that ODOT will comply with local requirements and plans that identify this as a vital connection. River Avenue is one of only three connections between the Willamette River and Northwest Expressway to cross the Beltline Highway and connect the River Road area with the Santa Clara area. It is a high priority to maintain and improve that connectivity. CONSTRUCTION CONSIDERATIONS 14. How much would night-time construction add to the cost of the project? Staff did not include night-time construction in the project primarily because of the apartment complex at 150 River Avenue with approximately 167 units and other residential units. The contractor is willing to use night time construction as one tool to meet the request of minimizing impact to commercial properties from construction. Other tools include working closely with property owners and adjusting the schedules of individual work items to meet the needs of individual property owners. The contractor has suggested that excavation, pipe work and rock work be done at night because Page 4 of 4 that has the largest spatial impact. The contractor is working on an estimate that would include the cost of keeping the plant and offices open, keeping staff such as mechanics available, having lights to support plant, dumping and construction site work lit. CONSTRUCTION BIDS The competitive bid process last summer resulted in a very favorable bid available. Since petroleum prices (i.e., asphalt for pavement and diesel for running construction equipment) have increased substantially since last summer, redesigning and rebidding would provide a good likelihood of getting a higher bid and doing less work for more money. If you have any questions please call me at 682-6855 or by e-mail michelle, r. cahill~ci, eugene, or. us. Page 5 of 5