HomeMy WebLinkAboutItem B: I-5/Franklin UpdateEUGENE CITY COUNCIL
AGENDA ITEM SUMMARY
Work Session: Interstate 5/Franklin Boulevard Update
Meeting Date: May 11, 2004 Agenda Item Number: B
Department: Public Works Staff Contact: Chris Henry
www. cl. eugene, or. us Contact Telephone Number: (541) 682-8472
ISSUE STATEMENT
This work session is an opportunity for the City Council to receive information from the Oregon
Department of Transportation (ODOT) on the second phase of system refinement planning and National
Environmental Policy Act (NEPA) processes needed to consider grade separated ramp connections
between Interstate 5 0-5) and Franklin Boulevard.
BACKGROUND
The Oregon Transportation Investment Act (OTIA III) includes programmed funds for the replacement
of the I-5 bridge structure across the Willamette River. The planned new interstate bridge over the river
has generated significant interest in assessing freeway ramp connections at this location as part of the
permanent bridge project. Due to several key factors including the OTIA bonding and construction
timeframes, lack of existing system planning for a new freeway connection to the metro area at this
location, and uncertainty about design considerations, cost, and funding in the context of regional
priorities, ODOT will pursue the NEPA process on the OTIA III permanent bridge separately from
refinement planning and NEPA documentation for potential ramp connections. Note that it is expected
that the permanent bridge will be designed to accommodate potential future ramp connections to the
freeway. (See Attachment A: letter presented to the Metropolitan Policy Committee (MPC) indicating
ODOT's financial commitment to environmental study of an interchange.)
During Phase 1 of the process, ODOT conducted a "groundcheck," assessing the existing conditions and
needs for the proposed bridge and ramp connections. A series of stakeholder interviews were
conducted, and a project management team was developed, including staff from the City of Eugene, City
of Springfield, Lane County, ODOT, FHWA and Lane Transit District. The outcome of Phase 1 is the
proposed work approach for Phase 2 and subsequent phases. (See Attachment B: summary of project
area stakeholder interviews conducted during Phase 1 .)
The second phase of transportation system planning is envisioned as a high level community dialogue
and decision process. The decision process includes technical work such as conceptual design evaluation
and preliminary traffic and environmental analysis, as well as an open public process with appointed and
elected officials, citizens and stakeholder groups. The outcome of the proposed decision process is
anticipated as a "thumbs up" or "thumbs down" decision by the three local governments and ODOT to
proceed with more detailed analysis that supports amendments to local Transportation System Plans, and
the federal Regional Transportation Plan (Phase 3).
L:\CMO\2005 Council Agendas\M050511\S050511B.doc
COUNCIL OPTIONS
Not applicable.
CITY MANAGER'S RECOMMENDATION
Not applicable.
SUGGESTED MOTION
Not applicable.
ATTACHMENTS
A. ODOT letter (Jeff Scheick, Region 2 Manager) dated April 13, 2005, presented to the Metropolitan
Policy Committee (MPC)
B. Technical memorandum dated March 4, 2005, Phase 1 project area stakeholder interview results.
FOR MORE INFORMATION
Staff Contact: Chris Henry
Telephone: (541) 682-8472
Staff E-Mail: chris.c.henry~ci.eugene.or.us
L:\CMO\2005 Council Agendas\M050511\S050511B.doc
ATTACHMENT A
}Oregon
Region 2 Headquarters
Theodore R. Kulongoski, Governor 455 Airport Road SE Building B
Salem, Oregon 97301-5395
Telephone (503) 986-2600
Fax (503) 986-2630
April 13, 2005
Mr. Mike Kelly
City of Springfield
225 Fifth Street
Springfield, OR 97477
Dear Mr. Kelly:
Thank you for your March 21 letter about an I-5/Franklin Interchange. I think all parties
have been clear about their goals - ODOT must construct a new bridge by 2012 and
the City of Springfield would like to include an interchange project. Less clear has been
the steps we need to take together to accomplish both goals. I will be very clear in this
letter.
We will construct a new I-5/Willamette Bridge by 2012 using OTIA III Bridge Funding.
This will not be easy. While we are confident that a full Environmental Impact Study
(ELS) will not be required for the bridge replacement, we anticipate the required
environmental work will take two years, followed by two years of design and any needed
right-of-way acquisition. Finally, we anticipate two years to complete construction of the
new bridge.
I understand that you would like one ElS conducted for both the bridge and the
interchange projects. The interchange will require a full ElS which will result in delaying
construction of the bridge until the environmental work is completed. This is not a
feasible option. The interchange ramps will have to be built after the bridge is
completed.
The need to study and potentially build an interchange after the current bridge
replacement should not be a major concern to the City. First, unless it is physically
impossible, we will design and build the bridge so that ramps can be added. Second,
ODOT remains committed to providing $2.75 million to fund an ElS for a full interchange
at Franklin Boulevard. Third, it is entirely possible that the interchange project will be
ready to move forward within 3 years if the City and metropolitan area update their
transportation plans and complete 'the necessary land use actions to include the full
interchange and related improvements.
It is critical that the Cities of Springfield and Eugene and the Metropolitan Planning
Organization (MPO) begin working to update their transportation plans, solidify their
priorities, and secure any critical land use approvals as soon as possible. This work
must be done before we will initiate the ElS for the interchange. We have learned
through experience that a solid system planning foundation is necessary for projects to
move successfully through the environmental and project development process. We
have committee $500,000 to your local planning effort and ODOT region staff is ready
to provide the technical information, the needed transportation system improvements,
preliminary cost estimates and documentation necessary for the metropolitan area to
complete the required system planning. We will work closely with you to complete this
task expeditiously.
ODOT has previously said we would fund an ElS for the interchange - and we will
follow through on that commitment provided that the Cities and MPO do their part as
well, including the transportation planning and land use work. I am optimistic that we
can build a new bridge and position the interchange project to move forward if we work
together towards both goals.
Sincerely,
Jeff Scheick
Region 2 Manager
cc: Congressman Peter DeFazio
Commissioner Bobby Green, Lane County
Mayor Sid Leiken, City of Springfield
Mayor Kitty Piercy, City of Eugene
Dennis Taylor, City of Eugene
Ollie Snowden, Lane County
Doug Tindall, ODOT
ATTACHMENT B
TECHNICAL MEMORANDUM CH2MHILL
Franklin Avenue/Glenwood Area Interchange Study
PREPARED FOR: Willamette River/Glenwood PMT
PREPARED BY: Sam Seskin, CH2M HILL
DATE: March 4, 2005
The consultants conducted hour-long interviews in person with project area stakeholders.
The interviews were conducted during the second week of February 2005. This memo
includes the interview format and questions, interviewees, and summary of the interviews.
Interview Format and Questions
· Statement of interview purpose:
- to obtain their input on problems, issues and decision making process related to a
possible Franklin Ave/Glenwood Area interchange
- to summarize ODOT's interests and their commitment
· Brief description of the anticipated work
· Indication that their input will be used in development of the scope of work for Phase 2,
including both technical issues and public/agency involvement
· Open discussion based generally around the following questions:
- 1. How would you describe the problem? What is the history of the problem (not the
project) as you see it? What is causing the problem?
- 2. What are the key issues related to solving the problem?
- 3. How do these issues affect you and/or the constituency you represent?
- 4. Do you feel the project scope as described is an appropriate way to address the
problem?
- 5. What types of activities would be most helpful in developing the best solution to
the problem? What approaches have worked well in the past, and why? What
approaches have been unsuccessful, and why?
- 6. How do you (or the organization you represent) want to be involved in the
project? What type and level of information do you want to receive?
- 7. Who else should we be talking with (what other groups are affected, what
organizations represents them, who are the appropriate contacts)?
- 8. Are there any other questions you wish we would ask?
TECH MEMO 030705.D0C
FRANKLIN AVENUEIGLENWOOD AREA INTERCHANGE STUDY
Franklin/Glenwood Interchange Area Interviewees
David Kelly, Eugene City Council
Allen Lowe, Eugene Senior Planner
Bill Dwyer, Lane County Commissioner
Rich Hazel, Laurel Hill Neighborhood Association Co-Chair
John Lawless, Eugene Planning Commissioner
Bobby Green, MPO Vice Chair
John Brown, Cai Young Neighborhood President, Real Estate Analyst
Kristen Taylor and Jeff Nelson, Fairmount neighborhood co-chairs
David Sonnicksen, Whilamut Natural Area of Alton Baker Park
John Lively, Lane/Metro Partnership
Chris Ramey, University of Oregon Architect
Terry Connolly, Eugene Chamber
Rob Zako, Laurie Siegel, 1000 Friends of Oregon
Steve Moe, Springfield Planning Commission
Sid Leiken, Springfield Mayor
Mike Kelly, Springfield City Manager
Greg Mott, Springfield Planning Manager
Steve Dignam, Lane County Planning Commission
TECH MEMO 030705. DOC 2
FRANKLIN AVENUEIGLENWOOD AREA iNTERCHANGE STUDY
Stakeholder Interviews Summary
Introduction
This memorandum summarizes the remarks of 19 stakeholders who were interviewed by
the project team during the period February 7-9, 2005. The interviewees were from the list
of stakeholders made part of Project Management Team (PMT) meeting summary notes
(January 12, 2005) for the January 4th meeting.
Stakeholders interviewed were: David Kelly, Eugene City Council; Allen Lowe, Eugene Sr.
Planning Planner; Bill Dwyer, Lane County Commissioner; Rich Hazel, Laurel Hill
Neighborhood Association Co-Chair; John Lawless, Eugene Planning Commissioner; Bobby
Green, Lane County Commissioner; John Brown, Cai Young Neighborhood Association
President; Kristen Taylor and Jeff Nelson, Fairmount Neighborhood Association Co-Chairs;
David Sonnicksen, Whilamut Natural Area of Alton Baker Park; John Lively, Lane/Metro
Partnership; Chris Ramey, U of O Architect; Terry Connolly, Eugene Chamber of
Commerce; Rob Zako and Laurel Siegel, 1000 Friends of Oregon; Steve Moe, Springfield
Planning Commissioner; Greg Mott and Sid Lieken, City of Springfield Planner and Mayor;
and Mike Kelly, Springfield City Manager.
To maintain confidentiality, none of the remarks below is attributed to specific interviewees.
The remarks have been combined to eliminate duplication and are grouped under the
following categories: Attitude Toward Project, Issues/Constraints, Data/Information
Needs, Outreach Process, and Other Stakeholders. Each category begins with an overview
of the remarks.
Attitude Toward Project
All interviewees demonstrated an understanding of how the proposed project could
improve access to the Glenwood area and simplify access to the Eugene downtown core and
U of O. Neighborhood and environmental group representatives were especially wary of
the impacts, however. City and County officials expressed the most enthusiastic support.
Representative remarks follow:
Wonderful idea in principle
Questionable viability relating to need
Replacement of existing city entrance would be a good thing
Need to plan for access ahead of development
People get lost very often--no good connections
New interchange at Glenwood would create development environment
Need a comprehensive Franklin Corridor study
Concerned--project is driven by university
Issues/Constraints
Interviewees were concerned with potential for funds diverted from other projects,
increased congestion on Franklin Boulevard, traffic circulation/cut-throughs, neighborhood
and business access, land use and property value impacts, parkland impacts, river
greenway preservation, replacement housing, bike path connections, noise, aesthetics, bus
TECH MEMO 030705. DOC 3
FRANKLIN AVENUEIGLENWOOD AREA INTERCHANGE STUDY
rapid transit (BRT) construction and function, pedestrian safety, development of Glenwood,
and U of O arena events traffic. Specific remarks included:
Consider egress from Laurel Hill (16th Street underpass now) with new configuration
Connections from Laurel Hill to 30th--prohibited in Laurel Hill plan--has stopped other
proposed developments
Would like aesthetically pleasing bridge not marred by high flyovers, etc.
Consider use of "quiet" pavement or noise walls on structures
New subdivision of 200+ homes in progress (East Ridge Village) will need access to freeway
at Glenwood
Judkins Point---viewed by community as a natural feature
Need City Charter Amendment to change Alton Baker Park
ODOT doesn't maintain its property next to the Willamette
Be clear about project objective (purpose and need)
Need to put project in a regional planning context
Need to look at metro area growth patterns
Urban renewal district in Glenwood will result in new civic, mixed use and industrial
growth
Ferry St interchange overloaded
Arena could encourage hotel/tourism development at Glenwood
Exceptions required to meet state/fed policy (interchange spacing, etc.)
Data/Information Requirements
The most often mentioned need for data and other information was in regard to traffic.
Interviewees recognized that the Ferry Street Bridge was inadequate to serve the needs of
the area. Several interviewees wanted to know how much a new interchange at Glenwood
would relieve the volume on the Ferry Street Bridge. Interviewees also wanted to know the
traffic volume and circulation impacts to Franklin Boulevard. Specific remarks often
centered on design details, and included:
Lane configuration, secondary road locations
Capacity improvements
Footprint--how far would impacts extend east and west
Interchange forms
Visual simulations
Areas where access management might be required
Need a comprehensive Franklin Corridor Study
See prior study (done as part of Ferry St. project) -- South Bank Conceptual Study (City of
Eugene, Sept. 14, 1994)
See Option D of the Ferry Street Bridge Improvements Feasibility Study (19887)
Need better origin/destination (O/D) data
Impacts of increased traffic and access on intersecting arterials (Orchard, Walnut, Agate)
Outreach Process
Interviewees all recognized that a broad community discussion was necessary for the
proposed project. Neighborhood association and environmental groups may need their own
special meetings. Those who were familiar with the public process for the I-5/Beltline
TECH MEMO 030705. DOC 4
FRANKLIN AVENUEIGLENWOOD AREA INTERCHANGE STUDY
Interchange project cited it as an example. Meetings that would be held jointly by Eugene
and Springfield officials (and Lane County) were encouraged. The use of outside facilitators
was also encouraged. Generally, the message was, "do what has worked in the past." A
rather comprehensive list of remarks follows:
Show and ask---here are our ideas, what do you like?
Provide irrefutable facts/constraints about design requirements (not overblown standards)
Use Mayors as conveners
Changes to TSP--need to create boundaries of alternatives, enough definition so elected
officials can agree to move forward (e.g., no impacts to park)
Need to present a "replacement bridge project only" as one alternative, as well as 3 or 4
others--very conceptual, not engineering drawings
Simulations of some form very useful--what it would look like (height, placement, etc.--not
detailed design
Tie into two other Eugene planning efforts---Walnut Mixed Use Study (on Franklin to
consider redevelopment options) and 6th/7th Street Project
Real players are in City Council---meet with them in a work session to lay out the issues
before going to the public, involve the Planning Commission
Meet with executive board of neighborhood association first, then full community meeting
Website
Use LCOG list for mailing
Use process of U of O and Fairmont Neighborhood Association on consideration of East U
of O Plan as model--coming together--at first very controversial
Neighborhood Leadership Council--good way to get word out about study before it starts,
education about process, timelines, etc.
Use joint meetings of all the planning commissions--it has been done for other things
Use JEO meetings ---Joint Elected Official meetings of Lane County Commission and both
City Councils
Send letters to 2 Mayors and County Board Chair (Anna Morrison)
Use meetings with small group discussions, not open houses---people won't understand it
by just viewing posters
Hold events at schools and places where people are comfortable
Keep language simple
Media coverage is important---newspaper and TV
We had a good relationship with ODOT over the temporary bridge
TECH MEMO 030705.DOC 5
FRANKLIN AVENUEIGLENWOOD AREA INTERCHANGE STUDY
We want the process to be inclusive, and take environmental issues into account
Find the broader voice by involving Glenwood, Fairmount, and Laurel Hill
Use recent planning process (East Campus Plan) with Fairmount as a model-listened to
neighbors, while keeping institutional commitment to enlarged campus in mind
Beltline was a good model
Need to involve the metropolitan Policy Committee, but maybe involve them as elected
officials rather than as a policy board, since the former would lead to more public
involvement
Don't let [some neighbors] run the show--they have to be led
Beltline Decision team is the model for decision making...you have the model
Concern about ODOT's assertion that planning consensus must be complete in 6 months
Can we uncouple this project from the bridge replacement?
Keep the issue on ODOT's mind
It's hard to find out what ODOT's policy is [for NEPA studies]
Who speaks for ODOT?
Other Stakeholders
Many of the people who interviewees mentioned as other stakeholders to contact were
already on the PMT's list, and some were interviewed. A comprehensive list of
recommended names and organizations follows with names in italics of people that were
interviewed. (We regret any misspellings and other irregularities.)
George Poling--Eugene Councilor representing Chevy Chase neighborhood (part of Harlow,
north of park)
East Alten Baker Park Citizens Planning Committee (CPC)---682-4800--Parks Department
can give us names of members
Jim Carlson ---Assistant Eugene City Manager, 682-5524
Jan Bowman--Eugene Community Relations, 692-5587
Chris Ramey--U of O campus architect and planner
Jim Werfelmann--Peace Health Medical Center Hilyard Campus
Railroad
Chamber of Commerce
Jerry Diethlem, Otto Poticha--architects who developed Glenwood plan
John Tamulonis--Springfield economic development
TECH MEMO 030705.DOC 6
FRANKLIN AVENUEIGLENWOOD AREA INTERCHANGE STUDY
Peter Thurston--architect who developed Glenwood redevelopment plan (may be good
source of data for traffic generation, projections)
Faye Stewart--County Commissioner who represents Glenwood
County Roads Advisory Committee
Steve Moe, a major property owner in Glenwood--very civic minded and long-time resident
East Ridge Village/Son Blaze Development, Laurel Hill Valley neighborhood
Charles Biggs, ex-pres CYNA, (generally, growth and park impacts)
Neighborhood residents
Laurel Hill neighbors
Allen Lowe, Eugene Planning and Garry McNeal, Eugene Public Works Transportation
South University Neighborhood - Peg Peters, chair
Eugene Parks and Open Space
Glenwood Urban Renewal Board
Downtown Association, Russ Brink
Convention and Visitors' Ass'n., Kari Westland
Lane County Commission, Bobby Green
Hugh Prichard, Real Estate Broker
Sierra Club
Convention and Visitors' Assn of Lane County
Eugene Bicycle Coalition
Bill Dwyer
Peter DeFazio, U.S. Congressman
Nick Arnis, Springfield Transportation Planner
TECH MEMO 030705. DOC 7