HomeMy WebLinkAboutAdmin Order 58-17-19-FADMINISTRATIVE ORDER NO. 58-17-19-F of the City Manager of the City of Eugene INFLATIONARY ADJUSTMENT OF SYSTEMS DEVELOPMENT CHARGES FOR TRANSPORTATION SYSTEM, LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND PARKS SYSTEM. The City Manager of the City of Eugene finds as follows: A. Section 2.020 of the Eugene Code, 1.971 (EQ, authorizes the City Manager of the City of Eugene to determine and set fees and charges to be imposed by the City for services, goods, use of municipal I property, and licenses and permits. EC 7.710(5) and Section 2.4 of the Systems Development Charge (SDC) Methodologies authorize the City Manager to adopt by administrative order pursuant to EC 2.020, a change yin the amount of a reimbursement fee or an improvement fee if the change in amount is based on: (1) the periodic application of an adopted specific cost index (inflationary adjustment); or (2) a modification to any of the factors related to rate that are incorporated in the established methodologies. However, pursuant to Section 2.4 of the SDC Methodologies, revisions of such fees in an amount greater than five percent within any 12 -month period must be established by resolution of the City Council. B. The SDC Methodologies were adopted by Resolution No. 4900 effective May 7, 2007, and have subsequently been amended by Resolution Nos. 4929, 4977, 4991 and 5100. Inflationary adjustments to SDCs for the Regional Wastewater System, Parks System, Local Wastewater System, Stormwater System, and Transportation System have been adopted, most recently by Administrative Order No. 58-16-14-F, effective July 1, 2016. In addition, amendments to the MWMC Capital Improvements List and MWMC SDC Fee Schedule for the Regional Wastewater System were adopted by Administrative Order No. 58-17-02-F, effective March 10, 2017. C. In accordance with the procedures set forth in Sections 2.020 and 7.710(5) of the Eugene Code, 1971, after considering the applicable policies, enactments and directives of the City Council, the amount charged for these services by the City in the past, the full costs of providing these services supported by the fees, the amounts charged by other comparable providers, and the revenue needs of the City as determined by the adopted City budget, on August 4, 2017, 1 issued Administrative Order No. 58-17-19, proposing to implement inflationary adjustments to SDCs for the Transportation System, Local Wastewater System, Stormwater System, and Parks System rates as shown on Exhibit A attached to that Order. General descriptions of the adjustments are described in Findings D and E below. D. Based on the Engineering News -Record 20 -City national average Construction Cost Index of 3.7% (May 2016 through May 2017), it is necessary to amend the Transportation System, Local Wastewater System, and Stormwater System SDCs by implementing a 3.661/o increase for those SDCs. As such, these increases will not result in a 5% or greater fee revision within a 12 -month period. Administrative Order -Page 1 of'2 E. Based on: (1) the park development/renovation cost adjustment using the Engineering News -Record 20 -City national average Construction Cost Index of 3.7% Index (May 2016 through May 2017), and (2) the park land acquisition cost adjustment using the Lane County Assessment & Taxation office's published 2016 Sales Ratio Report, it is necessary to adjust the Parks System SDCs by implementing an average 2.6% increase in the Parks System SDC for residential development, and an average 2.7% increase in the Parks System SDC for nonresidential development. As such, these increases will not result in a 5% or greater fee revision within a 12 - month period. F. The 'inflationary adjustments are consistent with adopted policies of the City, are in conformity with applicable state law, are authorized by Section 7.710(5) of the Eugene Code, 1971, and should be implemented effective September 1, 2017. G. Notice of the proposed inflationary adjustments was given by providing copies of Administrative Order No. 58-17-19, including Exhibit A (the proposed amendments) and Exhibit B (the Notice), to the Mayor and City Councilors; making those documents available for inspection by interested persons at the office of the City Engineer, Public Works Department, 99 East Broadway, Suite 400, Eugene, Oregon, 97401; and by posting those documents at two locations at City Hall on August 15, 2017. In addition, Notice of the adjustments was published in the Register - Guard Newspaper on August 25, 2017, and persons who requested notice of the amendments were mailed informational postcards as notification of the proposed amendments. H. Notice provided that written comments would be received for a Period of 15 days from the date of posting and publication. No comments were received within the time or in the manner set forth in the Notice. On the basis of these findings, I order that: 1. The adjusted Systems Development Charges set forth in Exhibit A attached to this C� Order are to be implemented effective September 1, 2017. effect. The unamended. Systems Development Charges shall remain in full force and Dated this 317�ay of August, 2( 7 Jon R. Ruiz City Manager Administrative Order - Page 2 of 2 SUMMARY OF LOCAL SYSTEMS DEVELOPMENT CHARGES (See Appendix C-2 for information regarding the Regional Wastewater SDC) Exhibit A to Administrative Order No. 58-17-19-F -- Page 1 of 22 Transportation Wastewater Local (C�qy) Parks Cost per Trip = $2,113.26 Cost per new residential units _Stormwater Total stormwater unit cost per Net Residential cost per Dwelling (e.g., single-family, mobile home sqft of impervious surface Area = Unit: parks, duplexes, apartments) = a $0.2303 except development that Single Family = $4,246; base rate of $462.40 plus $0.1121 is required to provide for off-site Duplex/TH/MH/ADU = $3,442,00 per square foot of living area. LID function for which unit cost per Multifamily = $2,686.00 Residential additions will be sq,ft. of impervious surface area = Nonresidential: charged $0.1121 per square foot $2.0612. Charges are based on Class A = $1,697.00 per room; of increased living area. use. 1-2 Family development Class B = $1,134.00 per TGSF; Nonresidential uses = $3.5030 per under 3,000 sq,ft. have tiered Class C = $694.00 per TGSF; gallon of daily flow/discharge. rates based on est. imp. surface Class D = $413.00 per TGSF; ry areas. 1-2 Family over 3,000 Class E = $167.00 per TGSF. sq.ft.. and Multi -Family & Nonresidential are based on actual imp. surface area. Charges for Mfg. Home Parks are based on est. imp. surface area per space plus actual impervious surface area of additional common area. Estimated costs of Estimated non -assessable cost of Estimated non -assessable cost of Unit costs for various components. arterial/collector Street system existing system using costs from system -wide capacity from future (non assessable cost per lane- "Gravity Sewer Lines System capacity -enhancing projects as mile, costs of intersections, traffic Valuation Model" developed by contained in the Stormwater SDC cc signals, street lights, structures) CH2M Hill. Charges are net of all Project List and available existing 0 and off street bicycle paths. federal grants and outstanding stormwater system capacity. debt. Existing levels of service for Design flow standards currently Design standards currently used Planned levels of service for various components as used by the city for Various land by the City to handle a Five-year various components, as established by current City use types, PFUs equivalents are storm. established in the adopted Eugene transportation design standards. determined per Oregon adopted Parks, Recreation, & Open Space Plumbing Code. Comprehensive Plan's Project & Priorities List. as U) C Street Component: Reimbursement fee Reimbursement fee Reimbursement fee .0 El 1� - 0, 60% 1 mpr. Fee o 84% Ir 47% 0- 23% U m P 40% Reim. Fee 'i;; ra Bike Component: Improvement fee Improvement fee Improvement fee m 6 10- 100% Impr. Fee ► 16% 0* 53% d 77% ci Charges for new or expanding New or expanding residential uses Charges for new (all) or expanding Charges for new or expanding development are based on the are charged based on a per (Multi -family, Nonresidential) development are based on a cost per trip times the trip rate dwelling unit cost plus a rate per development are based on a tiered flat rate per dwelling unit for assigned for a specific square foot of living area. Non- estimated or actual impervious residential development types and C development type times the residential uses are charged surface areas and the total a tiered flat rate per room or per M number of units of measurement based on the number of PFUs at a stormwater unit cost per square thousand gross square feet of proposed. rate for the specific development foot. Stormwater impact not building area for nonresidential E type. Credit for past trunk sewer attributable to impervious surface development types. levy payments will be applied to area will be charged based on E the local charge. equivalent surface area and the total stormwater unit cost per square foot. Note: Administration costs are not included in the figures above, see section 2.3.1 for more information, Exhibit A to Administrative Order No. 58-17-19-F -- Page 1 of 22 Q Z Q W d f.S h - z Lu 2 CL 0 LU uj i' w h- r ryz V 0 CL • r 0- •w •- C1 x X W w v «. w w. w d. w w w ry w «a• N w «. r a � � V I a N E I n O �, II,, IF ro III' un521 N I IqE N a� w N r: E M - a a f„ y r 7 r I aS f f/1n a o � �! E N o � a a N � o T - NE`12114 76 E va In F F a _ ~ O b a r , W U !1 _ _ 4 m LL> r 4 s, M r w EIIM. w E E E c z , _ v E . E E r r u 9 -b C NO G Q — M W a a b O V � U _ p +. r a a N a O_ VIII 2 V U _ 4r, - 2 O 2 o m 6 sao7oailo0lleia a3ay C1 x X W 11. Analysis of System Value I Total Replacement Cost - Pipe $644,408,484 Total Replacement Cost - Pumping Stations $24,600,233 City Cost of future projects within UGB $15,404,090 Other Wastewater Components $5,049,356 Tota) —Cost of Existing Wastewater System $689,462,164 12. Analysis of Assessable Amount Total System Valuation, existing and planned Size Total Cost 6 -inch $14,641,676 8 to 48 -inch $487,216,521 ITotal Assessable Cost $501,858,197I 13. Capacity information I ITotal City System Capacity in mgd 49.0 14. Calculation of Wastewater SDC Total System Valuation, existing and planned $689,462,164 Cost per unit of capacity per gallon $3.50 Residential Rate Structure $462.40 per RDU + $0,1121 per sq. ft. of living area Non -Residential Rate Structure 7— See Table 7 5. Calculation of Reimbursement Percentage I City System Capacity (EDUs) in mgd 49.0 100.00% Existing Use in mgd 21 A 43.7% Percent Available for New Development in mgd 27.6 56.3%11 Total Value of Reserve Capacity (value of system) $96,413,581 100,00% Value of Increased Capacity (cost of future projects UGB- Master Plan) $15,324,095 15.98% Value of Reimbursable Capacity (previously paid value -existing users) $81,009,630 84,02% Exhibit A to Administrative Order No. 58-17-19-F -- Page 3 of 22 Eugene Local Wastewater Use Code* Description Average Daily Flow per Cost per PFU 1 F Single -Family / Duplex Housing $462A0 + (Sq Ft Living Area x $0.1121) ix Mixed Use with Residential $462A0 + (Sq Ft Living Area x $0.1121) I I Multi -Family Housing $462.40 + (Sq Ft Living Area x $0.1121) 12 A, B, & C Elderly Housing Attach, Detach, & Group/Retirement Home $462.40 + (Sq Ft Living Area x $0.1121) 13 Residential Hotel $462.40 + (Sq Ft Living Area x $0.1121) 14 Mobile Home Park $462.40 + (Sq Ft Living Area x $0.1121) 15 Hotels, Motels, Loclaina 19.05 $66.73 21 Beverage/Food Mfg 39.87 $139.55 24 Wood Products 47.93 $167.90 2X Light Mfg./Printing 56.62 $19834 3X Manufacturing 58.65 $205.45 4X Transportation & Utilities 18.22 $63.82 41 Fire Station 7.75 $27.15 51 Wholesale Trade 21.37 $74.86 54 Retail Trade / Grocery 55.46 $194.28_ 55 Retail Trade Automotive 7.83 $27.43 59 Retail Trade Other 3991 $139.80_ 5A Restaurant - Fast Food 25A4 $89.12 5B Restaurant - Low to Med Turnover 62.47 $218.83 5C Restaurant - Higher Turnover 22A5 $78.64 5D Drinking Establishments 5498 $192.59 5E Take/Bake & Pick Up/Delivery Establishments 26.49 $92.79 5X Retail Trade / Clothing & Dry Goods 12.35 $43.26 61 Financial Offices / Banks 1&99 $59.52 62 Other Services 2851 $99.87 63 Rental/Storage Services 6.49 $22.73 64 Automotive & Other Repair Services 16.17 $56.64 65 Medical Services 2875 $100.71 66 Construction Trade Services 1169 $47.96 67 Government Services, Office/Business Parks Based on specific use of development 68 Education / Cultural 15.66 $54.86 69 Churches/Clubs/Organizations 15.70 $55.00 6A1 Laundry Services (Linen, Uniform) 53896 $1,887.97 6A2 Laundry, Self -Service 299.64 $1,049.63 6A3 Dry Cleaning Service (with or w/out laundry services) 36.30 $127.16 6B Car Wash 264.54 $926.68 6X Profess ional/Real Estate/Insurance 67.76 $237.36 7X Entertainment, Recreation & Sports 88.42 $309.73 82 IVeterinarian Service 2479 $86.84 *The unit cost of capacity for the local wastewater system is $3.50 per gallon per day. 'The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use. Land use types that do not fit into the above categories will receive a default flow assignment based on the sample average. The default flow is 47.93 galiday x $3.50 = a cost per PFU of $167,76. A rate per PFU may be assigned by the City Engineer should a proposed use not be represented by one of the published SDC use codes and for which a default flow assignment is not representative of the proposed flow. |nthe case ofthose proposed developments thatawda8anninedtohaveapotanUa|fo,oxcepUuna|wmteruuaQc.thcCityEnginecrmaymquirethatthe0wner(s) enter into an agreement with the City to review water usage or wastewater discharge at such time the development is in full use or production as the final basis of the local wastewater SDC. A complete list of wastewater SDC/HUD BPR use codes is provided in Table 8. Exhibit AtoAdministrative Order No. 58 -17 -1A -F - Page 4of22 rd�q�� 1111111 1111�!! 11111!1 111 11. Existing Stormwater Drainage System Value & SDC -Eligible Costs (Reimbursement Fee) Total Replacement Cost - Existing Pipe System $345,704,684 Total Replacement Cost - Existing Open Channel Systems $98,817,731 Total Replacement Cost, Existing (Replacement Cost New) $444,522,415 Percent of Existing Pipe System to be Used by New Development 4.27% Percent of Existing Open Channel system to Used by New Development 2.34% Total SDC -Eligible Cost - Existing Pipe* $14,761,591 Total SIDC-Eligible Cost - Existing Open Channel Systems* $2,312,336 Total SDC -Eligible Cost, Existing System * Based on percent available capacity per hydraulic model $17,073,927 12. Future Stormwater System SDC -Eligible Project Costs (improvement Fee) Total Est. Cost, Future System (SDC -Eligible Projects) (From Table 9) $42,149,922 Portion of Project Cost, Future System (excluding LID S2pacity)_ (From Table 9) $18,800,662 E—i Portion of Project Cost for Future System LID Capacity (From Table 9) $8,513,629 13. Stormwater System Calculation Details Single -Family Dwelling (SFD), estimated average impervious surface area Unit Cost per Square Foot, Improvement Fee Small Residential (building footprint , 1,000 sq. ft.) 1,800 sq, fL Medium Residential (building footprint 1,00C sq. ft. and < 3,000 sq.ft.) 2,900 sq. ft Mfg. Home Park Space, estimated average impervious surface area 1,780 sq, ft Total Additional Impervious Surface Area within UGB (build -out) 155,770,560 sq. ft. I Total Additional Impervious Surface Area within UGB (build -out) requiring LID c t. 14. Calculation of SDC - Unit Cost per Square Foot, Improvement Fee [$18,800,662 / 155,770,560]1 SO.1207 Unit Cost per Square Foot, Improvement Fee for LID capacity component [$8,513,629 / 4,650,OCO] S1.8309 Unit Cost per Square Foot, Reimbursement Fee [$17.073,927 / 155,770,560] $0.1096 Total Unit Cost per Square Foot for General Capacity [improvement + Reimbursement) $0.2303 Total Unit Cost per Square Foot with LID component [improvement + LID + Reimbursementj $2.0612 Small Residential SIDC �hujlding footprint < 1,000 sq. ft.) 1,800 sq. ft. X 50,23031 $414.54 Medium Residential SDC (building footprint 1,000 sq. ft. and , 3,000 sq.ft) [2,900 sq.ft x $0,23031 $667.87 Small Duplex SDC (unit building fcGtprints < 1.000 sq. ft.) t$414.54 x 2] $829.08 Medium Duplex SIDC (unit building footprints >1,000 sq. ft. and , 3,000 sq.ft.) [$667.87 x 2] $1,335.74 Mfg. Home Park SDC per Space (portion of total charge) [1,684 sq. ft. x SO.2303] $387.83 Small Residential SDC with LID (building footprint , 1,000 sq, ft.) 1,800 sq- ft. x $2.0612] $3,710.16 Medium Residential SDC with LIE (bUdding footprint >1 000 sq. ft, and < 3,000 sq'ft) [2,900 sq.ft x $2.06121 $5,977.48 Small Duplex SDC with LID (urit building footprints � 1,000 sq. ft.) [$3,710.16 x 2] $7,42032 Medium Duplex SDC with LID (unit building footprints 1,000 S . ft. and < 3,000 sq.ft.) [$5,977.48 x 21 $11,954.96 I L Mfg. Home Park SDC per Space (pertion of total charge) with LID [1,684 sqft. x S2 061?jL_ $3,471.06 *See Appendix F for complete rate schedule. Exhibit AtoAdministrative Order No. 58-17-1Q-F—Page 5of22 kff-.N7-.I*4wo LOU== nommun -117,myr-ml *Tsag in P1 ry imm Project Name Estimated Project Cos ligible Cost Martin Drive Pipe Improvements (02-07 CIP) $150,541 $150,541 Mt. Cavalry Pipe Improvements $1,235,418 $300,507 Frederick Court Pipe Daylight $191,497 $88,089 43rd Avenue Pipe Improvements $3,489,180 $1,116,538 Morse Park Ranch Park Pipe Improvements $1 � 706,956 $187,765 Laurelwood Flood Control Fac/Pipe Imps $3,211,163 $487,659 Jackson Street Pipe Improvements $125,289 $31 �322 Windsor Circle Pipe Improvements $1,487,617 $956,325 West Hawkins Lane Water Quality Facility $1,012,194 $819,395 Bell Avenue (increase Pipe Sizes Along) $1,286,245 $591,673 Ernpire Park Pond Retrofit $623,212 $124,642 Royal Node Stormwater Infrastructure $2,266,226 $2,266,226 Greenhill Tributary Storm Improvements Ph 2 $605�406 $206,388 Greenhill Tributary Water Quality Facility $1,212,109 $363,633 Roosevelt Channel - Culvert Improvement $219,985 $69,469 A-1 Main Channel Culvert & Open Waterway Improvements $831324 $133,332 Lynnbrook Drive Open Waterway & Culvery Improvements $780,877 $234,263 Spring Creek Bridge Construction & Waterway Improvements $22&490 $51,863 Sanders Street Water Quality Facility $1,209,679 $60,484 Spring Greek Drive Water Quality Facility $38Z991 $76,598 Kirsten Street Pipe Improvements $619,973 $179,792 HUnsacker - Open Channel Improvements (02-07 CIP) $644�253 $386,876 Lenox/Salty - Culvert Replacement (02-07 CIP) $278,422 $166,730 Hunsacker Culvert Replacement (02-07 CIP) $42,090 $25,901 Division Avenue Tip -Up Pipe Replacement $17,630 $4,055 Irvington Drive Water Quality Facility $1,058,328 $148,166 St. Peter School Culvert Replacement $89,735 $26,921 River Point Pond Outlet Channel $604,273 $247,752 Gilharn Road System Culvert Replacement $43,707 $43,707 Gilham Road System Water Quality Facility $1,058,491 $105,849 Ascot Park Open Waterway Modification $116,874 $77,137 3rd -4th Connector Stormwater Improvements (02-07 CIP) $194,248 $194,248 Beaver St & Hunsaker Ln Stormwater Improvements $80,937 $80,937 Greenhill Rd Stormwater Improvements $161,876 $161,876 Irvington Drive - Stormwater (02-07 CIP) $161,876 $161,876 Kinney Park Flow Diversion & Restoration $1,003,615 $742,675 River Road - Stormwater (02-07 CIP) $80,937 $80,937 Royal Ave., Terry to Greenhill $161,876 $161,876 Services for New Development ($1 00,000/year) $5,503,693 $5,503,693 Streambank Stabilization ($ varies/year) $7,931,793 $1,982,948 FOTT, for General System Capacity Projects $42,149,9� $18,800,662 ILID Facilities in conjunction Wth Pavement Preservation Program $6,324, ET -9- $6,324,995 ILID Facilities in conjunction with Drywell Elimination Program $2,491,3301 $2,188,633 tem Capacity Projects $8,513,629 Exhibit A to Administrative Order No. 58-17-19-F -- Page 6 of 22 .1 (Pue�)o Pa[)Ljnj 4110 % co C) N m (A9C]) papun M m cz, -c ao 0, Ili cao (sapui) livii ftiuun�3 c� rirn cdo j co leji ;3sn-ijjnrq o oo C� CPp Q m Dop dS@DuP.wMP;;d _7= pp P7 uapieJ ju3!uujoq "ET WeH) jjeqja4seq -E—t o cv to m co - - u-) Lr, r15 0 Z4, N 69 11 C) m�m a, o �2 (Al V� 19 cN 2 CD co Ln F Iii m, c)cc) mo S G O(c WIT m co I Gco Lo N iAl cn N w tL cl U' o E G –E7 N cc co 6. o) - c%� CO (D 1�9 M Lo 6 c516 6j6 of N n n m M M Nic4 o o Q- 0 ooL" CJ O II7 C7) -15 N CO c,4 04 D I ro LO o M < > 7 to to co < cN N ro vi x C —rd r N co En jc 0 Cn I (D Ct) (L (h x =w:: 2� !'E (D m IL o E 0 0 ch m (L x u- Q c C, (D E�E E w z N it 0) < m o (u L, o o c g CL CL 0 rr 2 Gi E m E -2 a) c: o ':5 E o E :S 10 E z z cn ul -j :E 0 UOUO)l I I .1 N N L GI O O Im aw m ml v I wiw(w r 4 U I 1 a, f i w m .NC o '.I. S EI S c.. o 10l a o I c ea m w it w '-' w m o w `r m vim. ry Z i c c u- O i c c u. 0 0 '0 � U > O � N N N I P - N N I �- ^ j rp l� m 47 un] m f9 N C C m _ O U o wwwww - c o w 1. IS 0 w o w N I w ww i i W rta^r vt w U 4 Z Z Z z z z Z Z z z o. z z z Z z '.. z I Z a Z Z Z a z z z Z Z Z 7 Z a l a z I Z Z Z Z Z a a Z Z N a a a Z Z z Z z Z a Z Z a a Z Z a a Z Z a Z a Z a Z h� o. C £ m m U f £ '� a d o o -p .-.. � n O SII m gl n t s m r { m E v, x - t c o f i E P d on a a n. ° ....� N n E o £££ -c > n n V f EE m v cI .0 rn li U U m 2 t 4 4 Q Q Q 4 O� O 4 �' < �' Q Cl C Q GY `m 4 U' L7 O O O O O O O D D c 0 < 0 A A A A O O a CJ Z CV N a co 0 0) ccs CL -0 s W O IL O 0 Ci R, E2 MY u3 a5 77 7,7 LL .... . . .... I Is 1 .1 R R El E S O 15 ao 6 'n < z < < 7 z z 21 if t5 z f 0 2 'p R 2 'p S B < < F E E < 4 < 4 < O IL c6 LO O Cell 0 m (n -E 7D M I 2 2 6 c+ an E --ET- F, C-1 -Is -E n _0 ul LL a, a ary "I TS -77- #... 1 y m m o M �� r^r n N �R NPi v cl u a I -u z z z < < z z < z z 2 2 IR 75 Et -5 9, �F 155 76 onIlimm w, -i, -6 1 -6 -6 -6 1 -r, < < o< w z o 2 E F? � c6 LO O Cell 0 m (n -E 7D M I 6 n yy -m I 1. �EF -77 6- m -6 'u, 77 77 TT u. O 77 H 81 14 O R 1" 2 ----------- - ------ ---- - -- ---- ----- - < < < < <l< '2 lf, az az ❑ I z z z z z 71 L� z z z z 7� z Z17 7 z 7:E "5 LM g, L T Z, -Cc by 21 cc ul 2, F �g E E, 35 IT 5m s a a . . . . . z z z . . . . . 1 E K K f K K E E CN cli 0 (14 CL Cil LO 6 -E _0 "i 5 'o 0. IR CL c3 Z 77 77 LL LL Iv, IIF c6 R R 115 S5 1. g s 8 8 S ll� 11 2 2 11 Id, ,Gil—d < < Zz Z Z z 7 0 0 0 z z z z z > w U) ib Ki 16 TO .10 a`a ea IE E. F6 E E 21E E 16 E E E'� E F� 2 -a E W Ui ul u Ij 0 E E 2 E¢ CN cli 0 (14 CL Cil LO 6 -E _0 "i cV N 0 co 0 n . .. .. ... . .... —,7EF 77 -17 07 E17 Tirn tl i5 r Z4 O �2 2 2 1 2 (2 s S -El -ET -E- w3 7 2 IS M o Cr s 0 q s 's "2 2 c6a 1. .6 .1 �111 11; 1. .1 8 8 1. IS 1. 1; 42 ti co m Q IT 41 -Pd 7 z 6. d LL CL z z u ... ..... .. ZE g s Z 2 a UJ Zi —E 2 j 5 b E 2 zi - I- E �-i w WIM cV N 0 co 0 n N 0 CL L.L. 67 ca Oz (D '0 0 E "0 0 x uj �5 t u. 11 w 12 2 s �1,1 O Mp-Pd v. x x x x x x x[x x x x x 8 p c I� E E � F� L w 0 E 7, E= ug LLL E E�E 0 > El CL 145 2 o > D Ho � :z 2 S U1= 2 w 6 I C) ff a 5 5 4 u N 0 CL L.L. 67 ca Oz (D '0 0 E "0 0 x uj Table 16 System -Wide Unit Costs; Residential & Nonresidential Development per Component Table 17 SDC Schedule Category Cost Basis 83.6% Residential Share 43,819 Nesicenuai unit Cost ($/New Person) 16,4% Nonresidential Share 8,596 N onresioenijai unit Cost ($/New Equiv. Pop.) New Parks and Open Space Improvement Fee Single-family_--- Duplex/Town Hrn/Mobile HmiAccess.DU Nei hborhood Parks Community Parks $12,181,694 $17,122,746 $10,183,896 $14,314,618 $232 $327 $1,997,798 $2,808,131 $232 Urban PFaza$905,587 -S-687- $757,071 $17 $148,516 --$..327 t-1`7 Linear Parks $994,074 $831,045 $19 $163,028 $19 Natural AreaParks $10,462,806 $8,746,906 $200 $1,715,900 $200 Metropolitan 11 Parks I I , $1,974,960 $1,651,067 $38 ­- $323,893 $38 Special Use Facilities $77,965, $65,178 $1 $12,786 $1 Sub -total $43,719,835 $36,549,782 $834 $7,170,053 $834 New Recreation Facilities $29,428,594 $24,602,304 $561 $4,826,289 $561 Improving Existing Facilities $6,280,840 $5,250,-782- $120 $1,030,058 ------ $120 Access Improvements $1,428,209 $1,193,983 $27 $234,226 $27 Subtotal IMPROVEMENT $80,857,477 $67,596,851 $1,543 $13,260,626 $1,543 Existing Parks and Facilitief Reimbursement Fee Neighborhood Parks $6,912,395 $5,778,762 $132 $1,133,633 $132 Community Parks $0 $0 $0 $0 $0 Urban Plaza $0 $0 $0 $0 $0 Linear Parks $1,934,489 $44 $379,493 $44 Natural Area Parks $101,453 $84,815$2 $16,638 $2 Metropolitan Parks $14,628,163 $12,229,144 $279 $2,399,019 $279 Spe ial Use Facilities $99592 $83,259 $2 $16,333 $2 Subtotal REIMBURSE $24,055�5861 $20,110,470 $459 $3,945,116 $459 Total SYSTEM $104,913,0631 $87,707,321 -72,002 $17,205,742 $2,002 Less Credit$393 Net Cost per Unit - ­­-­- ----- $1,608 $1,123 $879 Table 17 SDC Schedule Category Persons or EP per Unit Gross SDC per Unit Credit per Unit Net SDC per Unit Residential per DU Single-family_--- Duplex/Town Hrn/Mobile HmiAccess.DU 2.64 2.14 $5,284 1,038 842 $4,246 -$]3,4-42- Multi-familV 1,67 _34,283 $3,343 -S-687- $2,686 Nonresidential per Room A Nonresidential per TGSF 1.93 ----------- ---- - $3,863 $2,166 $1,697 B $2,582----$1,134 C $1,581, 58-87 $694 D .0.79............ 0.47 $528 -$413 E E-61 $3801 - ----12M $161-1 EP - Equivalent Population; TGSF = Thousand Gross Square Feet; DU = Dwelling Unit Exhibit A to Administrative Order No. 58-17-19-F -- Page 15 of 22 i i:111111111 1111111 1!1110l111 •&SH MOM 1.1 Formula and Calculation Details 1.2 General Rate Setting, Cost of Service Formula SDC Eligible Costs SDC per Unit of Service Impact Measurement 1.3 Transportation System Cost of Service consists of non -assessable arterial and collector street system cost of service plus off-street bicycle cost of service. 1.3.1 Non -Assessable Arterial & Collector Street System Cost of Service General Formula Non -Assessable Cost per Lane Mile X Lane Miles per trip = Cost per Trip Street System Cost per Trip Reimbursement: $1,321,301 X (0.8888/675) = $1,739.81 = Cost per Trip Improvement: $1,567,748 X (0.8888 / 675) = $2,064.32 = Cost per Trip Total Street Allocated Cost per Trip = $1,739.81 (0.4) + $2,06432 (M) = $1,934.51 City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-1 Exhibit A to Administrative Order No, 58-17-10-F -- Page 16 of 22 1.3.2 Off -Street Bicycle path Cost of Service (Improvement Fee Only) General Formulas Miles of Bicycle Paths per Person X Cost per Miles = Cost per Person WEI Cost per Person Cost per Trip # of Trips per Person Path Lighting + Path Section ($21.42) + ($138.56) $159.98 (per Person) Total Off -Street Bicycle Allocated Cost per Trip = $159.98 - = $178.75 (per Trip) 0.895 1.3.3 Total Transportation Cost per Trip Total Transportation Cost per Trip = Total Street Allocated Cost per Trip + Total Off -Street Bicycle Allocated Cost per Trip . .. . ........ Calculations Total Transportation Cost per Trip = $1,934.51 + $178.75 = $2,113.26 . ......... City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-2 Exhibit A to Administrative Order No. 58-17-19-F -- Page 17 of 22 I 1 4 1.4 Wastewater System Cost of Service: 1.4.1 Local Wastewater System Cost of Service Determination of Flow Estimation Formula for Residential Development Graphical comparison of water consumption per month to square foot of living area results in a slope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 gallons per month. 8000 7000 6000 5000 Gallons per Month 4000 3000 2000 1000 0 A Base Flow 0.951 gal/mo/sq ft Intercept, 3,946 Gal. /Month 0.032 Gal. / Day (GPD) 132 --30 day month -- $0,1121 Cost per Gal/Day $3.5030 Base Charge = $462.40 GPD Y Cost per Gal. 0 816 1585 2382 3280 Total A re a Living Sp ace Projected Sampled Actual Data Slope 0.951 gal/mo/sq ft Days per Month 30 Slope / 30 Days 0.032 Cost per Gal/Day $3.5030 Cost per sq ft Daily usage factor x Cost per Gal. $0,1121 The implementation of this rate structure results in each new single family dwelling being charged a local wastewater SDC that is comprised of a base rate of $462.40 plus an additional charge of $0.1121 applied to the total proposed living space area of the dwelling. City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-3 Exhibit A to Administrative Order No. 58-17-19-F -- Page 18 of 22 ^ `° Formulas for Non -Residential Development Non -Assessable System Valuation (Value of Existing + Value of Planned) Cost per Unit ofCapacity Build -out Capacity (mgd) Per Unit Capacity Flow per PFUfor Development Type X Number of PFUs for Development = SDC for Development Calculations for Non -Residential Development $156.249662*815.324095M $3.5O30per Gallon per Day 4Q.Omgd 33.5030 X Gallon per PFU(varies bvdevelopment type) X Number of PFUs = SDC for Development 1.5 Storn|vvatmrSystem Cost ofService: General Formulas SDC eligible 000ts Total additional imperviousimpervious surface area surface area using capacity (sq. ft) Reimbursement $17,073,927 1S5.77O.5SOsq. ft.impervious surface area � Unit cost per square foot of = $U]OQGper sq. ft. City ofEugene SDC Methodologies Fee Schedule 8^Formulas, Page F-4 Improvement: General System Capacity 518.800.662 155,770,560 sq. ft. LID System Capacity $8,513,629 $0.1207 per sq. ft. impervious surface area $1.8309 per sq. ft. 4,650,000 sq. ft. impervious surface area General System Capacity Total Unit Cost per Sq. Ft. Impervious Surface Area = (Reimbursement + Improvement) = $0.1096 + $0.1207 = $0.2303 Total Unit Cost per Sq. Ft. Impervious Surface Area with LID System Capacity = (Reimbursement + Improvement + LID) = $0.1096 +$0.1207 +$1.8309 = $2.0612 1.6 Parks System Cost of Service: General Formulas: Residential — costs and equivalent population densities per dwelling unit type vary Cost per person X Persons per Dwelling Unit Type = Cost per DU development category type vary Cost per Person X Persons per TGSF = Cost per TGSF OR Cost per Person X Persons per Room Cost per Room TGSF = Thousand Gross Square Feet of floor area Calculations: Vary; see Table 17 City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-5 Exhibit A to Administrative Order No. 58-17-19-F -- Page 20 of 22 2.0 Adopted SDC Fee Schedule: Current Rates 2.1 Transportation System: Cost per trip $2,113.26 2.2 Local Wastewater System: Residential dwelling unit base fee $46240 Residential dwelling unit total living area multiplication factor $0.1121 Non -Residential rate per gal/day per land use type per PFU Varies 2.3 Regional (MWMC) Wastewater System: Residential dwelling unit $1709.67 Non -Residential rate per gal/day per land use type per FEU Varies 2/4StmrmxvaterSystem: General System Capacity Small Residential (building footprint �< 1,000 sq. ft.) $414.54 Medium Residential (building footprint `1.O00nq�.and < 3,000 sq. ft.) $687.87 Small Duplex (unit building footprints :< 1,000 sq. ft.) S829.08 Medium Duplex (unit building footprints >1.000 sq. ft. and < 3.000 sq. ft.) $1.335.74 Manufactured Home Park Parepece (assumes 1.084sq. ft. per space) $387.83 Plus Per sq. ft. actual impervious surface area, eddt'|common areas $0.2303 All Other Development Parsq.ft. actual impervious surface area and/or equivalent $0.2303 LID System Capacity Small Residential (building footprint <1.00Osq. ft.) $3.710.16 Medium Residential (building footprint >1.O0]eq.ft.and /J.U8Osq. ft.) $5.977.48 Small Duplex (unit building footprints < 1,000 sq. ft.) $7.420.32 Medium Duplex (unit building footprints >1,000 sq. ft. and <J.00Usq, ft.) $11,854.96 Manufactured Home Park Perspaoe (assumes 1.8G4sq. ft. per space) $3'471.06 Plus Per sq. ft. actual impervious surface area, addt'|common areas $2�0612 All Other Development Per aq.ft.actual impervious surface area and/or equivalent $2.0012 City mfEugene SIDCHWethodo|ogUes Fee Schedule & Formulas, Page F -O 2.5 Parks System: Residential (per Dwelling Unit) Single Family $4,246.00 Duplex/Town Home/Mobile Home/Accessory DU $3,442.00 Multifamily $2,686.00 Nonresidential (unit varies — see Table 19 for Class description) Class A (per Room) $1,697.00 Class B (per thousand gross square feet or TGSF) $1,134.00 Class C (per TGSF) $694.00 Class D (per TGSF) $413.00 Class E (per TGSF) $167.00 2.6 Administration Fees: City of Eugene if based on percentage 9.0% City of Eugene if based on flat rate $80.00 2.7 Appeal Fee: City of Eugene per SDC appeal $100.00 City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-7 Exhibit A to Administrative Order No. 58-17-19-F -- Page 22 of 22