HomeMy WebLinkAbout06/09/1986 Meeting
M I NUT E S
e
City Council Work Session
Eugene Community Conference Center, Studios Band C
June 9, 1986
5:30 p.m.
@RESENT Brian Obie, Mayor; Richard Hansen, Cynthia Wooten, Freeman Holmer,
Roger Rutan, Jeff Miller, Debra Ehrman, Ruth Bascom, councilors;
Mike Gleason, City Manager; Dave Reinhard, Chris Andersen,
Sandra Gleason, Bert Teitzel, Cathy Freedman, staff; Jim Boyd,
Register-Guard; John Selix, KUGN.
The mayor called the work session to order at 5:30 p.m.
I. SUMMER CONSTRUCTION PROJECTS UNDERWAY
A packet of materials called "Transportation Issues," dated June 9,1986, was
distributed. Ms. Andersen introduced the presentation by reporting that,
since TransPlan is adopted, the implementation is being built into the work
plan. The handout is a draft of the key transportation issues to be worked
into the department-wide work plan which will be finalized in October.
Ms. Andersen reported that the major construction projects underway during
the summer of 1986 are:
e
1. 6th and 7th Avenue Widening Project
The 6th and 7th Avenue Widening Project is due for bid opening on June 12,
according to Ms. Andersen; construction will begin in early July and will
include only 7th Avenue from Garfield to Washington this year. During the
summer of 1987, 6th Avenue will be completed. The City will do the contract
administration for the project and expects a smoother communication system
between the contractor and private property owners.
Mr. Rutan asked why the project was being divided into two seasons.
Mr. Teitzel explained that the volume of work will take two summers and that
tearing up both streets would cause too much disruption. A public meeting
was held with property owners, who chose the alternative of doing one street
at a time.
In response to Ms. Ehrman's question, Ms. Andersen said that two lanes of
traffic will be kept open in order to provide access to business properties.
These decisions are approved by the property owners involved. Mr. Miller
asked if there were any way of rerouting traffic in a planned manner.
Mr. Reinhard replied that the property owners wanted to minimize the spill-
over onto 5th and 8th avenues. Some people will use alternate routes, but to
specifically direct people away from 6th and 7th would run counter to the
concerns expressed by the business and residential property owners.
e
MINUTES--Eugene City Council
June 9, 1986
Page 1
e
e
e
Ms. Andersen added that business owners want the route to stay on 6th and
7th. The media will give construction information, but the hope is that not
too many people will use alternate routes.
Mr. Miller asked if the traffic signals could be adjusted; Ms. Andersen said
that this was not possible. Mr. Miller suggested that the streets be moni-
tored so adjustments can be considered, and Ms. Andersen said that traffic
counts could be taken on parallel streets.
2. Chambers Street Connector
Ms. Andersen reported that the Chambers Street Connector is under contract
for Phase I of the construction by Lane County. Ross Brothers Construction
was the successful bidder. Phase I will affect the River Road area more than
6th and 7th avenues. In response to Ms. Bascom's question, Ms. Andersen said
that the east/west portion of the project is part of Phase I, which is the
structural portion, and includes the bridge. The area between 5th and 8th
avenues will be a part of the State contract for 6th and 7th avenues.
3. Interstate 5 Improvements
Ms. Andersen reported that several meetings with property owners have been
held. The State has worked very closely with the property owners near
Gateway and 1-5 who have businesses. So far the owners are happy with the
access routing and signing planned for the project. The City will be
referring the public to the State for detailed information.
4. Airport Parking Lot
Mr. Hansen asked if the Airport parking Lot was being contracted out, and
Ms. Andersen said yes. Mr. Teitzel replied that the plans for bids on the
design and access roads will be ready in a few weeks. Ms. Wooten asked if
this project was connected to the County funds under negotiation; that the
County Commissioners would be making a final decision within 30 days.
Mr. Hansen was concerned that the City was doing more than was approved by
the council on the airport. The council has approved expenditure of the
lottery and Federal money already received. Ms. Andersen explained that the
project will be funded by those monies already received, but that if the
County approves allocation of road funds for the airport, this part of the
project would qualify as one for which those funds could be used.
Ms. Bascom asked about the landscaping on 1-5 and Ms. Andersen replied that
it was a two-year project; the landscaping will not be done until next year.
Ms. Andersen reported that these construction projects total approximately
$40 million for the area. Ms. Wooten asked what the City's indirect staff
cost would be. Ms. Andersen replied that the 6th and 7th avenue widening
costs were recoverable; there were no costs for 1-5; and because of the need
to relocate the shop, the City cost for the Chambers Connector was
approximately $400,000.
MINUTES--Eugene City Council
June 9, 1986
Page 2
e
e
e
II. TRANSPLAN IMPLEMENTATION
1. Ferry Street and Valley River Bridge
Mr. Reinhard reviewed the goal, purposes, major steps in the process, and
time required for both projects, which are included together in the process
planni~g, but would be treated as separate projects, at different times.
Ms. Ehrman asked why a Citizen Advisory Committee was required; Mr. Reinhard
responded that the committee would consider the impact on businesses, the
approaches, and the sidewalks.
Mr. Holmer asked about dollars and Mr. Reinhard said that the Ferry Street
Bridge is estimated at $20 million and the Valley River Bridge at $10
million: the City money would be between $300,000 and $500,000 for
preliminary engineering studies.
Mr. Reinhard said that it was the position of the staff that the alignment
and right-of-way for the Valley River Bridge project be established quite
soon, even though the project is fairly long-range.
Mr. Obie expressed a concern about timing for the Ferry Street Bridge project
because of its impact on the Riverfront Project, the Dome, Agripac, EWEB, and
Chase Garden property. Mr. Reinhard replied that the Ferry Street Project
would be scheduled before the Valley River Bridge according to the staff
outline. In response to Mr. Rutan1s question, Mr. Reinhard said that the
Ferry Street Bridge would have a project scope of five to 12 years, to be
completed in the 19901s. Mr. Miller asked if there were an alternative plan
to construct a bridge between Ferry Street and 1-5; Mr. Reinhard said that
this was part of the analysis process, that the old bridge could be repaired
and renovated, making a new bridge possible, or the old bridge replaced,
making a new bridge unnecessary. The Ferry Street Bridge is structurally
sound; however, the engineers say that it is functionally obsolete. Mr. Obie
asked if the cost estimates and identification of funding sources could be
moved up in the process. Mr. Reinhard said, yes, but probably not at the
very beginning.
Ms. Wooten asked about the relationship of right-of-way acquisition on River
Road to the construction of the Valley River Bridge. Mr. Reinhard replied
that projections indicate that with or without the bridge, five lanes will
clearly be needed at the south end of River Road.
Ms. Wooten questioned the need for acquisition now if the Valley River Bridge
is a long-range (1992 and beyond) project. Mr. Reinhard replied that the
current acquisition is the best way to insure low costs. Ms. Andersen also
responded at length regarding the long-range needs on River Road.
Mr. Gleason explained that when the land-use decision was made to choose West
Eugene as a growth area instead of 1-5, River Road and Santa Clara were
affected as well. Ten years out, with or without a bridge, five lanes will
be needed.
MINUTES--Eugene City Council
June 9, 1986
Page 3
e
e
e
Mr. Hansen asked where the pressure points would be if the Valley River Bridge
were not built. Mr. Reinhard replied that Washington-Jefferson Bridge, the
Delta Loop, and Valley River Interchange would be the focus of an alternative
package which would include adding a lane each way on the Washington-Jefferson
Bridge, a new ramp, and major improvements to the interchange. The total
package would probably exceed $10 million and add stress to 6th and 7th
avenues. The Valley River Bridge would move traffic to the Chambers
Connector.
Ms. Bascom commented that the Transp1an is clear about the need for the Valley
River Bridge and that the need for right-of-way acquisition early in the
process was clear as well. Mr. Obie commented that the Valley River Bridge
would principally serve River Road, Valley River, and Goodpasture Island, and
also access southwest Eugene.
2. Refinement Studies
Mr. Reinhard defined the purpose of this portion of Transplan implementation,
as provision for transportation planning refinements to the Transplan. The
needs for refinement studies are in four areas: Central Area Transportation
study (CATS); North Willakenzie; Willow Creek; and Riverfront. Mr. Obie
asked about the Harlow Road overpass and interchange. Mr. Reinhard replied
that the Transplan calls it an overpass and calls for improvements for the
safety of pedestrians and bicycles.
Mr. Miller asked if money is currently budgeted for the Refinement Studies;
Mr. Reinhard explained that they would done on the work plan within the
normal staff time and operating budget. In response to Ms. Wooten, Mr.
Reinhard said that citizen involvement processes would be approved by the
Citizen Involvement Committee. Mr. Holmer asked if the Central Area
Transportation Study process included contact with users outside of the West
University Neighborhood. Mr. Reinhard replied that the contact would be
through public hearings and other organizations where they exist.
Ms. Ehrman asked when the Wi11amette project between 11th and 19th would be
completed; Mr. Reinhard replied that it was scheduled for completion before
the Eugene Celebration. Ms. Wooten asked when the final decision would be
made regarding the treatment of 12th and Wil1amette and was told that several
alternatives are being reviewed, but no decision had been made.
3. Eugene Planned Street and Highway Right-of-Way Plan
Mr. Teitzel reviewed the information. Mr. Miller had several questions
regarding West 11th and major and minor collectors. Mr. Gleason said that
Mr. Miller would be provided with the information he requested.
4. Street Standards
Mr. Teitzel continued with a review of street standard specifications.
Mr. Hansen asked what the typical width in older areas built in the 1940's
and 1950's was in comparison with proposed widths. Mr. Teitze1 replied that
many streets were 26 to 27 feet wide. Mr. Gleason pointed out that the
MINUTES--Eugene City Council
June 9, 1986
Page 4
-
e
e
process is much different now; the standards apply principally to new
development. Mr. Hansen asked if there were any provision for 24-foot-wide
streets during redevelopment, when no further development was projected.
Mr. Teitzel said that the standard would not insist on 28 feet in improved
areas, especially when trees and other impediments were taken into consider-
ation. Emergency Services requires a minimum of 20 feet. He assured
Mr. Hansen that people are made aware of this flexibility. Mr. Hansen also
commented that when standards are so high, the streets don't get improved and
it ends up costing the City money. Mr. Gleason explained, using Lorane
Highway as an example, that the issue is grade; there is no "in between"--
either you have a country road or a street. A country road does not provide
drainage and the road bed doesn't last.
Ms. Ehrman asked about the criteria for repair of streets. Mr. Teitzel said
that repairs will be made as long as they are economically feasible; minimal
repairs will be made for safety purposes. He also said that there is a
priority list of street repair needs, and that property owners need to
petition for improvements.
5. Arterial/Collector Improvements
Mr. Miller asked how the effect of buses on substandard streets is handled.
He was concerned that a relationship needs to be established in order to keep
property owners from being penalized by street use by LTD. Mr. Teitzel said
that damage to streets would move that street higher on the priority list for
improvement.
6. Proposed Project Schedule
Ms. Andersen reviewed the proposed schedule for major transportation work
items. Mr. Hansen suggested that because so much development has begun on
Goodpasture Island, the options in 1988 would be lessened considerably. He
believed that the City would be financially ahead if the Valley River Bridge
were moved up in the timeframe. Ms. Andersen also explained that the City
has received pressure from both the public and the City Council to review
street standards. A public task team is being established in order to begin
work on street standards after the map process is underway or adopted.
III. WEST EUGENE PARKWAY
Ms. Andersen distributed the Supplemental EIS for the West 11th Avenue to
Garfield project (State of Oregon terminology). The State will release the
supplemental EIS on June 10. An information session for the Citizen Advisory
Committee will be held June 26. On July 9 the City Council will have a work
session, and on July 15 a public hearing will be held. The State report to
the City Council will be on August 11, and public information will be provided
in September and October. The election is November 4. The preliminary
engineering and right-of-way acquisition will be in 1987-1989, 1990 will be
Phase One, and 1992, Phase Two.
Ms. Andersen distributed a memorandum entitled "Limited Access Throughway
Amendment," dated June 9, 1986, which she thoroughly reviewed, concluding
with the staff recommendation.
MINUTES--Eugene City Council
June 9, 1986
Page 5
e
e
e
Mr. Holmer concurred with the staff recommendation to assess voters during
the West Eugene Parkway election through a surveyor exit interview geared
toward perception of public support for removal or retention of the Charter
provision. Mr. Holmer questioned why the 6th/7th extension was now called
the West Eugene Parkway. Ms. Bascom believed the title to be descriptive and
appropriate.
Ms. Wooten was impressed by the presentation but was concerned that the City
was beginning to gear up for projects not scheduled for completion until the
1990's. She suggested a more thorough analysis as priorities are set,
especially along the way. Ms. Andersen explained that the proposals are part
of the work plan for the City and that they will be inserted into the budget
process for consideration. Needs will be evaluated in connection with the
Metropolitan land Use Plan, which is the best vehicle for updating current
needs during the process. The Transportation Plan may be adjusted accord-
ingly. Mr. Gleason said that the arterial study will affect the shorter,
ongoing phase of the Transplan. Ms. Wooten suggested that as budgets are
considered, needs for use of staff time need to be evaluated. Ms. Andersen
explained that the bridge projects were pulled from the Transplan because
they involve both alignment provisions and right-of-way acquisitions; most of
the Transplan projects involve neither.
Ms. Bascom asked about Highway 99, which is absent from consideration.
Ms. Andersen replied that improvements to Highway 99 are not currently
scheduled by the State, although they concur with the need for eventual
improvements.
Ms. Wooten asked if the City Council can prioritize Transplan projects, and
Ms. Andersen said yes, that council input would be welcome. She reminded the
council that the lead time on the bridge projects is quite long and if the
council is not interested in pursuing them, the staff needs to know.
The work session was adjourned at 7:10 p.m.
Respectfully submitted,
?;J/;~
(~~~4~~
Mike Gl eason
City Manager
(Recorded by Judy Jernberg)
JJ:ky/MINS6
MINUTES--Eugene City Council
June 9, 1986