HomeMy WebLinkAbout04/10/1989 Meeting
e
-
e
M I NUT E S
Eugene City Council
Dinner/Work Session
Eugene Community Conference Center--Wilder Room
April 10, 1989
5:30 p.m.
)
COUNCILORS PRESENT: Ruth Bascom, Rob Bennett, Shawn Boles, Bobby Green,
Freeman Holmer, Roger Rutan, Debra Ehrman, Emily Schue
(after 6:40).
Mayor Jeff Miller called the City Council work session to order.
I. STATUS REPORT ON SEWER RATES
Public Works Director Christine Andersen briefly reviewed the process that
will be used to adopt new local and regional sewer rates.
George Jessie, Public Works Department staff, referred to the draft Regional
Sanitary Sewer User Rate Study (FY1989-1991), which was prepared for the
Metropolitan Wastewater Management Commission (MWMC) by the Lane Council of
Governments (L-COG). A year ago, it was anticipated that significant
regional rate increases would be needed; this recent study, however,
indicates that only moderate increases will be necessary, because of several
factors: declining administrative costs; only moderately increasing
operational costs; larger than anticipated reserves; and a moderate growth in
the customer base. The study indicates that rate increases of about 2.2
percent in FY90 and 2.0 percent in FY91 will be needed. In response to a
question, Mr. Jessie said he did not expect that rate increases greater than
four to six percent would be needed for the years after FY91.
Mr. Jessie mentioned three factors affecting the local sewer rate:
moderately increasing operational costs; a great need for infrastructure
improvements; and a moderate growth in the customer base. He said the
following local sewer rate increases are expected: 6.1 percent for FY90 and
4.4 percent for FY91.
Mr. Jessie said that for the typical single-family dwelling, the combined
(regional and local) sewer rate increases would be about 4.3 percent in FY90
and 3.5 percent in FY91.
Mr. Jessie also mentioned that the L-COG study recommended that a single-year
rate structure be used, rather than the current biennial rate structure.
Under a single-year rate structure, no over-charging would be required during
the first year in order to pay for cost increases in the second year, and
MINUTES--Eugene City Council
April 10, 1989
Page 1
e
thus there would be a smaller percentage increase during the first year for
the majority of users.
In response to a question, staff said operational cost increases are due
primarily to increases in wage and power costs. Mr. Jessie added that the
number of FTEs is being reduced at both the regional and local levels.
City Manager Micheal Gleason said a significant issue affecting the local
sewer rate is the need for capital improvements. He said the City Council
will have to make a policy decision regarding the level of long-term
investment that should be made in the local sewer system.
Mr. Boles asked whether the current regional sewer reserves are adequate. He
wondered whether it would be more prudent to endure somewhat larger rate
increases now, rather than reducing the reserves and having, at some point in
the future, to raise regional sewer rates substantially. Mr. Bennett said
MWMC is concerned about this issue, too, and will be taking it into account
when it makes its regional sewer rate recommendations to the City Council.
In response to a question, staff said the regional rates are covering the
cost of replacing equipment, but not of replacing the sewage treatment plant.
-
Mr. Rutan asked about the technological state of the plant relative to
treatment facilities elsewhere in the world. He also said he has read about
new research on water purification techniques. Ms. Andersen said the current
plant is at a fairly high technological level; for example, it adheres to the
highest effluent standards that are required for new water treatment
facilities. Terry Smith, Public Works staff, added that new techniques have
been developed for small-scale water purification; however, there has not
been a lot of success in applying these new techniques to a large scale. He
said the staff at the treatment plant tries to keep abreast of new
technological developments and to make modifications whenever they are
advantageous.
Mr. Rutan asked about the sewer system investments that were made recently in
west Eugene. Mr. Gleason said these investments, in a sense, will do double
duty: they will serve any industrial development that occurs in the area;
and they were a necessary component in the integration of the entire sewer
system. He said that even if no industrial development occurs (which is not
likely), the investments still would have been necessary. He said the City
will recover its costs over the next 20 years or so as development occurs.
In response to a question, Mr. Jessie said the flow-based rate structure has
worked reasonably well. It has increased administrative costs a little. Mr.
Smith mentioned that Eugene has one of the most flow-based of flow-based rate
systems; therefore, it has some of the lowest sewer rates at the low-use end
of the spectrum, and some of the highest sewer rates at the high-use end of
the spectrum.
-
MINUTES--Eugene City Council
April la, 1989
Page 2
e
II. INFORMATION ON BUILDING PERMIT SERVICES
Planning, Development, and Building Director Abe Farkas introduced Bill
Johnson, chair of the Building Construction Advisory Committee (BCAC). The
BCAC advises the City Manager on the building permit review process.
Terri Vanderpool, Planning, Development, and Building Department staff,
explained that the building permit review process has two "loopSIl: the site
loop, during which issues relating to land use and site development are
considered; and the structural loop, during which bUilding construction
issues are reviewed. She mentioned the three components of building permit
services: customer assistance, plan review, and field inspection.
e
Ms. Vanderpool provided some information on building permit review activity
levels over the past several years. There was an unusually high level of
construction from 1977 to 1979. The current permit volume is almost as high.
Moreover, commercial development plans (which are much more complex than
residential plans) account for a larger share of the volume now than they did
from 1977 to 1979; thus, the actual amount of plan review activity is greater
than it was from 1977 to 1979. Ms. Vanderpool also compared 1979 and current
turnaround times. In 1979, from the time a set of plans was submitted until
the time the review by the code analyst (the last stage in the review
process) began, four to six weeks had elapsed. Currently, the average time
before the code analyst review begins is three to four weeks. In order to
realize the current turnaround goal (three "netll weeks, 90 percent of the
time), the average time before the code analyst review would have to be
reduced to two weeks or less. In summary, Ms. Vanderpool said that roughly
the same number of plans--but more complex plans--are being reviewed in a
shorter time now than in 1979.
Ms. Vanderpool also provided information on customer assistance activity
levels and service levels over the last ten years. She explained that
customer counts in the PIC were up 20 percent in the 1988 construction season
over the previous year. This is significant because the same staff members
who provide customer assistance also provide building permit plans review
services. With activity levels significantly higher in both service areas,
staff members are having a difficult time meeting service level expectations.
In order to deal with this issue, staff and the BCAC are working on a staff
resource allocation policy.
Mr. Johnson said that last fall, City Councilors brought to staff's attention
several examples of problematic building permit reviews. These examples and
a few others were used by staff to conduct a detailed case study of the
building permit review process.
Mr. Smith reported on the findings of the case study: inadequate staffing
caused some delays; the submission of inadequate, incomplete, or incorrect
plans was the most significant cause of delay; there is no policy for
allocating resources among the building permit services; and staff does not
have an established regulatory profile or philosophy.
e
MINUTES--Eugene City Council
April 10, 1989
Page 3
e
Mr. Smith stressed that the eight permits that were part of the case study
are representative of only about one-fifth or one-fourth of the plans that
the City reviews.
Mr. Smith said the average turnaround time for the eight permits was 97 days,
50 of which were spent waiting for complete plans or corrected plans to be
submitted. He said code compliance problems delayed all of the permits. One
question, of course, is whether the Building Division is too nit-picky in its
enforcement of the code. Mr. Smith found that this was not the case in these
eight permits; all of them had fundamental code compliance problems (he cited
several examples of structural and life safety deficiencies in the plans).
Mr. Smith stressed the need for the City to develop a policy for allocating
staff resources among different building permit services--particularly among
customer assistance and permit review. He said 45 percent of staff resources
for the site review loop, and 25 percent for the structural review loop, were
devoted to customer assistance at the time of the study.
e
Mr. Smith also stressed the need for the staff to establish a clearer
regulatory profile or philosophy. This will allow staff members to review
plans more efficiently, because they will spend less time wondering how a
particular code requirement should be applied; furthermore, it will help the
design community know what to expect from the building permit review process.
Doug Eveleth, Planning, Development, and Building Department staff, briefly
reviewed some of the recent improvements that have been made to the permit
review process: a new plans completeness checklist, which will help ensure
that complete building plans are submitted; a permit processing guide, which
will explain the design review process to the design community and help them
to submit more complete plans; a new policy regarding partial permits and
phased construction; and a new plans coordination system to improve
coordination among the various types of code reviews that are done.
Mr. Gleason said some of the biggest permit review problems arise when
developers do not use qualified design professionals, or when communication
between a builder, developer, and designer is poor. He said it has become
fashionable to complain that the permit review staff is purposely trying to
thwart economic development; this is simply not true. He said staff wants to
receive constructive suggestions about how to improve the permit review
process, and has been working hard to make improvements. Mr. Gleason added,
however, that building code review is a difficult and often controversial
process in all communities; there will never be a time when everyone believes
that the City's code reviews are completely correct or fair; attaining this
level of satisfaction, therefore, cannot be the City's goal.
Mr. Boles raised the possibility of adjusting permit fees to take account of
the fact that some members of the design community take up more staff time
and resources than others.
Mr. Bennett said the City encourages rehabilitation, which is very different
than new construction. He said that either the City should develop a
e
MINUTES--Eugene City Council
April 10, 1989
Page 4
e
e
e
bUilding permit review process that deals effectively and appropriately with
rehabilitation projects, or it should not encourage rehabilitation so much.
He mentioned that handicap accessibility is a difficult and critical issue
relating to rehabilitation projects; at some point, the community needs to
address this issue. Mr. Bennett also wondered whether the staff is devoting
too large a share of its resources to customer assistance and not enough to
actual plan review.
Mr. Gleason said staff intends to shift some of its resources away from
customer assistance and toward plan review.
Mr. Bennett stressed the need for the City to develop a timely process for
reviewing building permits that are small and raise no major structural or
safety issues (for example, permits for tenant office improvements). He also
addressed the issue of regulatory philosophy. He cautioned that some of the
worst problems can arise when a consummate philosophy is developed, because
it often goes too far and is taken to its absurdly logical conclusions. He
said what is needed is a group of people with the field experience--the
wisdom--to know where to draw the line in the dirt, so to speak. Mr. Bennett
said the City should give a lot of thought to the issue of regulatory
philosophy, and should try to develop a staff team that has this sort of
wisdom, the ability to strike the right balance. Finally, Mr. Bennett said
the City should set a conservative goal for permit review turnaround time and
try to be accountable by meeting this goal.
Mayor Miller expressed appreciation for the attitude taken by staff--that is,
trying to be constructive and solve problems, rather than trying to blame one
side or the other.
The work session adjourned at 7:05 p.m.
Respect. fully SUbmit~.
~~. .~ ".
, '~~~~ h
M i c a 1 G 1 ~1ta son . '
City Manager
(Recorded by Monty Hindman)
MNCC 041089-530
MINUTES--Eugene City Council
April 10, 1989
Page 5