HomeMy WebLinkAbout09/24/1984 Meeting
M I NUT E S
e Eugene City Council
City Council Chamber
September 24, 1984
7:35 p.m.
COUNCILORS PRESENT: Brian Obie, John Ball, Richard Hansen, Freeman Holmer,
Debra Ehrman, Emily Schue, Ruth Bascom
COUNCILOR ABSENT: Cynthia Wooten
Adjourned meeting of the City Council of the City of Eugene, Oregon, was
called to order by His Honor Mayor Gus Keller.
I. ITEMS FROM COUNCILOR HANSEN
A. Sorrel Way Sidewalks
Councilor Hansen, stating that he would be absent from the City Council
meeting on September 26, asked that the issue of the construction of sidewalks
on Sorrel Way be postponed so that he might participate in the council action.
-- B. Ballot Measure 2
Councilor Hansen said he wished to go on record as opposing Ballot Measure 2
since he would be absent on September 26 when the council would take formal
action on the issue.
C. Historic Street Tree Ballot Measure
Councilor Hansen stated for the record that he opposed the Historic Street
Tree ballot measure, explaining that the measure would hinder the City in
developing long-range transportation plans for the community.
C. Laurelwood Golf Course Contest
Councilor Hansen reported that he and Mayor Keller had kicked off the "Hole-in-
Oneil Contest at the Laurelwood Golf Course that afternoon. He explained that
for a $5 entry fee individuals could try to win $100,000 by making a hole-in-one.
He added that proceeds from the contest will go to the Parks Department and
Laurelwood Golf Course.
-
MINUTES--Eugene City Council September 24, 1984 Page 1
II. PUBLIC HEARINGS
e A. Recommendations on the Evaluation Report for the T-2000 Plan (memo,
background information distributed)
City Manager Micheal Gleason introduced the agenda item. Kirk McKinley of the
Planning Department presented the staff report, stating that staff was request-
ing feedback from the City Council on the input to be used in the transporta-
tion computer modeling for the T-2000 Plan Update. Based on that feedback and
direction, staff will perform the modeling, identify traffic overloads,
and develop methods to alleviate those overloads. Mr. McKinley said staff
expected the draft Transportation Plan Update to be ready for review in spring
1985. Referring to the L-COG memorandum of September 6, 1984, he said that
consensus had been reached on the issues of Land Use, Alternative Modes, and
Level of Service by the Eugene, Springfield, and Lane County planning commis-
sions and the Lane County Roads Advisory Committee. Addressing the two issues
on which consensus was not reached, he then reviewed the recommendations of
the four bodies on Transit and Trip Making as reported in the September 19,
1984, Planning and Public Works memorandum to the City Council. He stated
that Dave Reinhard (Public Works), John Replinger (L-COG), Roger Rutan
(Planning Commission), and Stefano Viggiano (LTD) were present to answer any
questions of the council.
In response to a question by Councilor Holmer regarding the T-2000 Plan,
Mr. McKinley said that staff was attempting to develop a new name for the plan
to emphasize that the plan was to serve the metropolitan population rather
than a specific year. In response to another question, Mr. McKinley said
e that council was free to question any of the five issues addressed in the
Evaluation Report.
The public hearing was opened.
There being no testimony presented, the public hearing was closed.
Councilor Obie asked how the City Council recommendations will dovetail with
the recommendations of Springfield and Lane County. Mr. Reinhard responded
that the council could either modify the recommended figures to reach a
consensus with the other elected bodies or staff could use the various recom-
mended numerical figures as input for the computer model. In response to a
request for clarification on the difference between the household and per
capita trip making rates, Mr. McKinley distributed a graph illustrating the
two levels. As an example, he said that a household might generate 16 trips
per day while an individual would generate only a small portion of that
figure, regardless of the household makeup. He said that staff foresaw
household size decreasing in the future while the number of households
increased. He said that staff believed that the number of trips by a household
would be greater than the per capita rate.
In response to a question by Councilor Ehrman regarding the three-tiered
approach recommended for the Transit issue, Mr. Rutan said he did not person-
ally agree with the recommendation of the Eugene Planning Commission but that
-
MINUTES--Eugene City Council September 24, 1984 Page 2
e the commission had agreed that the LTD goals were too optimistic. He said
that computer modelin~ for Eugene and Springfield could occur separately.
Referring to Mr. Obie s question regarding the Trip Making issue, he said the
commission had chosen the household rate as a compromise between the per
capita rate and the rate originally used in the T-2000 Plan and a continuation
of present trip making trends which show continued increases in trip making
rates. In response to a question by Mr. Obie regarding outlying industrial
areas, Mr. Rutan said the commission was not assuming a total build-out of
those areas and that the plan was flexible in addressing the build-out as it
occurred.
Councilor Bascom said she had participated in the development of the T-2000
Plan. She felt that the new plan would not be any more error-free than the
original plan. However, she stressed that the original developers of the plan
had been correct in assuming that bicycle facilities would be used if built.
She suggested that the council adopt the per capita trip making rate and the
seven percent goal for the Transit issue.
In response to a question by Councilor Schue regarding the Transit goals,
Mr. Viggiano said it would be difficult to determine how future factors
might affect the LTD recommended goals. He felt that LTD could achieve the
eight percent ridership goal if it experienced the same rate of growth through
2000 as experienced during the previous year.
Councilor Holmer said it was wise to be conservative in planning pUblic works.
Referring to the graph distributed by Mr. McKinley, he asked how staff could
e justify the eight percent transit ridership goal in the light of past exper-
ience. Mr. Reinhard said that some saturation point must exist. He said staff
was unsure how long the increase in the per capita rate would continue. He
commented that the Evaluation Report addressed the socia-economic changes
which had created the increases in the household rate; however, he felt that
any choice would be based on individual philosophy. In response to another
question, he said staff was not sure whether a realistic set of assumptions
could be developed.
In response to a question regarding the review process, Mr. McKinley said
staff hoped to review the Metro Plan Land Uses in conjunction with the T-2000
Plan during the next major update. Mr. Hansen said he viewed the Evaluation
Report as a document to plan what may happen. He stressed that the City must
be realistic in planning what may happen as opposed to what individuals wish
to occur. He felt that the City must plan for a more mobile population in the
future. He said he viewed the plan optimistically and that the City goals
could be developed in another document such as the Community Goals and Policies.
Ms. Bascom said she agreed with Mr. Hansen except that she had reached a
different conclusion regarding trip making rates. Mr. Replinger explained
that the per capita rate was six trips per day, stating that an average
household of 2.7 individuals would generate a household rate of 16 trips per
day. He said the household size was expected to decrease from 2.7 to 2.3
individuals over the next 20 years. Ms. Bascom said the difference between
the two rates was only 15 percent. She felt that reaching for a higher
transit level would not be necessary because the plan contained other errors.
e She felt that the number of trips would decrease as the average age of the
area population increased. She did not feel that the City would underbuild
the transportation system by using the per capita rate.
MINUTES--Eugene City Council September 24, 1984 Page 3
e In response to a question by Councilor Ehrman regarding the levels developed
for walking and bicycling, Mr. McKinley explained that the trip making figure
was a number from which the other modes were subtracted. He said the 1978
trip making rate was determined through surveys and national trends. He said
the 1980 United States Census data on individual trips to employment was also
used in developing the transportation figures.
Councilor Ball, referring to a comment by Ms. Bascom, said he understood that
the number of trips per individual would increase as those individuals had
more time away from employment. Mr. McKinley said he had not read any data to
validate that theory. Mr. Ball felt that the household rate and the three-
tiered approach would be the most appropriate choices.
Mr. Gleason said a tendency existed to describe the assumptions as more
accurate than they were intended to be. He said staff would make projections
based on assumptions validated by past experience. He cautioned against using
the data ,as precise knowledge, stating that judgment by policy makers was
still necessary. He said that little empirical observation was necessary to
determine that the T-2000 Plan assumptions were overly generous. He said
Ms. Bascom was correct in that an impact was made on bicycles within the
transportation system. He said it was rational to choose a course, but he
stressed that the City must still make a judgment on the meaning of the
transit figures.
Responding to a question by Councilor Schue on the time frame of the T-2000
Plan, Mr. McKinley said staff had erred in referencing 2000 in the document.
e He said that staff was attempting to develop a transportation system which
would serve the projected Metro Plan population of 293,700 residents whenever
that level was reached.
Councilor Ehrman said that many of the transportation figures were speculative.
She said she liked the three-tiered transit approach because it provided
flexibility to make adjustments as necessary. Regarding the trip making
rate, she said she was unclear how a decrease in the size of households would
increase the per capita rate. Mr. McKinley suggested that the number of trips
might increase as the number of children in the household decreased, resulting
in more leisure time; however, he also said that an increased number of
children might necessitate a greater number of trips.
Councilor Hansen, stating that the recommendations of the Eugene Planning
Commission were similar to the recommendations of Lane County and Springfield
regarding Transit and Trip-Making, suggested that it might be appropriate for
the City to adopt the recommendations of the other two groups. He felt that
it would be easier to study the entire metropolitan area if identical figures
were used in the mOdeling.
Mr. Obie moved, seconded by Ms. Schue, to adopt the recommenda-
tions of the Eugene Planning Commission regarding the T-2000
Plan Evaluation Report.
e
MINUTES--Eugene City Council September 24, 1984 Page 4
Councilor Holmer asked if the question could be divided to separately address
- the five issues. City Attorney Tim Sercombe said a motion was necessary to
divide the question unless the maker of the motion wished to withdraw the
motion. Mr. Obie was he was unwilling to withdraw his motion. He said that
amendments could be made to reflect any disagreement with the recommendations.
Councilor Bascom suggested that the council could amend the motion to approve
the Planning Commission recommendations on which consensus had been reached
and then develop a separate motion addressing the remaining two issues.
Mr. Hansen moved to amend the motion by revising the Transit
goal recommendations to model future transit ridership at seven
percent, with an intermediate goal of four percent in 1995. The
motion died for lack of a second.
Councilor Ehrman agreed with the three-tiered approach, but she preferred the
per capita trip-making rate because it better reflected the action of the
City. She said, however, she would support the recommendations of the Planning
Commission. In response to a request for clarification on the motion by
Ms. Bascom, Mr. McKinley reviewed the recommendations of the Planning Commis-
sion. Councilor Holmer said he favored three of the commission's recommenda-
tions but disagreed with the recommendations on Trip Making and Level of
Service.
Roll call vote on the original motion; the motion carried 5:2;
Councilors Obie, Ball, Ehrman, Hansen, and Schue voting aye; and
Councilors Bascom and Holmer voting nay.
e Councilor Obie said that the City must at some point decide what was sufficient.
He said that the difference between Level of Service D and E might not be
critical, but that going to a higher level of service would negatively
impact the City in its attempts to make any changes. Councilor Schue thanked
those individuals involved in developing the Evaluation Report. Councilor
Bascom commented that the report was of excellent quality, stating that it
had been easy to read and understand.
Councilor Hansen temporarily left the meeting at this time.
B. Appeal of Sign Code Board of Appeals Decision (904 West 6th Avenue
(memo, background information distributed)
City Manager Micheal Gleason introduced the agenda item. Sign Code Inspector
Barbara McDonald stated that Michael O'Connell, the appellant in the case, was
unable to attend the hearing because of an emergency situation. City Attorney
Tim Sercombe said it would be appropriate to set the item over to a date
certain. This would preclude the necessity of renotifying the parties involved.
He did not feel it would be procedurally fair to proceed with the appeal in
the absence of the appellant.
Mr. Obie moved, seconded by Ms. Schue, to set the item over
until October 22, 1984.
e
MINUTES--Eugene City Council September 24, 1984 Page 5
e Councilor Ball asked if the council would hear, at this time, from the other
parties involved in the appeals. Mayor Keller said that the item would be set
over until October 22. He added that he had received no requests to testify
on the item. In response to a question by Councilor Ehrman, Ms. McDonald
stated that Mr. O'Connell had sent a representative to present his request for
postponement.
Roll call vote; the motion carried unanimously, 6:0.
Councilor Hansen returned to the meeting at this time.
III. ADOPTION OF FINDINGS/LEVY ASSESSMENTS (memo distributed)
A. Adoption of Findings (findings distributed)
B. Levy Assessments
City Manager Michea1 Gleason introduced the agenda item. City Engineer Bert
Teitzel presented the staff report. Referring to his memorandum of
September 18, 1984, which described the three projects, he reviewed the
process which had been followed by staff in developing the proposed projects
and assessments. Mr. Teitzel stated that Council Bill 2778 was being modified
to eliminate the sidewalk on Clinton Drive because that sidewalk had already
been constructed. He said staff was recommending that the City Council adopt
the findings and approve the three ordinances.
e CB 2776--An ordinance levying assessments for paving and storm
sewer in Country Club Road from Club Road to Coburg
Road; and in Club Road from Country Club Road 200'
south (84-24).
CB 2777--An ordinance levying assessments for sanitary sewer
in Country Club Road from Sand Avenue to Wi11agi11espie
Road (84-25).
CB 2778--An ordinance levying assessments for sidewalks at
1494 Goodpasture Island Road; at 3322 Storey Boulevard;
and on the north side of Kimberly Drive west of Spring
Boulevard Drive (84-26).
Mr. Obie moved, seconded by Ms. Schue, to adopt the findings
relating to contract numbers 84-24, 84-25, and 84-26; that the
bills be read the second time by council bill numbers only, with
unanimous consent of the council, and that enactment be consid-
ered at this time. Roll call vote; the motion carried unanimously,
7:0.
Council Bills 2776, 2777, and 2778 were read the second time by council bill
numbers only.
e
MINUTES--Eugene City Council September 24, 1984 Page 6
Mr. Obie moved, seconded by Ms. Schue, that the bills be
e approved and given final passage. Roll call vote; the bills
were declared passed (and became Ordinance No. 19280 [CB
2776], Ordinance No. 19281 [CB 2777], and Ordinance No.
19282 [CB 2778).
IV. DESIGN REVIEW COMMITTEE REPORT ON 6TH/7TH WIDENING (memo distributed)
City Manager Micheal Gleason introduc~d the agenda item. Dave Reinhard of
Public Works presented the staff report, stating that the purpose of this
agenda item was to report to the council on the status and the major design
features of the first phase of the 6th/7th Reconstruction Project. He said
that the State Highway Division was completing the final plans and specifica-
tions for the project and expected to advertise for bids in October. Based on
that date, he believed that a contract would be awarded in late October or
early November, with the majority of the construction to be performed in 1985.
He explained that State and City staff and the Design Review Committee had
been working on major design elements during the past nine months as directed
by the City Council. He said the committee had discussed its possible role in
future phases of the 6th/7th project at its last meeting. Mr. Reinhard
reported that the State Highway Division might be able to begin its design
work on the next phase of the 6th/7th Corridor as early as Spring 1985. He
said that staff was requesting direction from the City Council on whether the
present or a new design review committee should be given the charge of addres-
sing that next construction phase.
e Brian Bauske, 1012 West 8th Avenue, Chair of the Design Review Committee,
explained that the committee had been charged with the design review process
by the City Council. He said the committee had addressed the major public
concern of minimizing the impact of the project on the existing mature street
trees as well as refining other aspects of the proposal. Referring to a
series of diagrams illustrating the project area, Mr. Bauske pinpointed the
location of those trees to be removed, those to be retained, and the new trees
to be planted. He said the committee was able to consider the plantings,
lighting fixtures, and signaling in an integrated fashion to minimize clutter.
He also identified the areas and type of paving material to be used for the
pedestrian crossings. Addressing the problem area at the intersection of 7th
Avenue and 1-105, Mr. Bauske said that widening alone would not resolve the
problems of congestion and high carbon monoxide levels. He said the committee
had forwarded a letter to MAPAC which recommended that the intersection be
identified as an area of concern during the T-2000 Plan Update. Mr. Bauske
said he was pleased with the work of the committee and the staff involved,
stressing that he felt the committee had resolved the main issues of concern.
He recommended that the City Council use a similar committee to review the
design of the subsequent phases of the widening project.
Councilor Hansen commented that the committee had been composed of a diverse
group but that the members put forth their best efforts in completing the
committee's charge. He thanked Bill Quinn and Jim Gix of the State Highway
Division for their efforts and cooperation with City staff. Mr. Hansen
e
MINUTES--Eugene City Council September 24, 1984 Page 7
reported that the State Highway staff wanted the project to be a showcase for
4It Eugene and for the State. Mr. Bauske agreed, stating that the cooperation
between the two staffs set the tone for the committee.
Responding to a question by Councilor Ehrman regarding the design plans,
Mr. Hansen said he and the committee felt that the State had been honest in
its efforts and that the City would have the full cooperation of the State in
completion of the project as designed. Addressing the issue of the trees, he
suggested that some tree-banking be performed for the subsequent phases of the
widening project. He suggested that the Parks Department study the possibility
of acquiring trees for this purpose.
Mayor Keller said the council appreciated the work of the Design Review
Committee. He also expressed his appreciation to the State Highway Division
staff for their cooperative efforts.
The meeting was adjourned at 8:45 p.m.
Respectfully ~
~
y (~ . -
Micheal D. Gleason
Ci ty Manager
e
(Recorded by Thorn Strunk)
MDG:TS:pv/CM8a18
e
MINUTES--Eugene City Council September 24, 1984 Page 8