HomeMy WebLinkAbout11/25/1985 Meeting
,(1
--'
M I NUT E S
e Eugene City Council--Dinner/Work Session
Wilder Room--Conference Center
November 25, 1985
5:30 p.m.
COUNCILORS PRESENT: Richard Hansen, Ruth Bascom, Jeff Miller, Freeman Holmer,
Emily Schue, Roger Rutan, Debra Ehrman.
COUNCILOR ABSENT: Cynthi a Wooten.
Mr. Hansen opened the meeting in the absence of Mayor Brian Obie and Council
President Cynthia Wooten.
1. TRANSPLAN
Mr. McKinley introduced the presentation by referring to the several items on
the memorandum for the work session dated November 19, 1985, on the Draft
TransPlan. The purpose of the presentation, according to Mr. McKinley, is to
bring the Draft TransPlan before the City Council in order to identify issues
and hear questions before the pUblic hearing process. The TransPlan document
takes the place of the T-2000 Plan adopted in 1978. The L-COG board is the
e final adopting body.
Mr. Reinhard clarified that the TransPlan attempts to be a transportation plan
for the Metropolitan Area General Plan without an attached date. Mr. Gleason
explained that demographics are predicted without identifying a year.
Mr. McKinley continued by explaining the process by which the plan assumptions
were chosen. The TransPlan assumptions were developed over a year ago in the
Evaluation Report process and had to do with transit goals, alternative modes
of transportation, toleration levels on streets and highways, and light indus-
trial development. The Metropolitan Area Transportation Committee agreed to
these and approved them as the assumptions for TransPlan. He also said that
the TransPlan does not include the Riverfront Park property or the property in
the Mid-Period Review. The TransPlan includes a recommendation for a trans-
portation refinement study of the Downtown, University, Sacred Heart, and
Riverfront areas. Mr. McKinley added that the Metropolitan Bike- ways Master
Plan has been integrated into the TransPlan.
As Mr. McKinley went through the TransPlan document, several questions were
.. asked. He responded by saying that the plan will be subject to an annual
update, as it is done now, and that the document will be reprinted after
adoption.
e
MINUTES--Eugene City Council November 25, 1985 Page 1
Mr. McKinley referred to the Goals, Objectives, and Policies Element; Street
- and Highway Element; and Bicycle Element of the plan, explaining that listed
projects and maps were keyed to the different elements. The Street and
Highway Element is divided into three time phases by which the projects will
be included into future Capital Improvement Programs.
Ms. Ehrman expressed concern about how the TransPlan fits together with the
CIP and Mr. Reinhard explained that the TransPlan projects and the current CIP
projects will be integrated and that the CIP would be updated annually. Some
current CIP projects will be updated or replaced by the TransP1an projects.
Mr. Gleason added that the TransP1an, once adopted, would become a policy
foundation for prioritizing projects.
Mr. McKinley continued by referring to the Financial Element in the TransP1an,
which was not included in the T-2000 Plan.
Several projects in the T-2000 Plan were dropped in the TransPlan, according
to Mr. McKinley: 6th/7th Freeway; WOW Hall Ramps; Linco1n/Charnelton Couplet;
30/30 Connector; and North Delta Extension. These were dropped either for
financial reasons or because of other alternatives.
Two major projects which were not in T-2000 were added to the plan:
1. Extension of Beltline to Willow Creek Area
Mr. McKinley explained that a refinement study of this area will be needed as
e well. Mr. Reinhard said that the County has raised several questions about
this project. Ms. Bascom asked if the widening of West 11th was included and
Mr. Reinhard said no.
2. Valley River Bridge
Rather than doing expensive improvement and modification of the Washington/
Jefferson Bridge, it is suggested that a Delta Highway/Be1tline Bridge would
be an alternative. This is project 314 in TransPlan's Highway Element.
Ms. Bascom asked if this was similar to the Park Avenue connector.
Mr. Reinhard said that it was geographically close but would serve not only
the River Road and Valley River Center area, but the southwest Eugene area as
we 11. It would reroute southwest Eugene traffic to the Valley River Center
and Goodpasture Island area off of 6th and 7th avenues.
II. IDENTIFICATION AND ISSUES AND QUESTIONS ABOUT THE TRANSPLAN
A. Washington/Jefferson Bridge Improvement
Mr. Miller expressed concern about the merging lanes on the Washington/
Jefferson Bridge interchange to Valley River Center. He suggested that a
widening of the merging area be added to the TransP1an. Mr. Reinhard agreed
that this could be added. In a later discussion, it was suggested that this
would be a short-range project and should be suggested to the State agency for
investigation.
e
MINUTES--Eugene City Council November 25, 1985 Page 2
B. Transit Goals
e Mr. Holmer identified the transit goal assumption as a major question for
discussion. Mr. Hansen agreed that a discussion of the modal splits must be
done before the pUblic hearing. Mr. Reinhard responded to Ms. Ehrman's
question by reviewing how the TransPlan included the modal splits in its
assumptions.
Mr. McKinley referred to the Evaluation Report, explaining that the intention
of the Evaluation Report was to try to get the community to agree on the
assumptions to be used in TransPlan. The transit goal adopted by MATC was
3 percent by 1990; 5 percent by 1995 or 1997; and 8 percent by 293,700
population. The whole TransPlan system was modeled around the 8 percent
transit goal. He agreed that there were questions about whether this was too
high or unattainable. The T-2000 Plan had a transit goal of 14 percent; the
TransPlan lowers it to 8 percent. The TransPlan will be updated in a major
way every five years. During this time the trip-making rate per household
rate will be monitored and re-evaluated. Mr. McKinley suggested that the
council stick with the 8 percent goal, leaving it open for re-evaluation. In
response to Mr. Holmer's question, he said that the transit percentage of use
is now about 1.3 percent and was the same five years ago.
Mr. Rutan asked Ms. Anderson if the joint Eugene/Springfield/Lane County
Planning Commissions came to a consensus on this assumption during development
of the Evaluation Report; and that goals are not expected to be reached if not
set. Ms. Anderson agreed. Mr. Rutan added that the implications of the
e 8 percent transit goal do have an impact on today's planning and that the
problem is not easily resolved. Mr. Hansen asked if the City Council had
signed off on this transit goal assumption and Mr. Gleason responded that all
the bodies, including the council, had signed off on the documents so that the
modeling could be done.
Mr. Reinhard responded to Mr. Rutan by saying that there is a problem if the
8 percent is not realistic, because we could be under-designing the highway
system. However, the short-range projects (within five years) would probably
not be designed differently. When long-range projects are begun, project
modeling will be done, and the 8 percent transit goal will be evaluated for
each project. They will look at alternatives if the goal is high for that
time and plan expandibility or flexibility into the projects, even though the
TransPlan does not predict that need.
Mr. Hansen asked if the council wanted to re-open the issue of the transit
goal as an assumption for the TransP1an. Hearing no willingness to do so, he
asked for other questions.
C. Suggestions for Understanding TransP1an
Mr. Rutan commented that the TransPlan document is lengthy. The public
testimony and the staff responses are lengthy. The time line for decision-
making is short. He asked the staff for suggestions on how to get through the
materials in a way to help the councilors understand and make an intelligent
dec; s; on.
e
MINUTES--Eugene City Council November 25, 1985 Page 3
Mr. Gleason suggested that in order to get an overview of the plan and what
e the model does, that the councilors sit down with either Mr. McKinley or
Mr. Reinhard and look at the models which would result with or without the
assumptions of the plan. Then ask, that given all the reasonable assessments,
if that is really what is going to happen and if so, are you satisfied.
Mr. McKinley suggested that the policies are an important area on which to
focus. The action will be on those. He asked that the councilors call one of
the staff if they have questions. Mr. Reinhard agreed that the plan assump-
tions and policies, not the projects, have drawn the most comments.
D. TransPlan's Tie into the Capital Improvement Program
Ms. Ehrman expressed concern about the possibility of TransPlan projects
taking priority over other projects in the CIP which are not transportation
related.
E. Revenue Availability
Mr. Holmer asked to what extent the TransPlan was constrained by available
revenue. He also asked if there was an adequate identification of projects
sustainable by the City budget without new taxes. Mr. Reinhard said that
there was not a sub-list, but that this could be done. Mr. Holmer asked if
the City was committing itself to raising dollars for the TransPlan and
commented that, if the projects were not financed, they had no meaning and
became a wish list.
e Mr. Gleason responded by saying that the council needed to decide if it agreed
with the assumptions of the plan. The projects will be financed largely by
Federal, State, and County funds. If the City does not have metropolitan
priorities, it would be difficult to work in the Federal, State, and County
area. A plan needs to be in place. Mr. Hansen asked if a list of the sources
for funds for short-range projects could be made. Mr. Reinhard explained that
the plan does this partially, and such a list could be made. The tables
included now are for the metropolitan area, not just Eugene. He added that a
list of short-range project fund sources would be made. Mr. Rutan suggested
that City projects which are sustainable by the City be listed, so that the
public can see which projects are funded by other sources.
Mr. Hansen asked what happens if the City Council makes changes in the plan
after the other governing bodies have approved. Mr. Reinhard responded that
the MATC is the appropriate forum for resolving metropolitan differences.
Information sharing with other jurisdictions will be done prior to a final
decision by the City Council.
F. Process for Updating TransPlan
Mr. Holmer expressed concern that the TransPlan be updated and evaluated
annually was too frequent. He suggested every three years, as the review
process takes up a great deal of staff time and energy. He also asked how the
T-2000 Plan got out of date if it was evaluated every year.
-
MINUTES--Eugene City Council November 25, 1985 Page 4
Mr. McKinley responded that the T-2000 Plan process for review did not include
e citizen input. The TransPlan could allow for amendments to project~ through
citizen input.
Mr. Hansen asked if policies and assumptions would be evaluated each year.
Mr. Gleason said that there would not be a debate on policies each year, but
that projects would be evaluated annually. Mr. Miller asked how a project
could be added to the plan and Mr. Reinhard suggested that it would be better
to add it now.
There was further discussion regarding how to determine whether projects
should be included or added to the TransPlan. Mr. Hansen suggested that the
council needed time for a work session to determine how to make decisions
about the TransPlan.
III. 6TH AND 7TH AVENUE ARTERIAL
Mr. Reinhard distributed and reviewed the memorandum explaining the alterna-
tives for the 6th and 7th Avenues Arterial Plan. He also referred to the
aerial photograph, routing two alternative plans. Ms. Ehrman asked if the
State planned to expand the two-lane section of Highway 126 by Fern Ridge
Reservoir. The staff knew of no such immediate plans. Mr. Rutan asked why
Alternative #1 was not routed on 5th Avenue. Mr. Reinhard responded that
there was substantial impact on businesses either way and that this suggestion
had been investigated by the Citizen Advisory Committee and the State pre-
e viously. Mr. Miller asked if 6th and 7th avenues could be two-way streets in
order to allow business access in the limited section. Mr. Reinhard said that
this was also considered, but found unfeasible. Ms. Ehrman asked if the plan
was a freeway model. Mr. Reinhard explained that both alternatives are
limited access roadways and that limited direct access is different from the
freeway model. There is no direct driveway access, but there is at grade
access at each major arterial: Greenhill, Terry, Danebo, Beltline, Seneca,
etc.
Mr. Holmer asked if elevation at the east end was considered. Mr. Reinhard
said that the State did not consider it because of cost and local circulation,
but that the Planning Commission had recommended elevation be studied.
Mr. Reinhard referred to the section entitled, "Public Input" on the memoran-
dum and explained that there has been a massive outreach program regarding
this project. Nearly 100 people attended a half-day information session. He
also referred to the recommendations listed on the memorandum. He said that
the Planning Commission had recommended Alternative #1.
Ms. Ehrman asked about the purpose of the project. Mr. Reinhard responded
that it would provide an alternative to West 11th in order to alleviate
traffic there. It would also serve the Willow Creek area.
Mr. Hansen asked what would happen if the route diversion (in green on the
map) from Alternative #1 to Alternative #2 was used, but originated on 5th
e
MINUTES--Eugene City Council November 25, 1985 Page 5
Avenue. Mr. Reinhard replied that this had been considered in the early
e deliberations. He also said that nine businesses would be displaced in
Alternative #1 and 18 businesses displaced in Alternative #2.
Mr. Gleason summarized the need for the arterial project. A decision was made
to develop the city towards Greenhill and the Willow Creek basin instead of
1-5. Development on 1-5 for the transportation system was not unacceptable to
the State. Willow Creek is a feeder area and the areas surrounding it will be
developed too. Mr. Reinhard added that the urban growth boundary is at
Greenhill Road.
Mr. Miller asked about the rerouting of Alternative #1 up the Amazon Canal and
along the the railroad track. Mr. Reinhard said that the Planning Commission
has recommended this change, will submit it to the State, and continue to
discuss it with the property owners. The council will be receiving the
details of the change.
Mr. Reinhard reiterated the conclusions about the possibility of an elevated
roadway in the industrial park on the east end of the route for the benefit of
Ms. Bascom. He said that the State is looking at this, but City staff has not
yet received a report.
Item #4 on the memorandum addresses wetlands. Mr. Reinhard pointed out the
Bertelsen Slough and Stewart Pond on the map and explained that measures would
need to be taken to protect these from development. Perhaps, it would be
required that the State purchase them. Mr. Hansen asked about acquiring other
~ wetlands and Mr. Reinhard said that even though the Federal agencies interpret
the law to mean that destroyed wetlands be replaced with creation of new ones,
the City would prefer to preserve those already existing.
Item #5 on the memorandum refers to the provision for the Amazon Fern Ridge
Bike Path. Mr. Reinhard said that the Planning Commission wants to emphasize
this during the design process.
Mr. McKinley explained that the reason for moving so rapidly on this project
was to be able to have a decision in time for input into the State's six-year
highway improvement program update which is done every two years. After the
December 18 public hearing by the State, they will issue a hearing study
report which will include the recommended alignment by late January or early
February. Then the City Council will need to call for a vote in March.
Ms. Bascom expressed her appreciation for the explanation of what a limited
access roadway means and she felt that the public would be benefited by this
kind of system, rather than a freeway. Ms. Ehrman asked if the 6th and 7th
widening project anticipated this change and Mr. Reinhard said, yes.
Mr. Hansen asked if the State would support a one-way traffic system and
Mr. Gleason responded that the justification for building a state highway was
to connect to another state system which ultimately connects to the freeway.
Funding would be questionable if the State planned an arterial for City use
only.
e
MINUTES--Eugene City Council November 25, 1985 Page 6
Mr. Hansen also asked if the route could go on 5th Avenue and 7th Avenue with
e one-way traffic--wou1d this save money? Mr. Reinhard answered that the
analysis was not done but the condemnation issue would be the same.
Mr. Miller asked if the route was one-way, if access was possible through
separate lanes for businesses. Mr. Reinhard said that this could not be done
unless the right-of-way was purchased which would still condemn the buildings.
Ms. Ehrman asked about purchasing and relocation of displaced businesses.
Mr. Reinhard said that this would be part of the State project expense and
referred to the figures starting on page 87 of the draft book.
n was adjourned at 7:10 p.m.
(Recorded by Judy Jernberg)
1916C
e
.
MINUTES--Eugene City Council November 25, 1985 Page 7