HomeMy WebLinkAbout06/08/1981 Meeting
e
e
.
M I NUT E S
Eugene City Council
City Council Chamber
June 8, 1981
7:30 p.m.
COUNCILORS PRESENT: Betty Smith, Mark Lindberg, D. W. Hamel, Brian Obie, Eric
Haws, and Cynthia Wooten, Gretchen Miller.
ABSENT: Councilor Emily Schue and Mayor Gus Keller.
Regular meeting of the City Council of the City of Eugene, Oregon, was called to
order by Her Honor Acting Mayor Gretchen Miller.
I. AGENDA ADJUSTMENT
Mr. Gleason stated that Item I-C--Parade Permit Ordinance and Administrative
Rules Revision--would be set over to a Monday evening agenda in July.
II. PUBLIC HEARINGS
A. Street Vacation for City of Eugene--Performing Arts Center/Conference
Center (SV 81-1) (map distributed)
Mr. Gleason introduced Jerry Jacobson, Planning Department.
Mr. Jacobson stated that this is a City-initiated street vacation request for
Willamette Street between 6th and 7th avenues. This follows the Master Site
Plan for the development of the Eugene Performing Arts Center, Hilton Hotel, and
Conference Center. The Master Site Plan was approved by the City Council on
April 9, 1979, and included the vacation of Willamette Street to provide part
of the public area and to add to the overall design of the Performing Arts
Center. The Planning Commission unanimously ~oted to recommend approval of
this vacation request. He indicated that Ed Smith, Development Director of the
Civic Center; Randy Thwing, Planning Commission; and Jim Hanks, Traffic
Engineer, were present to provide further information.
Mr. Smith stated that a series of decisions had led to this public hearing. The
Master Site Plan concept includes closure of Willamette Street to vehicular
traffic. This is the final implementation of the plan based upon the eventual
closure of that street. On January 9, 1979, the Civic Center Commission
reviewed the Master Site Plan concept and it was approved in total. On
January 17, 1979, the City Counci 1 approved the Master Site Pl an and it was
assumed that the vacation of Willamette Street was a part of that approval.
Traffic patterns were researched at that time due to construction of the parking
MINUTES--Eugene City Council
June 8, 1981
P ag e 1
e
e
e
lot. The parking and transportation study was referred to the Civic Center
Commission on April 4, 1979, and it was approved. This same recommendation was
approved by the City Council on April 9, 1979', after extensive public hearings.
However, it was decided to delay closure of the street until later, in case
minor adjustments were necessary. At this point, everything became pedestrian-
oriented. Staff also was faced with subterranean problems which caused diffi-
culties in locating the rehearsal hall underneath. They had been considering
joint uses of the lower level. Before these decisions were made, the community
decided to build the two-block site with the inclusion of the Conference Center
and hotel. He showed a map indicating the various types of uses available in
that two-block section. These uses included commercial, retail, and public
meeting areas. They tried not to duplicate functions in both the Conference
Center and the Performing Arts Center. This is more than a street vacation. It
became the nucleus of the center. If the street were not vacated, there would
be many consequences. $150,000 has been spent on the Master Site Plan, and if
the street were not vacated, additional studies would have to be done for
designs to include the street. Access to the lower level would be severely
impaired, if not impossible. There would be no easy pedestrian access between
the facilities. There would be no public open space or outdoor activities area.
Retail space in the arcade area would not exist. The continuation concept of
the mall would be eliminated and landscaping amenities would be minimal. The
art that has been acquired could not be displayed. It seems more important to
cater to the Conference Center and hotel than to those who drive automobiles.
Ms. Miller asked to what extent design alternatives would be determined by the
street closure. Mr. Gleason stated that if the street were not closed, they
would have to redesign both facilities since they were designed around the
closed street. If that were the case, Ms. Smith asked, who would be responsible
for the arcade design and how would it be financed? Mr. Smith stated that
Pfeiffer has the contract for design and is responsible for seeing that the
integrity of the plan is met. However, they could hire someone to design that
space if they chose not to do it themselves. They are almost finished with the
design process now and the parameters have been defined. He stated that it is a
$1.5 million construction project and he did not know where the money would come
from. Mr. Gleason said the current contracts for the Conference Center and the
Performing Arts Center include vacation of Willamette Street for use of the
common space. If that were not done, redesign of some parts of both would have
to occur, and that could be done in phases. He does not know what the cost
would be.
Ms. Wooten asked what public amenities are in the common area now and what
provisions there are for bike transportation and handicapped access. Mr. Smith
stated that the total area is accessible at all levels by the handicapped.
Bicyclists and pedestrians have access through and about the open space and
access is available for emergency vehicles. They have retaining walls in place
and a base for forming the arcade. Also, a major piece of art work has been
acquired for that area. Mr. Lindberg asked if there are ways in which the open
space would be used as an activity and mobility center. He asked if this
would be a link between the downtown mall and the 5th Street Market district.
Mr. Smith stated that this project will be a major pedestrian generator in
itself. The access to 5th Street Public Market is a possibility. The hotel and
the Conference Center want access to the north. The continuation is important.
Pedestrian traffic will be heavy.
MINUTES--Eugene City Council
June 8, 1981
Page 2
Ms. Miller distributed information from the Eugene Firefighters Association and
from downtown merchants regarding this vacation.
~ Public hearing was opened.
Speaking in favor:
Chuck Heauser, 1906 Lemming, stated that he is in favor of the vacation. The
primary purpose of this project was to help stimulate the economy and to protect
the investment. This should not be redesigned; rather, implementation should
occur. Traffic patterns have been considered and without this street vacation,
the danger could be increased. He has spoken to merchants on the perimeter of
the mall and most feel that it would not necessarily be in the best interest of
merchants on the mall to leave the street open. He submitted some petitions.
He feels the vacation would benefit all citizens and merchants.
e
Roger Wood, 65 Monroe, stated that he is speaking for the Whiteaker Land Use and
Site Review Committee. He indicated that he had distributed a letter to the
council earlier. They support the concept of the vacation conditionally. The
conditions of their support are: 1) an easement for pedestrian through traffic
should be retained; 2) design details should allow convenient two-way flow of
pedestrians (including people walking bicycles, people in wheelchairs, and
other mobility-handicapped persons) between 6th and 7th avenues; 3) amenities
such as landscaping, drinking fountains, lighting, and benches should be
oriented for north-south pedestrian through traffic as well as for east-west
traffic and crowds lingering in front of the Performing Arts Center itself; and
4) careful attention should be paid to connecting this block of Willamette to
other blocks to the north and south as well as to vehicular traffic moving east
and west on 6th and 7th avenues. Pedestrians approaching the Performing Arts
Center along Willamette Street from the north or south should feel there is no
impediment to cross 6th or 7th avenues and proceed through and past this block.
Eye-level sight lines running north and south through this block should not be
obstructed by landscaping or building projections.
If the conditions he listed can be met, the Whiteaker Land Use and Site Review
Committee recommends that the City of Eugene vacate the right-of-way in the
block of Willamette Street between 6th and 7th avenues. However, if those
conditions, particularly retention of a pedestrian easement, cannot be met, they
strongly recommend against vacation at this time.
Les Anderson, 2110 Hubbard Lane, stated that he is chairperson of the Civic
Center Commission and the Performing Arts Commission. This street vacation
request is based on the Master Site Plan, which included consideration of
structure placement, design, traffic flow, aesthetic conditions, and making this
area a destination area. The street has had relatively light use since creation
of the urban renewal district. Some of the opposition is well-meaning, but it
is based on economic conditions from post-World War II. Access is important,
but streets do not have to be laid in a grid system for good transportation.
Parking is important. The City has done a good job on this project. This
vacation will not adversely affect business; rather, it will enhance business.
Willamette Street has been closed for two years. He wondered what advantage
e
MINUTES--Eugene City Council
June 8, 1981
Page 3
e
there would be to reopening it. The council will need to base their decision
upon the considerations dealing with aesthetic standards versus hindrance of
free-flow of traffic in the downtown area. They also need to consider pedes-
trian safety and the economic advantages or disadvantages that are involved.
e
Speaking against:
George Boehenke, 2040 Willamette, submitted petitions containing approximately
300 signatures. He began his testimony by recalling when the community passed
the ballot measure to start the Performing Arts Center. A group of people got
together and put their money on the line. They thought that Willamette Street
would remain completely open. They wanted it left open to generate downtown
business with a new hotel and auditorium. The majority of major retailers
downtown want service organizations downtown but most have moved out because
traffic has been cut off. Most people coming in to Eugene from 1-5 cross the
Ferry Street Bridge and go down 6th. That is the major connector to downtown.
He had gone to the Eugene Downtown Association, Chamber of Commerce, and the
City Manager and asked that the sign directing people to the downtown area be
changed to direct people to use 8th Avenue temporarily. No one would do that
because they wanted the Hilton to locate here. Traffic linkage is needed for
the downtown area. Many peop 1 e go down 6th Avenue and on out and take the
Washington/Jefferson Bridge to Valley River Center. The survey Les Anderson
took which alluded to a small amount of traffic was done between 10 a.m. and 2
p.m., not between 7 and 10 a.m. when people are there in the downtown area
for other business such as going to the post office. The post office antici-
pates 5,000 post office box holders by 1985 or 1990, which would be a lot of
people to shove out of the downtown area, who would be potential shoppers.
Surveys taken in Fresno and other cities have shown that business does come back
to the downtown area once streets have been reopened. Ada Lee, owner of Asia
Garden, could tell the council of the hardship this closure has placed on her
business, as could the owners of Original Joe's. He feels that temporary
barricades could be used during performances such as those that are used in
Portland. There is a need for the movement of traffic.
Keith Rodman, 2004 East 26th Avenue, stated that State statutes allow the
council to initiate street vacations and this is what was done in this case.
State statutes define affected areas as those geographic areas closest to the
street being proposed for closure. This is the first opportunity there has been
for property owners from the "affected area" to testify. All the private
property owners on Willamette Street from 5th Avenue to 8th Avenue on both sides
have been contacted. Unanimously, they signed a petition to keep Willamette
Street open. He has al so tal ked to tenants and lessees of the II affected area"
and most of them feel it is vital to their economic welfare that the street be
open. They feel an important north-south traffic artery is severed with this
closure. With the closure, traffic movement is not convenient as it takes eight
to ten blocks, rather than two and one-half to three blocks, to go from the post
office to the downtown core area which is wasteful of fuel. He has questions
concerning the legal implications of this proposed street vacation. As he
understands it, by vacating this public street, one-half of the street would be
owned by the Hilton and they can do with it as they please. He does not know if
the City has utilities running under the street, but if they do, the City will
no longer have that easement if the vacation occurs.
~
MINUTES--Eugene City Council
June 8, 1981
Page 4
e
e
e
If this vacation is granted, 4,240 square feet are being deeded over to the
Hilton which is a $63,222 give-away to the Hilton. Although this is the first
opportunity for him to be heard, he would like to know why action on this street
vacation was not taken before it became so costly. The original vacation
request was prepared by Mr. Coleman, acting for the City of Eugene, on May 20,
1980, but for some reason, it was not presented at that time. People who make
their living in the "affected area" feel this will be detrimental to their
economic welfare. He asked if some reasonable arrangement could be made
such as temporary closures during events. Serious consideration should be given
to their objections. Once the street is vacated, nothing further can be done.
Otto Poticha, 1820 Kona, stated that Ed Smith had summarized the original plans
very well, but that every single thing relating to the Conference Center, the
Hilton, and the Performing Arts Center has changed since the original Master
Site Plan was done in 1979. The galleria concept was very exciting at that
time. Originally, all parking was to be underground and both sides of Willa-
mette Street were to have shops. Then, the central arcade was an integral part
of the concept. Now it has become just another paved open space. Parking
cannot be underground because of the level of the water table. The hotel has
been turned 90 degrees since the original Master Site Plan and it no longer fits
the connection as it did. Also, the Conference Center does not relate in the
same way that was originally proposed. There was no reason to cover it because
in the original plan, it was a galleria in the Milan fashion. Now it is just a
paved area. He feels it important that buildings be a part of the city and not
"islands unto themselves." He asked if there would be a guarantee of a free-
flow for pedestrians and a visual connection between these facilities with the
rest of the city. He feels the area now designated as retail is only large
enough for small flower stalls. The plaza is four feet above grade level. It
is not open as the map indicates. He pointed out potential traffic flow on the
maps and explained the problems with the proposal. He suggested having two
pull-off drop-off lanes with a shelter. He also suggested railroad-type cross-
arms that would prohibit traffic temporarily. He feels that some streets can be
closed temporarily on a satisfactory basis. He feels the largest cost in
reopening this street would be to provide more light for the green room. He
volunteered the services of the AlA local chapter for design work, if that is
necessary.
Tom Slocum, 2125 Fairmount, stated that he had presented 53 signed letters to
the council as well as 20 new signatures on petitions showing the concern there
is for linkage between the core area and downtown. He indicated agreement
with Mr. Poticha. He encouraged the council to take another look at possible
alternatives. He stated that there are planning efforts throughout the city
with one group doing something and another group wanting something else, yet
with no one taking a look at the overall picture. The 5th Avenue district
should not be set aside from the mall or vice versa. They are interrelated.
There is an extensive free parking program, but the bureaucracy is frustrating
those who wish to participate in the program. The automobile is still the major
form of transportation. Structures have been built and now people are frustra-
ted because they are not able to use them easily. In regard to the cost of the
kiosks, perhaps the rest of the downtown merchants could supply the retail space
and the cost savings would allow the $1.5 million for the street.
MINUTES--Eugene City Council
June 8, 1981
Page 5
e
There being no further testimony, public hearing was closed.
CB 2308--An ordinance authorizing vacation of Willamette Street, a 66-
foot-wide right-of-way, between 6th and 7th avenues.
Ms. Wooten expressed concern and asked for clarification regarding the statement
made that at no time prior to this evening had the merchants been given the
opportunity to testify in regard to the Master Site Plan. Mr. Smith stated that
over the past one-and-one-half years, hearing after hearing has been held. The
Willamette Street closure was not specifically addressed, but there were oppor-
tunities to testify. Ms. Wooten asked if there were objections regarding this
proposed closure prior to the time the matter came before the Planning Commis-
sion. Mr. Smith responded that there had not been objections regarding either
a permanent or temporary closure. Ms. Wooten asked if there is an objective way
to determine how much business loss will occur because of the street closure.
Mr. Smith stated that there was no way as far as he knew. He feels that eco-
nomic benefits will occur as this area becomes a destination area. Ms. Wooten
asked if consideration had been given to alternatives such as those suggested
by Mr. Poticha or to making this a two-way street. Mr. Smith stated that many
alternatives had been considered. Originally, parking was to be underground
with everything else on top. However, when it became apparent that the con-
struction and parking would need to be above ground, it began squeezing the
ground level area that was available. The Willamette Street area was to be
retained as the nucleus of the three structures.
e
Mr. Obie asked if the comments made regarding a four-foot elevation on both
sides of Willamette were correct. Mr. Smith said they were correct, but that
was only part of the story. Mr. Obie asked if what used to be Willamette Street
would be above street grade if he were standing and looking at it. Mr. Smith
showed on the model how it would look and explained that there are variations in
the grade. He explained which area is to be 18 feet wide. Mr. Obie asked if he
was seeing things on the model that he had not seen before. Mr. Smith said that
he was not. Mr. Obie asked if there were changes in the Conference Center
design. Mr. Smith said there were not. Mr. Obie asked if the galleri~ was in
the plan when the Civic Center Commission approved this. Mr. Smith said that it
was not, at least not with a covering over the whole street. Mr. Obie stated
that he remembered that that had been the case.
Ms. Smith stated that she had some concerns regarding the testimony. Specific-
ally, she is concerned about the comments that this was the first opportunity
for testimony. She is concerned about the traffic flow and if the traffic flow
could be changed to a regular traffic pattern. She asked if there is an oppor-
tunity for modification of the design. She had received a letter from the
Eugene Firefighters Association regarding safety concerns. Mr. Smith stated
that life safety concerns were reviewed by the Fire Chief and he was satisfied.
Mr. Smith stated that there could be two lanes of traffic through that area,
but then the covered connection could not be there. Ms. Smith asked if one lane
could be installed. Mr. Smith stated that there would not be enough clearance.
Also, other changes would be required for the rehearsal hall and the green room.
It would be necessary to move a wall. Ms. Smith asked where two lanes of
traffic would go if they were allowed. I~r. Smith demonstrated that on the
model. Ms. Smith asked if there is a way to raise the walkway. Mr. Smith
stated that there is not.
e
MINUTES--Eugene City Council
June 8, 1981
Page 6
e
e
.
Ms. Miller asked how fire trucks get access if traffic cannot go underneath the
covered area. Mr. Smith stated that fire trucks could not get through but an
ambulance could. Mr. Smith said that the vertical clearance is ten feet.
Mr. Gleason indicated that cars could drive through on one lane, but if two
lanes are desired, some significant design decisions would need to be made. He
feels that design questions would be best handled in a format other than at a
City Council meeting. Mr. Obie indicated agreement but feels Mr. Smith has
overstated the permanency of what is going to happen. As a member of the Civic
Center Commission, he has not seen the overpass concept prior to tonight,
although he has seen many models in the past three years. There are areas
where pedestrians and vehicles can co-exist, such as by the First Interstate
Bank. He granted that the area would be more aesthetically pleasing without
cars, but he is concerned for the downtown retailers. He would like to see
alternatives before making a decision. He is concerned about closing off that
end of town and wonders what would happen to that area. He does not want to see
empty storefronts such as now exist between 10th and 11th. He feels the post
office is a traffic generator. Convenient access is important. He is concerned
that a barricade is being placed to the downtown area. He feels Mr. Poticha
presented an excellent case.
Mr. Haws stated that the issue is whether the street should be vacated. If it
is not vacated, design features would need to be changed. The greater good
would be to vacate the street. He will vote in favor of the vacation.
Mr. Lindberg stated that the range of problems has been well identified. He
asked about people who would be using the origination point of the arcade and
the open space and whether people need encouragement to go to the 5th Street
district or to downtown. He would like to see a number of alternatives exam-
ined, including the cost of a walkway over 6th and 7th avenues, shuttle service
around the mall, and the cost and benefit of promotional activities to change
people's habits in order to keep the same design. He asked what the conse-
quences would be of delaying to explore other options. Mr. Smith stated
that the rehearsal hall has already been excavated and they had to go out on to
Willamette Street for that purpose. They would have to back off from some
foundation wall construction. He said that the discussion now centers on a
street through the area. If that is what was wanted originally, then concep-
tually many things should have been done differently. This may mean some
drastic and expensive design changes. Temporary closures were examined, but
staff was unable to determine the times when the area would need to be closed.
The major delay will be in finishing the rehearsal hall.
Ms. Wooten asked about the street closure at the time of the council adoption of
the Master Site Plan. Mr. Haws noted that he had not envisioned cars in the
middle of this project. Mr. Hamel stated that Willamette Street was blocked off
at the time due to the construction and he does not recall any discussion of
permanent closure of Willamette Street. He appreciated Mr. Poticha's remarks
and liked the idea of a similar treatment as in front of First Interstate Bank.
Another option would be similar to that used on 6th Avenue in Portland. He
would like to see something that would help business and be culturally pleasing
as well.
MINUTES--Eugene City Council
June 8, 1981
Page 7
e
e
e
Ms. Miller asked if the downtown mall streets had been vacated. Tim Sercombe,
City Attorney, stated that they were not. Ms. Miller suggested that perhaps
Willamette Street could remain City property. Present discussion demonstrates
that there may have been inadequate amounts of information and discussion
previously regarding the present configuration. Also, there had not been
significant testimony against the closure in the earlier stages. She asked
about the possibility of holding this item over to a later date for further
review. Mr. Gleason stated that we have completed over two years of a three-
year project. All the decisions have been made based on the street being
vacated and planned for pedestrians. It is possible, however, to redesign the
facility. One needs to look at a detailed perspective to understand the concept
before making a determination. Council could delegate the review to a subcom-
mittee of the council which could bring back a recommendation. A report could
include alternatives and the costs. He disagrees entirely with the comments
regarding fire access/egress and does not feel this should be part of the
considerations. He suggested that council instruct staff to come back with a
procedure for review, including outside help if necessary because of the
long-range effect of this project.
Ms. Smith stated she feels there is a need to delay on this item. In the Civic
Center Commission minutes, staff was told not to take action on the street
vacation until it was known what would happen with the Hilton. She feels the
Civic Center Commission should discuss this further and consider alternatives.
Mr. Obie noted that when the Master Site Plan was considered, he thought the
consideration was whether the galleria would exist or not. He felt staff should
come back with a recommended process to review the alternatives. Mr. Lindberg
indicated that he recommends a delay to allow more time for review of the
information and time to assimilate it.
Mr. Obie moved, seconded by Ms. Smith, to postpone action and
request that staff come back with a recommended process to look at
the alternatives and give those who are affected by the decision a
chance to participate in the process.
Mr. Lindberg asked if Mr. Obie's motion included bringing back cost figures for
redesign. Mr. Obie stated that it did not. Ms. Miller stated staff must look
at whether north-south access, through access, or the present plan is best.
She does not feel it is appropriate to turn half the street over for the hotel
right-of-way.
Roll call vote; motion carried 6:1 with Councilor Haws voting no.
The meeting was recessed briefly.
B. Rezoning--Property Located West of Pearl Street, North of the 3rd-
4th Connector from RG Garden Apartment Residential District to R-4/SR/
89.3A High-Rise Multiple-Family Residential District with Site Review
procedures, and a density limitation of 89.3 units per acre (Evergreen
Union Retirement Association) (Z 81-1) (map distributed)
Mr. Gleason introduced .Jim Croteau, Planning Department.
MINUTES--Eugene City Council
June 8, 1981
Page 8
e
e
.
Mr. Croteau stated that this request for a zone change is made by the Evergreen
Union Retirement Association. The zone change would be from RG Garden Apartment
Residential District to R-4/SR/89.3A High-Rise Multiple-Family Residential
District with Site Review procedures, and a density limitation of 89.3 units per
acre. This was considered by the Planning Commission on March 10, 1981, and
it was recommended for approval with a 4:2 vote. The applicant owns 3.36 acres
currently developed with 224 units. It is known as Ya-Po-Ah Terrace. This is
an amended application from the previously submitted request. The applicant
would like to construct an additional 75 units. The density limitation of 89.3
units per acre and inclusion of the site review process relieve many of the
concerns that had been raised. This property is within the Whiteaker Neighbor-
hood and the neighborhood organization has received notice of this request.
Mr. Haws asked a specific question about the proposed additional development.
Mr. Croteau stated that the applicant could address that question in the public
testimony portion.
No ex parte contacts or conflicts of interest were noted. Ms. Wooten stated
that she had no ex parte contacts with the zoning request; she has had contact
with the applicant but does not believe that that is a problem since that
was during the course of her regular job. Mr. Lindberg stated that he also had
discussed this with the applicant but did not feel he had any conflicts of
interest or ex parte contacts.
Mr. Haws asked if the area is built to maximum density now. Mr. Croteau
responded that when the project was first built, part of it was zoned RG and
part was zoned M-2. In the mid-1970s, the M-2 portion was rezoned to RG to
permit construction of 25 to 30 additional units for elderly housing. However,
it is not feasible now to construct only 25 units. The applicant will provide
additional information to indicate that that is the case. Liberal variances
were granted for parking and for the height of the structures.
Staff notes and minutes were entered into the record.
Public hearing was opened.
Speaking in favor:
Richard Danielson, 1 East Broadway Mall Walk, stated that he represents the
Evergreen Union Retirement Association. HUD has encouraged the applicant to
develop to higher density in order to provide additional housing for the
elderly. They would like to make maximum use of this well-known senior
facility. Present zoning would allow construction of an additional 29 units,
but they would like to add 75 units. Higher density for this site is consistent
with the general application of the Metropolitan Plan diagram regarding downtown
housing and higher density housing.' In 1977, the rezoning to RG was in compli-
ance with the goals. The impact of 75 new units would not be really different
from the 29 units allowed now through the current zoning. He indicated that he
had slides available to show the general design concept. It is anticipated that
the new portion would be raised, and would be located in front of the building
MINUTES--Eugene City Council
June 8, 1981
Page 9
e
e
-
where the parking lot now exists. This concept would add four stories in front
of the current Ya-Po-Ah Terrace. Another concept is to have parking partially
underneath or to move the parking lot to the west. They would have access from
Pearl Street between the existing structures and out onto 4th Street. There is
good access and good safety control. This facility would comply with the zone
restrictions. They have no problem accepting the site review criteria. He
feels the proposed zoning would be justifiable to assist senior citizens in
their search for housing.
John Humbert, 350 Pearl, stated that he is the administrator of Ya-Po-Ah
Terrace. He distributed a handout and noted that he is the appointed repre-
sentative for the Evergreen Union Retirement Association. He feels that need is
the primary concern. The waiting period for additional development may be as
long as ten years, and prospective tenants are in need of additional housing
as the senior citizen population grows. As Eugene expands, the need for
senior housing will increase. HUD 202(8) funding is difficult to acquire now,
but since they have an existing application, changes are very good. They
received a letter recently from the Eugene Commission on the Rights of Aging
which was in unanimous support of this proposal. The Board of Directors
realizes the current economic situation and they are looking at this as a
construction project which would create additional senior housing and put some
people back to work.
Sid Thoresen, 350 Pearl, Apt. 1202, stated that he has lived at Ya-Po-Ah Terrace
for five years and lS in favor of the zone change request. On March 3, 1981, a
meeting was held and the residents were told of this proposal. They feel this
project entails "people helping people" and unanimously voted in favor of the
proposal. Housing needs are not currently being met. There is a need for more
long-term housing for the elderly and disabled. He quoted Senator Mark Hatfield
regarding elderly housing needs. Mr. Thoresen also feels this expansion will
add to the City's cash flow.
Robert C. Thompson, stated that he is a member of the Advisory Board of the Lane
County Commissioners for Housing and Social Services. He feels there is no
better location for an addition to the housing stock for the elderly than
Ya-Po-Ah Terrace. It is close in and has access to transportation modes.
Ya-Po-Ah Terrace has a good social program as well as food service for shut-ins.
It is also near good restaurants. He feels this is the best location in the
city to have 75 more housing units for senior citizens.
At the Mayor's request, support for this proposal was shown by raised hands.
Over 30 people indicated support for this zone change proposal.
Speaking in opposition:
Olivia Clark, 65 Monroe, stated that she works as a low-income housing advo-
cate. The City has made a commitment to affordable housing as well as citizen
invo lvement in the pl anni ng process. The Whiteaker Neighborhood has affordab le
housing and they have also developed a housing cooperative. While they are
housing advocates, they are also interested in neighborhood planning. They are
working with mixed-use zoning for the city and have worked for two-and-one-half
MINUTES--Eugene City Council
June 8, 1981
Page 10
.--.
e
e
e
years on their refinement plan. The refinement plan calls for 20 to 40 units
per acre in the area, but the proposed development would be 89.3 units per acre.
She asked what the council is really saying to neighborhood groups if they do
not adhere to the refinement plan. She also would like to know what the council
was saying if the refinement plan is acknowledged but the council does not act
accordingly. Perhaps, if the input of the neighborhood residents will not be
incorporated, the neighborhood planning process should be stopped before
more energy is spent. Residents feel that this kind of housing should be
dispersed. They would rather see this as a mixed-use area. They feel housing
should be affordable but that the refinement plan should be taken into consider-
ation. They do not want to see Skinner Butte denuded nor obscured further
than it has been. They have worked with other developers on site review plans.
Roger Wood, 65 Monroe, indicated that he is a member of the Whiteaker Community
Council Land Use and Site Review Committee and that he is in agreement with
Ms. Clark. Senior housing is important, but a sound and reasonable planning
process should not be side-stepped. The Whiteaker Refinement Plan is the
planning document for the neighborhood. This plan has involved many residents,
City staff, and others. The proposed new development is inconsistent with
the refinement plan densities. This project would incorporate more than double
the amount of recommended housing for that area. The City Council should
overrule the Planning Commission. There are many opportunities for senior
housing as well as a sincere desire to work with developers and planners and to
help the development process. Changes should be approached with citizen
involvement. Balancing needs to be done between the need for affordable housing
and the integrity of the planning documents.
There being no further testimony, public hearing was closed.
CB 2309--An ordinance authorizing rezoning from RG Garden Apartment
Residential District to R-4/SR/89.3A High-Rise Multiple-Family
Residential District with Site Review procedures, and a density
limitation of 89.3 units per acre for property located west of
Pearl Street, north of the 3rd-4th Connector.
Mr. Obie moved, seconded by Ms. Smith, that findings supporting
the rezoning as set forth in Planning Commission staff notes
and minutes of April 13, 1981, be adopted by reference thereto;
that the bill be read the second time by council bill number
only, with unanimous consent of the council; and that enactment
be considered at this time.
Ms. Wooten asked if there are any documents indicating projected future needs
for subsidized housing for seniors. Mr. Croteau stated that there is no
empirical data, but at the Planning Commission hearing, there was a good deal of
testimony regarding the need for low-income and elderly housing. There is
currently a long waiting period for this type of housing. Ya-Po-Ah Terrace has
a considerable waiting list. Ms. Wooten asked how long the waiting period would
be for funds to subsidize these units. Mr. Humbert stated that the HUD subsidy
202 program, as well as the Section 8 program, are at present in poor shape, but
it is necessary to receive the rezoning so that when funding is available, they
MINUTES--Eugene City Council
June 8, 1981
Page 11
~
e
e
e
can be one of the first to be considered. Ms. Wooten asked him if they had
worked with the neighborhood association. Mr. Humbert stated that they had
tried to set up an appointment with the Whiteaker Land Use and Site Review
Committee, but at the time of the meeting, all the committee members were ill
except for one person. Also, the association wrote the neighborhood group a
letter and asked for design input, but to date they have not received any
response. Ms. Wooten asked about further projections for subsidized senior
units in the City and how many units will be available in what was formerly the
Eugene Hotel. Mr. Croteau responded that he did not know.
Mr. Lindberg stated that a number of people had mentioned balancing what may
be conflicting policies. He asked if there is some reason that this is coming
to the council as a zone change request rather than as a variance request. Mr.
Croteau stated that the Zoning Ordinance does not allow this "use" as a vari-
ance. The use of variances is not available to the Planning Commission or to
the council in this instance. Therefore, it can only be considered as a zone
change. Mr. Lindberg indicated concern over what appears to be a conflict
between the Whiteaker Refinement Plan and the Metropolitan Plan. Mr. Croteau
stated that the Metropolitan Plan is the general planning document and the
Whiteaker Refinement Plan is a refinement of the Metro Plan. The Metro Plan
states medium- to high-density residential as the use for this area. In the
plan, specific instructions are given as to how to use the diagram although it
is not a zoning map. In view of the Whiteaker Refinement Plan and the Metro-
politan Plan, the Planning Commission felt this proposal is an exception. This
should not be viewed as a compromising plan. Ya-Po-Ah Terrace is an exceptional
case which should be given special consideration. It was also an exceptional
case at the time the Whiteaker Plan was being developed. Mr. Lindberg stated
that it seems the precedent has already been established, but the Whiteaker
Community Council is saying that is not true. Mr. Croteau indicated that one
cannot make a determination by just looking at the diagram. The Planning
Commission felt this request was in strong conformance to the text of both
plans. Ms. Miller indicated that part of the problem is trying to interpret two
different planning documents. Mr. Gleason indicated that the refinement plan
would allow this development, but even if it did not, the General Plan has
overriding authority.
Mr. Obie asked what would assure the council that the proposed units would be
built in front of the existing development rather than beside it. Mr. Croteau
stated that staff had looked at the height limitations and the addition would be
allowed to be built up to a height of 500 feet. The only possible area for
additional development would be in front of the existing development. In light
of the strong concerns of the Planning Commission, the site review process would
consider the request that the addition occur in front. Ms. Miller asked if
there will be special variances for parking. Mr. Croteau responded that there
are. Ms. Miller asked about parking requirements for the addition. Mr. Croteau
stated they would need to seek a variance for a reduction in the number of
parking spaces. It would be nice if the parking could be underneath the struc-
ture, still leaving an open area.
MINUTES--Eugene City Council
June 8, 1981
Page 12
e
Mr. Lindberg stated that this is a difficult decision. His feelings are consis-
tent with the Planning Commission recommendation, and rather than overthrowing
the refinement plan, the council is simply interpreting that document in con-
junction with the General Plan. He indicated that he would vote yes.
Roll call vote; motion carried unanimously.
Council Bill 2309 was read the second time by council bill number only.
Mr. Obie moved, seconded by Ms. Smith, that the bill be approved
and given final passage. Roll call vote; all councilors present
voting aye, the bill was declared passed and numbered 18812.
C. Parade Permit Ordinance and Administrative Rules Revision (memo,
ordinance, administrative rules distributed)
This item was held over to a future council meeting as noted earlier.
D. Public Works Bid Awards (tabulations attached)
Mr. Gleason introduced Bert Teitzel, Public Works.
e
Mr. Teitzel stated that these bid awards as proposed are for six different
projects. Staff is recommending that all bids be awarded to the low bidder.
Project 1 is for paving and sidewalks on Goodpasture Island Road, which was
included in the TIP for 1980-81, and was also included as a recommendation from
the School Safety Committee. They have received complaints from owners of four
lots dealing with double- or multi-frontage assessments. The code allows for
equal-odd assessment if all property owners that are affected agree. Projects
2, 3, and 4 are all 100 percent petitions from property owners and Projects 5
and 6 are storm sewers that are part of the Capital Improvement Program with no
assessments.
Public hearing was opened.
Speaking in opposition:
Donald Husband, 72 West Broadway, distributed information to the council. He
indicated that he lS the attorney representing Joe Romania, Milan Raykovich,
Carl Raynor, and Berri, Inc., owners of Tax Lots 1900, 2000, 2100, and 2200,
respectively. He is filing a protest by reason of the proposed assessment which
the City Council is contemplating making in connection with Goodpasture Island
Road for Tax Lots 9, 8, 7, and 6 of the third addition to Flintridge Subdivi-
sion. This protest is being filed on the basis that there is no benefit and can
be no benefit to those four tax lots. All of those properties have sewers,
water supply, and paved streets either fronting or abutting the properties.
They do not feel that construction of any paving, sidewalks, or storm sewers
would benefit any of those lots nor would such improvements increase the market
value. He feels that the council should visit that area if they have not
already done so. It is impossible for any of those four lots to get any benefit
because immediately joining this road and at the rear of those four lots, there
e
MINUTES--Eugene City Council
June 8, 1981
P ag e 13
.
e
e
is an embankment of approximately 35 to 50 feet; therefore, they are asking that
these four lots be eliminated from the proposed assessment district. They feel
that these four lots should not be assessed and if the council does make an
assessment, it would not stand up against judicial determination. He noted that
he only found out about this hearing seven or eight days ago.
Carl Raynor, 2169 Stonecrest, stated that he had filed a remonstrance letter to
the council regarding this improvement project. He indicated that he had
received a letter from the Public Works Department stating that all owners of
property within the proposed assessment district were being notified for the
award of the contract and that the cost of the improvement would be paid by an
assessment of the property owners benefited within the assessment district. He
feels that any legal assessments from the Goodpasture Island Road improvements
that might be made against those accumulative back line lot distances of those
four properties should be prorated between the total 25 lots that are commonly
influenced, not benefited by said assessments. Stonecrest Drive development has
its own paving, storm sewer, curbs, gutters, and sidewalks where it is developed
and it was paid for by the developer and the property owners. He indicated that
he had distributed a letter to the council previously.
There being no further testimony, public hearing was closed.
Mr. Obie asked for a legal response to the comments. Mr. Sercombe stated that
there would be some benefits such as improved access, dust control, etc., which
could be seen as special benefit. Mr. Obie stated the decision on the assess-
ment would be made by the assessment panel.
Mr. Obie moved, seconded by Ms. Smith, to award the bids as
outlined by staff to the low bidders.
Ms. Wooten asked if these would be unretractable at a later date. Mr. Gleason
responded that the assessments can be considered at the time the assessments are
being levied. If, however, there was to be a change in the code, they would
need to wait six months before these projects could be reconsidered. Mr.
Sercombe stated that Section 37 of the City Charter states that changes in the
assessment procedures would not become effective for six months and after that
time, the new process would begin.
Roll call vote; motion carried unanimously.
II. ORDINANCES FOR FIRST READING
First reading of ordinances levying assessments and referral to Hearings
Panel to be held June 15, 1981.
CB 2311--An ordinance levying assessments for sanitary sewer to serve
properties on Jefferson Street between Cheshire Avenue and River
Street (80-19).
MINUTES--Eugene City Council
June 8, 1981
Page 14
./~
,
.
e
e
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
CB 2312--An ordinance levying assessments for paving, sanitary sewer, and
storm sewer within and adjacent to Royalwood Subdivision (80-22).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
CB 2313--An ordinance levying assessments for paving, sanitary sewer, and
storm sewers to serve Luella Subdivision (80-25).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
CB 2314--An ordinance levying assessments for paving, sanitary sewer, and
storm sewer within and adjacent to Shasta Gardens Third Addition
(80-26) .
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
CB 2315--An ordinance levying assessments for paving, sanitary sewer, and
storm sewer within and adjacent to Nolen Industrial Park First
Addition (80-34).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
CB 2316--An ordinance levying assessments for paving, sanitary sewer, and
storm sewer within and adjacent to Isabelle Plat (80-40).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
MINUTES--Eugene City Council
June 8, 1981
Page 15
.
CB 2317--An ordinance levying assessments for storm sewer north of Cal
Young Road from Fir Acres Road to 450 feet northwest (within and
adj acent to proposed Craviotto-Stratton Subdivi sion) (80-57).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously. '
CB 2318--An ordinance levying assessments for storm sewer 1650 feet north
of Royal Avenue from Terry Street to 900 feet east (80-58).
Mr. Obie moved, seconded by Ms. Smith, that the bill be read for
the first time and referred to the Hearings Panel for hearing June
15, 1981, with panel recommendations to be brought back for
council consideration June 22, 1981. Roll call vote; motion
carried unanimously.
III. PAYMENT OF BILLS, CLAIMS, AND PROGRESS PAYMENTS (distributed)
Res. No. 3525--A resolution authorizing the payment of bills and claims
for the period May 26, 1981, through June 8, 1981.
Mr. Obie moved, seconded by Ms. Smith, to adopt the resolution.
Roll call vote; motion carried unanimously.
e The meeting was adjourned to June 10, 1981.
Respectfully submitted,
~~-
-
Micheal D. Gleason
City Manager
(Recorded by Lynda Nelson)
MDG:LN:db/CM8aI8
.
MINUTES--Eugene City Council
June 8, 1981
Page 16
e
AWARD
e
DEPARTMENT OF PUBLIC WORKS
Engineering Division
BID NO.: 3
Opened: June 2, 1981
1. PAVING, SIDEWALKS AND STORM SEWER on Goodpasture Island Road from Delta Highway
to Tabor Street (1710)
Bidders
Contract Cost
1. Morse Bros. Contractors, Inc. ~--------
2. H & J Constrcrction ~-------------------
3. Eugene Sand & Gravel Inc. -------------
4. Wildish Construction Co. ~-------------
$187,868.90
198,231.00
203,589.70
205,658.10
Cost to Abutting Property
Cost to City
$ 95,450.00
Amount
Budgeted.
$83,500 County
$ 8,300 (331)
20-Foot Paving
36-Foot Paving
4-Inch Concrete
Sidewalk
5-Inch Concrete
A.C. Drive
$24.25/FF
$37.l0/FF
$ 1. 70/Sq. Ft.
Drive $ 1.95/Sq.Ft.
$ 0.4l/Sq.Ft.
COMPLETION DATE: October 1,1981
-------------------~---,----,---~--,--------------------------------------------------------------------
AWARD
,
2. PAVING AND STORM SEWER on Market Street from 5th Avenue to 7th Avenue (1892)
Contract Cost
Bidders Basic Alternate
1. Morse Bros. Contractors, Inc. -----~---
2. H & J Construction --------------------
3. Eugene Sand & Grayel Inc.u-u--uu---
4. Wildish Construction Co. --------------
5. Egge IS Sand & Gravel _u_u__uu_uu_
$ 70,363.86
72,279.75
74,391.43
76,306.50
76,939.38
$ 0
o
o
o
o
Cost to Abutting Property
44-Foot Paving
Storm Sewer
7-Inch Concrete
Cost to City
Amt. Budgeted
$50.70/FF
$ 0.06/Sq.Ft.
$ 2. 15/ Sq. Ft .
-0-
-0-
COMPLETION DATE: August 15, 1981
Page 1 of 3
.
AWARD
-
AWARD
;..
Bid No.: 3
3. PAVING AND SANITARY SEWER in Royalwood First Addition and within 160 feet of
the south and west boundaries of Roya1wood First Addition (1921)
Bidders
1. Morse Bros. Contractors, Inc. ----------
2. H & J Construction ---------------------
3. Eugene Sand & Gravel Inc. --------------
4. Egge's Sand & Gravel Co. ---------------
5. Wi1dish Construction Co. ---------------
Cost to Abutting Property
28-Foot Paving
Sanitary Lateral
Sanitary Servi ce
Storm Sewer
$ 31. 70/ FF
$ O.13/Sq.Ft.
$190.00/Each
$595.00/Lot
COMPLETION DATE: September 15, 1981
4. SANITARY SEWER within Havenwood PUD (1934)
Bidders
1. Emerald Excavating Inc. ----------------
2. Eugene Sand & Gravel Inc. --------------
3. Kenneth R. Bostick Construction Co. ----
4. Wildish Construction Co. ---------------
5. N. W. Excavating -----------------------
6. Bowers Excavating & Fencing Inc. -------
7. H & J Construction ---------------------
8. Dan D. Allsup Contractor, Inc. ---------
9. Egge's Sand & Gravel -------------------
Cost to Abutting Property
Sanitary Lateral
$0.06/Sq.Ft.
COMPLETION DATE: August 1,1981
Contract Cost
Basic Alternate
$42,633.69
- 4'3,633-.80
45,326.38
47,461.75
52,338.80
$42,457.61
o
o
o
o
Cost to City
Amount
Budgeted
-0-
-0-
Contract Cost
$ 5,389.83
5,609.25
5,751.00
6,921.45
6,971.10
7,512.75
7,963.50
8,178.60
15,894.00.
Cost to City
Amount
Budgeted
-0-
-0-
Page 2 of 3
.
AWARD
Bi d No.: 3
5. STORM SEWER between 25th Avenue and 26th Avenue from Onyx Street to Emerald
Street (1939)
Bidders
1. N. W. Excavating ~.--------------------.
2. Kenneth R. Bostick Construction Co. .---
3. Bowers Excavating & Pencing Inc. .,._u__.
4. L. D. Van Over Consruction, Inc. .,.----..,.
5: Eugene Sand & Gravel Inc. .,.-----------.-
6. H & J Construction ----------.----------
7. Dan D. Allsup Contractor, Inc. ---------
8. Wildish Construction Co. --------------_
Cost to Abutting Property
None
COMPLETION DATE: September 1,1981
Contract Cost
$ 7,015,00
7,225.60
7,281.50
7,369,46
8,721.50
9,361.00
11 ,731.41
12,484.05
Cost to City
$7,700.00
Amount
Budgeted
$7,200 (531)
-----------------------------------------------------------------------------------------------------
e
AWARD
,
OPENED: June 4, 1981
6. STORM SEWER between Vahalla and Elysium Avenue from Elysium Avenue to Azure
Street (1948)
Bidders
1. Bowers Excavating & Fencing, Inc. -----
2. Kenneth R. Bostick Construction Co. ---
3. Shur-Way Contractors, Inc. ------------
4. Northwest Excavating ------------------
5. Wildish Construction Co. --------------
6. H & J Construction --------------------
7. Eugene Sand & Gravel Inc. -------------
8. Dan D. Allsup Contractor Inc. ---------
Cost to Abutting Property
None
COMPLETION DATE; September 1,1981
Contract Cost
$21,121.40
21,161.10
22,255.25
23,391.40
23,566.10
24,598.70
35,794.80
36,440.70
Cost to City
$23,300.00
Amount
Budgeted
$30,500 (531)
. ,
. ,
Page 3 of 3
/