HomeMy WebLinkAbout9.10.2018 CMO Transportation PlanI TRANSPORTATION SYSTEM PLAN
UPDATE
b I SEPTEMBER 100 2018
I
w^e� k ,
µ� 1 � L
1
M1,11I
Transportation
System Plan
voume_
February 2017
3Ft
BACKGROUND
• Eugene 2035 TSP Adopted, June 2017
• Goals, Policies and Actions
• 105 Actions
• 264 Capital Projects
• Performance Measures
• Additional Council Direction
0'.. City of Eugene
Transportation System Plan
+� �b ((?
CITY COUNCIL DIRECTION
TSP Implementation Plan that will achieve
Climate Recovery Ordinance
• Vision Zero
The TSP Implementation Plan shall include:
Specific prioritized actions, programs,
projects and performance measures
2) Specify costs, benefits, co -benefits and
funding sources
3) Schedule for implementation
CITY COUNCIL DIRECTION
Create a strategy to incorporate new and emerging transportation
technologies into the TSP.
The strategy will at least include and describe:
• 50% electric vehicles by 2030 and 90% EVs by 2050 and
• autonomous vehicles
Identify any other transformative technologies expected within the
next 10 years. For any technologies determined unsuitable for
Eugene, provide an explanation why. p
I
MODELING OF TSP TO MEET CLIMATE RECOVERY GOALS
By the year 2030, all businesses,
individuals and others living or working
in the city collectively shall reduce the
total (not per capita) use of fossil fuels
by 50% compared to 2010 usage.
If fully implemented, the TSP will
achieve a 40% reduction in fossil fuels
by 2035.
LCO G
LANE COUNCIL OF GOVERNMENTS
70rey!
Department
of Transportation
TSP IMPLEMENTATION STRATEGY
Program Areas/Action Items
• Capital Infrastructure Projects
• Performance Measures
TSP IMPLEMENTATION STRATEGY
• 105 Actions
• Prioritized Actions
• Transportation Demand Management
• Individualized Marketing -- $martTrips
• Vision Zero Action Plan
• Traffic Calming
• Autonomous and Electric Vehicles
• Planning for Development
• Corridor Planning:
• MovingAhead
• Beltline
• Franklin Boulevard
TSP IMPLEMENTATION STRATEGY
Transportation Demand Management
• TSP Action: "Require all developments
and employers of a certain size and
type to prepare, implement and
monitor TDM plans.
• City has received two grants to enable
us to develop regulations, code
language, monitoring and other
elements of a TDM program.
L
TSP IMPLEMENTATION STRATEGY
SmartTrips Eugene
• Individualized marketing campaign that
focuses on a different neighborhood
each year
• Second Sunday Streets is typically in
SmartTrips neighborhood
• SmartTrips will focus on downtown in
2019 and 2020
mill
M , � .
TSP IMPLEMENTATION STRATEGY
Vision Zero Action Plan Afth
• Identified the top causes and locations
of fatal and life-changing injury
crashes.
• Developed strategies to eliminate
deaths and serious injuries.
• Prioritized actions to eliminate deaths
and life -changing injuries by 2035.
VISION
ZERO
EUGENE
TSP IMPLEMENTATION STRATEGY
Traffic Calming
• Traffic Calming budget has increased
using new funds from State
transportation bill — HB 2017.
TSP IMPLEMENTATION STRATEGY
Automated and Electric Vehicles
• Working with Urbanism Next and
Sustainable City Year programs at UO
to develop strategy to incorporate new
and emerging technologies into the TSP.
• Working with LCOG to develop shorter
term strategy to encourage more
electric vehicles in Eugene.
" t URBANISM NEXT
O�
LCOG
LANE COUNCIL OF GOVERNMENTS
TSP IMPLEMENTATION STRATEGY
Planning for Development
• TSP actions to amend Traffic Impact
Analysis rules to consider differently
how we measure and mitigate the
impacts of development on the
transportation system.
• Will likely include these actions in
grant -funded work to develop TDM
program.
TSP IMPLEMENTATION STRATEGY
Corridor Planning — MovingAhead
• Developing design concepts for
walking, biking and public
transportation on Eugene's major
corridors.
• The Alternatives Analysis has been
released for public review.
• In 2019, the City Council and LTD
Board will cooperatively select the
preferred alternatives for each
corridor and prioritize corridors for
implementation.
EmX Alternative
1 0=.c=. m 1.1.. I ,... on...,,.,A
D INN FINNf
1
P
TSP IMPLEMENTATION STRATEGY
Corridor Planning — Beltline
• City is working with ODOT and Lane
County on NEPA study of Beltline
alternatives including local arterial
bridge.
• In 2019, ODOT will begin construction
of safety improvements at the
interchange of Beltline and Delta
Highway.
TSP IMPLEMENTATION STRATEGY
Corridor Planning — Franklin Boulevard
• City is initiating process to redesign
Franklin Boulevard from Alder Street to
1-5.
• Key goals are to make street safer and
more comfortable for walking and
biking and to build one EmX lane in
each direction.
• There is close coordination with LTD and
the University of Oregon.
TSP IMPLEMENTATION STRATEGY
Actions related to Capital Projects
• Adopt new Transportation SDC
Methodology including Project List.
• Adopt new Multimodal Design
Standards.
• Develop sidewalk infill program and
strategy for upgrading unimproved
streets.
TSP IMPLEMENTATION STRATEGY
Capital Projects
• 9 TSP Projects completed in 2017
• 10 TSP Projects Under Construction in 2018
• 30 TSP Projects funded for 2019
• 8 TSP Projects + 1 Vision Zero Project funded for 2020
• 2 TSP Projects funded for 2021
• 8 TSP Projects funded + 4 TSP/Vision Zero Projects awaiting grant award
announcements (2022 — 2024) p
I
TSP IMPLEMENTATION STRATEGY
Key projects for achieving Vision Zero
and CRO:
• Protected bike lane network
• MovingAhead and Franklin
Boulevard redesign
• New projects on high crash street
network identified in Vision Zero
Action Plan
PERFORMANCE MEASURES
The Land Conservation and
Development Commission is expected
to soon amend the Transportation
Planning Rule (TPR) to:
• Remove requirement for Regional TSPS;
and
• Require new performance measures
related to reducing greenhouse gas
emissions from transportation.
TransPlan
TransPlan
T he tnKene sprinqfleld
Transyorlahan Sysienx Plan
July 2002
NEXT STEPS
• Complete TSP Implementation Strategy and bring to City Council
for approval.
• Continue to implement actions in TSP.
• Develop proposed Performance Measures.
• Amend TSP:
• Update transportation safety language to better align with Vision Zero
Action Plan
• Update project list to include Vision Zero projects and other key capital
projects
• Update to reflect AV/EV recommendations
• Update performance measures to reflect changes in TPR ^