Loading...
HomeMy WebLinkAboutAgenda Packet 9-19-18 Work SessionSeptember 19, 2018, Work Session EUGENE CITY COUNCIL AGENDA September 19, 2018 12:00 p.m. CITY COUNCIL WORK SESSION Harris Hall, 125 East 8th Avenue Eugene, Oregon 97401 Meeting of September 19, 2018; Her Honor Mayor Lucy Vinis Presiding Councilors Mike Clark, President Betty Taylor, Vice President Greg Evans Chris Pryor Emily Semple Claire Syrett Jennifer Yeh Alan Zelenka 12:00 p.m. CITY COUNCIL WORK SESSION Harris Hall, 125 East 8th Avenue Eugene, Oregon 97401 1.WORK SESSION: MovingAhead Project Update September 19, 2018, Work Session The Eugene City Council welcomes your interest in these agenda items. This meeting location is wheelchair-accessible. For the hearing impaired, an interpreter can be provided with 48 hours' notice prior to the meeting. Spanish-language interpretation will also be provided with 48 hours' notice. To arrange for these services, contact the receptionist at 541-682-5010. City Council meetings are telecast live on Metro Television, Comcast channel 21, and rebroadcast later in the week. El consejo de la Ciudad de Eugene agradece su interés en estos asuntos de la agenda. El lugar de la reunión tiene acceso para sillas de ruedas. Se puede proveer a un intérprete para las personas con discapacidad auditiva si avisa con 48 horas de anticipación. También se puede proveer interpretación para español si avisa con 48 horas de anticipación. Para reservar estos servicios llame al 541-682-5010. Las reuniones del consejo de la ciudad se transmiten en vivo por Metro Television, Canal 21 de Comcast y son retransmitidas durante la semana. For more information, contact the Council Coordinator at 541-682-5010, or visit us online at www.eugene-or.gov. September 19, 2018, Work Session – Item 1 EUGENE CITY COUNCIL AGENDA ITEM SUMMARY Work Session: MovingAhead Project Update Meeting Date: September 19, 2018 Agenda Item Number: 1 Department: Public Works, Planning and Development Staff Contact: Chris Henry www.eugene-or.gov Contact Telephone Number: 541-682-8472 ISSUE STATEMENT The City of Eugene and Lane Transit District, with the help of other regional partners, are collaborating on the MovingAhead project to determine how best to invest on our main corridors that connect our neighborhoods, shopping areas, and places of employment. Building on years of long-range planning in our community, MovingAhead is an implementation effort that will result in prioritized investments in transit, walking and biking projects in each of five corridors that are identified in Envision Eugene, LTD’s Long-Range Transit Plan, and the Eugene 2035 Transportation System Plan. In 2018, the MovingAhead project team has finalized the technical analysis and is now moving into a phase of extensive public engagement throughout the summer and into fall 2018. The team will gather feedback on the analysis and potential corridor investments. Following that outreach, the formal decision-making process by the Eugene City Council and LTD Board of Directors is planned for spring 2019. At that time, the City Council and LTD Board will be asked to select a preferred package of investments for people walking, biking, using mobility devices, and using transit. This noon work session is an opportunity for the Eugene City Council to learn about the process, provide feedback, and ask questions coinciding with the release and public comment on the project’s technical analysis, the Alternatives Analysis report (released on September 10 for a 30-day public comment period). The LTD Board of Directors will hold a separate work session at 4:00 pm, also on September 19. BACKGROUND In 2015, the MovingAhead project kicked off with public workshops held along the corridors under consideration. At each workshop, local residents were asked to design their ideal street to accommodate people walking, biking, using mobility devices, driving and using transit. After gathering that public input, the project team developed conceptual designs on which the formal technical analysis was conducted. These conceptual designs include Enhanced Corridor and EmX alternatives as well as a No-build alternative. Comprehensive bus rapid transit—known as EmX locally—is a recognizable transit service in our community. A No-build alternative assumes maintaining the current service on a street. On a continuum of transit service investments, the Enhanced Corridor alternatives fall between the September 19, 2018, Work Session – Item 1 other two alternatives, thereby providing improved transit service and reliability through less intensive infrastructure investments compared to EmX. These may include traffic signal prioritization for buses or additional lanes near intersections to create a “queue jump,” which allows buses to bypass points of congestion. There are complementary pedestrian and bicycle infrastructure investments in both the EmX and Enhanced Corridor alternatives. The Eugene City Council and LTD Board of Directors have received project updates and twice taken action to focus the MovingAhead analysis on five major corridors. In October 2015, the council and board advanced the following MovingAhead corridors for further study to evaluate an EmX alternative, an Enhanced Corridor alternative, and a No-Build alternative: • Highway 99 Corridor • River Road Corridor • Coburg Road Corridor • 30th Avenue/Lane Community College Corridor Also, the council and board recommended that the Martin Luther King, Jr. Boulevard Corridor advance with an Enhanced Corridor alternative and a No-Build alternative. This direction was reaffirmed in April 2016 by a joint action of the two bodies. With council and board direction to proceed, MovingAhead is developing the groundwork for five transportation corridors simultaneously instead of one-by-one, as has been the past practice for other EmX projects. This system-level approach readies projects for funding and construction. It also gains efficiencies in the environmental analysis and reduces the time to deliver important transportation services to our community. It’s a responsible approach to understand the complexities of environmental impacts and benefits of the EmX, Enhanced Corridor, and No-build alternatives. The MovingAhead project has performed an Alternatives Analysis that was prepared to support the federal National Environmental Policy Act process. Locally, Lane Transit District and the City of Eugene are committed to a public engagement process that supports informed decision-making that considers effects on people, our planet, and economic prosperity (the triple-bottom-line). Taken together, these efforts are a comprehensive approach to make investment decisions that support our community now and as we grow into the future. NEXT STEPS The technical analysis is complete. The MovingAhead project team continues to share the results and then seek additional feedback from neighbors and businesses along the corridors and the community as a whole. Preliminary Results of the Technical Analysis The results of the technical analysis are summarized for each corridor in an Executive Summary (Attachment A) and Alternatives Analysis report (also available on the project website at www.MovingAhead.org). Staff will provide a brief overview of the results during the work session. September 19, 2018, Work Session – Item 1 Multi-faceted Public Involvement The project is now shifting into a more intense period of public involvement, comprised of several activities. First, letters have been distributed to property owners whose properties are potentially affected by the concept designs, with an invitation to meet and discuss. The project team is also attending community events to inform people of the process schedule, opportunities to review, and ways to provide feedback on the technical analysis. In late summer 2018, the draft analysis was released for an initial round of public review and feedback. Our intent is to make the highly technical analysis accessible and clear through infographics and a distilled executive summary. The public review period is divided into two phases. The initial public review period in September and October will allow community members to provide corridor-specific feedback on the investments in their neighborhood, near their business or place of employment, or the streets where they travel most. This period will include four large open houses as well as listening sessions with under-represented stakeholder groups. A concurrent online open house is also available (on the project website at www.MovingAhead.org). The corridor-specific feedback will allow the project team to correct any inaccuracies in the technical analysis and compile several investment package options for the next phase of public review. In winter 2018, during the second round of public review, residents can provide feedback on packages that contain different combinations of proposed alternatives. With five corridors under evaluation, there are abundant options for aligning different corridor investments in a package. One of the three alternatives will be advanced for each corridor, either EmX, Enhanced Corridor, or No-build. Each combination will be evaluated based on (1) the MovingAhead project criteria and (2) the comprehensive benefits across the LTD system. This second public review period will include one large open house as well as an online open house. Once the public review of the proposed packages concludes, the project team will share that feedback with decision-makers or consider additional packages, as necessary. Decision-Making Process The MovingAhead project includes an Oversight Committee and a Sounding Board. The former is comprised of elected and appointed officials and executive staff from the City, LTD, the Oregon Department of Transportation, and Lane County, while the latter’s members come from and represent numerous City of Eugene and LTD committees and commissions. Both entities review project proposals, offer critical feedback to the project management team, and act as conduits back to their constituencies and fellow committee/commission members. Both bodies will continue to meet throughout 2018 and early 2019 to ensure broad distribution of project information and preparation for the final decision-making process. A process schedule is included here as Attachment B. In spring 2019, the Oversight Committee will make a formal recommendation to the LTD Board and Eugene City Council. LTD’s Strategic Planning Committee will also make a recommendation to the LTD Board. Following these actions, the Eugene City Council and LTD Board will be asked to select a preferred package of transportation investments (e.g., EmX, Enhanced Corridor, or No-build alternatives) to be completed within ten years. September 19, 2018, Work Session – Item 1 The selected package will be advanced to the next MovingAhead project phase, which will include seeking design and construction funding, preparing final NEPA environmental reviews, and initiating the Federal Transit Administration project development process for qualifying projects. This future phase will also include design refinements, which will be based on feedback we receive during the public review period this year and subsequent outreach to stakekholders along the corridors where projects are advanced. The selected package will include designs that reflect our community priorities and enable the City and LTD to make smaller strategic investments such as safer pedestrian crossings with islands and signals within the larger corridor visions. This type of incremental implementation allows us to make investments today that address our community’s needs without precluding our ability to later construct a larger project. RELATED CITY POLICIES The MovingAhead project is in alignment and consistent with policy direction contained in Envision Eugene, the Eugene 2035 Transportation System Plan, Eugene’s Climate Recovery Ordinance, LTD’s Long-Range Transit Plan, and our Regional Transportation Plan. Additionally, the project structure has embraced a ‘triple bottom line’ approach. It is part of the NEPA-required technical analysis. It is further reinforced in the composition of the Sounding Board and the evaluation criteria used to analyze each corridor alternative. COUNCIL OPTIONS This is an informational item. No action is requested. CITY MANAGER’S RECOMMENDATION This is an informational item only. SUGGESTED MOTION This is an informational item only. ATTACHMENTS A. MovingAhead Executive Summary B. MovingAhead Project Timeline FOR MORE INFORMATION Please visit the project website at www.MovingAhead.org. Staff Contact: Chris Henry, Transportation Planning Engineer Telephone: 541-682-8472 Staff E-Mail: chenry@eugene-or.gov Staff Contact: Terri Harding, Principal Planner September 19, 2018, Work Session – Item 1 Telephone: 541-682-5635 Staff E-Mail: tharding@eugene-or.gov Staff Contact: Sasha Luftig Vartanian, Lane Transit District Senior Project Manager Telephone: 541-682-6135 Staff E-Mail: sasha.luftig@ltd.org Alternatives Analysis Report EXECUTIVE SUMMARY A joint project of the City of Eugene and Lane Transit District SEPTEMBER 2018 September 19, 2018, Work Session - Item 1 Acknowledgments The City of Eugene and Lane Transit District gratefully acknowledge the efforts of every agency, committee, community organization, business and citizen who assisted in the development and evaluation of the MovingAhead project alternatives. A detailed list is included in the Alternative Analysis Report. Partners The City of Eugene Lane Transit District Agency Partners Federal Transit Administration Lane Council of Governments Lane County Oregon Department of Transportation City of Springfield Table of Contents What is MovingAhead 3 Project Goals 4 Community Involvement 5 Investment Options 6 Corridor Findings 8 Evaluation Criteria 9 Corridors Highway 99 Corridor 10 River Road Corridor 14 30th Avenue (Downtown) to LCC Corridor 18 Coburg Road Corridor 22 Martin Luther King, Jr. Boulevard. Corridor 26 Funding Plan 29 Next Steps 30 What is an Alternatives Analysis? An Alternatives Analysis is a part of established transportation planning practice that uses in-depth analyses to understand the trade-offs behind different options and how they compare on a variety of criteria. It is also an important first step in securing federal funding for local projects. An effective analysis answers critical project questions about each investment option, such as: • What are the current and anticipated problems and opportunities that need to be addressed? • What are the underlying causes of the problems? • What changes are needed to achieve future goals? • What are options for addressing the problems? • What are the costs, impacts, and benefits of each potential solution? • How can impacts be avoided or minimized? The purpose of this alternatives analysis is to: • Help select the best investments for each corridor that support local plans; • Prioritize which corridor investments should occur first; and • Identify realistic funding options. Locally, the City of Eugene and Lane Transit District have a commitment to a public engagement process that supports informed decision-making that considers effects on people, our planet, and economic prosperity (the triple-bottom-line). Collectively, these efforts are a comprehensive approach to decision-making that support our community now and as we grow into the future. Table of Contents | 1September 19, 2018, Work Session - Item 1 Eugene is growing – we expect 34,000 new people and 37,000 new jobs in our community by 2032. MovingAhead will help manage growth in a way that enhances our quality of life and reflects our shared community values. MovingAhead began in 2015 as a partnership between the City of Eugene, Lane Transit District (LTD), regional agencies, and the Eugene-Springfield community. The purpose of the project was to determine what transportation investments are needed on some of our most important streets. Driven by community needs and values, MovingAhead is built on community feedback and existing plans. MovingAhead is focused on creating active, vibrant places that are safe and accessible, that serve the community and economy, and that will accommodate future growth. MovingAhead is about more than just transit: it considers a range of options for getting us where we need to go, whether we ride the bus, bike, drive, use mobility devices, or walk. This document summarizes the Alternatives Analysis, a key step in the planning process. Based on previous community feedback, the MovingAhead team focused on five key corridors and identified the costs and benefits of various transportation investments for each. This analysis is a tool to help our community determine when and where to focus our investments over the next 10 years. A funding plan will be developed that outlines how to implement these corridor investments and will consider all potential funding options and the timing of each to deliver the most efficient solution for each corridor. At the conclusion of the project, the Eugene City Council and LTD Board of Directors will select a package of transit, walking, and biking investments across the five corridors that can be funded and built over the next 10 years. This list of prioritized investments will become a powerful tool for implementing local and regional land use, transportation, and community plans. MOVINGAHEAD?WHAT IS BUILDING A BETTER TRANSPORTATION FUTURE What is MovingAhead? | 3September 19, 2018, Work Session - Item 1 Neighborhoods Mixed Transitional Parks Transit Corridor DOWNTOWN CORE Parks Oak Savannah Office Industry Agricultural Wetlands/Rural Low Density Protect, Restore and Enhance Natural Resources Protect, Repair, and Enhance Neighborhood Livability Promote Compact Urban Development and Efficient Transportation Options Provide Ample Economic Opportunities for All Community Members Provide Housing Affordable to All Income Levels Plan for Climate Change and Energy Resiliency Provide for Adaptable, Flexible and Collaborative Implementation7 P i l l a r s en v i s i o n e u g e n e Community Involvement MovingAhead continues a tradition of proactive public engagement that supported the City’s Envision Eugene process. MovingAhead aspires to implement the collective vision and ideas included in several existing plans, such as Envision Eugene and LTD’s Long-Range Transit Plan. These plans are the culmination of decades of community engagement and input. MovingAhead builds off these plans and continues the community conversation set forth from these earlier efforts. Community involvement for MovingAhead got underway in 2015 with workshops to solicit input that informed the evaluation criteria and explored and identified which corridors should be advanced for further evaluation. During these meetings, the public shared what they knew about important destinations, barriers, desired transportation investments, and the importance of corridor features such as parking, trees, and sidewalks. Feedback from these workshops, an online open house, and other public comments determined the five corridors and the three levels of investment options that have been evaluated in the Alternatives Analysis. For more information about public feedback, refer to Chapter 2 of the Alternative Analysis report: “Outreach and Involvement.” What we heard Public comments have generally encouraged further investment to support walking, bicycling, and taking transit. Corridor-specific comments provided detailed information on safety concerns and facility needs within each corridor that were incorporated into the development of each corridor option. Built on Past Planning Envision Eugene is a community-based plan for accommodating new residents and jobs while protecting our quality of life and reflecting our shared values. A key element of Envision Eugene is a multimodal transportation system that provides mobility and transportation options while supporting compact urban development, sustainability, and affordable housing. MovingAhead supports Envision Eugene by identifying the most important and cost-effective investments in multimodal transportation along our major streets. MovingAhead also builds on the hard work of past planning efforts, including: Lane Transit District’s Long-Range Transit Plan; the Eugene 2035 Transportation System Plan (Eugene 2035 TSP); and the Central Lane Metropolitan Planning Organization Regional Transportation Plan (RTP ). “There should be more separation of bike lanes and transit all over to improve safety for all users.” “I have concerns about how access to business will be affected by transit changes.” “I would like to see improved connectivity between bike lanes and paved paths.” “The addition of EmX lanes is good for Eugene and use will increase with growth.” Project Goals MovingAhead’s ultimate goal is to create a 10-year investment plan for five key corridors in Eugene that will improve safety and accessibility for all modes of transportation - whether walking, biking, using a mobility device, taking the bus, or driving. The project is also dedicated to ensuring that these investments help improve the overall quality of life of our community. To achieve this purpose and meet our community’s needs and values, the work has been guided by a set of overall Goals and Objectives. The Purpose, Needs, Goals, and Objectives for MovingAhead were developed based upon community values that were articulated in existing local policies and previous planning efforts and refined through initial project outreach. Goal 1 Improve multimodal transit corridor service Improve transit travel time and reliability, minimize transfers, increase ridership, and improve access and safety for people walking, bicycling, and using mobility devices. Goal 2 Meet current and future transit demand in a cost-effective and sustainable manner Control costs while increasing transit capacity to meet demand. Leverage funding opportunities that provide a maximum return on investment. Minimize impacts to the environment. Goal 3 Support economic development, revitalization, and land use opportunities for the corridor Support and coordinate with other planned development and transportation projects and provide high-capacity transit that is consistent with the community vision. Minimize impacts to businesses and industry and improve transit so as to provide benefits to vehicles, freight, and emergency services. Project Goals & Community Involvement | 54 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 Investment Options Public feedback and community conversations helped define three investment options that were considered within four of the five corridors (only two options were explored for MLK, Jr. Boulevard). A low and high investment option looked at varying degrees of improvements, such as pedestrian and bicycle facilities, and transit enhancements, as well as improvements along the street like sidewalks, trees, and lighting. These were compared to what would happen without the MovingAhead project, referred to here as a “No-Build” option. Center Dedicated Transit Lanes Bicycle Lane Behind Station/Stop Buses use exclusive transit lanes in the street median Bicycle lane passes behind transit boarding area. Protected Bicycle Facility Enhanced Pedestrian Crossing Bicycle lane is buered from the adjacent travel lane.Pedestrian crossing is defined by a marked crosswalk and flashing lights. Protected Bicycle Facility Enhanced Pedestrian Crossing Bicycle lane is buered from the adjacent travel lane.Pedestrian crossing is defined by a marked crosswalk and flashing lights. The “build options” refer to the Enhanced Corridor and EmX Alternatives that would provide for infrastructure or facility upgrades along the corridor. The No-Build Alternative would leave the corridor as it is. Business Access/Transit (BAT) Lane BAT lanes are used by buses and right-turning trac.Bus gets a green light a few seconds before other trac. Queue Jump RIGHT LANE BUS & RIGHT TURN ONLY Business Access/Transit (BAT) Lane BAT lanes are used by buses and right-turning trac.Bus gets a green light a few seconds before other trac. Queue Jump RIGHT LANE BUS & RIGHT TURN ONLY Center Dedicated Transit Lanes Bicycle Lane Behind Station/Stop Buses use exclusive transit lanes in the street median Bicycle lane passes behind transit boarding area. Upgraded and Enhanced Crossings New crossings would generally be located at mid-block locations away from intersections and may include accessible ramps, pedestrian islands, striping, or flashing beacons. Bicycle Improvements Upgrades may include separated, protected bike lanes and routing bike lanes behind transit stations. Transit Queue Jumps Queue jumps reduce transit delay at signals and improve the efficiency of the transit system by allowing buses to proceed through signals ahead of other vehicles. Business Access and Transit (BAT) Lanes BAT lanes are reserved for buses and turning vehicles. These lanes allow access to businesses, improve transit reliability, reduce travel time, and remove buses and turning vehicles from the general traffic lanes. Bus-Only Lanes Bus-only lanes are reserved for transit and may be located in the middle of the street or adjacent to the curb. Toolbox for Enhanced Corridor and EmX Options EmX Alternative (Higher investment option) EmX is short for Emerald Express and is LTD’s branded Bus Rapid Transit (BRT) service. EmX currently operates between the Gateway area and west Eugene serving downtown Springfield, downtown Eugene, and the University of Oregon. Key features include: • Typically a bus every 10 minutes • Bus-only lanes in key locations • Higher capacity multi-door transit vehicles • Enhanced stations with raised platforms • Off-board fare collection to allow multi-door boarding • Transit signal priority at intersections • Longer distances between stops • More frequent and redesigned service to improve cross-town connectivity • Greater investment in pedestrian, bicycle, sidewalk, and streetscape improvements than with the Enhanced Corridor options No-Build Alternative (No new investments at this time) This option is helpful as a reference point to measure the relative benefits, costs, and impacts of the build alternatives. Under the No-Build option, the City and LTD would only make changes that are already planned as part of other projects. No additional investments would be made as a part of the MovingAhead project. Enhanced Corridor Alternative (Lower investment option) Enhanced Corridor is a new concept for the Eugene-Springfield region and is intended to improve safety, access, and transit service without requiring major capital investments. Key features include: • Typically a bus every 15 minutes • Consolidating the number of transit stops • Transit signal priority at intersections • Enhancing some bus stops • Improving or building new pedestrian crossings • Filling in gaps in the sidewalk network • Adding accessible sidewalk ramps at intersections • Improving or building new bicycle facilities • Streetscape investments such as lighting and landscaping Investment Options | 76 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 River Road Highway 99 Coburg Road Martin Luther King, Jr. Boulevard 30th Avenue/LCC (Existing EmX)SPRINGFIELD EUGENE U G B UG B 5 5 Corridor Findings MovingAhead takes a unique approach by comparing investment options within five corridors at once. The project started with a list of 10 potential corridors that were then subject to an evaluation process to determine the best options for near-term investment. An initial review, called a Fatal Flaw Screening, removed alternatives that were not a priority for capital investments over the next 10 years. This was followed by a Level 1 Screening that more thoroughly evaluated the corridors based on public support and the project’s Purpose, Need, Goals, and Objectives. Based on community input and technical analysis, five corridors and alternatives were deemed the most promising for near-term investment, and were advanced to the Level 2 Screening (Alternatives Analysis) described here. Corridors Considered Fatal Flaw Screening Level 1 Screening Level 2 Screening (Alt. Analysis) Enhanced EmX Highway 99 ✓ ✓ ✓ ✓ River Road ✓ ✓ ✓ ✓ Coburg Road ✓ ✓ ✓ ✓ 30th Avenue to LCC ✓ ✓ ✓ ✓ MLK, Jr. Blvd/Centennial Blvd.✓ ✓* ✓ Main Street-McVay Hwy ✓ ✓* Valley River Center ✓× Randy Papé Beltline × 18th Avenue × Bob Straub Parkway × * The Main Street-McVay Highway Corridor and the extension of the Martin Luther King, Jr. Blvd. corridor along Centennial Blvd. were advanced for consideration, but have been deferred pending completion of a separate study of safety improvements on Main Street. Five corridors advanced to Alternatives Analysis Evaluation Criteria The alternatives within each of the five corridors were evaluated using various performance measures. The following criteria were determined to be most useful in differentiating between the alternatives. Cost ―Capital Cost → Capital cost includes estimated costs for vehicles, design, construction, right of way, and project management. ― Operating Cost → This is the estimated annual cost to operate and maintain the service. This includes paying operators, vehicle maintenance and fuel, as well as administrative and overhead costs. Transit Performance +In Vehicle Transit Travel Time Savings → This measure estimates how long it would take for someone to travel from the end of the line to Eugene Station during the afternoon peak hour. +Ridership Increase → Annual transit ridership as projected for the year 2035 using the regional transportation model. Bicycling & Walking +New Bicycle/Pedestrian Access & Safety Improvements → This criterion is based on the amount of proposed investment in bicycle and pedestrian improvements in each corridor. Property & Development Impacts +Support Development & Redevelopment → This is an assessment of how well the alternative supports development and redevelopment as identified in adopted plans. ―Tree Impacts → This criterion is based on the number of medium and large trees which may need to be removed. ―Number/Acreage of Acquisitions → This criterion is based on the number and total acreage of properties that would potentially need to be purchased. ―Potential Property Displacements → This measure indicates the number of residences or businesses that may be displaced as a result of constructing the project. ―Parking Impacts → This criterion considers the amount of on-street and off-street parking that may need to be removed. Jobs & Population +Existing Jobs & Population Served → These estimates are based on the No-Build and Enhanced Corridor Alternatives providing transit that serves people working and living within ¼ mile of the corridor and the EmX Alternative serving people working and living within ½ mile of the corridor. Highway 99 Corridor Enhanced Corridor Alternative This map shows the transit, bicycle, and pedestrian investments included in the Highway 99 Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build and EmX Alternatives. W I L L A M E T T E N O R T H W E S T E X P R E S S W A Y H W Y 9 9 RANDY PAPE BELTLINE DOWNTOWN W 11TH AVE W 6TH AVE W 7TH AVE 105 WILLAMETTE HIGH SCHOOL BARGER CU B I T S T E C H O H O L L O W R D TA N E Y S T B E T H E L D R ROYAL AVE ELMIRA RD ROOSEVELT BLVD W 1ST AVE W 5TH AVE W 7TH PL GA R F I E L D S T C H A M B E R S S T W 13TH AVE WI L L A M E T T E S T Bike/ped bridge to Trainsong Park Dedicated Bus Turn Lane at Barger Drive on Hwy 99 One Way Business Access and Transit Lane Business Access and Transit Lane Existing 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 2 3 3 2 1 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served 15,000 15,000 29,000 34,000 34,000 50,000 Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts 0 14 40 0/0 44/1.3 38/1.6 0 0 0 0/0 0/50 0/53 New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost EmXNo-Build EnhancedCorridor $0.0M $38.0M -$0.1M $2.8M$0.0MSystemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance 0 min 10 min 12 min 0 111,000 267,000 In-Vehicle Transit Travel Time Savings $67.0M 2 These estimates are based on the No-Build and Enhanced Corridor Alternatives providing transit that serves people working and living within ¼ mile of the corridor and the EmX Alternative serving people working and living within ½ mile of the corridor. Ratings are coded by color to indicate how well they support project critera. Environmental Analysis Seventeen environmental topics were evaluated as part of the Alternatives Analysis, including impacts and benefits to air quality, water quality, and natural resources. Generally, the studies found minimal differences between the corridor alternatives. (For more detail refer to the AA report Chapters 3-8.) Corridor Findings & Evaluation Criteria | 98 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 The Highway 99 Corridor begins at the Eugene Station and overlaps with EmX West, travels through downtown, then extends northwest along Highway 99 to Barger Drive, turning west at Barger Drive to terminate north of the intersection of Barger Drive and Cubit Street, east of the Randy Papé Beltline Highway. Overview Compared to the No-Build Alternative, the Enhanced Corridor and EmX Alternatives significantly decrease transit travel time (by 10 and 12 minutes, respectively) and would increase ridership more than any other corridor (by 111,000 and 267,000 annual trips, respectively). Both build alternatives would provide more frequent transit service. The No-Build Alternative avoids impacts (including property acquisitions, off-street parking impacts, and potential tree removal) and costs, but does not provide the same level of benefits compared to the Enhanced Corridor and EmX Alternatives. What We Heard • Pedestrian and bicycle crossings are presently unsafe, make the environment safer. • Good Enhanced Corridor candidate because of anticipated long-term changes . • Railroad yards are a major obstacle - Maxwell Road to Roosevelt Boulevard. • Bus service is not frequent enough. • Highway 99 is hard to cross for pedestrian/bikes. • Lack of bike lanes north of Bethel Drive. • Opposition to EmX Investments within the boundary of the Jefferson Westside Neighborhood (JWN). Addressing Community Concerns Both build alternatives provide new investments in bicycle and pedestrian connectivity and safety, including a bicycle and pedestrian bridge connecting the Trainsong Neighborhood to the Highway 99 Corridor. Both build alternatives would also represent an increase in the frequency of transit service along the Highway 99 Corridor. To address JWN concerns, the EmX Alternative would be routed along 6th and 7th Street and no infrastructure improvements are proposed along 11th and 13th Street as part of the Enhanced Corridor Alternative. Highway 99 5 ½ MILES Highway 99 Corridor Highway 99 Corridor: Comparison of AlternativesHighway 99 Corridor Enhanced Corridor Alternative This map shows the transit, bicycle, and pedestrian investments included in the Highway 99 Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build and EmX Alternatives. W I L L A M E T T E N O R T H W E S T E X P R E S S W A Y H W Y 9 9 RANDY PAPE BELTLINE DOWNTOWN W 11TH AVE W 6TH AVE W 7TH AVE 105 WILLAMETTE HIGH SCHOOL BARGER C U B I T S T E C H O H O L L O W R D TA N E Y S T B E T H E L D R ROYAL AVE ELMIRA RD ROOSEVELT BLVD W 1ST AVE W 5TH AVE W 7TH PL GA R F I E L D S T CH A M B E R S S T W 13TH AVE W I L L A M E T T E S T Bike/ped bridge to Trainsong Park Dedicated Bus Turn Lane at Barger Drive on Hwy 99 One Way Business Access and Transit Lane Business Access and Transit Lane Existing 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 2 3 3 2 1 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served 15,000 15,000 29,000 34,000 34,000 50,000 Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts 0 14 40 0/0 44/1.3 38/1.6 0 0 0 0/0 0/50 0/53 New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost EmXNo-Build EnhancedCorridor $0.0M $38.0M -$0.1M $2.8M$0.0MSystemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance 0 min 10 min 12 min 0 111,000 267,000 In-Vehicle Transit Travel Time Savings $67.0M Highway 99 Corridor | 1110 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 W I L L A M E T T E N O R T H W E S T E X P R E S S W A Y H W Y 9 9 RANDY PAPE BELTLINE DOWNTOWN W 11TH AVE W 6TH AVE W 7TH AVE 105 WILLAMETTE HIGH SCHOOL BARGER C U B I T S T EC H O H O L L O W R D TA N E Y S T B E T H E L D R ROYAL AVE ELMIRA RD ROOSEVELT BLVD W 1ST AVE W 5TH AVE W 7TH PL GA R F I E L D S T C H A M B E R S S T W 13TH AVE WI L L A M E T T E S T Bike/ped bridge to Trainsong Park Dedicated Bus Turn Lane at Barger Drive on Hwy 99 One Way Business Access and Transit Lane Business Access and Transit Lane Existing 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 2 3 3 2 1 Enhanced Corridor Alternative Highway 99 Corridor These maps show the transit, bicycle, and pedestrian investments included in the Highway 99 build alternatives. EmX Alternative N O R T H W E S T E X P R E S S W A Y H W Y 9 9 RANDY PAPE BELTLINE DOWNTOWN W 11TH AVE W 6TH AVE W 7TH AVE WILLAMETTE HIGH SCHOOL BARGER C U B I T S T EC H O H O L L O W R D TA N E Y S T B E T H E L D R ROYAL AVE ELMIRA RD ROOSEVELT BLVD W 1ST AVE W 5TH AVE W 7TH PL GA R F I E L D S T C H A M B E R S S T WI L L A M E T T E S T Buered bike lane Bike/ped bridge to Trainsong Park Business Access and Transit Lane Existing Roadway Improvements on Highway 99 One Way Business Access and Transit Lane Dedicated Bus Turn Lane at Barger Drive on Hwy 99 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Station Existing Station Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 2 3 3 4 4 2 1 Highway 99 Corridor | 1312 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 The River Road Corridor begins at the Eugene Station and overlaps with EmX West, travels through downtown and the Whiteaker Neighborhood, and then north to the Santa Clara Community Transit Center (southeast of the intersection of Hunsaker Lane and River Road). Overview Of the two build alternatives, the EmX Alternative offers the greatest benefit to bicycle and pedestrian connectivity and safety, as well as the most improved transit service frequency because of repurposed travel lanes to Business Access and Transit (BAT) lanes. The Enhanced Corridor Alternative also provides transit benefits and improvement to bicycle and pedestrian facilities, but to a lesser extent than the EmX Alternative, and would result in a smaller increase in transit ridership. The No-Build Alternative avoids impacts (including property acquisitions, off-street parking impacts, and potential tree removal) and costs, but does not provide the same level of benefits compared to the Enhanced Corridor and EmX Alternatives. What We Heard • Dedicated transit and cycling lanes are needed • Reduce the speed limit on River Road • Beltline interchange is a particular area of concern • Consider safety of all road users in design for River Road • Avoid tree removal with any transit option • EmX option 2 [Business Access and Transit Lanes] is preferred because of turn lane in the middle • There are bus stops on both sides of River Road near Briarcliff but no crosswalks to get across; a crosswalk is critical here Addressing Community Concerns The build alternatives would increase transit frequency while providing new investments in bicycle and pedestrian connectivity and safety. Both build alternatives aimed to work within the existing right of way where feasible, to preserve trees along the corridor as much as possible. River Road 5 MILESRiver Road Corridor River Road Corridor: Comparison of AlternativesRiver Road Corridor Enhanced Corridor Alternative 105 W I L L A M E T T E R I V E R RANDY PAPE BELTLINE R I V E R R D IRVING RD HUNSAKER N. EUGENE HIGH SCHOOL DIVISION SILVER LN KOURT DR MAXWELL RD HOWARD AVE LINDNER LN HORN LN HILLIARD LN ELKAY DR PARK AVE KNOOP LN HANSEN LN RIVER AVE N O R T H W E S T E X P R E S S W A Y W 11TH AVE W2ND A V E E 6TH AVE E 7TH AVE B L A I R R D DOWNTOWN H W Y 9 9 N W 6TH AVE W 7TH AVE E 11TH AVE DE L T A H I G H W A Y Business Access and Transit Lane with Intersection Queue Jump1 1 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 19,000 19,000 28,000 35,000 35,000 44,000 0 13 132 0/0 5/1.3 40/2.2 0 4 6 0/0 0/2 0/31 This map shows the transit, bicycle, and pedestrian investments included in the River Road Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build and EmX Alternatives. EmXNo-Build EnhancedCorridor $0.0M $24.0M $78.0M -$0.6M $2.0M$0.0M 0 min 5 min 8 min 0 33,000 246,000 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost Systemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance In-Vehicle Transit Travel Time Savings River Road Corridor | 1514 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 105 W I L L A M E T T E R I V E R RANDY PAPE BELTLINE R I V E R R D IRVING RD HUNSAKER N. EUGENE HIGH SCHOOL DIVISION SILVER LN KOURT DR MAXWELL RD HOWARD AVE LINDNER LN HORN LN HILLIARD LN ELKAY DR PARK AVE KNOOP LN HANSEN LN RIVER AVE N O R T H W E S T E X P R E S S W A Y W 11TH AVE W2ND A V E E 6TH AVE E 7TH AVE B L A I R R D DOWNTOWN H W Y 9 9 N W 6TH AVE W 7TH AVE E 11TH AVE DE L T A H I G H W A Y Business Access and Transit Lane with Intersection Queue Jump1 1 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 Enhanced Corridor Alternative River Road Corridor These maps show the transit, bicycle, and pedestrian investments included in the River Road build alternatives. EmX Alternative 105 W I L L A M E T T E R I V E R RANDY PAPE BELTLINE R I V E R R D IRVING RD N. EUGENE HIGH SCHOOL SILVER LN KOURT DR MAXWELL RD HOWARD AVE LINDNER LN HORN LN HILLIARD LN ELKAY DR PARK AVE RIVER AVE H W Y 9 9 N W 2ND AVE B L A I R R D DOWNTOWN KNOOP LN HANSEN LN N O R T H W E S T E X P R E S S W A Y W 11TH AVE E 6TH AVE E 7TH AVE W 6TH AVE W 7TH AVE E 11TH AVE DE L T A H I G H W A Y HUNSAKER DIVISION Shared use path Protected bike lane Center Dedicated Transit Lanes at Beltline Business Access & Transit Lanes 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Station Existing Station Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND 1 1 2 2 River Road Corridor | 1716 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 The 30th Avenue to LCC Corridor begins at Eugene Station and travels south along Pearl Street to Amazon Parkway, then on E. 30th Avenue to the LCC Station. The return trip travels on Oak Street (inbound). Overview Of the two build alternatives, the EmX Alternative offers the greatest potential ridership increase as well as the most bicycle and pedestrian connectivity and safety improvements. The Enhanced Corridor Alternative would provide a lower level of bicycle and pedestrian investment, and fewer transit benefits, including a possible reduction in transit ridership due to the elimination of service on Harris Street and a direct transit connection between LCC and the University of Oregon. The No-Build Alternative, which would retain existing service, avoids impacts (including property acquisitions, off-street and on-street parking impacts, and potential tree removal) and costs, and offers transit travel times that are similar to the two build alternatives. Additionally, ridership for the No-Build Alternative is better than estimated ridership for the Enhanced Corridor Alternative due to the assumed elimination of Route 81 service. What We Heard • Needs bigger pedestrian improvements from 30th to LCC campus • Needs evening and weekend bus service to LCC for attending events and meetings • Oak and Pearl should be for buses along 30th/ LCC and High Street should be a cycle track • Corridor would complement changes occurring in the South Willamette area • Crossings along 30th are difficult • Need more details about how bicycles will be accommodated Addressing Community Concerns The build alternatives both provide new investments in bicycle and pedestrian connectivity and safety. Either of the build alternatives or the No-Build (which retains existing service) could extend service hours in the future. 30th Ave. to LCC 5 MILES 30th Avenue (Downtown) to LCC Corridor 30th Avenue to LCC Corridor: Comparison of AlternativesThis map shows the transit, bicycle, and pedestrian investments included in the 30th Avenue to LCC Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build and EmX Alternatives.30th Avenue to LCC Corridor Enhanced Corridor Alternative 105 5 DOWNT OWN UNIVERSITYOF OREGON W I L L A M E T T E RIV E R W 6TH AVE W 7TH AVE W 11TH AVE S. EUGENE HIGH SCHOOL AMAZONPARK W 13TH AVE W 18TH AVE W 20TH AVE W 27TH AVE W 29TH AVE E 24TH AVE H I L L Y A R D S T E 30TH AVE PE A R L S T OA K S T LANE COMMUNITY COLLEGE Striped bike lane Buered bike laneBuered bike lane 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Roadway Improvements: Oak and Pearl Streets1 1 15,000 15,000 30,000 30,000 30,000 45,000 0 58 102 0/0 13/0.4 20/0.5 0 0 0 0/0 69/0 140/16 EmXNo-Build EnhancedCorridor $0.0M $21.0M $53.0M -$0.5M $0.5M$0.0M 0 min 1 min 2 min 0 -30,000 198,000 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost Systemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance In-Vehicle Transit Travel Time Savings 30th Avenue to LCC Corridor | 1918 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 105 5 DOWNT OWN UNIVERSITYOF OREGON W I L L A M E T T E RIV E R W 6TH AVE W 7TH AVE W 11TH AVE S. EUGENE HIGH SCHOOL AMAZONPARK W 13TH AVE W 18TH AVE W 20TH AVE W 27TH AVE W 29TH AVE E 24TH AVE H I L L Y A R D S T E 30TH AVE P E A R L S T OA K S T LANE COMMUNITY COLLEGE Striped bike lane Buered bike laneBuered bike lane 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Roadway Improvements: Oak and Pearl Streets1 1 Enhanced Corridor Alternative 30th Avenue to LCC Corridor These maps show the transit, bicycle, and pedestrian investments included in the 30th Avenue to LCC Corridor build alternatives. EmX Alternative 105 5 DOWNTO WN LANE COMMUNITY COLLEGE UNIVERSITYOF OREGON W I L L A M E T T E RIV E R W 6TH AVE W 7TH AVE W 11TH AVE S. EUGENE HIGH SCHOOL AMAZONPARK W 13TH AVE W 18TH AVE W 20TH AVE W 27TH AVE W 29TH AVE E 24TH AVE H I L L Y A R D S T E 30TH AVE P E A R L S T H I G H S T OA K S T Striped bike lane Two-way cycle track 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Station Existing Station Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Business Access and Transit Lane: Pearl Street Business Access and Transit Lane: Oak Street 1 2 12 30th Avenue to LCC Corridor | 2120 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 The Coburg Road Corridor begins at the Eugene Station and continues to Coburg Road using the Ferry Street Bridge. The corridor continues north on Coburg Road to Crescent Avenue, east on Crescent Avenue, south on Shadow View Drive, east on Chad Drive to Old Coburg Road, and south on N. Game Farm Road and Gateway Street to the existing Gateway Station at the Gateway Mall. Although service extends from N. Game Farm Road to the Gateway Station, capital investments proposed as part of the MovingAhead project would terminate at Interstate 5 (I-5). Overview Although the two build alternatives are rated more favorably than the No-Build Alternative, the EmX Alternative in this corridor has the highest capital cost of all the corridor alternatives considered and would require the most property acquisition. The Enhanced Corridor Alternative has a lower cost, less impact, and an equivalent improvement in transit travel time than the EmX Alternative, but has lower projected ridership. The No-Build Alternative avoids cost and impacts (including property acquisitions, off-street and on- street parking impacts, and potential tree removal). What We Heard • The VA clinic and all the new development at Crescent and further north have limited bus service and bikeway options. • Auto access to businesses must be maintained • Coburg is scary with fast moving traffic • Bicycle and pedestrian crossings are difficult • Bicycling facilities separated from traffic are important • The corridor is important for autos, given the nature of development and connection to freeways Addressing Community Concerns The build alternatives provide investments in bicycle and pedestrian connectivity and safety, as well as improved transit service and connections to areas north of Beltline. Additionally, questions came up about how business impacts would be minimized. Both build options propose infrastructure investments that stay within the existing right of way as much as possible. Coburg Road 6 ½ MILES Coburg Road Corridor Coburg Road Corridor: Comparison of AlternativesThis map shows the transit, bicycle, and pedestrian investments included in the Coburg Road Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build and EmX Alternatives.Coburg Road Corridor Enhanced Corridor Alternative 25,000 25,000 36,000 41,000 41,000 50,000 0 9 149 0/0 47/1 73/4 0 0 2 0/0 0/67 7/128 105 5 RANDY PAPE BELTLINE CRESCENT AVE N G A M E F A R M R D C O B U R G R D WILLAKENZIE RD BAILEY LN HARLOW RD MARTIN LUTHER KING JR BLVD W 6TH AVE W 7TH AVE SHELDON HIGH SCHOOL MONROEMIDDLE SCHOOL SKINNERBUTTEPARK ALTONBAKERPARK UNIVERSITYOF OREGON PE A R L S T OL I V E S T OA K S T W I L L A M E T T E RIV E RW 11TH AVE M c K E N Z IE RIVER 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Business Access and Transit Lanes at I-105 Intersection with Queue Jump Existing 1 1 Service continues into Springfield without infrastructure investments EmXNo-Build EnhancedCorridor $0.0M $41.0M $113.0M $0.0M $1.8M$0.0M 0 min 5 min 5 min 0 63,000 258,000 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost Systemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance In-Vehicle Transit Travel Time Savings Lorem ipsum Coburg Road Corridor | 2322 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 105 5 RANDY PAPE BELTLINE CRESCENT AVE N G A M E F A R M R D C O B U R G R D WILLAKENZIE RD BAILEY LN HARLOW RD MARTIN LUTHER KING JR BLVD W 6TH AVE W 7TH AVE SHELDON HIGH SCHOOL MONROEMIDDLE SCHOOL SKINNERBUTTEPARK ALTONBAKERPARK UNIVERSITYOF OREGON P E A R L S T O L I V E S T OA K S T W I L L A M E T T E RIV E RW 11TH AVE M c K E N Z IE RIVER 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Business Access and Transit Lanes at I-105 Intersection with Queue Jump Existing 1 1 Service continues into Springfield without infrastructure investments Enhanced Corridor Alternative Coburg Road Corridor These maps show the transit, bicycle, and pedestrian investments included in the Coburg Road build alternatives. EmX Alternative 105 5 RANDY PAPE BELTLINE CRESCENT AVE N G A M E F A R M R D C O B U R G R D WILLAKENZIE RD BAILEY LN HARLOW RD MARTIN LUTHER KING JR BLVD W 6TH AVE W 7TH AVE SHELDON HIGH SCHOOL MONROEMIDDLE SCHOOL SKINNERBUTTEPARK ALTONBAKERPARK UNIVERSITYOF OREGON P E A R L S T O L I V E S T OA K S T W I L L A M E T T E R I V E R W 11TH AVE M c K E N Z IE RIVER 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Station Existing Station Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Center Dedicated Transit Lanes Under Beltline Single Dedicated Transit Lane at Intersections Business Access and Transit Lane: Downtown1 1 4 4 Service continues into Springfield without infrastructure investments Exclusive Transit Lanes 2 3 2 3 3 Coburg Road Corridor | 2524 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 The MLK, Jr. Boulevard Corridor begins at Eugene Station and travels through downtown Eugene and uses the Ferry Street Bridge to reach MLK, Jr. Boulevard and continues east on MLK, Jr. Boulevard past Autzen Stadium to Centennial Boulevard where it will intersect with Gateway EmX. Service will continue on Centennial Boulevard without any additional capital investments. Overview The Enhanced Corridor Alternative offers the greatest potential ridership increase and more benefits to bicycle and pedestrian connectivity and safety, however estimated travel time savings are relatively small compared to the No-Build Alternative. An EmX option was not considered in the MLK, Jr. Boulevard Corridor due to its shorter length and the lower return on investment potential at this time since proposed infrastructure investments currently end at the Eugene/Springfield boundary. There may be opportunities to reconsider EmX on this corridor in the future. The No-Build Alternative avoids impacts (including property acquisitions, off-street parking impacts, and potential tree removal) and cost. What We Heard • Traffic concerns are related to events at Autzen Stadium • Corridor is an essential connection to student housing, Eugene, and Springfield • Bicycle and pedestrian improvements are needed • Do not compromise Alton Baker Park to alleviate Ferry Street Bridge congestion • MLK without Springfield connection is a waste, connect the corridor to Springfield Addressing Community Concerns The build alternative provides investments in a variety of travel options that help address these needs, most notably, the inclusion of BAT lanes to provide transit priority and traffic calming. MLK, Jr. Blvd.3 MILES MLK, Jr. Boulevard Corridor: Comparison of AlternativesMLK Jr. Boulevard Corridor Enhanced Corridor Alternative No EmX alternative for this route 15,000 15,000 26,000 26,000 0 9 0/0 6/0.1 0 0 0/0 0/0 105 DOWNTOWN UNIVERSITYOF OREGON W I L L A M E T T E RIV E R W 6TH AVE W 7TH AVE 5 W 11TH AVE SKINNERBUTTEPARK ALTONBAKERPARK AUTZENSTADIUM MLK JR. BLVD W CENTENNIAL BLVD SPRINGFIELD OA K S T PE A R L S T C O B U R G R D E 8TH AVE 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Business Access and Transit Lanes with Multi-use Path1 1 Service continues into Springfield without infrastructure invesments No-Build EnhancedCorridor $0.0M $21.0M $1.1M$0.0M 0 2 min 0 186,000 This map shows the transit, bicycle, and pedestrian investments included in the Martin Luther King, Jr. Boulevard Enhanced Corridor Alternative. The table below provides a comparison of this alternative with the No-Build Alternative. 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Jobs Population Existing Jobs & Population Served Support Development and Redevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements Parking Impacts: On-Street/O-Street (number of spaces) Property & Development Impacts New Bike/Ped Access and Safety Improvements (1-5 rating) Bicycling & Walking Cost Capital Cost Systemwide Annual Operating Cost (Change from No-Build) Systemwide Annual Ridership Increase (Compared to No-Build) Transit Performance In-Vehicle Transit Travel Time Savings Martin Luther King, Jr. Boulevard Corridor Martin Luther King, Jr. Corridor | 2726 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 105 DOWNTOWN UNIVERSITYOF OREGON W I L L A M E T T E RIV E R W 6TH AVE W 7TH AVE 5 W 11TH AVE SKINNERBUTTEPARK ALTONBAKERPARK AUTZENSTADIUM MLK JR. BLVD W CENTENNIAL BLVD SPRINGFIELD OA K S T P E A R L S T C O B U R G R D E 8TH AVE 1/4 1/2 3/40 1 Mile N Dedicated Transit Lane Business Access & Transit Lane Roadway Improvements No Roadway Changes Existing EmX Line New or Improved Stop Existing Stop Bicycling improvements Enhanced Pedestrian Crossing Bicycling Walking Driving & Riding MAP LEGEND Business Access and Transit Lanes with Multi-use Path1 1 Service continues into Springfield without infrastructure invesments Enhanced Corridor Alternative Martin Luther King, Jr. Blvd. Corridor Funding Plan As part of the MovingAhead project, a funding plan for implementation of the corridor investments will be developed. The plan will consider potential funding options and the timing of corridor investments, with the goal of using local dollars to leverage state and federal funding to provide the most efficient overall funding strategy. Given the multiple revenue sources and the evolving nature of potential project funding, the funding plan must be nimble, providing flexibility to take advantage of funding opportunities as they arise. An advantage of the MovingAhead approach of evaluating multimodal transportation investments across multiple corridors at once is that the funding plan can consider creative implementation approaches based upon available funding sources, such as: • Combing two corridors into a single funded project • Implementing some initial, lower level investments, such as transit signal priority or sidewalk infill, across all corridors at one time • Blending a combination of mode-specific funding into an overall funding package The funding plan will consider both capital costs and operations and maintenance (O&M) costs. Capital costs are one-time investments needed to construct the corridor infrastructure, such as project design and engineering, property acquisition, vehicle purchases, and construction. O&M costs include ongoing operation of the service, such as operator wages, vehicle fuel and maintenance, administrative and supervisory costs, and general upkeep of the infrastructure investments. Capital Costs There are many potential sources for funding the implementation of corridor investments. Federal funding may be available to pay for up to 50% of project costs, with the most promising federal funding coming from the Federal Transit Administration’s Small Starts Program. While the EmX alternatives clearly qualify for that program, the Enhanced Corridor alternatives may or may not qualify, depending on how those alternatives are developed and defined. State and other federal funding may be available to assist with transit, bicycle, and pedestrian investments. Possible Capital Funding Sources: • FTA Small Starts • FTA Formula Funding • Better Utilizing Investments to Leverage Development (BUILD) grants (formerly called TIGER grants) • State Lottery Funds • ConnectOregon (for bicycle and pedestrian improvements) • All Roads Transportation Safety (ARTS) (for safety improvements) Operations and Maintenance (O&M) Costs O&M costs are funded through LTD’s annual budget. LTD maintains a Long-Range Financial Plan that projects O&M revenues and costs for a rolling 10 year period. That plan will be used to evaluate the system-wide O&M funding needs along with how the MovingAhead investments fit into the overall funding picture. Gaps in O&M funding can be addressed through changes in the corridor service levels, the timing of the implementation of the new service, or by identifying additional funding. It should be noted that most of the Enhanced Corridor Alternatives could result in an overall decrease in O&M costs. This map shows the transit, bicycle, and pedestrian investments included in the MLK, Jr. Blvd. build alternative. Martin Luther King, Jr. Corridor | 2928 | Executive Summary: MovingAhead Alternatives Analysis Report September 19, 2018, Work Session - Item 1 Next Steps Investment Packages The most promising corridor options will be combined into a full set of future system improvements for near-term (10 year) investment and implementation based on which options best meet the project goals and garner the community’s support. These Investment “Packages”, which will include combinations of No-Build, Enhanced Corridor, and EmX alternatives, will be evaluated using criteria that reflect the costs and benefits of the packages as a whole. A key consideration will be the capacity to fund the capital investment (implementation) and the ongoing operations and maintenance (O&M) costs associated with each package. Decision Making The LTD Board of Directors and Eugene City Council will review the technical findings included in the Alternatives Analysis report, the evaluation of the Investment Packages, and input from the community before making a decision on a preferred package of multimodal transportation investments for all five corridors. That package of investments will inform how we prioritize projects for near-term funding, design and construction. Get involved! Your feedback will help build a better transportation future. Visit the project website to find the latest project information, sign up for email updates, learn about upcoming events, and submit comments. www.MovingAhead.org Enhanced Corridor EmX Package A Package B Package C Cost Capital Cost Systemwide Annual Operating Cost(Change from No-Build) $148M -$0.1M $335M $8.2M $274M $4.3M $210M $5.9M $172M $2.4M In-Vehicle Transit TravelTime Improvement Systemwide Annual Ridership Increase(Compared to No-Build) Transit Performance -23 min 386,000 -29 min 1,318,000 -26 min 757,000 -27 min 771,000 -22 min 651,000 New Bike/Ped Access and SafetyImprovements (1-5 rating) Bicycling & Walking Support Development andRedevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements1 Parking Impacts: On-Street/O-Street(number of spaces) Development Impacts 103 115/4.1 4 69/119 432 177/8.4 8 147/229 362 176/8 8 76/209 190 131/4.9 6 0/152 248 104/4 6 140/97 Percent of Investment in Corridors with HigherLevel of Environmental Justice Population 56%50%50%79%68% 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 Hwy 99 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 30th Ave/LCC MLK Jr. Blvd River Rd Coburg Rd River Rd 30th Ave/LCC MLK Jr. Blvd Hwy 99 Coburg Rd 30th Ave/LCC MLK Jr. Blvd River Rd Coburg RdHwy 99 Preliminary Packages 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Subject to change based on public input — No-Build — Enhanced Corridor — EmX Enhanced Corridor EmX Package A Package B Package C Cost Capital Cost Systemwide Annual Operating Cost(Change from No-Build) $148M -$0.1M $335M $8.2M $274M $4.3M $210M $5.9M $172M $2.4M In-Vehicle Transit TravelTime Improvement Systemwide Annual Ridership Increase(Compared to No-Build) Transit Performance -23 min 386,000 -29 min 1,318,000 -26 min 757,000 -27 min 771,000 -22 min 651,000 New Bike/Ped Access and SafetyImprovements (1-5 rating) Bicycling & Walking Support Development andRedevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements1 Parking Impacts: On-Street/O-Street(number of spaces) Development Impacts 103 115/4.1 4 69/119 432 177/8.4 8 147/229 362 176/8 8 76/209 190 131/4.9 6 0/152 248 104/4 6 140/97 Percent of Investment in Corridors with HigherLevel of Environmental Justice Population 56%50%50%79%68% 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 Hwy 99 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 30th Ave/LCC MLK Jr. Blvd River Rd Coburg Rd River Rd 30th Ave/LCC MLK Jr. Blvd Hwy 99 Coburg Rd 30th Ave/LCC MLK Jr. Blvd River Rd Coburg RdHwy 99 Preliminary Packages 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Subject to change based on public input — No-Build — Enhanced Corridor — EmX Enhanced Corridor EmX Package A Package B Package C Cost Capital Cost Systemwide Annual Operating Cost(Change from No-Build) $148M -$0.1M $335M $8.2M $274M $4.3M $210M $5.9M $172M $2.4M In-Vehicle Transit TravelTime Improvement Systemwide Annual Ridership Increase(Compared to No-Build) Transit Performance -23 min 386,000 -29 min 1,318,000 -26 min 757,000 -27 min 771,000 -22 min 651,000 New Bike/Ped Access and SafetyImprovements (1-5 rating) Bicycling & Walking Support Development andRedevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements1 Parking Impacts: On-Street/O-Street(number of spaces) Development Impacts 103 115/4.1 4 69/119 432 177/8.4 8 147/229 362 176/8 8 76/209 190 131/4.9 6 0/152 248 104/4 6 140/97 Percent of Investment in Corridors with HigherLevel of Environmental Justice Population 56%50%50%79%68% 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 Hwy 99 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 30th Ave/LCC MLK Jr. Blvd River Rd Coburg Rd River Rd 30th Ave/LCC MLK Jr. Blvd Hwy 99 Coburg Rd 30th Ave/LCC MLK Jr. Blvd River Rd Coburg RdHwy 99 Preliminary Packages 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Subject to change based on public input — No-Build — Enhanced Corridor — EmX Enhanced Corridor EmX Package A Package B Package C Cost Capital Cost Systemwide Annual Operating Cost(Change from No-Build) $148M -$0.1M $335M $8.2M $274M $4.3M $210M $5.9M $172M $2.4M In-Vehicle Transit TravelTime Improvement Systemwide Annual Ridership Increase(Compared to No-Build) Transit Performance -23 min 386,000 -29 min 1,318,000 -26 min 757,000 -27 min 771,000 -22 min 651,000 New Bike/Ped Access and SafetyImprovements (1-5 rating) Bicycling & Walking Support Development andRedevelopment (1-5 rating) Number of Medium and Large Trees Impacted Number/Acreage of Acquisitions Potential Property Displacements1 Parking Impacts: On-Street/O-Street(number of spaces) Development Impacts 103 115/4.1 4 69/119 432 177/8.4 8 147/229 362 176/8 8 76/209 190 131/4.9 6 0/152 248 104/4 6 140/97 Percent of Investment in Corridors with HigherLevel of Environmental Justice Population 56%50%50%79%68% 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 Hwy 99 30th Ave/LCC MLK Jr. Blvd Coburg Rd River Rd Hwy 99 30th Ave/LCC MLK Jr. Blvd River Rd Coburg Rd River Rd 30th Ave/LCC MLK Jr. Blvd Hwy 99 Coburg Rd 30th Ave/LCC MLK Jr. Blvd River Rd Coburg RdHwy 99 Preliminary Packages 1 Mitigation measures would be used to avoid or reduce impacts Supports Project Criteria Does not Support Project Criteria Subject to change based on public input — No-Build — Enhanced Corridor — EmX September 19, 2018, Work Session - Item 1 SUMMER 2018 JUL – SEP FALL 2018 OCT – DEC WINTER 2019 JAN – MAR SPRING 2019 APR – JUN Alternatives Analysis Community Engagement Community Presentations, Events, Open Houses & Online Feedback Opportunities Recommend & Adopt Package of Transportation Investments Sounding Board Meetings Oversight Committee Meetings Strategic Planning Committee Meetings LTD Board Eugene City Council Timeline 2018 – 2019 Community Presentations & Events begin Open Houses 30 Day Comment Period Open House 30 Day Comment Period Publish Findings Joint Work Session & Public Hearing Updated: Aug 2018September 19, 2018, Work Session - Item 1