Loading...
HomeMy WebLinkAboutOrd. 20601 COUNCILORDINANCENO.20601 COUNCILBILL5194 ANORDINANCEVACATINGE.5THALLEY,LOCATED BETWEENPEARLSTREETANDOAKSTREET,ANDA PORTIONOFPEARLALLEY,LOCATEDBETWEENE.5TH ALLEYANDE.6THAVENUE,ANDPROVIDINGFORAN EFFECTIVEDATE. ADOPTED:July23,2018 SIGNED:July24,2018 PASSED:8:0 REJECTED: OPPOSED: ABSENT: EFFECTIVE:August24,2018,orupontherecordingofthe publicutilityeasementsdescribedinExhibitAinaform acceptabletotheCityManager,whicheverislater. Exhibit A Exhibit B Exhibit C Findings Background: The total area of request, consists of 6,942 square feet of public right-of-way. The areas to be vacated currently serve as surface parking areas in conjunction with the property south of East 5th Alley. Lane County and Mildred O, LLC applied for the vacation request as co-applicants. The applicants own all of the properties abutting the alleys proposed to be vacated. The Lane County Board of Commissioners agreed to lease its property to Market District, LLC (an affiliate of Obie Companies), in conjunction with an affordable housing project by Homes for Good (formerly HACSA) on adjacent County property, and approved a development plan for the project. At a March 2018 City Council work session, Obie Companies presented a refined development concept, which includes a 113-unit apartment building, a three-story retail and office building, and 82-room boutique hotel. A conceptual development plan of the adjacent lands is included as Attachments B. The vacation request process serves as a means to evaluate the need for public ways as land develops and uses change over time. This request for vacation is being considered in accordance with sections 9.8700-9.8725 of the Eugene Code (EC) and Oregon Revised Statutes (ORS) 271.080-271.230, and processed pursuant to EC 9.7445–9.7455. The public hearing is being conducted consistent with quasi-judicial procedures in State law and as set forth in EC 9.7065 – 9.7095. When rights-of-way are vacated, ORS requires ownership of the underlying land to revert back to the adjacent lands from which they were originally dedicated. If the vacation is approved, the alleys will revert from public to private ownership by Lane County and Mildred O, LLC. EC 9.8710(5) requires the applicants to pay to the City a special assessment equal to the assessed value of the real property and any costs incurred by the city in the construction of public improvements. Payment of the special assessment will be paid in a combination of cash and fair-market value of a 14 foot wide easement over the proposed alley vacations. The vacation request process provides a meansto evaluate the need for public ways as land develops and uses change over time, and to address the manner in which the City may dispense with public ways. Requests for the vacation of public streets and alleys are considered in accordance with Eugene Code (EC) 9.8700-9.8725 and Oregon Revised Statutes (ORS) 271.080- 271.230. These requests are also subject to procedural requirements at EC 9.7445-9.7455. Compliance with Approval Criteria: The sole approval criterion at EC 9.8725 requires the City Council to find that approval of the requested right-of-way vacation is in the public interest. The full text of the approval criterion is provided below, with findings demonstrating compliance: Exhibit C: Findings The city council shall approve, or approve with conditions and reservations of easements, the vacation of improved public right-of-way, public ways acquired with public funds, or undeveloped subdivision and partitionplats, or portions thereof, including public right-of-way and improved public easements located therein, only if the council finds that approval of the vacation is in the public interest. The required public notice and hearing have occurred on the vacation request in accordance with applicable statutory and local code requirements. Consent for the vacation request from abutting and affected owners, and payment of a special assessment for the area of vacated right-of-way, has been provided by the applicant, as required by statutes and local code. Vacation Findings The following findings demonstrate that vacation of the portion of E. 5th Alley, located between Pearl Street and Oak Street, and a portion of Pearl Alley, located between E. 5th Alley and E. 6th Avenue, is in the public interest. This determination is based on the conclusion that vacation of these alleys will provide efficient use of land and will not negatively impact the transportation system, surrounding neighborhoods or emergency access. Additionally, future development opportunities of the adjacent lands can be enhance through the consolidation of the site. As a result, vacation of the requested alleys will be in the public interest. Detailed findings to support these conclusions are provided below. The applicant has provided conceptual redevelopment information regarding their intention to revitalize the area, which demonstrates the need for the vacation. The concept calls for the redevelopment of the surface parking lots with a consolidated development plan for the southern half of the block that includes three new buildings with retail/office, hotel, and mixed use building with residential apartments. While this plan is conceptual in nature, it attempts to demonstrate how this site is likely to be redeveloped. As the plan shows, vacation of the current alleys is necessary to accommodate redevelopment options similar to the applicant’s proposal. The proposed redevelopment is part of an agreement between the developer and Lane County, who owns the southern half of the block. This project, in conjunction with an affordable housing project by Homes for Good, was selected by Lane County Board of Commissioners for redevelopment of their existing surface parking lots—a site identified in the City’s 2004 Downtown Plan as the first on a list of “Development Opportunity Areas.” Obie Companies’ proposal to expand the 5th Street Market District on the Lane County property has the potential to achieve the following Downtown Plan objectives: Redevelop one of the identified Development Opportunity Areas; Expand the 5th Avenue Area (a Special Place and a Great Street in the Downtown Plan); Exhibit C: Findings Strengthen the pedestrian connection between the downtown core and activity on 5th Avenue, and ultimately to the planned Riverfront Park and the Willamette River. Analysis from Public Works staff confirms the surrounding street network is a traditional blocked street grid, which provides ample street connectivity as required by Eugene Code and negates the need for a secondary public thoroughfare. Because of the existing local street grid, the alleys to be vacated do not provide significant public transportation benefit, although they do provide public vehicular and pedestrian circulation on adjoining streets aswell as the primary parking facilities for the surrounding businesses (primarily the 5th St Public Market). The proposed vacation will not impede or modify on-site circulation at this time. To the north is East 5th Avenue and to the west is Oak Street, both local City streets and fully improved with paving, curb and gutter, bike lanes, sidewalks and street lights. Pearl Street is to the east and is a major collector n, and East 6th Avenue to the south is a major arterial. The surrounding street network provides ample transportation facilities for all users and is consistent with city design standards and master plans. The proposed alley vacation will not have a significant effect on the surrounding transportation systems. Public Works staff supports the right of way vacation from the perspective of providing adequate transportation facilities and services. The applicant has not provided plans showing a feasible relocation of the existing facilities in the right of way to be vacated. The utilities currently provide service to existing development and improved public rights of way. The applicant has proposed a Public Utility Easement (PUE) over the entire vacated area until such time as plans can be provided and approved through a development or public improvement permit application. A subsequent PUE vacation process will be required prior to the approval of development or public improvement permits. The proposed PUE provides the easement necessary to continue perpetual ownership, operation and maintenance of public utilities that remain. Public Works supports the right of way vacation contingent upon the reservation of a PUE. Conclusion: The applicant’s requested right-of-way vacation is in the public interest, based on the above facts and the terms of the ordinance. Exhibit C: Findings