HomeMy WebLinkAbout11.26.2018 Clear and Objective Housing Approval Criteria Update PPTCLEAR &OBJECTIVE
Housing Approval
Criteria Update
envision
r'irENE
Why We're Here...
• Housing is a critical need
• Envision Eugene
• "Easy" land developed
• State law
• Neighborhood livability
Ar
■ City Council Direction (2015)
--Update the City's procedures and
approval criteria for needed housing
applications.
--Target for City consideration of
proposed updates: within 1 year of
State acknowledgement of the
baseline UGB.
C
W2
Identify land use y� '`
approval criteria and
procedures that need to
be updated, added, or
removed to:
Skywe_ ,fie%La._ • a 3
• mitigate barriers to
housing
• Increase efficiency and s
predictability 17
• Effectively address
development impacts
Right-
; of1� 9a
Sidewalk
Street
Lol
Front Yards
(Minimum Di as .-________--_-_------
per applicable
zone Fli in -of-Way
--- --
•---
until
eo
___soau
wa
BASIS
OF BEAHI�NG
Build
Here
Build
Hara
s pi ly y5
Build
Here
Build
Here
� 51e5nIT.
Build
Here
Build
Here
II
I
Here
_ Build
I Build II Build
Here Here
Build
Hare
AS
IS
P
T' HIes'Ss
Right -of -Way --. L
Interior Yards w
(Minimum Depth as : Right -
per applicable of -Way
zone)
`1<
•---
until
eo
___soau
wa
BASIS
OF BEAHI�NG
B�
s pi ly y5
� 51e5nIT.
s wsanT 9r S e
®� n swXY�eT ofisX'
�
AS
IS
P
T' HIes'Ss
699P� •
i?.jlis
yx 1e'Se
� W]b
6AW
C
�
q
er l Ap
YYYg
\Xg,�55ME
Lm
P
$'-
DBAN AYE. IM9N
b
� w9A9R
uaWdE
B�
� 51e5nIT.
s wsanT 9r S e
®� n swXY�eT ofisX'
�
x'
I
T' HIes'Ss
r
web756
xRs
C
�
q
er l Ap
YYYg
\Xg,�55ME
Lm
y]
^I
P Z%
rmXEsa \
e..�
28 25
t
viae
\\
`
a klf
mal
1 W
S a
alma x \
«ssne r
_
}
N •
n
DBAN AYE. IM9N
b
\
� 51e5nIT.
SePO S'N IIB
®� n swXY�eT ofisX'
xRs
C
�
q
er l Ap
YYYg
\Xg,�55ME
e
L W. o.
y]
^I
P Z%
rmXEsa \
e..�
28 25
t
viae
\\
`
a klf
1 W
S a
alma x \
«ssne r
_
}
N •
F7W A[GOp AVE
�'
_
1111_A
AIG ON AV.NBH
]N4P fw59^vrX NWA A
�RQZ......,.
...
119]1106" _ urr ea mn mm
5'WE
n
W, -" *TW
Eugene's Two Land Use Application Tracks
"Needed Housing" 4 Clear & Objective
"General" 4 Discretionary
What if we do nothing?
It may affect our ability to:
• Meet our housing needs
• Provide housing affordable to all
• Use land efficiently
• Provide certainty for housing
developers and neighbors
• Address safety and quality of life
concerns
K. %.
SIF"
aim
Project Scope
• Applies City-wide
• Encompasses all housing types
• Limited to clear and objective
procedures and approval �I
criteria for land use applications
' Survey • Concepts
&
Issues 2 Evaluation
Council Action 4 Initiate Formal Adoption
Early 2019
Draft Code PhasemmFormal
i Adoption
Outreach
If you are unable to attend the meetings but
be involved! Below are links to meeting mat
and the online survey component. Click here
Issues.
Click to explore our wet
Working Group 1 - September 13, 2018
Online Survey:
• Generating Concepts (Survey 1) (the Sc
meeting video will be helpful when coml
Presentation Slides:
• Background
• Emergency Response - COS -08, COS -14
• Process for Site Review, Conditional Use
Developments - COS -12, COS -09, and C
Meeting Summary:
• Working Group 1 Summary
Envision Eugene
Newsletter
Working Group Meetings
• Fire/Life Safety
• Process
• Transportation
• Geo -tech & Slope
• Compatibility
• Planned Unit
Developments
• Trees
Draft Preferred
Concepts Report
Addresses Key Issues
• Maintenance Issues
• Significant Issues
CLEAR & OBJECTIVE
HOUSING APPROVAL
CRITERIA UPDATE
This report is a compiled set of recommended preferred concepts for
atldressing the issues identified by interested parties during Phase 1 outreach
efforts_ Significant issues were discussed in a series of Working Group
meetings during Phase 2
Key Issues
Maintenance =ff Batch 1
Significant Batch 2
Batch ?
• Consistency with State law
• Consistency with other clear and objective application types
• Process improvements
• Effectiveness improvements
• No change or deferral to future code improvement
Planning Commission Recommendation
Proceed with drafting proposed code
language to implement the
recommendations for Batch 1
• Encourage public to attend Planning
Commission meetings or send them their
concerns
• More time may be required
z,
t
Next Steps
December 11— Planning
Commission Work Session on
Batch 2 items
TBD — City Council Work Session
on Batch 2 items
Uuest-lons?
obw -
Y
y
� T