Loading...
HomeMy WebLinkAboutResolution No. 5254COUNCIL RESOLUTION NO. 5254 A RESOLUTION ADOPTING AMENDMENTS TO THE SYSTEM DEVELOPMENT CHARGE METHODOLOGIES (GENERAL METHODOLOGY AND APPENDICES A, B AND F) ORIGINALLY ADOPTED BY RESOLUTION NO. 4900. PASSED: 6 REJECTED: OPPOSED: 1 ABSENT: Evans CONSIDERED: November 26, 2018 EFFECTIVE DATE: January 1, 2019 RESOLUTION NO. 5254 A RESOLUTION ADOPTING AMENDMENTS TO THE SYSTEM DEVELOPMENT CHARGE METHODOLOGIES (GENERAL METHODOLOGY AND APPENDICES A, B AND F) ORIGINALLY ADOPTED BY RESOLUTION NO. 4900. The City Council of the City of Eugene finds as follows: A. The City of Eugene System Development Charge Methodologies document was adopted by Resolution No. 4900, effective on May 7, 2007 and has subsequently been amended, most recently by Resolution No. 5100 on January 27, 2014. B. The amendments to the System Development Charge (SDC) Methodologies made by this resolution include: 1. Modifications to the General Methodology in order to clarify text that pertains to the implementation of existing SDC Methodology documents and update the text that pertains to the proposed Transportation Methodology. 2. Modifications to the Appendix A "Definitions of General Terms and Transportation Use Codes" in order to update the definitions of general terms referenced in the current and proposed SDC Methodology documents. 3. Modifications to the Appendix B "Transportation System Development Charge System -Specific Methodology and Details" in order to inserttext that describes the proposed Transportation Methodology and clarify portions of the existing methodology that will remain in the proposed Transportation Methodology. 4. Modifications to the Appendix F "Local SDC System Formulas and General Fee Schedule" in order to update the formulas and rates that pertain to the proposed Transportation Methodology. C. The Eugene City Council held a public hearing on June 18, 2018 to accept public testimony on the amendments to the SDC Methodologies made by this Resolution. NOW, THEREFORE, based upon the above findings, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. The amendments to the City of Eugene System Development Charge Methodologies shown in Exhibit A to this Resolution are adopted and include amendments to: A. The General Methodology; Resolution - Page 1 of 2 B. Appendix A ("Definitions of General Terms and Transportation Use Codes & Cross -References for Wastewater & Parks SDCs Based Upon HUD BPR Use Codes Descriptions"); C. Appendix B ("Transportation System Development Charge System - Specific Methodology and Details"); and D. Appendix F ("Local SDC System Formulas and General Fee Schedule"). Section 2. The unamended portions of the City of Eugene System Development Charge Methodologies, including the entirety of Appendices C, D and E, remain in full force and effect. Section 3. In order to phase-in the increased transportation system development charge, beginning on January 1, 2019, the City will apply a cost per trip of $2692.63 in determining transportation system development charges. Beginning on January 1, 2020, the City will apply the full cost per trip consistent with Appendix F to the SDC Methodology. Section 4. This Resolution shall become effective on January 1, 2019. Section 5. The City Recorder, at the request of or with the consent of the City Attorney, is authorized to administratively correct any reference errors contained in Exhibit A to this Resolution. The foregoing Resolution adopted the 26'h of November, 2018. ity Recorder Resolution - Page 2 oft Exhibit A City of Eugene System Development Charge Methodologies General Methodology TABLE OF CONTENTS City of Eugene System Development Charges General GeneralMethodology..............................................................................................................1 Figure G-1 ......Rate -Setting Methodology............................................................................16 Table G-1 ....... Potential Impact Reductions and Credits.......................................................17 Appendix A ..... Definitions of General Terms and Transportation Use Codes.......................A-1 Cross References for Wastewater & Parks SDCs..................................... A-19 Appendix F .....Local System Formulas and General Fee Schedule....................................F-1 Transportation Appendix B ..... Transportation System Charge Methodology and Details ............................B-1 Table B1 .......... Model Vehicle Weekday PM Peak Hour Trip Ends ..................................... B-2 Table B2 .......... Reimbursement Fee................................................................................... B-4 Table B3 .......... Improvement Fee....................................................................................... B-7 Table B4.......... Existing and Future Bike and Pedestrian Facilities ..................................... B-9 Table B5 .......... Population Growth...................................................................................... B-9 Table B6.......... Existing and Planned LOS........................................................................ B-10 Table B7.......... Existing and Growth Capacity Needs for Bicycle and Pedestrian Facilities B-10 Table B8.......... Existing and Growth Share of Stand -Alone Bicycle and Pedestrian Improvements..................................................................................................................B-11 Table B10 ........ Compact Development Adjustments......................................................... B-20 Wastewater Local Appendix C1 ... Local Wastewater System Charge Methodology and Details ...................... C-1 Table 6............ Local Wastewater System Development Charge Analysis .......................... C-4 Table 7............ Local Wastewater Plumbing Fixture Unit Rates ........................................... C-5 Figure 4 .......... Local Wastewater System........................................................................... C-6 Regional Appendix C2... Regional Wastewater System Charge Methodology and Details ................ C-7 Stormwater Appendix D ..... Stormwater System Charge Methodology and Details................................D-1 Figure 5 ..........Stormwater System.................................................................................... D-6 Table 8 ............ Stormwater System Development Charge Analysis .................................... D-7 Table 9 ............ Stormwater SDC -Eligible Project List ......................................................... D-8 Parks — next page City of Eugene Systems Development Charges Parks Appendix E ..... Parks System Charge Methodology and Details .........................................E-1 Figure6 ..........Parks System............................................................................................ E-3 Table 10.......... Land Acquisition & Development Capacity Analysis by Park Type .............. E-4 Table 11 .......... Capacity Analysis & Project List Allocations for Facilities ............................ E-5 Table 12.......... Determination of Growth Capacity Needs for Neighborhood Parks ............. E-7 Table 13.......... Reimbursement Fee Cost Basis.................................................................. E-8 Table 14 .......... Improvement Fee Cost Basis...................................................................... E-9 Table 15 .......... Allocation of Project listAcreage/Cost....................................................... E-17 Table 16 .......... System -Wide Unit Costs; Res. & Nonres. Develop. per Component......... E-18 Table 17 .......... SDC Schedule........................................................................................... E-19 Table 18 .......... Avg. Number Persons per Structure Type (Grouped), 2000 US Census... E-20 Table 19 .......... Summary of Nonresidential SDC Classes ................................................. E-21 Formulas & Fee Schedule Appendix F .....Local System Formulas & General Fee Schedule.......................................F-1 Table B9 .......... Transportation Trip Rates............................................................................F-4 GENERAL METHODOLOGY City of Eugene Systems Development Charges 1.0 Introduction The City's authority to establish and adopt system development charges (SDCs) is granted by the Eugene Charter of 1976 and by ORS 223.297 - 223.314. By virtue of that authority, the City adopted Eugene Code, 1971 sections 7.700 - 7.740 and related provisions. For the purpose of interpreting Eugene Code, 1971 sections 7.700 through 7.740 and this document, the public record before the Council shall constitute the legislative history. In addition to the general methodology for each system contained herein, the following appendices are adopted and made a part hereof: A: Definitions of General Terms and Use Codes; and Cross Reference of Wastewater/Parks SDC / HUD BPR Use Codes B: Transportation System Charge Detail Cl: Local Wastewater System Charge Detail C2: Regional Wastewater System Charge Detail D: Stormwater System Charge Detail E: Parks System Charge Detail F: Local System Formulas and General Fee Schedule 1.1 Basis for Charge Systems Development Charges (SDCs) have been collected and used by the City of Eugene since 1978. They are presently collected on all new development in the City and are used to fund that portion of the construction of infrastructure (i.e., transportation, wastewater, stormwater and parks system components) required to support new development. These SDCs help the City provide for increased capacity needs, and recoup a portion of the community's investment in specific infrastructure reserve capacity that is already in place. Sound planning requires future demands on each system be anticipated, and that reserve capacity needed to serve future users be built in. By preparing for this growth, standards for community infrastructure are maintained and the community can prosper with new development. The Metropolitan Area General Plan and amendments provide a basis for planning of growth and development and includes the following goals and policies related to the financing of new development: Generally reduce public subsidy for utilities and facilities in new development (#5, p. III -G-5). In general, the amount of public subsidy for public utilities, services and facilities, including schools in new development, shall be reduced (#1, p. III -G-5). City of Eugene SDC Methodologies - General Methodology Page 1 In addition, City Council adopted Growth Management Study (GMS) policies to provide direction for provision of infrastructure services related to new development: GMS Policy #14: Development shall be required to pay the full cost of extending infrastructure and services, except that the City will examine ways to subsidize the costs of providing infrastructure or offer other incentives that support higher -density, in -fill, mixed-use, and redevelopment. 1.2 SDC Charges The SDCs and the associated administrative charges, impact reductions, credits, and compact development adjustments imposed by Eugene Code, 1971 sections 7.700 through 7.740 shall be determined as set forth in these methodologies. The current rates of charge for each system are listed in the adopted SDC fee schedule in Appendix F. Methods for calculating each of the following items are located in this General Methodology, in the noted sections: • Administrative Charge Costs —Section 2.3.1 • Impact Reductions — Sections 7.0 — 7.1 • Credits — Sections 7.0 and 7.2 • Compact Development Adjustments — Sections 7.0 and 7.3 2.0 General Approach This section outlines the general approach taken in calculating the City's development charges and in determining and specifying appropriate expenditures of SDC revenue. For the purposes of this document, the definitions in the Eugene Code, 1971 shall apply unless expressly provided to the contrary. Appendix A contains definitions of words and phrases which are used throughout these methodologies. 2.1 Assignment of Use Classifications Developments will be assigned use classifications that best reflect the developments' use per system (transportation, wastewater, stormwater, parks) as set forth in these methodologies. Different functional areas within the floor area space of a single use or tenant are not charged separately based upon the jobs performed in those functional areas (e.g., office, break room, shipping, storage room); rather, functional areas within a single use or tenant are assessed as a part of the overall use. If multiple uses are proposed and/or exist within one development, a single use classification may be assigned, as consistent with the definitions of transportation use codes adopted in Appendix A. In the case of multiple uses that are proposed and/or exist within one development, a single use classification will be assigned for SDC fee and credit calculations where that single use classification accurately describes the multiple uses (e.g., the "General Office Building" use classification may be assigned for a development that includes restaurants, retail, and warehousing). 2.2 SDC Applicability Permits for development on a site shall be reviewed to determine whether the proposed City of Eugene SDC Methodologies - General Methodology Page 2 development will result in an increase in the usage of any capital improvement or will create the need for additional capital improvements. Development that will have such an impact will be charged SDCs and associated administrative charges. SDC administrative charges shall be charged per Section 2.3.1, Administrative Costs. To simplify the administration of the SDC, no development involving then -existing improvements on a site will be deemed to increase usage of or create the need for additional capital improvements until one of the following occurs: • For property improved with a residential use (e.g. single-family dwelling, duplex or other multiple -family use), when: ➢ An additional dwelling unit is created, ➢ There is an increase in square footage of living area, or ➢ All or part of any structure on the site is changed to a use not permitted outright in any residential zoning district as noted in Eugene Code, 1971 section 9.2740. • For all property improved with a nonresidential use (e.g. recreation center, convenience market), when: ➢ An additional dwelling unit is created, ➢ There is an increase in square footage of gross floor space or living area, ➢ There is an increase in the number of nonresidential plumbing fixture units on the site, ➢ 60 square feet of impervious surface is added to the site (for the purpose of calculating the stormwater SDC), or ➢ Either 3,000 or more square feet of floor space in a building changes use or 50% or more of the gross floor space of the building changes use. • An additional connection to, or an increase in the size of, an existing connection to the public wastewater or stormwater system is to be made. • A property previously granted an exemption for housing for low-income persons is subsequently used for other than housing for low income persons, subject to the limitations and/or conditions imposed in Eugene Code, 1971 section 7.725(c). 2.3 General Method for City of Eugene SDC Rates The intent of the methodology is that new development should be charged an equitable share of system facility costs. Additional capacity needs are determined using the City's planned levels of service. If the planned level of service is higher than the existing level of service, new development will not be charged to remedy the deficiency associated with providing service for existing system users. The general approach used to calculate the development charge for various systems is based on requirements set forth in ORS 223.304: City of Eugene SDC Methodologies - General Methodology Page 3 Reimbursement fees must be established or modified by ordinance or resolution setting forth a methodology that is, when applicable, based on: (A) Ratemaking principles employed to finance publicly owned capital improvements; (B) Prior contributions by existing users; (C) Gifts or grants from federal or state government or private persons; (D) The value of unused capacity available to future users or the cost of the existing facilities; and (E) Other relevant factors identified by the local government imposing the fee. The methodology for establishing or modifying a reimbursement fee must promote the objective of future system users contributing no more than an equitable share to the cost of existing facilities and it must be available for public inspection. Improvement fees must be established or modified by ordinance or resolution setting forth a methodology that is available for pubic inspection and demonstrates consideration of: (A) The projected cost of the capital improvements identified in the plan and list adopted pursuant to ORS 223.309 that are needed to increase the capacity of the systems to which the fee is related; and (B) The need for increased capacity in the system to which the fee is related that will be required to serve the demands placed on the system by future users. • Credits are required for "qualified public improvements." This general approach is illustrated in Figure G-1 and can be outlined in the following steps: • Determine System Service Characteristics. ➢ System consists of several components (e.g., lines, pump stations, force mains, and manholes are components of the wastewater system). ➢ Establish impact measure - that feature of development that best reflects use of system capacity (e.g., trips for the transportation system, impervious surface for the stormwater system, etc.). Determine System Value, including associated costs such as design, construction, right- of-way acquisition and project administration. ➢ Use replacement cost (current construction costs). ➢ Determine capacity -oriented cost of system, net of assessments and grants. ➢ Determine portion of system value attributable to servicing the needs of future development. • Allocate the system value to the unit of impact (e.g., cost per unit of impervious area for stormwater system). • Determine the service impact of specific development types (e.g., single-family dwelling, City of Eugene SDC Methodologies - General Methodology Page 4 motel, convenience market). 2.3.1 Administrative Costs Administrative costs are estimated annually and include the periodic and on-going direct and indirect costs associated with complying with the requirements of state law and the costs of processing and administering the SDCs. An administrative charge shall be incurred when one of the following occurs: When a redevelopment occurs that changes the use of a building in its entirety and it is determined that usage of any capital improvement is increased or there is need of additional capital improvements. The administrative charge will be calculated either as a percentage rate of the net charge after credits for previous use, compact development adjustments, and impact reductions are applied, or at a flat rate, whichever is higher, as listed in the SDC fee schedule in Appendix F. When a redevelopment permit application (other than for redevelopment that changes the use of a building in its entirety) requires a review to determine that there will be no increased usage of any capital improvement and no additional capital improvements will be needed. The administrative charge will be applied at a flat rate as listed in the SDC fee schedule in Appendix F. When an SDC is imposed for all other development: The administrative charge will be calculated either as a percentage rate of the net charge after credits for previous use, compact development adjustments, and impact reductions are applied, or at a flat rate, whichever is higher, as listed in the SDC fee schedule in Appendix F. In no case will administrative charges be refunded, unless necessary as a result of City error. Additional review fees (e.g., supplemental information permit review fees) may be incurred for additional city staff review time needed when permit plans are changed or new SDC -related information is provided after the initial SDC review has been completed. 2.3.2 Maximum Administrative Charge An administrative charge shall not exceed a maximum amount of $30,000.00 for a single permit issued. If multiple permits are issued for different phases of the same development, the maximum administrative charge shall be applied to each permit independently. 2.4 Amendment to the SDC Methodology and Fees Amendments to the SDC methodologies shall be made by resolution of the city council except as follows. An amendment to the methodology that changes the amount of a reimbursement fee or an improvement fee may be made by an administrative order of the city manager pursuant to section 2.020 of the Eugene Code, 1971, so long as the fees are not increased by more than five (5) percent within any 12 -month period, and only if the change is based on either: City of Eugene SDC Methodologies - General Methodology Page 5 • The periodic application of the cost index described in 2.4.1, or • A change in the costs of materials, labor or real property applied to projects or project capacity on a project list adopted pursuant to ORS 223.309. 2.4.1 Adopted Cost Index The 20 -city national average construction cost index, as published by Engineering News - Record (ENR), shall be used when preparing periodic cost index adjustments. 2.5 Expending City of Eugene SDCs Improvement fee revenue may be spent only on capacity increasing capital improvements included on the adopted capital improvement lists, as defined in Eugene Code 1971 section 7.715(2), or debt related to such improvements. Reimbursement fee revenue may be spent only on capital improvements associated with the systems for which the fees are assessed and debt related to such improvements. Revenue from both types of fees may be expended on direct costs of complying with related state statutes. 3.0 Transportation System The Transportation Systems Development Charge (SDC) is made up of several components. The costs of these components include the total cost of design, construction, right-of-way acquisition, purchasing, testing, and project administration. The components included in this analysis are: • Collector and arterial streets ➢ Non -assessable linear section construction costs, including, but not limited to, on - street bike lanes and greenways ➢ Intersection construction costs ➢ Traffic signal costs ➢ Street light costs ➢ Bridge and other structure construction costs • Off-street bicycle and multi -use paths ➢ Path construction costs ➢ Path light costs The cost impacts of new development on these components are allocated on the basis of p.m. peak hour traffic on adjacent streets using either the trips specified in the Standard Calculation or based upon an Alternate Calculation as set forth in Appendix B. The detailed Cost of Service formula as well as the cost per trip for each component of the {00294393;2 } City of Eugene SDC Methodologies - General Methodology Page 6 transportation system is set forth in Appendix B. The cost per trip is the sum of all transportation system components identified in Appendix B. The transportation SDC for a proposed development is determined by multiplying the units which describe the impact by the trip rate (to determine the number of trips assigned to the proposed development) using the Transportation Trip Rates table and the cost per trip in the current adopted SDC fee schedule in Appendix F. 4.0 Local (City) and Regional Metropolitan Wastewater Management Commission (MWMC) Regional Wastewater Systems Collection of the wastewater SDC includes both a local (City) and regional (MWMC) system charge. 4.1 Local Wastewater System The local wastewater SDC is based upon estimated wastewater flow discharge (impact on and/or use of system capacity) from various development types. A unit cost of capacity in terms of cost per gallon per day is established and used to determine SDC rates. For residential development the rate is based on number of dwelling units and area of living space. For nonresidential development the rate is based on number of PFUs and the proposed development type. The detailed analysis, methods for calculating, and the Cost of Service formula for the local wastewater system can be found in Appendix C. The local wastewater SDC rates can be found in the current adopted fee schedule in Appendix F. The local wastewater SDC for a proposed development is determined by: • Number of Residential Dwelling Units (RDU) and area of living space for single-family, duplex, multiple -family, and other residential development • Plumbing Fixture Units (PFU) and proposed development type for other than Residential Dwelling Units (e.g., recreation center, convenience market). 4.2 Regional Metropolitan Wastewater Management Commission (MWMC) Wastewater System The City of Eugene entered into an Intergovernmental Agreement with the City of Springfield and Lane County in 1978, which established the Metropolitan Wastewater Management Commission. On May 15, 1997, the Commission adopted the MWMC wastewater Systems Development Charge which included a regional administrative charge. On April 1, 2004, the Commission adopted a modified MWMC regional wastewater SDC methodology; the MWMC SDC structure was amended to include a compliance charge and to discontinue the use of a separate administrative charge. The regional MWMC wastewater SDC methodology is located in Appendix C2. Current regional rates are also summarized in the Appendix F fee schedule. 5.0 Stormwater System The stormwater SDC is based upon impervious surface area (e.g., rooftops, driveways, sidewalks, parking lots, patios, and other non -porous surfaces). The detailed formulas for calculating the stormwater SDC unit cost (rate) per square foot of impervious surface area is set forth in Appendix D. The stormwater SDC is determined by multiplying the applicable rate by the unit of measure for the proposed development type. The costs per unit of measure and resulting rates can be City of Eugene SDC Methodologies - General Methodology Page 7 found in Table 9 and the fee schedule in Appendix F. Where the stormwater SDC is a fixed amount per dwelling unit or space, it shall be determined by multiplying the applicable rate per dwelling unit or space times the number of units or spaces plus, for manufactured home park development, the SDC is based upon the impervious surface area of all additional common areas times the applicable stormwater unit cost per square foot of impervious surface area. Where the stormwater SDC is not a fixed amount per dwelling unit or space, it shall be determined by multiplying the applicable rate per square foot of impervious surface area times the total impervious surface area of the proposed development. Where a development creates impact not attributable to impervious surface area, the stormwater SDC shall be determined by evaluating equivalent impervious surface area, multiplied by the applicable rate per square foot of impervious surface area. 6.0 Parks System The parks SDC is based upon the estimated cost of capacity in future capacity -enhancing projects to serve new development, as contained in the Parks, Recreation and Open Space (PROS) Project & Priority Plan, and the estimated capacity in the existing parks system to be used by new development. The details for calculating the park SDC unit costs (rates) for residential development (per dwelling unit type) and nonresidential development (per room or per thousand gross square feet) are set forth in Appendix E. The park SDC is determined by multiplying the applicable rate by the unit of measure for the proposed development type. The costs per unit of measure and resulting rates may be found in Table 17. 7.0 Impact Reductions, Credits, and Compact Development Adjustments This section provides detail on the City's administration of SDC impact reductions, credits, and compact development adjustments. Potential sources, criteria for eligibility, and the basis for calculation of impact reductions, credits, and compact development adjustments are defined in this Methodology (including appendices) and in Eugene Code, 1971 sections 7.730 and 7.732. A list of examples of facilities and programs which are potentially eligible for these adjustments appears in Table G-1 of this section. (Note: As development standards change, some examples may no longer be considered eligible for reduction, but may influence future rates.) In no case may the sum of all approved credits, impact reductions, and compact development adjustments for a single system exceed the amount of the SDC assessed for that system for any approved building or development permit. The amount owed for SDCs may be reduced by one or more of the following processes described in this methodology: Impact Reduction, based on quantified mitigation of demand generated by the development for new identifiable capital improvements (available for transportation and stormwater system SDCs); Credit, based on the specific costs for privately engineered construction of certain public improvements as part of the development; • Credit, based upon the payment of or contribution to the cost of certain capital improvements in association with multiple -family residential projects of five dwelling units or more (available for transportation, wastewater, stormwater, and parks system SDCs); City of Eugene SDC Methodologies - General Methodology Page 8 • Credit based on previous payment or use (available for transportation, wastewater, stormwater, and parks system SDCs); • Compact Development Adjustments (available for transportation system SDCs) Adjustment of SDCs due to impact reductions, credits, and compact development adjustments: • Shall not be given for improvements constructed or programs instituted prior to City approval. • Shall be applied up to the maximum SDC fee for the applicable system. • Shall reduce the SDCs paid on building permits at the time of issuance, but in no case may the sum of impact reductions, credits, and compact development adjustments exceed the SDC. • Shall be applied to a particular system (e.g., Transportation, Stormwater, Wastewater, Parks); credits or reductions approved for a particular system cannot be transferred or applied to any other system charges. • Shall be applied to the SDCs for the particular development, may only be further applied to subsequent phases of the same development for which the improvement was constructed or program instituted, and cannot be transferred or applied to other properties or developments. 7.1 Impact Reductions or Mitigation City approval of an impact reduction or mitigation will be based on programs instituted in connection with development and/or private physical improvements (as defined in Appendix A) constructed as part of the development. Such programs and improvements shall: • Reduce the demand from that development for future construction of identifiable capital improvements; • Be privately financed; and • Be designed to be permanent. The anticipated reduction in demand must be demonstrated to the satisfaction of the City Engineer. Calculation of impact reduction shall be based on the ratio of the system impact with the program or facility in place, to the system impact if the program or facility did not exist. Prior to application of the impact reduction to the SDCs for the development, the City shall receive assurances that will bind the developer, owner, and the owner's successors as is necessary to ensure that the program or facility will function as planned for the agreed upon time period. Such agreements may include, but are not limited to performance bonds, maintenance programs, annual reports, monitoring and inspections, or other pertinent items to document proper functioning as determined by the City Engineer. 7.1.1 Transportation System Impact Reduction For the transportation system, an impact reduction may be granted if the applicant demonstrates to the satisfaction of the City Engineer, that the improvement or program to be instituted in connection with the development will materially reduce the number of automobile City of Eugene SDC Methodologies - General Methodology Page 9 trips the development will generate and that it will continue for at least twenty years after the development is occupied. 7.1.2 Stormwater System Impact Reduction or Mitigation For the stormwater system, an impact reduction may be granted based on two forms of impact reduction: Flood Control (Destination and Quantity Reduction) Stormwater Quality (Pollution Reduction) These impact reductions will be granted after review and approval by the City Engineer of the design documentation submitted in accordance with standards specified in Eugene Code, 1971 section 9.6790 (3). Criteria for stormwater SDC impact reduction for development can be found in Appendix D, section 6.0. 7.1.2.1 Stormwater System Impact Reduction Criteria Criteria for stormwater SDC impact reduction for development can be found in Appendix D, section 6.0. A development that meets the required criteria will be eligible to receive a reduction against stormwater SDCs at the time of permit issuance as follows: SFD and duplex residential development: ➢ 100% flat rate stormwater SDC impact reduction for complete containment of all on-site stormwater, with no direct or indirect connection to the public system; or ➢ 50% flat rate stormwater SDC impact reduction for any amount of partial containment of runoff on-site. Multi -family residential, commercial, industrial, other development using a common or shared facility: ➢ The stormwater SDC will be reduced in the same proportion that the mitigating facility reduces runoff leaving the fully developed site. 7.2 Credits City approval of credits shall be given based on one or more of the following: 7.2.1 Qualified Public Improvement Credit For any qualified public improvement (as defined in Eugene Code) to be constructed in connection with the development for which an SDC is collected. 7.2.2 Capital Improvement Credit City of Eugene SDC Methodologies - General Methodology Page 10 For any capital improvement (as defined in Eugene Code) to be constructed as part of a development to the extent: • That it reduces the need for construction of specific, identifiable public improvements; or • That it would otherwise have to be constructed or acquired at public expense and is eligible for funding with Systems Development Charge funds under the current policies of the City Council; or • That the City can recover credits through collection of an equivalent assessment from benefited properties, or for which the City Council has formed a Local Improvement District in accordance with provisions in Eugene Code, 1971 section 6.610 (6) or 7.407(2). 7.2.3 Credit for Multiple -Unit Housing Capital Improvements Per Eugene Code, 1971 section 7.731, a multiple -unit housing credit may be granted for the construction of, payment for, or contribution to the cost of certain capital improvements, as part of a multiple -family residential project consisting of five or more dwelling units, if all the following conditions are met: • The capital improvement must be included on a capital improvement plan described in Eugene Code 1971, section 7.715(2) and be eligible for SDC funding under the Plan; and • The improvement must be located within the boundaries of the neighborhood association in which the development is being constructed; and • Credit for the construction of or contribution to the improvement is permissible under state law: and • The City Council, the developer, and the applicable neighborhood association board of directors each: o Agree that the improvement will mitigate one or more impacts resulting from the multiple -family residential project in the neighborhood; and o Approve the grant of SDC credit in exchange for the construction of, or contribution to, the improvement. A multiple -unit housing credit may be applied only toward the SDC attributable to the same capital system (transportation, wastewater, stormwater, parks) as the improvement constructed, paid for, or contributed to by the developer. A multiple -unit housing credit may be for no more than fifty percent of the SDC for the applicable capital system. 7.2.4 Credit for Previous Payment or Use SDC fees, including administrative charges, that have been paid are not refundable and, in the case of an agreement to pay SDCs in installments, the terms of the agreement may not be modified. A partial refund of SDC fees will be made or a modification of an installment agreement will be allowed when an active development permit is canceled or expires without City of Eugene SDC Methodologies - General Methodology Page 11 being used, a change of design of an active development permit is approved that results in a less intense use of the property, or property previously developed as a manufactured home park is partitioned and redeveloped. No portion of the administrative charges will be refunded, and additional review fees may be imposed to cover the cost of calculating and processing the partial refund. Credits for other types of previous payment or use may, however, be provided. In calculating the credits given under this section, the City Engineer shall apply credit for previous payment or use only to developments (e.g. structure, impervious area) for which the previous use, including that for which developments have been demolished, or payment can be verified and for which a credit has not been previously given. The burden of proof is on the applicant to provide adequate documentation (e.g. tax records, utility billing / water usage records, building permit records). Credits for previous payment or use are provided in the following manner: • When redevelopment occurs that does not change the use of a building in its entirety, the credit will be based on the most previous verifiable use; or • When an entire building is demolished or when redevelopment occurs that will change the use of a building in its entirety, the credit for previous use will be based on the previous most intense verifiable use per system. In this case, the credit calculation will be performed independently for each system which may result in different periods of the use of the site being the basis of comparison. 7.2.5 City Cost of Construction Credit In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer shall estimate the cost of the capital improvement based upon what the City would pay were it to construct such improvements. 7.2.6 Revenue Collection for Equivalent Assessment or Special Benefit Credit When an equivalent assessment or a special benefit assessment is collected when property connects to a public improvement for which the City has granted a credit under 7.2.2 above, the revenue collected (net of the costs of collection) shall be deposited in the SDC fund for the system to which connection was made and for which the credit was given unless the SDC fund has been reimbursed for the credit from other City funds. If the SDC fund has been reimbursed in advance from other City funds, the revenue collected will be deposited to the City fund which reimbursed the SDC fund. 7.3 Compact Development Adjustments Compact development adjustments may be granted to reduce the amount owed for a transportation system SDC, as detailed in section 4.4 of the transportation methodology, located in Appendix B to this General Methodology. Commencing with the 2019 fiscal year, and continuing each fiscal year thereafter, the City may grant a base amount totaling $130,000 annually for location -based, transit proximity and transportation demand management adjustments, combined. Each fiscal year there is a change in the rates for the SDCs for residential development, the base amount for that fiscal year shall be adjusted in an amount proportionate to that change. City of Eugene SDC Methodologies - General Methodology Page 12 If any portion of the authorized base amount remains unallocated at the end of a fiscal year, that portion shall be added to the authorized base amount for the next fiscal year. 7.4 Revocation of Impact Reduction, Credit, or Compact Development Adjustment An impact reduction, credit, or compact development adjustment which has been applied to reduce SDC fees may be revoked and the unpaid portion of the SDC reimposed as a lien against the property, within the time required by these Methodologies, if: • The associated reduction program for which an impact reduction has been approved is not instituted or is modified without the approval of the City Engineer, or ceases to function as designed; • The associated capital improvement for which SDC credit has been given is not constructed or completed as required, or fails to function as designed; or The associated development for which a compact development adjustment has been approved removes required automobile and/or pedestrian connections to transit corridors, or changes use to a development type that does not meet the compact development adjustment criteria. Such revocation shall not occur until ten days prior written notice has been given to and an opportunity to be heard afforded the applicant and property owner. If the credit or impact reduction is revoked, the City Manager may add to the amount due, the cost of the revocation proceedings. 7.5 Application for Credit and Impact Reduction An application for a credit or impact reduction, including related documentation and information, shall be submitted by the applicant in the manner prescribed by the City, together with any fee set by the City Engineer pursuant to Eugene Code, 1971 section 2.020. The applicant shall have the burden of demonstrating the eligibility for a credit and/or impact reduction. No credit or impact reduction shall be granted for an SDC that has already been imposed, collected or agreed to be paid in installments unless resulting from cancellation of an active permit, expiration of a permit without being used, or an approved change of design of an active permit. 7.5.1 Application for Impact Reduction Applicants must submit their request for an impact reduction in writing, accompanied by documentation that supports the basic function and design criteria for estimated impact reduction. For commercial development, impact reduction will be applied uniformly for all lots or building sites in the development phase approved. Impact reductions granted under this methodology document may be used in subsequent phases of a development when the applicant demonstrates to the satisfaction of the City Engineer that the program or improvements continue to provide the anticipated reduction in demand, and the City has received assurances or agreements from the developer, owner, and owners successors, as approved by the City Engineer as is necessary to ensure that the program or facility will continue to function as planned for the agreed upon time period. Changes to the mitigated program or facility attributable to the connection of an additional phase which results in any deviation from the previously determined impact reduction will be adjusted proportionately. City of Eugene SDC Methodologies - General Methodology Page 13 7.5.2 Application for Credit Based on Construction of Public Improvements For credits derived from the construction of public improvements, the property owner(s) will be notified in writing about potential credit availability, subsequent to the approval and bonding of the construction plans. The property owner(s) will have 60 days from the date of written notification to submit the SDC Credit Application and complete the approval process. Applications that include disbursement instructions for ineligible lots or which contain requests in conflict with City code, state law, or current City policies/practices will be considered incomplete applications. 7.5.3 Credit Distribution in the Absence of Directions from an Approved SDC Credit Application With the exception of cases where the recovery of credit through an equivalent assessment is uncertain, if the owner does not comply with the requirements of section 7.5.2, the credit will be distributed by the "equal lot' method. All eligible lots or building sites will be identified, and the credit will be distributed in an equal amount to each of these eligible lots or building sites. Credit applied under this policy will not be eligible to be appealed. Development for which a building permit is issued prior to administration of credit disbursal or approval by the City Engineer will not be considered eligible for credit distribution. 7.5.4 Changes to an Approved Credit Application Whether established by the City using the "equal lot" method or by the property owner(s)/applicant(s), any modifications to the distribution of credits will require a new completed application, must be approved by the City Engineer, and will be effective only upon approval by the City Engineer of the revised credit application. The revised distribution will apply only to the remaining credit balances and undeveloped lots or building sites to which the credit originally applied. 7.6 Decision on Application for Credit The City Engineer shall approve, conditionally approve, or deny an application in writing, setting forth the reason for the decision. Such a decision shall be mailed or personally delivered to the applicant. 7.7 Credit and Impact Reduction Duration Credits for qualified public improvements, capital improvements, and multiple -unit housing capital improvements granted under this methodology document may be applied to SDC fees for a development up to a maximum of 10 years from the date of the original written notification. Impact reductions granted under this methodology document may be applied to SDC fees for a development until such time as the program or improvements no longer continue to provide the anticipated reduction in demand and the City has determined that assurances or agreements from the developer, owner, or owners successors, are no longer adequate to ensure that the program or facility will continue to function as planned for the agreed upon time period. City of Eugene SDC Methodologies - General Methodology Page 14 8.0 Appeals An appeal by an applicant or a permittee of any decision of the City Manager under these Methodologies shall be governed by Eugene Code, 1971 section 7.735 and must be filed and the appeal fee paid within 15 working days of the date of the decision. Such appeals shall be in writing and filed with Public Works Engineering Permit Technician staff located at the City's Permit & Information Center. A separate appeal must be filed for each decision being appealed. The appeal fee, as established under Eugene Code, 1971 section 2.020, can be found in the current adopted SDC Fee schedule in Appendix F. A person objecting to the City's final decision under Eugene Code, 1971 section 7.735 concerning the calculation of a systems development charge may seek judicial review of the decision pursuant to ORS 34.010 to 34.100. 9.0 Interested Persons Notification The City shall maintain a list of persons who have made a written request for notification prior to adoption or modification of a methodology for any SDC. The City shall mail written notification to persons on the list at least 90 days prior to the first hearing to adopt or modify a system development charge. The methodology supporting the adoption or modification will be available 60 days prior to the first hearing to adopt or amend a systems development charge. The failure of a person on the list to receive a notice that was mailed will not invalidate the action of the City. The City may periodically delete names from the Interested Persons List or require a new written request for notification be made if the person wishes to remain on the list. At least thirty (30) days prior to removal of the name from the Interested Persons List, the City will send notification to the person whose name is to be deleted. It is the responsibility of the person requesting to maintain a current address with the City for the purposes of being included on the Interested Persons List. An amendment to a methodology that changes the amount of a reimbursement fee or an improvement fee is not a "modification" of the system development charge subject to this notification requirement if the change is based on the periodic application of the cost index described in 2.4.1, or on a change in the costs of materials, labor or real property applied to projects or project capacity on a project list adopted pursuant to ORS 223.309. City of Eugene SDC Methodologies - General Methodology Page 15 FIGURE G-1 Rate -Setting Methodology Level of Service Impact Measurement Formula System Value Replacement costs for existing reserve capacity (plus) expenditures (minus) Assessable costs & Grants (equals) SDC eligible costs Cost of Service SDC Eligible Costs = SDC Impact Measurement (PER UNIT OF SERVICE) Apply SDC to specific types of development City of Eugene SDC Methodologies - General Methodology Page 16 TABLE G-1 Potential Impact Reductions, Credits, and Compact Development Adjustments for System Development Charges NOTE: These are examples only; eligibility is established at time of review of plans which approve the proposed improvements. 1. Transportation System 11 IMPACT REDUCTIONS: • Successful bus pass program for employees CREDITS: • Street width in excess of assessable width • Off-site, non-contiguous arterial or collector intersection • Street light on arterial or collector street • Off-site arterial or collector right-of-way and easement acquisition • Traffic signal on arterial or collector street • Off-street shared -use paths identified in adopted City plan • Off-site eligible public improvements where equivalent assessments can be collected COMPACT DEVELOPMENT ADJUSTMENTS: • Adjustments based on site's location in relation to nodal areas, key corridors, frequent transit network routes, and Downtown Plan and West University Commercial Districts boundaries • Transportation Demand Management (TDM) agreement to reduce parking spaces • Accessory dwelling units (ADUs) 11 2. Wastewater System CREDITS: • Public Wastewater collection lines > 8 -inch diameter • Public pump stations and pressure lines that serve more than the development • Off-site public improvements, where equivalent assessments can be collected • Prior payment of Metropolitan Wastewater Service District debt service 11 3. Stormwater System IMPACT REDUCTIONS: • Destination and Quantity: Reduction or elimination by retention of stormwater otherwise discharged into public system • Pollution: Reduction of pollution via approved treatment techniques CREDITS: • Stormwater collection lines > 24inch diameter • Major drainage channels: construction and off-site easement • Off-site public improvements where equivalent assessments can be collected or that benefit existing developments 11 4. Parks System CREDITS: • Land dedication (for sites accepted by City, consistent with adopted City plans) • On-site park facility dedication (for improvements accepted by City, consistent with adopted City plans) City of Eugene SDC Methodologies - General Methodology Page 17 City of Eugene System Development Charge Methodologies Appendix A Definitions of General Terms and Transportation Use Codes L; Cross -References for Wastewater & Parks SDCs Based Upon HUD BPR Use Codes Descriptions Page A-1 City of Eugene SDC Methodologies, Appendix A Appendix A Definitions of General Terms and Use Codes Accessory Dwelling Unit (ADU): (Also referred to as a Secondary Dwelling Unit). As used in the determination of SDC rates, an accessory dwelling unit is any interior, attached or detached residential structure that is used in connection with or that is accessory to a single family dwelling on the same lot. An ADU typically has the following components: • separate ingress / egress • living area • kitchen facilities including sink (in addition to bathroom sink), refrigerator, orstove separate bathroom Acquisition Costs: The indirect or direct amount expended to procure use, possession, rights, or title as related to the construction of public improvements. This cost may be determined by current market experience, or other reasonable and prudent methods approved by the City Engineer. Administrative Charge: A City charge to recover costs associated with staff time to review a permit's SDC impact, the development of the methodologies, the provision of an annual accounting of system development charge expenditures, and the implementation and operational costs associated with the SDC program. Assessable Costs: The amount of capital improvement costs which are collected through the City's local improvement assessment program as established in City code. This cost has been removed from the total cost of capital improvements in determining the system-specificSDC. Average Cost Determination: • The average cost of inspecting and installing connections with the wastewater facilities and with the stormwater facilities, which are not part of the SDC as defined in E.C. 7.010, is the connection permit fee established by the City. • If an applicant to connect to a wastewater or stormwater facility would result in extraordinary cost of inspecting and installing the connection, nothing in this definition shall prevent the City from requiring the applicant pay such costs. The extraordinary costs may be paid by the applicant in installments as part of the SDC. Average Flow: The typical average daily flow of development, by type of land use. For purposes of calculating the Metropolitan Wastewater Management Commission SDC, this flow is expressed in terms of a unit of development. BOD: Biochemical Oxygen Demand. The quantity of oxygen utilized in the biochemical oxidation of organic matter. Change of Use of a Building in Its Entirety: An existing building proposed to redevelop in manner that changes all existing use classifications as determined by staff. City Engineer: The City Manager, the person designated by the City Manager to serve as the City Engineer, orthe City Engineer's designee. City Manager: City Manager or designee Page A-2 City of Eugene SDC Methodologies, Appendix A Construction Costs: The cost in current fiscal year dollars for construction of future capital improvements. Cost of Service: The calculation of a "per unit" cost to the City of providing system -specific capacity (e.g., wastewater collection capacity). Credit: An amount that may be subtracted from the net SDCs assessed for a development. Credits may be based upon (a) previous payment or use, or (b) the costs of, or contributions to, certain capital improvements associated with the development. Development Types: As used in determining SDC rates, development and uses of development sites are categorized, per system, depending on the relative impact. Also referred to as use codes. EDU: Equivalent Dwelling Unit: EDU is used in the parks SDCs as a basis for determining the relative impact or service used by different types of development. Represents the use of capacity that is approximately equal to that of a single dwelling unit. Equitable Share of Public Facility Costs: As used in the development of SDCs, the City's cost of providing system capacity, allocated to new development relative to the development's impact or use of system capacity. FEU: Flow Estimation Unit. For the Metropolitan Wastewater Management Commission SDC, the Flow Estimation Unit is the unit of impact upon which the rate per unit is based. The FEU is typically per 1,000 square feet of building area for most commercial users, and dwelling units for residential development. ITE: Institute of Transportation Engineers Impact Measurement: The unit of system capacity used to determine the relative effect of a new development on the capacity of a specific system. For example, the number of gallons of discharge flow per plumbing fixture unit is used to determine the effect of various development types on the local wastewater system. Impact Reduction: (a) Private physical improvements constructed as part of a development, or programs instituted in connection with the development, which will reduce the demand from that development upon one or more capital systems; (b) the amount by which an SDC fee is lowered based upon an impact reduction. Impervious Surface: Impervious surface is used as an impact measure for the stormwater SDC. An impervious surface is that which prevents or retards saturation of water into the surface of the soil or causes water to run off the surface in greater quantity or at an increased rate of flow compared to the natural condition of the property before development. Asphalt, concrete, and roofing materials are examples of impervious materials. Improvement Fee: The portion of the system -specific SDC charged for costs associated with capital improvements to be constructed to increase capacity of the system to accommodate new development. Level of Service (LOS): (per unit of development) As used in development of SDC rates, LOS represents the amount of system (or sub -system) capacity provided at a certain point in time. The planned level of service is used as the basis for determining the system impacts of new development. This is presented in terms of the appropriate impact measure. Page A-3 City of Eugene SDC Methodologies, Appendix A Living Area: As used in the determination of local wastewater SDC rates, living area is defined as the gross floor area, to the outside perimeter, of a dwelling including floor area within structures accessory to the dwellings that is intended for habitation, e.g. bonus rooms over garages, some attic spaces. Low Impact Development (LID): As used in determination of stormwater SDC rates, LID is the management of stormwater runoff by approved infiltration and filtration facilities in accordance with standards specified in EC 9.6792 (3). Methodology: This document entitled "City of Eugene Systems Development Charge Methodologies" and any amendment or modification made hereto. Mixed -Use Development: As relating to Transportation Compact Development Adjustments (see section 4.4 of Appendix B / Transportation SDC Methodology), a development (either a single building or a group of buildings) that includes a combination of commercial and certain residential uses. Residential uses may include the following compact development types, but shall not include detached single-family dwelling or duplex development: • Multi -family residential development, including apartments and apartment -style condominiums • Rowhouses and townhouses MWMC: Metropolitan Wastewater Management Commission - responsible for regional wastewater treatment. Peak Flow: For purposes of the Metropolitan Wastewater Management Commission SDC, peak flow is the peak wet weather design capacity of the regional wastewater treatment plant. PFU: Plumbing Fixture Units. PFUs are defined in the state Uniform Plumbing Code. A unit equivalent is assigned to different drainage fixtures depending on drain pipe or fixture size. The rate of charge per PFU will vary and is dependent upon a development's land use and associated impact to the pubic wastewater system. Private Physical Improvements (for impact reduction/mitigation): A facility or asset, designed and constructed at the developer's expense, which is owned and maintained by the property owner or owner's agent; not a program or activity or naturally occurring physical attribute. Process Wastewater: Water which, during manufacturing or processing, comes into contact with or results from the production of or use of any raw material, intermediate product, finished product, byproduct or waste product. Proportionate Share of Public Facility Costs: The cost of capital improvements which are reasonably attributable to new development. Reimbursement Fee: The portion of the system -specific SDC charged for costs associated with capital improvements already constructed, or under construction when the fee is established, that have existing capacity to serve future growth. Replacement Costs: The cost (in current fiscal year dollars) of replacing existing system capacity. Page A-4City of Eugene SDC Methodologies, Appendix A Residential Dwelling Unit (RDU): Residential Dwelling Units are used in the calculation of wastewater SDCs as a basis for determining the relative impact or service used by residential development. A base fee is applied to each RDU, such as one house, one accessory dwelling unit, or each apartment unit, plus a rate per square foot is applied to the total living area. For manufactured home parks, which are charged SDCs at the time a park's initial development permit is issued, the local wastewater SDC will be based upon the maximum size of manufactured home that can be placed on building pads located within the park. Each space shall constitute an RDU and the rate per square foot shall be applied to the total gross floor area of all additional proposed structures within the park. SDC Eligible Costs: System value net of assessable costs, grants and outstanding debt. This cost is allocated to all development in proportion to its impact on system capacity. SS: Suspended Solids. The total elements and compounds which float on the surface of, or are suspended in, wastewater and which are removable by laboratory filtration, expressed in milligrams per liter. Secondary Dwelling Unit (SDU): See Accessory Dwelling Unit. Single Family Dwelling (SFD): As used in EC 7.725(b) and this methodology, a "single family dwelling" means a "Dwelling, single family detached" as defined in EC9.015. TGSF: Thousand Gross Square Feet. Sum (expressed in the thousands, in decimal form) of the area of each floor level, including, but not limited to, basements, mezzanines, penthouses, corridors, mechanical rooms, and storage areas that are within the principal outside faces of the exterior walls. The City's TGSF definition is based upon the definition of "gross floor area" in the Institute of Traffic Engineer's Trip Generation Manual. TGSF measurements: • Include exteriorwalls • Include all areas that have clear standing headroom (6 feet, 6 inches minimum), regardless of their use • Shall count the area of stairs once for each two floors the stairs connect • Shall count the shaft of an elevator once, regardless of the number of stories it connects • Do not include parking and drive aisle areas within parking garages TGSFLA: Thousand Gross Square Foot Leasable Area Transportation Demand Management (TDM): A transportation planning proposal for a given development that reduces the demand that development places upon the transportation system by redistributing or eliminating vehicle trips and encouraging the use of alternate modes of travel. Unit of Development (Unit): Unit of measure for determining the size of a development for use in calculating the effect of the development on a system. • Example: Number of Units of Development x Impact Measure per Unit = Impact of Development Page A-5 City of Eugene SDC Methodologies, Appendix A Definitions of Transportation Use Codes 030 Truck Terminal Truck terminals are facilities where goods are transferred between trucks, trucks and railroads, or trucks and ports. 090 Park & Ride Lot with Bus Service Park-and-ride lots with bus service are areas used for the transfer of people between private vehicles and buses. They usually contain a bus passenger shelter, a parking lot, and circulation facilities for buses, as well as for private motor vehicles. In addition to park-and-ride, there are a significant number of passengers who are dropped off. 110 General Light Industrial Industrial facilities have an emphasis on activities other than manufacturing, and may include activities such as printing, material -testing laboratories, and assembling of data processing equipment. Typically these facilities are freestanding and devoted to a single use/activity. 130 Industrial Park Development within an industrial park is characterized by a mix of manufacturing, service, and warehouse facilities with a wide variation in the proportion of each type of use from one location to another. Industrial park tenants may be highly diversified; some parks may contain a large number of different types of small businesses, while others may have one or two dominant industries. 140 Manufacturing Manufacturing facilities are areas where the primary activity is the conversion of raw material or parts into finished products. The size and type of activity may vary substantially from one facility to another. In addition to the actual production of goods, manufacturing facilities generally also have office, warehouse, research, and associated functions. This use code also includes general heavy industrial uses which are facilities typically limited to the manufacturing of large items. [Combines ITE use codes 120 General Heavy Industrial and 140 Manufacturing.] 150 Warehousing Warehouses are primarily devoted to the storage of materials; they may also include office and maintenance areas. 151 Mini -Warehouse Mini -warehouses are buildings in which a number of storage units or vaults are rented for the storage of goods. Each unit is physically separated from other units, and access is usually provided through an overhead door or other common access point. These are often referred to as "self -storage facilities." 160 Data Center Data centers are free-standing, warehouse -type facilities that are primarily used for off-site storage of computer systems and associated components, including applications and secure data. Data centers may be occupied by single or multiple tenants and may include maintenance areas and a small office. Data centers typically have a small number of employees and visitors. 170 Utilities Utilities are free-standing buildings containing electromechanical or industrial space equipment. These facilities may include storage areas and office space. Page A-6 City of Eugene SDC Methodologies, Appendix A 210 Single -Family Dwelling / Duplex This use code includes single-family detached housing, mobile homes, and /duplex homes on individual lots. [Combines ITE use codes 210 Single -Family Dwelling and 240 Mobile Home Park.] 211 Accessory Dwelling Unit (ADU) / Secondary Dwelling Unit (SDU) Any interior, attached or detached residential structure that is used in connection with or that is accessory to a single family dwelling on the same lot. An ADU typically has the following components: • separate ingress / egress • living area • kitchen facilities including sink (in addition to bathroom sink), refrigerator, orstove • separate bathroom 220 Apartments Apartments are rental dwelling units located on the same property with at least two other dwelling units. 230 Condom inium/Townhome Condominiums/townhomes are ownership dwelling units constructed in a group of three or more attached units. 251 Senior Housing Development Senior adult housing consists of detached independent living developments, such as retirement communities, age -restricted housing and active adult communities. In addition to residential units, these developments may include golf courses, pools, security, transportation and common recreational/social facilities. [Combines ITE use codes 251 Senior Adult Housing — Detached and 252 Senior Adult Housing - Attached.] 253 Congregate Care Facility / Continuing Care Retirement Community Congregate care facilities are independent living developments that provide centralized amenities such as dining, housekeeping, transportation, and organized social/recreational activities. Limited medical services may or may not be provided. 254 Assisted Living / Nursing Home Assisted living developments and nursing homes are residential facilities that provide protective oversight and/or daily care to mentally or physically limited persons. Assisted living facilities provide routine general assistance with activities necessary for independent living. They commonly have separate living quarters for residents and services related to dining, housekeeping, social and physical activities, medication administration, and transportation. Nursing homes are facilities whose primary function is to provide care for persons who are unable to care for themselves. Skilled nurses and nursing aides are available 24 hours a day. Both assisted living and nursing homes are occupied by residents who do very little or no driving; traffic is primarily generated by employees, visitors, and delivery trucks. [Combines ITE use codes 254 Assisted Living and 620 Nursing Home.] 310 Hotel/Motel Hotels are places of lodging that provide sleeping accommodations and supporting facilities, such as, restaurants, cocktail lounges, meeting and banquet rooms or convention facilities, limited recreational facilities (pool/fitness room), and other retail and service shops. Motels are places of lodging that provide sleeping accommodations and often a restaurant. Motels generally have little or no meeting space. Page A-7 City of Eugene SDC Methodologies, Appendix A (Combines ITE use codes 310 Hotel and 320 MoteL] 411 City Park City parks are publicly owned and operated and may vary widely as to location, type, and number of facilities. Seasonal use of the individual sites differs widely as a result of the varying facilities and local conditions. 430 Golf Course Golf courses can be publicly or privately maintained and operated. This category also includes private country clubs. Some sites have driving ranges and clubhouses with a pro shop and/or restaurant, lounge, and banquet facilities. 437 Bowling Alley Bowling alleys are recreational facilities that include bowling lanes. A small lounge, restaurant and/or snack bar, video games, and pool tables may also be available. 444 Movie Theater Movie theaters consist of audience seating, single or multiple screens and auditoriums, a lobby, and a refreshment stand. Matinees may or may not be provided. [Combines ITE use codes 443 Movie Theater without Matinee, 444 Movie Theater with Matinee, and 445 Multiplex Movie Theater.] 491 Racquet/Tennis/Handball Facility Racquet, tennis, squash, and handball sports facilities may be either publicly or privately owned and include indoor and/or outdoor facilities. These facilities may include other ancillary uses such as swimming pools, saunas, weight rooms, snack bars and retail. [Combines ITE use codes 490 Tennis Courts and 491 Racquet/Tennis Club.] 492 Health/Fitness/Athletic Club Health, fitness, and athletic clubs are privately owned facilities that may include swimming pools, whirlpools, saunas, tennis, racquet ball, and handball courts, exercise classes, weightlifting and gymnastics equipment, locker rooms, and a restaurant or snack bar. Athletic clubs may offer additional team sports activities and social facilities. [Combines ITE use codes 492 Health/Fitness Club and 493 Athletic Club.] 495 Recreational Community Center/ Multi -Purpose Recreational Facility Recreational community centers are facilities similar to and including YMCAs, often including classes and clubs for adults and children; a day care or a nursery school; meeting rooms; swimming pools and whirlpools; saunas; tennis, racquetball, and handball courts; exercise classes; weightlifting and gymnastics equipment; locker rooms; and a restaurant or snack bar. Multi- purpose recreational facilities contain two or more of the following uses: miniature golf, video arcade, bumper boats, go-carts, and golf driving ranges. [Combines ITE use codes 435 Multi -Purpose Recreational Facility and 495 Recreational Community Center.] 520 Elementary School Elementary schools typically serve students attending kindergarten through the fifth or sixth grade. This use category consists of public schools where bus service is usually provided to students living beyond a specified distance from the school. 522 Middle School / Junior High School Middle schools or junior high schools serve students who have completed elementary school and have not yet entered high school. Page A-8 City of Eugene SDC Methodologies, Appendix A 530 High School High schools serve students who have completed middle school or junior high school. Land use category includes both public and private high schools. 536 Private School (K-12) Private schools in this category serve students attending kindergarten through the twelfth grade. Students may travel a long distance to get to private schools. 540 Junior/Community College This use category includes two-year junior colleges, technical schools, or community colleges. Some include sizable evening programs. 550 University/College This use category includes undergraduate universities or colleges that may offer graduate programs. 560 Worship Facilities This type of facility is a building in which public worship services of any religious or spiritual practice are held. It may also house an assembly hall or sanctuary; meeting rooms; classrooms; and, occasionally, dining, catering, or party facilities. [Combines ITE use codes 560 Church, 561 Synagogue, and 562 Mosque.] 565A Child Day Care Center A child day care center is a facility where care for pre-school age children is provided, normally during the daytime hours. Day care facilities generally include classrooms, offices, eating areas, and playgrounds. Some centers also provide after-school care for children. 5656 Adult Day Care Center An adult day care center is a facility where care for older teens and adults is provided, normally during the daytime hours. Adult day care facilities generally include classrooms and social activity rooms, offices, and eating areas. 566 Cemetery A cemetery is a place for burying the deceased, possibly including buildings used for funeral services, a mausoleum, and/or a crematorium. 590 Library A library can be either a public or private facility that consists of shelved books, reading rooms or areas, and sometimes meeting rooms. 591 Lodge / Fraternal Organization A lodge or fraternal organization typically includes a clubhouse with dining and drinking facilities, recreational and entertainment areas, and meeting rooms. 610 Hospital A hospital is any institution where medical or surgical care and overnight accommodations are provided to non-ambulatory and ambulatory patients. The term "hospital' does not, however, refer to stand-alone medical clinics (facilities that provide diagnoses and outpatient care only) or to nursing homes (facilities devoted to the care of persons unable to care forthemselves). Hospital campuses may include outpatient services, medical office buildings/uses, diagnostic imaging, and/or pharmacies. Page A-9 City of Eugene SDC Methodologies, Appendix A 640 Animal Hospital / Veterinary Clinic An animal hospital or veterinary clinic is a facility that specializes in the medical care and treatment of animals. 710 General Office Building This use category provides for flexible tenant space and lends itself to a variety of business, commercial, and/or service activities uses, including subdivision or planned unit developments, containing general office buildings and support services. Uses may include offices, retail and wholesale stores, restaurants, recreational area, warehousing, manufacturing, industrial, scientific research functions, financial institutions, service stations. [Combines ITE use codes 710 General Office Building, 714 Corporate Headquarters Building, 715 Single Tenant Office Building, 730 Government Office Building, 733 Government Office Complex, and 750 Office Park.] 720 Medical -Dental Office A medical -dental office building is a facility that provides diagnoses and outpatient care on a routine basis but is unable to provide prolonged in-house medical and surgical care. This type of facility is generally operated by one or more private physicians or dentists. Medical office/clinic uses contained within a hospital campus are assessed under 610 Hospital use code. [Combines ITE use codes 720 Medical -Dental Office and 630 Clinic]. 731 Department of Motor Vehicles A state motor vehicles department is an office -type building where driver license testing, vehicle registration, and other related functions are administered. 760 Research and Development Center Research and development centers are facilities or groups of facilities devoted almost exclusively to the investigative activities to improve existing products and procedures or to lead to the development of new products and procedures. Research and development centers may contain offices and light fabrication areas. 770 Business Park Business parks consist of a group of flex -type or incubator one- or two-storey buildings served by a common roadway system. The tenant space is flexible and lends itself to a variety of uses. Tenant spaces may be served by a garage door. Spaces may include offices, retail and wholesale stores, restaurants, warehousing, manufacturing, light industrial, scientific research functions, and/or recreational facilities. 811 Construction Equipment Rental Store A construction equipment rental store is a business that specializes in the rental of construction - related equipment tools and supplies including, but not limited to, electrical and industrial tools, lawn and garden equipment, earthmoving equipment, and safety equipment. 812 Building Materials and Lumber Store A building materials and lumber store is a small freestanding building that sells hardware, building materials, and lumber. The lumber may be stored in the main building or in a yard storage shed. The storage areas are not included in the total gross floor areas. 813 Free -Standing Discount Superstore Free-standing discount stores and superstores offer a variety of customer services, centralized cashiering, and a wide range of products; some also include grocery. They often maintain long store hours, seven days a week. (Combines ITE use codes 813 Free -Standing Discount Superstore and 815 Free -Standing Page A-10 City of Eugene SDC Methodologies, Appendix A Discount Store.] 814 Variety/Dollar Store A variety/dollar store is a retail store that sells a broad range of inexpensive items, often at a single price. Items sold typically include kitchen, cleaning, office, and household supplies. 816 Hardware/Paint Store These stores typically sell home improvement supplies such as home-building materials, small tools, keys, locks, plumbing supplies, electrical supplies, cleaning products, housewares, paint, and lawn and garden products directly to consumers for use at home or for business. 817 Nursery (Garden Center) A nursery or garden center is a freestanding building with an outside storage area for planting or landscape stock. Some have large greenhouses and offer landscaping services. Most have office storage, and shipping facilities. Outdoor storage areas are not included in the size for purposes of assessing the SDC. (Combines ITE use codes 817 Nursery (Garden Center) and 818 Nursery (Wholesale).] 820 Shopping Center A shopping center is an integrated group of commercial/retail stores that are planned, developed, owned and managed as a unit. In addition to a variety of store types, a shopping center may contain non -merchandising facilities, such as office buildings, movie theaters, restaurants, post offices, banks, health clubs, and recreational facilities (e.g. ice skating rinks, indoor miniature golf). A shopping center also provides on-site parking facilities sufficient to serve its own parking demands. In addition to the integrated unit of stores and commercial areas, a shopping center may include out -parcels (peripheral buildings or pads located on the perimeter of the center adjacent to the streets and major access points). 823 Factory Outlet Center A factory outlet center is a shopping center that primarily houses stores that sell factory -made goods directly to consumers for less than current retail prices. 826 Specialty Retail Center and Other Specialty retail centers are generally small strip shopping centers that contain a variety of retail shops and specialize in quality apparel, hard goods, and services such as real estate offices, dance studios, florists, and small restaurants. This use category also includes miscellaneous retail and services that may not fit into other available use categories, as determined by staff. A specialty retail center is typically oriented along and parallel to the adjacent street. 841 Automobile Sales In addition to automobile sales, these dealerships often include areas for servicing, parts sales, offices, and used car sales. [Combines ITE use codes 841 Automobile Sales and 842 Recreational Vehicle Sales.] 843 Automobile Parts Sales These facilities specialize in the sale of automobile parts for do-it-yourself maintenance and repair. Items sold include items such as spark plugs, distributor caps, and batteries. These facilities are not equipped for on-site vehicle repair or automobile sales/service. 848 Tire Store These stores primarily specialize in the sale, installation and repair of tires. Some stores also include other automotive maintenance or repair services and customer assistance. These stores generally do not contain large storage or warehouse areas. Page A-11 City of Eugene SDC Methodologies, Appendix A 850 Supermarket Supermarkets are typically freestanding retail stores selling a complete assortment of food (sometimes in bulk), food preparation and wrapping materials, and household cleaning and servicing items. They may also contain facilities such as money machines, photo center, pharmacies, and video rental areas. [Combines ITE use codes 850 supermarket and 854 discount supermarket.] 851 Convenience Market (Open 24 Hours) The convenience markets in this classification are open 24 hours per day. These markets typically sell convenience foods, newspapers, magazines, and often, beer and wine; and they do not have gasoline pumps. 852 Convenience Market (Open —15 - 16 Hours) The convenience markets in this classification are open 15 to 16 hours per day. These markets sell convenience foods, newspapers, magazines, and often, beer and wine; and they do not have gasoline pumps. 854 Discount Supermarket Discount supermarkets are free-standing retail stores selling a complete assortment of food (often in bulk) and food preparation materials, and household cleaning and servicing items at discount prices. 857 Discount Club A discount club is discount store or warehouse where shoppers pay a membership fee in order to take advantage of discounted prices on a wide variety of items such as food, clothing, tires, and appliances. Many items may be sold in large quantities or bulk. Some sites may include on-site fueling pumps. 862 Home Improvement Superstore Home improvement superstores are freestanding warehouse -type facilities that typically provide a variety of construction, tools, supplies, and landscaping materials associated with home construction, remodeling and upgrades. Some of the sites also include garden centers/nursery facilities. The outside storage areas/garden areas are not included in the determination of the SDCs. They typically maintain long store hours seven days a week. 863 Electronics Superstore Electronic superstores are large, freestanding facilities that specialize in the sale of home and vehicle electronic merchandise. They typically maintain store hours seven days a week. Major home appliances may also be sold at these facilities. 864 Toy/Children's Superstore These stores are large, freestanding warehouse type facilities offering a variety of baby and child - oriented supplies, toys, clothing, and home -related goods. 875 Department Store Department stores are free-standing facilities offering a variety of products, including apparel, footwear, home products, bedding and linens, luggage, jewelry, and accessories. These stores typically maintain long hours of operation, seven days a week. 876 Apparel Store An apparel store is an individual store specializing in the sale of clothing. Page A-12 City of Eugene SDC Methodologies, Appendix A 879 Arts and Crafts Store Arts and crafts stores are free-standing facilities that sell art, framing, decor, and seasonal merchandise. These stores may also provide in-store arts and crafts classes. 880 Pharmacy/Drugstore without Drive -Through Window Pharmacies/drugstores are retail facilities that primarily sell prescription and non-prescription drugs. These facilities may also sell cosmetics, toiletries, medications, stationary, personal care products, limited food products, and general merchandise. These drugstores do not have drive - up windows. 881 Pharmacy/Drugstore with Drive -Through Window Pharmacies/drugstores are retail facilities that primarily sell prescription and non-prescription drugs. These facilities may also sell cosmetics, toiletries, medications, stationary, personal care products, limited food products, and general merchandise. These drugstores have drive -up windows. 890 Furniture Store These stores often include large show -rooms, featuring home furnishings, carpeting, and both pre -assembled as ordered furniture. Both customer pick-up and delivery options are often provided. These stores often also have large storage areas, which are included in the calculation of size for assessing the SDC. 911 Walk -In Bank Walk-in banks are generally free-standing buildings without drive-in windows for customer service. They often provide walk-up ATMs. 912 Drive -In Bank Drive-in banks provide facilities for motorists to conduct financial transactions (often including ATM access) while in a vehicle. Many also provide services for walk-in patrons within the building. 918 Hair Salon Hair salons are facilities that specialize in cosmetic and beauty services, including hair cutting and styling, skin and nail care, and massage therapy. Hair salons may also contain spa facilities. 931 Quality Restaurant Quality restaurants are full-service eating establishments with a typical duration of stay of at least one hour. Quality restaurants generally do not serve breakfast; some do serve lunch; all serve dinner. This type of restaurant is generally not part of a chain, reservations are often required, and patrons are served by a waiter/waitress. Some also contain bar/lounge facilities that support the restaurant. 932 Higher Turnover Restaurant, Including Tavern/Bar A higher turnover restaurant consists of sit-down eating establishments that generally serve lunch and dinner, may also be open for breakfast, and are sometimes open 24 -hours per day. These restaurants typically do not offer reservations; rather patrons wait to be seated. Turnover rates are usually one hour or less. Some facilities contained within this land use may also operate as a tavern, brewpub, or bar and serve alcoholic drinks. [Combines /TE use codes 925 Drinking Place and 932 High -Turnover (Sit -Down) Restaurant] Page A-13 City of Eugene SDC Methodologies, Appendix A 934 Fast Food Restaurant with or without Drive -Through This use code includes both restaurants with drive-through windows and those without. These restaurants are characterized by long hours of service (some are open for breakfast, all are open for lunch and dinner, some are open late or 24 hours) and high turnover rates for eat -in customers. [Combines ITE use codes 933 Fast -Food Restaurant without Drive -Through Window and 934 Fast -Food Restaurant with Drive -Through Window.] 937 Coffee/Donut Shop and Coffee/Donut Drive -Through Establishment This use code includes single -tenant facilities serving coffee, beverages, pastries, sandwiches, and a variety of food/snack items and other small, miscellaneous products. This category includes shops with and shops without drive-through windows, as well as those with and those without indoor seating. [Combine 1 TE use codes 936 Coffee/Donut Shop without Drive -Through Window, 937 Coffee/Donut Shop with Drive -Through Window, and 938 Coffee/Donut Shop with Drive -Through Window and No Indoor Seating.] 941 Quick Lubrication Vehicle Stop These facilities primarily perform oil change services for vehicles. Other ancillary services provided may include preventative maintenance, such as fluid and filter changes. Automobile repair service is generally not provided. 942 Auto Care Center An automobile care center houses numerous facilities (that may or may not be under common ownership) that provide a variety of automobile -related services, such as repair and servicing, stereo installation, and seat cover upholstering. 944 Gasoline/Service Station The primary activity for these stations is for the fueling of motor vehicles; some facilities may have ancillary servicing and/or repair services. This use includes service stations without convenience stores. For purposes of assessing the SDC, the vehicle fueling position is defined as the maximum number of vehicles that can be fueled simultaneously. 945 Gasoline/Service Station with Convenience Market with or without Car Wash The primary activity for these stations is for the fueling of motor vehicles and provision of small food items, beverages and other ancillary convenience -oriented goods. Some facilities may have ancillary servicing and/or repair services. These facilities may include car washes. For purposes of assessing the SDC, the vehicle fueling position is defined as the maximum number of vehicles that can be fueled simultaneously. [Combines ITE use codes 945 Gasoline/Service Station with Convenience Market and 946 Gasoline/Service Station with Convenience Market and Car Wash] 947 Self -Service Car Wash Self-service car washes are stand-alone facilities, not co -located with gasoline/service stations, that allow for the manual cleaning of vehicles by providing stalls for the driver to park and wash the vehicle. 948 Automated Car Wash Automated car washes are stand-alone facilities, not co -located with gasoline/service stations, that allow for the mechanical cleaning of the exterior of vehicles. Manual cleaning and detailing services may also be available. Page A-14 City of Eugene SDC Methodologies, Appendix A 950 Truck Stop Truck stops are facilities that provide refueling, food, and other services to motorists and truck drivers. These facilities typically contain convenience stores, showers, restaurants, and on-site truck parking spaces. Page A-15 City of Eugene SDC Methodologies, Appendix A Table A-1 Cross -References for Wastewater & Parks SDCs Based Upon HUD BPR* Use Code Descriptions * Bureau of Public Records, Housing and Urban Development Eugene Wastewater SDC Use Code Eugene Park SDC Use Code HUD BPR Land Use Codes Land Use Description 1F SFD 1111 Single Family Housing 1F SFD 1119 Common or Open Area - Typically In Single Family Area 1F Duplex 1120 Two Family Housing Unit -Duplex 1F Duplex 1129 Common or Open Area - Typically In Duplex Structure Area 11 Multifamily 1130 Apartment Under Construction 11 Multifamily 1131 Quad 11 Multifamily 1132 Apartment With 1 To 4 Units 11 Multifamily 1133 Apartment With 5 To 19 Units 11 Multifamily 1134 Apartment With 20 Units or More 11 Multifamily 1139 Common or Open Area - Typically In Multi -Unit Structure Area 1F MH 1150 Mobile Home - Not In Mobile Home Park 1F MH 1151 Mobile Home - Temporary 1F MH 1159 Common or Open Area - Typically In Mobile Home Area 1F MH 1160 Houseboat -Separate 12C per Person 1210 Boarding & Rooming Houses 12C per Person 1221 Fraternity & Sorority Houses 12C per Person 1231 Nurses Home 12C per Person 1232 College Dormitory 12C per Person 1239 Other Residence Halls or Dormitories 12A, B, or C per Person 1241 Retirement Home 12C per Person 1251 Convents 12C per Person 1252 Monasteries 12C per Person 1253 Rectories 12C per Person 1259 Religious Quarters 12C per Person 1290 Group Quarters (Military, Forest Service) 13 per Rm/Multi 1300 Residential Hotel or Motel With 75% or More Permanently Occupied 14 MH 1400 Mobile Home Park or Court 15 A 1510 Hotels, Motels, Lodges, Cabins, Resorts 15 MH 1520 Mobile Home, Temporary Weekly Lodging 15 per Person 1590 Other Transient Lodgings (YMCA or YWCA) 15 MH 1900 IMoorages, Houseboat, Commercial 15 SFD 1910 ISeasonally Occupied Family Quarters 21 C 2111 Meat Packing Establishments or Slaughtering Plants 21 C 2113 Poultry & Small Game Dressing & Packing 21 C 2120 Creamery Multi -Dairy Products 21 C 2121 Butter, Creamery & Whey/ Mfg 21 C 2122 Cheese Natural& Processed 21 C 2123 Condensed & Evaporated Milk/ Mfg 21 C 2124 Ice Cream & Frozen Desserts/ Mfg 21 C 2125 Milk Processing & Distribution 21 C 2131 ICanning & Preserving Of Seafoods/ Mfg 21 C 2132 Canning Specialty Foods 21 C 2133 Canning Fruits, Vegetables, Preserves/ Mfg 21 C 2134 Drying & Dehydrating Fruits & Vegetables / Mfg 21 C 2135 Pickling Of Fruits & Vegetables 21 C 2137 Frozen Food Processing (Fruits, Vegetables, Specialties) / Mfg 21 C 2140 Grain Mill Products (Prepared, Concentrated, Supplemented Feeds) 21 C 2150 Bakery Products/ Mfg Page A-19 City of Eugene SDC Methodologies, Appendix A 21 C 2171 Candy & Other Confectionery Products / Mfg 21 C 2185 Beverages, Nonalcoholic, Bottled or Canned / Mfg 21 C 2195 Roasting Coffee & Coffee Products / Mfg 21 C 2190 Other Food Preparations & Kindred Products/ Mfg 2X C 2220 Knit Goods/ Mfg 2X C 2330 Women's, Misses, Girl's, Children's, Infant's Outerwear/ Mfg 2X C 2361 Leather Tanning & Finishing / Mfg 2X C 2369 Other Leather Products/ Mfg 2X C 2392 House Furnishings (Except Curtains & Draperies) / Mfg 2X C 2393 Textile Bags/ Mfg 2X C 2394 Canvas Products / Mfg 2X C 2395 Pleating, Tucking, Decorative & Novelty Stitching For Trade 24 C 2400 Lumber & Paper Co. -Multi -Products 66 C 2410 Logging Camps & Logging Contractors 24 C 2421 Sawmills & Planning Mills, General / Mfg 24 C 2422 Hardwood Dimension & Flooring / Mfg 24 C 2429 Special Sawmill Products (Shingles, Hoops, Staves) / Mfg 24 C 2431 Millwork/ Mfg 24 C 2432 Veneer & Plywood / Mfg 24 C 2433 Prefabricated Wooden Buildings & Structural Members / Mfg 24 C 2440 Wooden Containers/ Mfg 24 C 2491 Wood Preserving 24 C 2499 Other Lumber & Wood Products (Except Furniture) / Mfg 2X C 2510 Household Furniture/ Mfg 2X C 2520 lOffice Furniture/ Mfg 2X C 2540 Partitions, Shelving, Lockers & Store Fixtures/ Mfg 2X C 2599 Other Furniture & Fixtures (Cabinets, Carts, Stools) / Mfg 2X C 2620 Paper/ Mfg 2X C 2642 Envelopes, Printed or Unprinted, Paper, Glassine, Cello / Mfg 2X C 2646 Pressed & Molded Pulp Goods / Mfg 2X C 2647 Sanitary Paper Products/ Mfg 2X C 2649 Other Converted Paper & Paper Products (Except Containers)/Mfg 2X C 2650 Paperboard Containers & Boxes / Mfg 2X C 2660 Building Paper & Building Board (Fiber, Siding, Felt) / Mfg 2X C 2710 Newspapers, Publishing & Printing or Publishing Only/ Mfg 2X C 2720 Periodicals, Publishing & Printing or Publishing Only/ Mfg 2X C 2730 Books, Publishing & Printing, or Publishing Only/ Mfg 2X C 2740 Commercial Printing / Mfg 2X C 2750 Business Forms, Manifold / Mfg 2X C 2760 Cards, Greeting, Except Hand Painted / Mfg 2X C 2781 Typesetting For The Printing Trade 2X C 2789 10ther Printing Trade Service Industries (Decals) 2X C 2790 Other Printing & Publishing (Maps, Directories) / Mfg 3X C 2810 Industrial Inorganic & Organic Chemicals/ Mfg 3X C 2820 Plastics, Synthetic Resins, Rubbers & Other Manmade Fibers / Mfg 3X C 2860 Gum & Wood Chemicals/ Mfg 3X C 2850 Paints, Varnishes, Lacquers, Enamels & Allied Products / Mfg 3X C 2870 Agricultural Chemicals (Fertilizers, Herbicides) / Mfg 3X C 2899 Other Chemicals & Allied Products / Mfg 3X C 3140 Miscellaneous Plastic Products/ Mfg 3X C 3190 Other Fabricated Rubber Products / Mfg 3X C 3200 Stone, Clay & Glass Products / Mfg 3X C 3229 Other Glass & Glassware Products (Pressed or Blown) / Mfg 3X C 3230 Cement, Hydraulic, Portland, Natural, Masonry, Puzzolan / Mfg 3X C 3249 Structural Clay Products/ Mfg 3X C 3259 Pottery & Related Products/ Mfg 3X C 3261 Blocks, Concrete & Cinder / Mfg {0024 ff '& Eugene SDC Methodologies, Appendix A Page A-20 3X C 3262 Concrete Products (Excluding Brick & Block) / Mfg 3X C 3263 Concrete (Ready Mixed)/ Mfg 3X C 3270 Cut Stone Products For Building, Ornamental, Paving, / Mfg 3X C 3280 Abrasive, Asbestos & Misc. Nonmetallic Mineral Products / Mfg 3X C 3311 Blast Furnace, Steel Works & Rolling / Mfg 3X C 3320 Iron & Steel Foundries/ Mfg 3X C 3360 Nonferrous Foundries (Aluminum, Bronze, Copper, Brass) / Mfg 3X C 3390 Other Primary Metal Industries / Mfg 3X C 3421 Engines & Turbines / Mfg 3X C 3423 Construction, Mining & Materials Handling Machinery & Equipment / Mfg 3X C 3424 Metalworking Machinery & Equipment/ Mfg 3X C 3425 Special Industry Machinery (Sawmill Machinery) / Mfg 3X C 3426 General Industrial Machinery& Equipment/ Mfg 3X C 3429 Other Machinery Manufacturing (Pistons, Valves) 3X C 3433 Household Electrical Appliances / Mfg 3X C 3435 Radio & Television Receiving Sets / Mfg 3X C 3437 Electronic Components & Accessories / Mfg 3X C 3439 Other Electrical Machinery, Equip. & Supplies Manufacturing 3X C 3441 Motor Vehicles & Equipment / Mfg 3X C 3443 Ship & Boat Building 3X C 3449 Other Transportation Equip. (Campers, Trailers) / Mfg 3X C 3491 Metal Cans / Mfg 3X C 3492 Cutlery, H& Tools & Hardware / Mfg 3X C 3493 Heating Apparatus & Plumbing Fixtures/ Mfg 3X C 3494 Fabricated Structural Metal Products (Awnings, Boilers) / Mfg 3X C 3496 Metal Stamping / Mfg 3X C 3497 Coating, Engraving & Allied Services 3X C 3498 Fabricated Wire Products (Misc.) / Mfg 3X C 3499 Other Fabricated Metal Products (Irrigation Equipment, Industrial Patterns). 3X C 3521 Mechanical Measuring & Controlling Instruments/ Mfg 3X C 3542 Orthopedic, Prosthetic & Surgical Appliances & Supplies / Mfg 3X C 3913 Lapidary Work, Contract & Other Stone Polishing 3X C 3930 IToys, Amusement, Sporting & Athletic Goods / Mfg 3X C 3950 Costume Jewelry, Novelties, Buttons & Misc. Notions/ Mfg 3X C 3997 Signs & Advertising Displays / Mfg 3X C 3999 Other Miscellaneous Manufacturing 4111 Railroad Right -of -Way 4112 Railroad Switching & Marshaling Yard 4X C 4113 Railroad Terminals, Passenger 4X C 4114 Railroad Terminals, Freight 4X C 4115 Railroad Terminals, Passenger & Freight 4X C 4116 lRailroad Equipment & Maintenance 4X C 4119 10ther Railroad Transportation 4X C 4211 Terminal, Bus Passenger, Intercity 4X C 4214 Maintenance Facilities For Passenger Bus Vehicles 4X 4219 Bus Stops 4X C 4221 Freight Trucking Terminals, With or Without Maintenance Facility 4X C 4222 Motor Freight Garaging & Maintenance Facility 4X E 4223 Moving & Storage, Household 4X C 4229 Other Motor Freight Transportation 4X C 4291 Taxicab Transportation 4X C 4311 Airport & Flying Field Landing/Takeoff Fields 4X C 4312 Airport & Flying Field Terminals (Passenger) 4X C 4313 Airport & Flying Field Terminals (Freight) 4X C 4314 Airport & Flying Field Terminals (Passenger & Freight) 4X C 4315 Aircraft Storage & Equipment Maintenance 4X C 4319 Other Airports & Flying Fields Necessary {OdffVbF}Eugene SDC Methodologies, Appendix A Page A-21 4X C 4391 HeliportLanding(Takeoff Pads 4X C 4399 Other Aircraft Transportation 4500 Highway & Street Rights -of -Way 4508 Bridges - Railroad, Vehicular or Pedestrian 4510 Freeways, (i.e., Routes With No At -Grade Intersections) 4520 Expressways, (i.e. Routes With Grade Intersect Only At Major Streets) 4550 Collector/Distributor Streets 4570 Alleys, Public 4571 Bicycle Path 4575 Pedestrian Walkway, Stairway, Etc. 4580 Rights -Of -Way, Roads -Proposed Roadway 4590 Private Roads 4599 Other Rights -of -Way Related 4X 4600 Automobile Parking (Non-Structure/Retail) 4X 4601 Automobile Parking (Non-Structure/Service) 4X 4602 Automobile Parking (Non-Structure/Government) 4X 4603 Automobile Parking (Non-Structure/Education) 4X 4604 Automobile Parking (Non-Structure/Transportation) 4X 4605 Automobile Parking (Non-Structure/Recreation) 4X 4606 Automobile Parking (Non-Structure/Industrial) 4X 4607 Automobile Parking (Non-Structure/Utility) 4X 4608 Automobile Parking (Non-Structure/Religious) 4X 4610 Automobile Parking (Structure/Retail) 4X 4611 jAutomobile Parking (Structure/Service) 4X 4612 Automobile Parking (Structure/Government) 4X 4613 Automobile Parking (Structure/Education) 4X 4614 Automobile Parking (Structure(fransportation) 4X 4615 Automobile Parking (Structure/Recreation) 4X 4616 Automobile Parking (Structure/Industrial) 4X C 4711 Telephone Exchange Stations 4X C 4719 Telephone Equipment Repair & Servicing 4X D 4721 Radio Telegraph Message Center 4X D 4731 Radio Broadcasting Studios, Commercial & Public Educational 4X D 4732 Radio Broadcasting Transmitters & Towers, Commercial & Public Education 4X D 4739 Other Radio Communication 4X D 4741 Television Broadcasting Studio, Commercial & Public Educational 4X D 4742 Television Transmitters & Towers, Commercial & Public Educational 4X D 4749 Other Television Communication 4X D 4759 Radio & Television Transmitter, Combined, Commercial or Public Education 4X C 4810 1 Electric & Power Companies 4811 jElectric Transmission Right -of -Way 4X C 4812 Electric Generation Plant 4X C 4813 Electricity Regulating Substations 4X C 4819 Other Electric Utility 4X C 4823 Gas Storage Tanks & Distribution Facilities, Mfg or Natural 4X C 4824 Gas Pressure Control Stations 4831 Water Pipeline Right -of -Way (EWEB Canal) 4X C 4832 Water, Domestic Supply, Treatment Plant 4X C 4833 Water Storage (Flood Control Dam, Water Tower) 4X C 4835 jPumping Station, Domestic Water 4X C 4839 Water, Domestic Supply, Aqueduct 4X C 4841 Sewage Treatment Plant 4X C 4842 Sewage Sludge Drying Beds 4X C 4843 Sewage Pressure Control Station 4X C 4852 Garbage Grinding Station, Central 4X C 4853 Composting Plants 4X C 4854 Sanitary Land Fill {0dNVb'f Eugene SDC Methodologies, Appendix A Page A-22 4X C 4855 Refuse Disposal, Except Industrial Wastes 4X C 4856 Industrial Waste Disposal 4X C 4859 Other Solid Waste Disposal 4911 Petroleum Pipeline Right Of Way 4X D 4921 Freight Forwarding Service 4X D 4922 Crating & Packing Service 4X D 4923 Travel Arranging Services (Information, Freight Agencies) 4X D 4924 Transportation Ticket Services (Travel Agency, Ticket Office) 4X D 4990 Other Transportation, Communication & Utilities 51 C 5111 Automobiles & Other Motor Vehicles / Whsle 51 C 5112 Automotive Equipment/ Whsle 51 C 5113 Tires & Tubes / Whsle 51 C 5121 Drugs, Drug Proprietaries & Druggist's Sundries / Whsle 51 C 5122 Paints & Varnishes (Shellac, Lacquers, Enamels) / Whsle 51 C 5129 Other Drugs, Chemicals & Allied Products / Whsle 51 C 5131 Dry Goods, Piece Goods & Notions / Whsle 51 C 5132 Apparel & Accessories, Hosiery & Lingerie / Whsle 51 C 5133 Footwear / Whsle 51 C 5141 Groceries, General Line / Whsle 51 C 5142 Dairy Products/ Whsle 51 C 5143 Poultry Products / Whsle 51 C 5144 Confectionery / Whsle 51 C 5145 Fish, Fresh / Whsle 51 C 5146 Meat & Meat Products / Whsle 51 C 5147 Fruits & Vegetables / Whsle 51 C 5149 Other Groceries & Related Products / Whsle 51 C 5151 Cotton, Raw/ Whsle 51 C 5152 Grain / Whsle 51 C 5153 Hides, Skins & Pelts / Whsle 51 C 5154 Exporters Of Leaf Tobacco 51 C 5155 Wool, Raw/ Whsle 51 C 5156 Livestock/ Whsle 51 C 5157 Horses / Whsle 51 C 5159 Farm Products, Raw (Except Cotton, Grain or Livestock) / Whsle 51 C 5161 Electrical Apparatus & Equipment, Wiring Supplies & Construction Equipment 51 C 5162 Electrical Appliances, TV & Radio Sets / Whsle 51 C 5163 Electronic Parts & Equipment/ Whsle 51 C 5171 Hardware / Whsle 51 C 5172 Plumbing & Heating Equipment & Supplies / Whsle 51 C 5173 Air Conditioning, Refrigerated Equipment & Supplies / Whsle 51 C 5181 Commercial & Industrial Machinery, Equipment & SuppliesNVhsle 51 C 5182 Farm Machinery & Equipment/ Whsle 51 C 5183 Professional Equipment& Supplies/ Whsle 51 C 5184 Equipment & Supplies For Service Establishments / Whsle 51 C 5185 Transportation Equipment & Supplies (Except Motor Vehicles)NVhsle 51 C 5189 Other Machinery, Equipment & Supplies / Whsle 51 C 5191 Metals & Minerals (Except Petroleum Products & Scrap) / Whsle 51 C 5192 Petroleum Bulk Stations & Terminals / Whsle 51 C 5193 Scrap & Waste Materials / Whsle 51 C 5194 Tobacco & Tobacco Products / Whsle 51 C 5195 Beer, Wine & Distilled Alcoholic Beverages / Whsle 51 C 5196 Paper & Paper Products/ Whsle 51 C 5197 Furniture & Home Furnishings / Whsle 51 C 5198 Lumber & Construction Materials / Whsle 51 C 5199 Other Wholesale Trade 5X D 5211 Lumber Yards/ Ret 5X D 1 5212 IBuilding Materials / Ret {0dRybYEugene SDC Methodologies, Appendix A Page A-23 5X D 5220 Plumbing & Heating Equipment/ Ret 5X D 5230 Paint, Glass& Wallpaper/ Ret 5X D 5240 Electrical Supplies/ Ret 5X D 5251 Hardware Stores/ Ret 5X D 5252 Farm Equipment/ Ret 5X D 5310 Department Stores/ Ret 5X D 5320 Mail Order Houses / Ret 5X D 5330 Limited Price Variety Stores / Ret 5X D 5340 Merchandise Vending Machine Operators / Ret 5X D 5350 Selling Organizations, Direct, Headquarters of Door -To -Door 5X D 5391 Dry Goods & General Merchandise / Ret 5X D 5392 General Stores / Ret 54 B 5410 Grocery Stores, With or Without Fresh Meat / Ret 54 D 5421 Meat Markets / Ret 54 D 5422 Sea Food Markets / Ret 54 D 5430 Fruit & Vegetable Stands / Ret 54 D 5440 Candy, Nut & Confectionery / Ret 54 D 5450 Dairy Products Stores / Ret 54 C 5461 Retail Bakeries / Mfg 54 D 5462 Bakeries, Nonmfg, Retail 54 D 5491 Egg & Poultry Dealers / Ret 54 D 5499 Other Retail Trade - Food 55 D 5511 New & Used Cars & Trucks/ Ret 55 D 5512 Automobiles, Used Cars & Trucks Only / Ret 55 D 5520 Tires, Batteries & Accessories / Ret 55 D 5530 Automobile Service Stations, With or Without Minor Repair Service 55 D 5591 Marine Craft & Accessories / Ret 55 D 5592 Aircraft Dealers / Ret 55 D 5599 Other Retail Trade - Auto trailers, Mobile Homes, Motorcycles 5X D 5610 Clothing Stores, Men's & Boy's / Ret 5X D 5620 Clothing Stores, Women's Ready To Wear / Ret 5X D 5630 Women's Accessories & Specialties / Ret 5X D 5640 Children's & Infant's Wear/ Ret 5X D 5650 Family Clothing Stores / Ret 5X D 5660 Shoe Stores, Family, Men's, Women's or Children's / Ret 5X D 5670 Custom Tailors / Ret 5X D 5680 Furriers/Retail 5X D 5690 Other Retail Trade --Apparel & Accessories 5X D 5711 Furniture / Ret 5X D 5712 Floor Covering Stores / Ret 5X D 5713 Draperies, Curtains & Upholstery / Ret 5X D 5714 China, Glassware & Metalware Stores / Ret 5X D 5719 Other Furniture, Home Furnishings & Equipment/ Ret 5X D 5720 Household Appliances/ Ret 5X D 5731 Radios, TV's, Stereos/ Ret 5X D 5732 Music Supplies / Ret 5X D 5733 Calculators, Computers & Other Office Machines / Ret 5A/B/C B 5810 Eating Places (Food & Both Food & Alcoholic Beverages) 5D B 5820 Bars, Drinking Establishments 59 D 5910 Drug & Proprietary / Ret 59 D 5920 Liquor, Wine & Beer (Packaged) / Ret 59 D 5931 Antique Stores/ Ret 59 D 5932 Secondhand Merchandise / Ret 59 D 5941 Book Stores, New/ Ret 59 D 5942 Stationery Stores / Ret 59 D 1 5951 ISporting Goods/ Ret 59 D 1 5952 1 Bicycle & Bicycle Parts Dealers / Ret {0dRybYEugene SDC Methodologies, Appendix A Page A-24 59 D 5961 Feed Grain & Hay Stores / Ret 59 D 5969 Other Farm & Garden Supplies (Nurseries) / Ret 59 D 5970 Jewelry, Precious & Precious Metals, Including Custom Made/Ret 59 D 5981 Fuel Dealers, Coal, Wood, Ice / Ret 59 D 5982 Fuel Oil Dealers / Ret 59 D 5983 Bottled Gas / Ret 59 D 5991 Florists / Retail 59 D 5992 Cigars & Cigarettes/ Ret 59 D 5993 1 Magazines & Newspapers / Ret 59 D 5994 ICamera Shops & Photographic Supply Stores / Ret 59 D 5995 Gift, Novelty & Souvenir Shops (Ceramic Shop) / Ret 59 D 5996 Optical Goods Stores / Ret 59 D 5999 Other Retail Trade --Artist Supply, Luggage Shop, Pet Shop 61 B 6111 Banking Services 61 B 6112 Bank -Related Functions 61 B 6121 Savings & Loan Associations 61 B 6122 Agriculture, Business & Personal Credit Services (Credit Union) 61 B 6129 Other Credit Services (Loan Co.) 61 B 6131 1 Security Brokers, Dealer & Flotation Services 61 B 6132 lCommodity Contracts Brokers & Dealers Services 61 B 6133 Security & Commodity Exchange 6X B 6141 Insurance Carriers 6X B 6142 Insurance Agents, Brokers & Services 6X B 6151 Real Estate Operators (Except Developers) & Lessors 6X B 6152 Real Estate Agents, Brokers & Management Services 6X B 6153 Title & Trust Companies 6X B 6154 Real Estate Subdividing & Developing Services 6X B 6155 Real Estate Operative Builders 6X B 6159 10ther Real Estate & Related Services 6X B 6160 Holding & Investment Services 6X B 6190 Other Finance, Insurance & Real Estate Services 6A3 D 6211 Laundering, Dry Cleaning & Dyeing Services (Except Rug Cleaning) 6A1 D 6212 Linen Supply & Industrial Laundry Services 6A1 D 6213 Diaper Service 6A2 D 6214 Laundries, Self -Service 6A3 D 6215 Rug Cleaning & Repairing Plants 62 D 6220 Photographic Services (Including Commercial) 62 D 6231 Beauty Services 62 D 6232 Barber Services 62 D 6241 Funeral & Crematory Services 62 D 6242 Cemeteries 62 D 6251 Pressing & Alteration, & Clothing Repair Shops 62 D 6252 Fur Garments, Cleaning, Repairing, & Storage 62 D 6253 Shoe Repair Shops 62 D 6290 Other Personal Services 62 D 6311 Advertising Agencies 62 D 6312 Outdoor Advertising Services 62 D 6319 Other Advertising Services, NEC 62 D 6320 Collection Agencies , Accounts (Except Real Estate) 62 D 6332 Blueprinting & Photocopying Services 62 D 6339 Stenographic Services & Other Duplicating & Mailing Services 62 D 6341 Window Cleaning Services 62 D 6342 Disinfecting & Exterminating Service 62D 6349 Building Maintenance, Janitorial, & Similar Services 62 D 6350 News Syndicate Services 62 1 D 1 6360 lCommercial Employment Agencies 63 1 D 1 6371 1 Farm Product Warehousing & Storage (Barns, Livestock Shelters) {0dNVb'f Eugene SDC Methodologies, Appendix A Page A-25 63 D 6372 Stockyards (Not Exclusively For Fattening Livestock) 63 E 6373 Refrigerated Warehousing, Except Food Lockers 63 E 6374 Rental Of Cold Storage Lockers 63 E 6375 Commercial Warehousing & Storage 63 E 6379 Industrial Warehousing & Storage 62 D 6391 Research Development & Testing Services 62 D 6392 Business & Management Consulting Services 62 D 6393 Detective & Protective Services 62 D 6394 Equipment Rental & Leasing Services 62 D 6395 Photographic Laboratories, Not Manufacturing 62 D 6396 Trading Stamp Redemption Store 62 D 6397 Automobile & Truck Rental Services 62 D 6398 Motion Picture Distribution & Services 62 D 6399 Other Business Svc (Garbage Collctn, Sewer or Answering Svc) 6B D 6412 Car Wash 64 D 6411 Automobile Repair Shops, General 64 D 6419 Other Automobile Services 64 D 6491 Electric Appliance Repair (Except Radio, TV, or Refrigeration) 64 D 6492 Television & Radio Repair Services 64 D 6493 Watch, Clock & Jewelry Repair Services 64 D 6494 Re-upholstery & Furniture Repair Services 64 D 6499 Other Repair Services (Tool, Locksmith, Musical Instrument, Hydraulic) 6X B 6500 Professional Office Building 65 B 6511 Physicians Services 65 B 6512 Dental Services 65 B 6513 Hospital Services 65 B 6514 Medical Laboratory Services 65 B 6515 Dental Laboratories 65 per person 6516 Convalescent Homes, Sanitariums, Nursing Homes 65 B 6517 Medical Clinic, Out- Patient Service 65 B 6519 Other Medical & Health Services 6X B 6520 Legal Services 6X B 6591 Architectural & Engineering Services 6X B 6592 Scientific & Educational Research Services 6X B 6593 Accounting, Auditing & Bookkeeping Services 6X B 6599 Other Professional Services 66 D 6611 Building Construction--General Contractor Services 66 D 6619 Other General Construction Contractor Services 66 D 6621 Plumbing, Heating & Air Conditioning Services 66 D 6622 Painting, Paper Hanging & Decorating Services 66 D 6623 Electrical Work/ Contractors 66 D 6624 Masonry, Stonework, Tile Setting & Plastering Services 66 D 6625 Carpentry Work / Contractors 66 D 6626 Roofing & Sheet Metal Services 66 D 6627 Concrete Construction, Other Than Paving, Foundation & Excavation 66 D 6628 Water Well Drilling/ Contractors 66 D 6629 Other Special Construction Trade Services 67 B 6710 Executive, Legislative & Judicial Functions (Offices, Courts) 67 B 6719 Other Publicly Owned Property 67 B 6721 Police Protection & Related Activities 67 B 6722 Fire Stations, Community Fire Protection 67 B 6729 Other Protective Functions & Their Related Activities 67 B 6730 Post Offices & Related Facilities 67 per person 6741 Prisons, State, Federal or Other Civil Government 67 per person 6749 Other Correctional Institutions 67 B 1 6755 1 Recruiting Station, U.S. Army, U.S. Navy, etc. 67 1 B 1 6759 10ther Military Bases & Reservation {0dRybYEugene SDC Methodologies, Appendix A Page A-26 6X 6810 School District Administration Office 68 6811 Nursery Schools 68 6812 Elementary Schools 68 6813 Junior High Schools 68 6814 Senior High Schools 68 6815 Private Handicap Schools 68 B 6816 Parochial Schools 68 B 6821 Universities & Colleges 68 B 6822 Junior Colleges 68 B 6823 Theological Seminaries 68 B 6831 Vocational or Trade Schools 68 B 6832 Business & Stenographic Schools 68 B 6833 Barber & Beauty Schools 68 B 6834 Art & Music Schools 68 B 6835 Dance Studios & Schools 68 B 6836 Driving Schools 68 B 6839 Other Special Training & Schooling (Language, Modeling) 69 D 6911 Churches, Temples, Sunday School Facilities 69 D 6919 Other Religious Activities (Retreats, Camps, Diocesan Offices) 69 D 6920 Welfare & Charitable Services (Red Cross, Salvation Army) 69 D 6991 Business Associations, (Grange Halls, Trade or Farm Assn.) 69 D 6992 Professional Membership Organizations 69 D 6993 Labor Unions & Similar Labor Organizations 69 D 6994 Civic, Social & Fraternal Associations 69 D 6999 Misc. Services (Historical Clubs, City Clubs, Youth Projects) 68 D 7111 Libraries 68 D 7112 Museum, Historical Exhibit 68 D 7113 Art Galleries 68 D 7119 Other Cultural Activities 68 D 7123 Arboreta & Botanical Gardens 7X D 7212 Theater, Motion Picture, Indoor 7X D 7213 Drive -In Motion Picture Theater 7X D 7214 Theater, Legitimate Stage 7X D 7219 Other Entertainment Assembly 7X D 7221 Stadium, Football, Baseball, Track & Field or Other 7X D 7223 Race Track Operation, Horse, Dog, Automobile 7X D 7231 Auditorium 7X D 7232 Exhibition Hall 7X D 7239 Other Miscellaneous Assembly 7X D 7290 Other Public Assembly 7X D 7311 Fairground 7X D 7312 Amusement Park 7X D 7391 Penny Arcades 7X D 7393 Golf Driving Ranges 7X D 7399 Other Amusements (Pool Hall, Shooting Range) 7X D 7411 Golf Course, Without Country Club 7X D 7412 Golf Course, With Country Club 7X D 7413 Tennis Courts 7X D 7414 Ice Skating Rinks 7X D 7415 Roller Skating Rinks 7X D 7416 Riding Stable 7X D 7417 Bowling Alleys 7X D 7419 Other Sports Activities 7X D 7421 Play Lot or Tot Lot (Preschool or Elementary School -Aged Children) 7X D 7422 Playground, Equipped (Not Part of Another Facility) 7X D 7423 Play Fields or Athletic Fields 7X D 7424 1 Recreation Center, General {0dRybYEugene SDC Methodologies, Appendix A Page A-27 7X D 7425 Gymnasiums & Athletic Clubs 7X D 7429 Other Playground & Athletic Areas 7X D 7431 Swimming Beach, Designated 7X D 7432 Swimming Pool, Indoor or Covered (Not Part of Residential Use) 7X D 7442 Boat Rentals & Boat Access Sites 7X D 7449 Other Marinas 7X D 7491 Camping & Picnicking Areas 7X D 7499 Other Recreation Not Elsewhere Classified 7X D 7520 Group or Organized Camps (Girl Scout & Boy Scout, etc.) 7X D 7620 Park, Ornamental (Plaza or Monument or Traffic Circle, etc.) 7X D 7625 Park, Private Leisure 7X D 7630 Open Space, Natural Area, Wetland 7X D 7690 Other Parks 7X D 7900 Other Cultural, Entertainment & Recreational Activities C 8010 Orchards, Tree Fruit or Nut C 8020 Intensive Grain or Field Crop C 8030 jBush, Fruit, Berries C 8040 Pasture, Cows, Sheep, Cattle C 8120 Farm, Predominant Crop - Cash Grain (Wheat, Corn, etc.) C 8130 Farm, Predominant Crop - Field Crop Except Cash Grain or Fiber C 8141 Farm, Predominant Crop - Tree Fruits (Pear, Date, Lemon, etc.) C 8142 Farm, Predominant Crop -Tree Nuts C 8143 Farm, Predominant Crop - Vegetables, Ground Fruits C 8150 Farm, Predominant Product - Dairy Goods (Milk, Cheese, etc.) C 8161 Farm, Predominant Activity - Cattle Raising C 8170 Farm, Predominant Activity- Poultry Raising (Incl. Egg Products) C 8180 Farm, General, No Predominant Crop or Activity C 8192 Farm, Predominant Activity - Nursery or Flower Stock C 8194 Farm, Predominant Activity - Horse Raising C 8199 Other Agricultural & Related Activities C 8213 Grist Milling Services C 8219 Other Agricultural Processing Services 82 B 8221 Veterinarian Service 82 B 8222 Animal Hospitals & Other Veterinary Service C 8223 Poultry Hatcheries C 8229 Animal Breeding & Other Husbandry Services (Worm Hatchery) C 8310 Timberlands C 8321 Forest Nurseries C 8390 Guard Station, Game Management Area & Other Forestry Activities C 8542 Quarrying - Crushed & Broken Stone Including Riprap C 8543 Quarrying - Sand & Gravel C 8553 jCrude Petroleum & Gas Field Services C 8900 Other Resource Production & Extraction 9100 Vacant, Unused, Undeveloped Land 9101 Broadleaf Brush 9102 Stump Land, Cutover Land 9103 Sand Dunes 9220 Non -reserve Forests 9310 Rivers, Creeks, Streams 9320 Lakes, Ponds, Reservoirs 9390 11the Water Areas (Swamps) 9395 ISand Bars 9400 jUnused Building or Structure 9410 1 Vacant Shop or Office {0dRybYEugene SDC Methodologies, Appendix A Page A-28 Eugene City of Eugene System Development Charge Methodologies Appendix B Transportation System Development Charge System -Specific Methodology and Details Transportation System Development Charge Detail Transportation SDC Methodology The transportation system development charge (SDC) methodology is based on a system -wide cost per trip, where the costs associated with meeting future growth needs are divided by the projected growth in trips. The methodology includes both improvement and reimbursement SDC components. Development of the SDC includes the following basic steps: Determine growth in trips Determine growth share of system costs Calculate the system -wide costs per trip Develop SDC rate schedule These steps are discussed further below. 1.0 Growth in Trips To evaluate the roadway capacity needs and the amount of vehicle trips that are generated by growth, the regional travel demand model was utilized. Table B-1 shows the projected growth in the number of trip ends for the 2035 Transportation System Plan period, broken down by trip ends that have both an origin and destination within the City's Urban Growth Boundary (UGB) (internal - internal), and trip ends that have one end outside of the UGB (internal-external & external- internal). Like most infrastructure systems, roadway systems are designed to accommodate peak rates of use, which typically occur during the weekday afternoon period between the hours of 4 and 6 p.m. (the "PM peak"). Therefore, roadway system capacity is typically measured by trip generation during the average weekday PM peak hour. Table B-1 Model Vehicle Weekday PM Peak Hour Trip Ends (within the City's Currently Acknowledged UGB) CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-2 Internal -Internal Internal -External & External -Internal Total Existing Trip Ends 104,128 52,818 156,949 Projected Trip Ends 131,128 66,790 197,918 Growth Trip Ends 27,000 13,972 40,972 Source: Lane Council of Governments EMME travel demand model for the Eugene 2035 Transportation System Plan CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-2 2.0 Growth Share of System Costs Future development capacity needs will be met by a combination of existing system available capacity and future improvements that increase the level of performance of existing facilities, or add new facilities. The value of existing system capacity is referred to as the reimbursement fee cost basis, while the value of future growth -related improvements is referred to as the improvement fee cost basis. The development of the improvement and reimbursement cost bases are summarized below. 2.1 Reimbursement Fee Determination of the reimbursement fee cost basis includes the following steps: 1. Reserve capacity of existing roadways is determined, 2. The existing system value net of contributions is estimated, and 3. The existing system value for growth in the planning period (the reimbursement fee cost basis) is determined. 2.1.1 Existing System Reserve Capacity The LCOG EMME travel demand model was used to determine the portion of the existing roadway network that has reserve capacity for growth in the planning period. The reserve capacity of the roadway system was determined by comparing the traffic volume on each roadway to the capacity of that roadway (based on level of service E). If the future volume was less than capacity, the amount available for growth was calculated as a simple ratio of the future volume less the existing volume to the capacity of the particular roadway. If the total volume in 2035 exceeded the capacity, the amount of capacity available for growth was calculated as a ratio of the capacity less the existing daily traffic volume to the capacity. A weighted average reserve capacity was determined for each roadway classification (excluding local streets and state highway facilities). The resulting calculations are shown in Table B-2. This shows the reimbursement fee is based, in part, on the value of unused capacity available to future users. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-3 T D G) m C3 III Major Merials $5,745,499 $0 $5)45,499 $919,283 16.M$22 Maar Arterials $26,174,864 $619,230 $25,555,634 $$836,675 11.1% $69 Major Collectors $16,176,479 $3,204,075 $12,972,404 $1,193,461 9.2% $29 Neighborhood Collectors $10,433,027 $3,291,865 $7,141,162 $349,917 4.9% $9 PedesMan (On -Street) $790,772 $407,127 $383,645 $0 0.0% $0 Bike& Pedeslrlan(Off-street) $19,384,550 $0 $13,4W,409,$87 $5,9)4.962 I $0 0.0% $0 I Subtotal $28,6,957 30 $585,692 $13,SBJ $14,635,678 $0 $0 On Proof $20.556,303 $245561308 $22201081 9,8% $64 Off4ystem $15,924,100 $14,331,690 41,592,410 $156,056 9.8% $4 Subtotal $36,480,408 $0 $14,331,690 $22,148,718 $2,3]6,13) $58 Subtotal Wmbursement $123.641.235 $7700.a62 $27,741,25rJ $9$199,095 $7,675,471 $187 ')Based on replacement WW2 for presaNal (Segments obWIOEtl from other agencies) aM him construction (city constructed) excludes bike and pedestrian facility costs 2Avemge assessable cost of new roadway construction Net of assessable value and other funding 4PM Peak -bur Trip Ends through 2035'. 'City -owned 2.1.2 Existing System Valuation The Geographic Information System (GIS) was used to produce an inventory of existing arterial and collector roadways. The inventory included the necessary data to determine the replacement cost of each roadway segment, broken down into the following cost components: • Right of way • Pavement (rehabilitation and new construction costs) • Curb and gutter • Sidewalk • Bike lanes • Street lights • Traffic signals For roadways transferred to the City from other agencies, only the costs of recent reconstruction improvements are included in the system value, since the original construction was not funded by the City. Local streets are excluded from the reimbursement fee cost basis, as local streets are generally funded by developers or assessments. By excluding local street value, the reimbursement fee excludes prior contributions by existing users consistent with ORS 223.304(1)(a)(B). As for roadways, GIS data was used to develop an inventory of off-street bike and pedestrian facilities, as well as on- and off -system bridges. The current value of each facility was estimated by applying the growth in the Engineering News Record Construction Cost Index since the time of construction to the original facility cost. The existing system value for all facilities is reduced by estimated assessments and other funding sources (grants and contributions), to determine the net system value. These estimates are provided in the "Assessable Cost' and "Other Funding" columns on Table B-2. 2.1.3 Growth Share of Existing System Value (Reimbursement Fee Cost Basis) The reimbursement fee cost basis for roadways is determined by applying the existing system reserve capacity for growth within the planning period, (calculated by multiplying the net system value by the average reserve capacity for each road classification). For bridges, the growth share is assumed to be the system average reserve capacity (across all roadway classifications). The existing system value associated with active travel modes (bicycle and pedestrian facilities) is excluded from the reimbursement fee cost basis, as there is no reserve capacity. As is discussed later in Section 2.2.2.4, the planned level of service for bicycle and pedestrian facilities is higher than the existing level of service; therefore, the existing system facilities are not adequate to meet the needs of existing development (i.e., there is no reserve capacity for future growth). The reimbursement fee cost basis is provided in Table B-2. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-5 2.2 Improvement Fee The improvement fee is calculated to obtain the cost of capital improvements for the projected transportation system needs of future users. Determination of the improvement fee cost basis includes the following steps: 1. The portion of project costs related to increasing system capacity is determined. 2. New capacity costs are allocated between growth and existing development, based on the portion of each project that relates to providing capacity for growth vs. addressing an existing deficiency or future service level enhancement related to existing development. 3. Capacity costs are reduced by any external funding sources (assessments, grants, contributions by other agencies) that are projected to cover a portion of growth's new capacity costs. The improvement fee cost basis is shown in Table B-3. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-6 D M m ID v Street Protects 3118,600,000 $21,101 $93',500,000I $28,824,569 30% 326,624,569 $650 $19,800,000 Upon Development Naw Signals $8,7:50,000 $fS,7W,W0 $2,147,843 25% $2,147,843 $52 Accessible Pedestrian Signals $7,490,000 $7,490,1)00 $1,838,554 25% $1,838,554 $45 Mosler Traffic Shared Use Palhs7 $24,5:29,000 $0 $24,529,000 $24,52,000 100% $21,354,321 Bike Facilities $29,010,282 30 329,010,282 $11,634,752 40% 310,721,547 Pedestrian Facilitless $9,781,000 $0 $9,781,000 $810,000 8% $772,519 Subtotal $63,3:20,282 Wf,320,282 $36,973,752 58% $32,648,367 Subtotal lmpravemeM $341,&50,282 5331,300,000 $30Ek560,282 $152,231,146 37% $113,721,290 1 No[ OI muItimu IN c...ndo, bundb oun, v Net Of lulHulatiOd IcaOCt[0515 u Reflects appicatian of at& tundir,y on a protect-spedtic basis 4Column (g) divided by PM rank Hour Into Ends trough 2035:611.972 e Average assesm ble cost at new ma ovary comtrucllon <Reflect, estimated existing coma mosso s Z'Includes "Shored Use Earn," 'Grade Sawraled Path, "and "gdewalk Palls" Projects. e Includes "Accesswoys" Protects andl sidewalk proteins not funded wIIh SDC revenue. $46,424,569 $521 $3,174,679 424,529,000 $262 34592,661 $15,314,208 $19 48,971,000 $37,481 $9,781,000 3802 $8,971,000 $7,804,821 $49,624,208 $2,776 $92,871,000 $7,804,821 $208,078,769 2.2.1 New Capacity Costs Detailed cost estimates for each project included in the Transportation SDC Project Plan were reviewed to determine what portion of project costs related to replacement of existing capacity versus expanding existing facilities or constructing new facilities. Existing facility replacement costs included overlay or reconstruction of existing pavement, as well as replacement of existing facilities (e.g., bridges or other crossings). This shows that, in calculating the improvement fee, the City considered the projected costs of the capacity - increasing capital improvements identified on the Transportation SDC Project Plan. 2.2.2 Growth Share of Capacity Costs For purposes of determining SDC -eligibility, individual projects from the Transportation SDC Project List ("Project List") are analyzed to determine first, the portion of costs that expand or provide new capacity, versus replacing existing system capacity. Second, the new capacity costs are further analyzed to determine the portion of costs related to meeting the needs of future growth (the "growth share") versus costs associated with raising the level of service for existing development. The general methods used for determining the growth share of costs for each project on the Project List are summarized below. These methods show that, in calculating the improvement fee, the City considered the increased capacity needed to meet the demands of future transportation system users. 2.2.2.1 New Roadways New roadways and expansions driven by future development capacity requirements are allocated 100% to growth, since the capacity is needed entirely for new development. 2.2.2.2 Upgrades to Roadways and Intersections Improvements to existing facilities to address safety, modernization, and other performance considerations provide capacity for growth and enhanced performance for existing development, so the costs are allocated in proportion to the utilization of the facilities. Specifically, weekday PM peak hour travel demand data by roadway link (from the LCOG travel demand model) are used to quantify growth's utilization of future roadway and intersection capacity. The growth share is estimated based on the growth in trips over the planning period, as a percentage of total future trips for individual roadway links. If a link provides regional 'through' traffic capacity, an adjustment to the growth share is made to exclude the portion of trips that represent "through" versus local trips. 2.2.2.3 Operational Improvements Capacity enhancing improvements include new traffic signals, as well as improvements that enhance intersections performance (accessible pedestrian signals and master traffic communications plan). The growth share for these improvements is determined based on growth's share of future person trips, as estimated from the LCOG travel demand model. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-8 2.2.2.4 New Bicycle and Pedestrian Facilities (Active Modes) The growth share for bike and pedestrian facilities is determined based on the planned level of service (LOS) for each facility type. The planned LOS for purposes of this analysis is defined as the quantity of future facilities per capita served. The following equation shows the calculation of the planned LOS for bicycle and pedestrian facility analysis: Existing Q + Planned Q = PlannedLOS Future Population Served Where: Q = quantity (miles of bicycle or pedestrian facilities) The existing and future miles of bicycle and pedestrian facilities are shown in Table B-4, based on the Project List. Population data for the estimated base year and future year (2035) are presented in Table B-5. Table B4 Existing and Future Bike and PedesL-tan Facilities (miles) Table B-5 Population Growth Existing New (Project List)' Future (Total) Shared Use Path 43.3 9.5 52.8 Bicycle Facilities 160.2 121.4 281.6 Pedestrian Facility 223.2 77.4 300.6 ' Includes multimodal and stand-alone bicycle and pedestrian projects Table B-5 Population Growth Table B-6 presents the existing and planned LOS for each facility type, based on the existing and planned future facilities presented in Table B-4, divided by the estimated existing and projected population presented in Table B-5. (For purposes of this analysis, population figures are divided by 1,000 in order to show the planned LOS per 1,000 population in Table B-6.) CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-9 Base Year Future Year (2035) Population Growth Population 177,332 219,060 41,728 Source: Table 3-1 Transportation System Plan, February 2017 Table B-6 presents the existing and planned LOS for each facility type, based on the existing and planned future facilities presented in Table B-4, divided by the estimated existing and projected population presented in Table B-5. (For purposes of this analysis, population figures are divided by 1,000 in order to show the planned LOS per 1,000 population in Table B-6.) CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-9 Table B-6 Existing and Planned LOS (miles per 1,000 population) The capacity requirements, or number of miles, needed for the existing population and for the growth population are estimated by multiplying the planned (future) LOS for each facility type (from Table B-6) by the estimated population (in 1,000's) of each group (from Table B-5). These calculations are shown in Table B-7; each column is then described following the table. Table B-7 Existing and Growth Capacity Needs for Bicycle and Pedestrian Facilities (Miles) Existing LOS Planned LOS Shared Use Path 0.244 0.241 Bike Facility 0.903 1.286 Pedestrian Facility 1.259 1.372 The capacity requirements, or number of miles, needed for the existing population and for the growth population are estimated by multiplying the planned (future) LOS for each facility type (from Table B-6) by the estimated population (in 1,000's) of each group (from Table B-5). These calculations are shown in Table B-7; each column is then described following the table. Table B-7 Existing and Growth Capacity Needs for Bicycle and Pedestrian Facilities (Miles) (1) Existing Population Need The need for the existing population is equal to the planned LOS multiplied by the estimated base year population (from Table B-5) in 1,000's. (2) Existing Inventory Existing users' needs are assumed to be met first by the existing inventory of facilities; column (2) shows the existing facility miles from Table B-4. (3) Existing Need from Project Improvements The difference between columns 1 and column 2 is the portion of existing development's need that will be met by the Project List improvements. Some of the need is met through the multimodal projects that add bicycle and pedestrian facilities; the remainder will be met through the stand-alone bicycle and pedestrian improvements on the Project List. (4) Growth Need from Project Improvements The total facility need required by growth is equal to the planned LOS (from Table B-6) multiplied by the projected increase in population over the planning period (from Table B-5) in 1,000's. Table B-8 shows the existing and growth shares for the stand-alone bicycle and pedestrian improvements by project type. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-10 Existing Population Need (1) Existing Inventory (2) Existing Need from Project Improvements (3) Growth Need from Project Improvements (4) Multimodal Projects Stand -Alone Proects Multimodal Projects Stand -Alone Projects Shared Use Paths 42.7 43.3 0 0 0 9.5 Bicycle Facility 228.0 160.2 24.6 43.2 24.7 28.9 Pedestrian Facility 243.4 223.0 21 0 22.6 34.6 (1) Existing Population Need The need for the existing population is equal to the planned LOS multiplied by the estimated base year population (from Table B-5) in 1,000's. (2) Existing Inventory Existing users' needs are assumed to be met first by the existing inventory of facilities; column (2) shows the existing facility miles from Table B-4. (3) Existing Need from Project Improvements The difference between columns 1 and column 2 is the portion of existing development's need that will be met by the Project List improvements. Some of the need is met through the multimodal projects that add bicycle and pedestrian facilities; the remainder will be met through the stand-alone bicycle and pedestrian improvements on the Project List. (4) Growth Need from Project Improvements The total facility need required by growth is equal to the planned LOS (from Table B-6) multiplied by the projected increase in population over the planning period (from Table B-5) in 1,000's. Table B-8 shows the existing and growth shares for the stand-alone bicycle and pedestrian improvements by project type. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-10 Table B-8 Existing and Growth Share of Stand -Alone Bicycle and Pedestrian Improvements 2.2.3 Growth Share of Project List Cost (Improvement Fee Cost Basis) The improvement fee cost basis is determined by applying the growth share of new capacity costs for each project, by the project new capacity costs, and deducting any other funds to be applied. Other funding sources include assessments which are likely to pay for a portion of development -driven (based on the City's current assessment policy), and grants for bicycle and pedestrian facilities. The improvement fee cost basis is provided in Table B-3. 3.0 System -Wide Cost per Trip The system wide costs per trip (also known as "costs per vehicle trip" or "costs per trip end") are determined by dividing the improvement and reimbursement fee cost bases (as shown in Tables B-2 and B-3) by the projected growth in weekday PM peak hour trip ends (shown in Table B-1). 3.1 Reimbursement Fee Table B-2 shows the result of this calculation for the reimbursement fee in the column entitled "SDC per Vehicle Trip". 3.2 Improvement Fee The improvement fee SDC per trip is shown in Table B-3 in the column entitled "SDC per Vehicle Trip". 4.0 SDC Rate Calculations 4.1 Formula The transportation SDC for an individual development is based on the total cost per trip (including the reimbursement and improvement components) and the number of weekday PM peak hour trips attributable to a particular development. This calculation is as follows: CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-11 Total Stand- Existing Existing % Growth Growth % Alone Share Share Improvements (TSDC Project List) Shared -Use Path 9.5 0 0% 9.5 100% Bicycle Facility 72.2 43.2 60% 28.9 40% Pedestrian Facility 34.6 0 0% 34.6 100% 2.2.3 Growth Share of Project List Cost (Improvement Fee Cost Basis) The improvement fee cost basis is determined by applying the growth share of new capacity costs for each project, by the project new capacity costs, and deducting any other funds to be applied. Other funding sources include assessments which are likely to pay for a portion of development -driven (based on the City's current assessment policy), and grants for bicycle and pedestrian facilities. The improvement fee cost basis is provided in Table B-3. 3.0 System -Wide Cost per Trip The system wide costs per trip (also known as "costs per vehicle trip" or "costs per trip end") are determined by dividing the improvement and reimbursement fee cost bases (as shown in Tables B-2 and B-3) by the projected growth in weekday PM peak hour trip ends (shown in Table B-1). 3.1 Reimbursement Fee Table B-2 shows the result of this calculation for the reimbursement fee in the column entitled "SDC per Vehicle Trip". 3.2 Improvement Fee The improvement fee SDC per trip is shown in Table B-3 in the column entitled "SDC per Vehicle Trip". 4.0 SDC Rate Calculations 4.1 Formula The transportation SDC for an individual development is based on the total cost per trip (including the reimbursement and improvement components) and the number of weekday PM peak hour trips attributable to a particular development. This calculation is as follows: CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-11 Cost per Trip X Number of Development Trips = SDC for Development Where: Cost per Trip = Cost per Trip (reimbursement) + Cost per Trip (improvement), and Number of Development Trips = Trip Generation Rate X Pass -by Adjustment X Development Size (based upon the unit of measure). Table B-9, which is located in Appendix F, shows the assumptions for the SDC rate schedule, including the total cost per trip and the trip rates and adjustments by land use category. 4.2 Assigned Trip Generation Rates The standard practice in the transportation industry is to use information contained in the Trip Generation Manual, as published by the Institute of Transportation Engineers (ITE) to calculate the SDCs for individual developments. ITE trip rates by land use category are based on studies from around the country, and, in the absence of local data, represent the best available source of trip data for specific land uses. Pass -by trip adjustments to ITE trip rates have been applied to the ITE trip rates. Also referred to as linked trips or trip chaining, pass -by trips refer to trips that occur when a motorist is already on the roadway (as in the case of a traveler stopping by a fast food restaurant on the way home from work.) In this case, the motorist making a stop while "passing by" is counted as a trip generated by the restaurant, but it does not represent a new trip on the roadway. Pass -by adjustments are provided for those uses included in the Trip Generation Manual. An applicant may choose to submit a request for an alternative pass -by adjustment through the Alternate Calculation method. Except when the City Engineer has approved an applicant's election to use the Alternate Trip Generation Calculation method or an alternative pass -by adjustment, the City Engineer shall apply rates included in the Transportation Trip Rates table, Table B-9, which is located in Appendix F. Descriptions for the land use categories included in Table B-9 are included in Appendix A and are based upon ITE land use categories. A land use category may be assigned by the City Engineer should a proposed use not be accurately represented by one of the published transportation use codes. In addition, trip rates for published use codes may be alternatively assigned as best available information in the case that a revised ITE trip rate is published prior to an administrative modification to the Transportation Trip Rates Table (Table B-9). CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-12 4.3 Alternate Trip Generation Calculation Prior to the issuance of a permit requiring payment of Transportation SDCs, an applicant may elect to use the alternate calculation method (ACM) of determining the trip generation for the type of development proposed, as provided here. This election must be by written application to the City Engineer, must be accompanied with payment or the agreement to pay the transportation SDC using the standard calculation and must be approved by the City Engineer. Issuance of a final certificate of occupancy for the development will be contingent on a final decision by the City Engineer on the alternate calculation submitted for review. In the absence of the City Engineer's approval of the applicant's election to use an alternate calculation, the standard calculation shall be used. All calculations shall be based on the site's trip generation that occurs concurrently with the PM peak hour of the City's transportation system (as defined as the peak one-hour period between 4 PM and 6 PM). 4.3.1 Existing Traffic Study Standards If an applicant provides previously performed traffic studies that meet the standards in section 4.3 and have been approved by the City Engineer, the trip rate based upon those studies may be used to calculate the transportation SDC. Except that the studies may come from geographic locations other than those listed in section 4.3.3.3 the studies shall meet the standards set in section 4.3.3 and shall not be more than ten years old. 4.3.2 Independent Traffic Study If an applicant does not want to use the trip generation rates in section 4.2 or to have the rate determined under section 4.3.1, with the prior written approval of the City Engineer by complying with the standards in section 4.3.3 below, the applicant may conduct an independent survey of the proposed development's trip generation rate. 4.3.3 Transportation Traffic Study Criteria To be used to calculate the Transportation SDC for a proposed development under this section 4.3.3, a transportation study must meet the following standards unless the City Engineer modifies them because of unique circumstances: 4.3.3.1 Qualifications of Study The completed study must be stamped by either a licensed civil engineer qualified to conduct traffic studies or a licensed transportation engineer, who has been approved by the City Engineer. 4.3.3.2 Development Specifications The study shall be based upon analyses of the trip -making characteristics of similar facilities, both in size and type of land uses operating at full occupancy/capacity. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-13 4.3.3.3 Specifications for Number of Sites A minimum of five local sites with comparable land use shall be proposed for the study and approved by the City Engineer. If, in the sole discretion of the City Engineer, there are insufficient local sites, the City Engineer will consider alternate sites within the states of Idaho, Oregon or Washington. The sites shall have land uses that are of comparable general description to that proposed upon build -out. 4.3.3.4 Specifications for Traffic Study Scope The assumptions, parameters and methodology included in the traffic study shall be scoped in accordance with both the methodology described in the current edition of the Institute of Transportation Engineers Trip Generation Manual, and direction provided by the City Engineer. 4.3.3.5 Specifications for Description and Drawings The request to use the alternate calculation shall include a detailed description and drawing of the proposed development site, a description and drawing of each sampling site, a description of why these sites are representative of the impact likely to be generated by the proposed development and such other information as may be required by the City Engineer. 4.3.3.6 Specifications for Report Format The completed report of the study shall be in a form approved by the City Engineer and upon its completion shall be submitted to the City Engineer forapproval. 4.3.4 Approval & Outcome of Alternate Calculation Traffic Study The City Engineer may approve, approve with conditions, or reject the trip generation rate calculated in a report prepared under -section 4.3 hereof. Upon approval, the trip rate for the proposed development shall be used to calculate the transportation SDC. In the event that the alternate calculation results in a transportation SDC less than the standard calculation, upon approval of the alternate calculation by the City Engineer, the City shall refund the excess transportation SDC collected to the applicant or reduce the amount the applicant agreed to pay. If the approved alternate calculation results in a transportation SDC greater than the standard calculation, the applicant shall pay the underage to the City or modify the agreement to pay to include the underage. In the event the applicant fails to promptly pay the underage to the City or to promptly modify the agreement to pay, the City may suspend the permit for the development until payment is made or the agreement to pay is modified to include the underage. 4.4 Compact Development Adjustments As part of the City's strategies to promote compact development and the goals of Envision CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-14 Eugene, certain types of compact development may receive one or more adjustments to reduce their calculated Transportation SDC. These compact development adjustments fall within one of the following categories, as summarized in Table B-10: • Location -Based o Eugene Downtown Plan boundary o West University Commercial District o Residential or mixed-use development along a key corridor o Nodal development • Transit Proximity o Frequent Transit Network (FTN) • Transportation demand management (TDM) • Accessory dwelling units (ADUs) The location -based and transit proximity compact development adjustments are geographically based adjustments. The areas in which these geographic adjustments may apply are shown on the maps in Appendix B of the Transportation SDC Project Plan. Compact development adjustments: • Shall be applied to the calculated base transportation SDC fee, prior to the application of any credits or impact reductions; • Are cumulative (using the categories listed in Table B-10), not to exceed 100% of the transportation SDC; • May not to be applied to single-family detached or duplex housing; and • Are subject to annual caps. See section 7.3 of General Methodology and section 4.4.4, below. 4.4.1 Location -Based Compact Development Adjustments There are four types of location -based compact development adjustments. The city will not approve more than one type of location -based compact development adjustment for a development, even if the development meets the criteria for more than one type. 4.4.1.1 Development within the Eugene Downtown Plan Boundary Development within the boundary of the Eugene Downtown Plan shall be given a compact development adjustment when at least one of the following criteria is met. A. Re -development of Existing Building or Tenant Space with a Use Generally Found in a Shopping Center A 100% reduction to the calculated transportation SDC shall be granted for re -development located within the Downtown Plan Boundary that changes the use of an existing commercial tenant space or building from a use generally found in a shopping center to another use also generally found in a shopping center. For purposes of this adjustment, a "use generally found in a shopping CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-15 center" includes commercial/retail stores and non -merchandising facilities as described in the definition of Shopping Center in Appendix A to the General Methodology. Development is not eligible to receive this compact development adjustment if it: o Changes use from a shopping center use to a non -shopping -center use or vice -versa (e.g., commercial to residential), or o Includes a new building, or o Includes a building addition (the addition of floor area). B. Development Subject to Density and/or FAR Requirements A 30% reduction of the calculated transportation SDC shall be granted for new commercial or mixed-use buildings, building additions, and changes of use not consistent with section 4.4.1.1A above if such development is: o Located within the Downtown Plan boundary; and o Located within a zone or overlay zone (e.g., /TD Overlay) that requires density and/or minimum floor area ratios (FAR); and o Meets the minimum land use code requirements for the zoning area (e.g., FARs that are adjusted to a lower ratio will not receive the compact development adjustment). C. Development Not Subject to Density and/or FAR Requirements A 30% reduction of the calculated transportation SDCs shall be granted for new commercial or mixed-use buildings, building additions, and changes of use not consistent with section 4.4.1.1A above if such development: o Is located within the Downtown Plan boundary; and o Is not located inside a zone or overlay zone (e.g., /TD Overlay) that requires additional density standards; and o Has a floor area of at least 0.65 square feet for each 1 square foot of lot area. For the purposes of calculating the floor area for the adjustment described in 4.4.1.1.C, floor area shall be defined as the entire floor area of the building, as measured from the outside of the exterior walls, including that portion of the basement that is designed and constructed as permanent underground parking, office, or retail use; stairs and elevator shafts shall be counted once per every two floors that they service. D. Residential -Only Buildings A 30% reduction to the calculated Transportation SDC shall be granted for new residential -only buildings, additions to existing residential -only buildings, or changes of use of existing buildings to residential -only uses which are located in the Downtown Plan boundary and which are designed with a minimum of twenty (20) residential dwelling units per net acre. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-16 4.4.1.2 Location -Based Adjustment for Development within the West University Commercial District A 100% reduction to the calculated transportation SDC shall be granted for re -development that: o Is located within the West University Commercial District; and o Changes the use of an existing commercial tenant space or building from a use generally found in a shopping center to another use also generally found in a shopping center. For purposes of this adjustment, a "use generally found in a shopping center" includes commercial/retail stores and non -merchandising facilities as described in the definition of Shopping Center in Appendix A to the General Methodology. Development is not eligible to receive this compact development adjustment if it: o Changes use from a shopping center use to a non -shopping - center use or vice -versa (e.g., commercial to residential), or o Includes a new building or o Includes a building addition (the addition of floor area). 4.4.1.3 Location -Based Adjustment for Residential or Mixed -Use Development along a Key Corridor The Envision Eugene Plan has identified key transportation corridors that are intended to have transit service connecting downtown to numerous core commercial areas. A 15% reduction to the calculated transportation SDC shall be granted for multi -family apartments and condominiums, rowhouses, townhouses, and mixed-use development that: o Is located on property with frontage on identified key corridors; and o Provides pedestrian corridors from the development to the key corridor right-of-way. Single-family detached and duplex housing are not eligible to receive this adjustment. 4.4.1.4 Location -Based Adjustment for Nodal Development The General Plan (Metro Plan) recognizes the plan designation of "Nodal Development Area (Nodes)". The intent of this designation is to establish areas for mixed-use, pedestrian -friendly development that will reduce reliance on the automobile. There is evidence that shows that this type of development can result in reduced automobile trip generation rates. Furthermore, the Oregon Transportation Planning Rule (TPR), in OAR 660- 012-0060(5) states in part that: CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-17 and, ... local governments shall give full credit for potential reduction in vehicle trips for uses located in mixed-use, pedestrian -friendly centers ... ... local governments shall assume that uses located within a mixed-use, pedestrian -friendly center, or neighborhood, will generate 10% fewer daily and peak hour trips than are specified in available published estimates, such as those provided by the Institute of Transportation Engineers (ITE) Trip Generation Manual.. . A 10% reduction to the calculated transportation SDC shall be granted for commercial development, multi -family apartments and condominiums, rowhouses, and townhouses in Nodal Development Areas. Single-family detached and duplex housing are not eligible to receive this adjustment. 4.4.2 Transit Proximity Compact Development Adjustments - Frequent Transit Network The Frequent Transit Network (FTN), as defined by Lane Transit District, provides transit service for at least 16 hours per day with an average trip frequency of 15 minutes or better. The City FTN area is shown on the maps in Appendix B of the Transportation SDC Project Plan, which show the rights-of-way included in the Frequent Transit Network and the centerlines for the FTN corridors. The FTN includes both current and future routes that will provide the above defined level of service. Multi -family apartments and condominiums, rowhouses, townhouses, and mixed-use development will be granted a reduction of the calculated transportation SDC based on the following proximities to the centerlines of the FTN corridors: A. Proposed development located wholly or partially within 0.25 miles of the FTN centerline will be granted a 10% reduction, unless a physical condition (e.g. a water body or intervening development) precludes direct pedestrian access between the development and the FTN; OR B. Proposed development located wholly or partially within 0.5 miles of the FTN centerline will be granted a 5% reduction, unless a physical condition (e.g. a water body or intervening development) precludes direct pedestrian access between the development and the FTN. The city will not approve more than one type of transit proximity compact development adjustment for a development, even if the development meets the criteria for more than one type. Single-family detached and duplex housing are not eligible to receive this adjustment. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-18 4.4.3 Transportation Demand Management Compact Development Adjustments A development that qualifies for one of the location and/or transit proximity adjustments listed above may also be eligible for a Transportation Demand Management (TDM) compact development adjustment. A 10% reduction to the calculated transportation SDC shall be granted for TDMs that meet the following TDM criteria: o Have a signed TDM agreement with the City, pursuant to EC 9.8030(10); o Meet one of the location and/or transit proximity criteria described above; and o Reduce the number of parking spaces otherwise required by code. TDMs used to increase the number of parking spaces are not granted adjustments. A TDM that has been additionally reviewed by the City Engineer as a transportation impact reduction, per the SDC Methodology, to reduce the demand from the development for the future construction of identifiable capital improvements may receive the 10% TDM reduction (in addition to the approved impact reduction), if it meets the TDM criteria above. 4.4.4 Accessory Dwelling Unit Compact Development Adjustments As part of the City's strategies to further efficient housing options and the goals of Envision Eugene, new accessory dwelling units (ADUs) shall be granted a reduction equal to 100% of the calculated transportation SDC. This reduction is available to any structure meeting the definition of "Accessory Dwelling Unit" provided in Appendix A to the City of Eugene's System Development Charge Methodologies, regardless of whether the structure is referred to as an "accessory dwelling unit" or an additional "one -family dwelling" on the same lot as another. Commencing with the 2019 fiscal year, and continuing each fiscal year thereafter, the City may grant a base amount totaling $40,000.00 annually for accessory dwelling unit compact development adjustments. Each fiscal year there is a change in the rate for the system development charges for residential development, the base amount for that fiscal year shall be adjusted in an amount proportionate to that change. If any portion of the authorized base amount remains unallocated at the end of a fiscal year, that portion shall be added to the authorized base amount for the next fiscal year. CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-19 Table B-10 —Compact Development Adjustments Criteria' % Reduction of Transportation SDC' Location(only one applies) • Commercial, residential', or mixed-use2 development in the Eugene Downtown Plan boundary o Re -development of existing building or tenant space 100% from and to a use generally found in a shopping center o Commercial or mixed-use development meeting either 30% (1) land use code density and/or FAR requirements, or (2) SDC -imposed 0.65 floor area ratio (for sites outside zoning areas with minimum requirements) o Residential—only buildings 30% • Re -development of existing building or tenant space within 100% the West University Commercial District from and to a use generally found in a shopping center • Residential or mixed-use development fronts on a key 15% corridor • Development is located within one of five nodes 10% Transit Proximity (only one applies) • Residential or mixed-use development is within % mile of an 10% adopted LTD Frequent Transit Network FTN Route • Residential or mixed-use development is within % mile of an 5% adopted Frequent Transit Network FTN Route Transportation Demand Management (TDM) (only applicable to developments qualifying under at least one of the above criteria) • Development has a signed transportation demand 10% mana ement TDM agreement with the Cit Accessor Dwelling Unit (SDU) 100% 1 Single-family detached and duplex housing are not eligible for compact development adjustments. See the Methodology for specific requirements for each adjustment. 2 A mixed-use development is a development that includes a combination of commercial and certain residential uses, as defined in Appendix A. 3Adjustments are subject to annual caps. See General Methodology section 7.3 and section 4.4.4, above CITY OF EUGENE SDC METHODOLOGIES, APPENDIX B PAGE B-20 Appendix F Local SDC System Formulas and General Fee Schedule City of Eugene System Development Charge Methodologies Appendix F City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-1 1.0 Local System Formulas & General Fee Schedule Local System Formulas, Calculation Details, and Rates 1.1 General Rate Setting, Cost of Service Formula SDC Eligible Costs = SDC per Unit of Service Impact Measurement 1.2 Transportation System Cost and Rates 1.2.1 Transportation System Cost of Service Cost Basis / Growth Trips = Cost perTrip Initial cost per trip calculations at the time of the Transportation System Development Charge Methodology adoption (shown in the box below) employ a cost per trip calculation that has been rounded to the nearest whole number (or dollar) and was based upon 2014 project costs. Cost per Trip Calculation Using Original Cost Basis Amounts in Tables B-2 and B-3, Appendix B, Based upon 2014 Project Costs Reimbursement: Improvement: $7,675,471 / 40,972 = $187 per Trip $113,721,290 / 40,972 = $2,776 per Trip Allocated Cost per Trip = $187 + $2,776 = $2,963 per Trip City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-2 As part of the adoption of the Transportation System Development Charge Methodology in 2018, the calculated "total allocated cost per trip" shown in the box above was adjusted for inflation using the 20 -city national average construction cost index (CCI), as published by Engineering News -Record (ENR), to reflect then current day costs at the time of adoption. This adjusted amount, as shown in the box below, was rounded to the nearest whole number (or dollar) and was included in Section 2.0 of this Appendix F. Inflationary Adjustment to 2014 Calculations, Prior to Methodology Adoption 2014 Cost per Trip X (1 + Increase in ENR CCI (Between Dec 2014 and April 2018) = Current Cost per Trip ➢ Increase in ENR CCI (Between Dec 2014 and April 2018) = 10.42% $2,963 X (1.1042) = $3,272 Cost per Trip Subsequent adjustments to the cost per trip (i.e., fee changes adopted per Section 2.4 of the General Methodology) shall round to the nearest hundredth (or penny). See Section 2.0 of this Appendix F for current rates. 1.2.2 Transportation SDC Rates Except when the City Engineer has approved an applicant's election to use the Alternate Trip Generation Calculation method or an alternative pass -by adjustment, the City Engineer shall apply rates included in the Transportation Trip Rates table, Table B-9, located below. Descriptions for the land use categories included in Table B-9 are included in Appendix A and are based upon ITE land use categories. City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-3 Table B-9 Transportation Trip Rates Eugene Trip % Adjusted Trip Trans Use Description Unit of Measure Code Rate Pass by Rate 30 TRUCK T ERMINAL PERTGSF 0.83 0% 0.83 90 PARK& R IDE LOT WITH B US SERVICE PER PARKING SPACE 0.62' 0% 0.62 110 GENERAL LIGHT INDUSTRIAL PERTGSF 097' 0% 097 130 INDUSTRIAL PARK PERTGSF 0.85' 0% 0.85 140 MANUFACTURING/ HEAVY INDUSTRY (120&140) PERTGSF 073' 0% 073 150 WAREHOUSING PERTGSF 0.32 0% 0.32 151 MINI WAREHOUSE PERTGSF 0.26 0%'. 0.26 160 DATA CENTER PERTGSF 0.09 0%'. 0.09 170 UTILITIES PERTGSF 0.76 0%'. 0.76 210 SINGLE FAMILY DWELLING/DUPLEX PERDU 1.00 0%: 1.00 211 ACCESSORY DWELLING UNIT PERDU 0.52 V. 0.52 220 APARTMENTS PERDU 0.62 0%'. 0.62 230 CONDO/TOWNHOME PERDU 0.52 0%'. 0.52 251 SENIOR HOUSING DEVELOPMENT PERDU 0.27 0%'. 0.27 253 CONGREGATE CARE FACILITY/ CONTINUING CARE RETIREMENT COMMUNITY PERDU 0.17 0% 0.17 254 ASSISTED LIVING/ NURSING HOME (254 & 620) PERDU 022 0% 022 310 HOTEL/MOTEL PER ROOM 0.60 0% 0.60 411 CITY PARK PER ACRE 350' V. 350 430 GOLF COURSE PER ACRE 030' V. 030 437 BOWLING ALLEY PERTGSF 171' 0% 171 444 MOVIE THEATRE PERTGSF 3.80' 0% 3.80 491 RACQUET/TENNIS/HANDBALL FACILITIES (490 & 491) PER COURT 335' 0% 335 492 HEALTH/FITNESS/ATHLETIC CLUB (492 & 493) PERTGSF 353 0% 353 495 RECREATIONAL COMMUNITY CENTER/ MULTIPURPOSE RECREATIONAL FACILTV(435&495) PERTGSF 274 0%', 274 520 ELEMENTARY SCHOOL PERTGSF 121 0%I 121 522 MIDDLE SCHOOL/ JUNIOR HIGH SCHOOL PERTGSF 1.19'. 0%'. 1.19 530 HIGH SCHOOL PERTGSF 0.97 0%'. 0.97 536 PRIVATE SCHOOL (K 12) PERTGSF 550 0%'. 550 540 JUNIOR/COMMUNITY COLLEGE PER STUDENT* 0.12. 0%'. 0.12 550 UNIVERSITY/COLLEGE PER STUDENT* 0.17 V. 0.17 560 WORSHIP FACILITIES (560, 561,&562) PERTGSF 055 0%I 055 565A CHILD DAV CARE CENTER PERTGSF 6.01 0% 6.01 5658 ADULT DAV CARE CENTER PERTGSF 2.64 0% 2.64 566 CEMETERY PER ACRE 0.84 0% 0.84 590 LIBRARY PERTGSF 7,30' 0% 730 591 LODGE/FRATERNAL ORDER PER MEMBER 0.03' V. 0.03 610 HOSPITAL PERTGSF 0.93' 0% 0.93 640 ANIMAL HOSPITAL/VETERINARY CLING PERTGSF 472' 0% 472 710 GENERAL OFFICE BUILDING (710,714715733&750) PERTGSF 1.49 0%I 149 720 MEDICAL/DENTAL OFFICE (720 & 630) PERTGSF 357 0%'. 357 731 DEPARTMENT OF MOTOR VEHICLES PERTGSF 17.09. 0%'. 17.09 760 RESEARCH & DEVELOPMENT CENTER PERTGSF 1.07 0%'. 1.07 770 BUSINESS PARK PERTGSF 1.26 0%'. 1.26 811 CONSTRUCTION EQUIPMENT & RENTAL STORE PERTGSF 099 0%I 099 812 BUILDING MATERIALS & LUMBER STORE PERTGSF 4.49 0%'. 4.49 813 FREE-STANDING DISCOUNT SUPERSTORE (813 & 815) PERTGSF 435 27%'. 3.18 814 VARIETY/DOLLAR STORE PERTGSF 6.82 34% 450 816 HARDWARE/PAINT STORE PERTGSF 4.84 0% 4.84 817 1 NURSERY (GARDEN CENTER) I PERTGSF 694 0% 694 NOTE. TGSF= Thousand Gross Square Feet TSFGLA = Thousand Square Feet Gross Leasable Area DU = Dwelling Unit * For school-based academic, administration, support, and classroom uses only, for uses that are also used by the community for n -school uses (e,A, large athletic facilities, museums, or performing arts centers), choose the use code that best fits the proposed development type. City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-4 Table B-9 --Transportation Trip Rates Eugene Trip % Adjusted Trip Trans Use Description Unit of Measure Code Rate Pass by Rate 820 SHOPPING CENTER PER TSFGLA 3.71'. 34%'. 2.45 823 FACTORY OUTLET CENTER '.PERTGSF 2.29 0% 2.29 826 SPECIALTY RETAIL CENTER &OTHER PER TSFGLA 2.71 34% 179 841 AUTOMOBILE SALES 'PERTGSF 2.62 0% 2.62 843 AUTOMOBILE PARTS SALES 'PERTGSF 5.98' 43% 3.41 848 TIRE STORE PER TGSF 4.15 28% 2.99 850 SUPERMARKET PER TGSF 9.48'. 36%'. 6.07 851 CONVENIENCE MARKET (open 24 hours) PER TGSF 52.41 51% 2568 852 CONVENIENCE MARKET (open `15-16Fours) :PERTGSF 34.57'. 63%'. 1279 854 DISCOUNT SUPERMARKET .PERTGSF 8.34 21% 6.59 857 DISCOUNT CLUB .PERTGSF 4.18 37% 2.63 862 HOME IMPROVEMENT SUPERSTORE 'PERTGSF 2.33' 42% 1.35 863 ELECTRONICS SUPERSTORE PER TGSF 4.50 40% 2.70 864 TOY/CHILDREN S SUPERSTORE PER TGSF 4.99 34% 3.29 875 DEPARTMENT STORE '.PERTGSF 1.87 0% 1.87 876 APPAREL STORE '.PERTGSF 3.83 0% 3.83 879 ARTS AND CRAFTS STORE .PERTGSF 621'. 34%'. 4.10 880 PHARMACY/DRUGSTORE W/OUT DRIVE-THROUGH WINDOW .PERTGSF 8.40 53% 395 881 PHARMACY/DRUGSTORE WITH DRIVE-TH ROUGH WINDOW .PERTGSF 991 499F. 5.05 890 FURNITURE STORE 'PERTGSF 0.45' 53% 021 911 WALK -INBANK PER TGSF 12.13 0% 12.13 912 DRIVE-INBANK PERTGSF 24.30 26% 17.98 918 HAIR SALON '.PERTGSF 145 0% 145 931 QUALITY RESTAURANT '.PERTGSF 7.49 44% 4.19 932 HIGHER TURNOVER RESTINCL TAVERN/BAR (925 & 932) PER TGSF 9.85 43% 561 934 FAST FOOD RESTAURANT WITH OR WITHOUT DRIVE-THROUGH 'PERTGSF 32.65' 50% 1633 937 'COFFEE/DONUT SHOP / COFFEE ESTABLISHMENT (936, 937, & 938) 'PERTGSF 42.80' 89% 471 941 QUICK LUBRICATION VEHICLE STOP PERSERVPOS 5.19 0% 5.19 942 AUTO CARE CENTER PER TSFGLA 3.11 0% 3.11 944 GASOLINE/SERVICE STATION PER VEHFUELPOS. 13.87 42% 8.04 945 GASOLINE/SERVICE STATION W/CONVENIENCE MARKET (W/ OR W/OUT CAR WASH) PER VEH FUEL POS. 1351 56% 594 947 SELF SERVICE CAR WASH PER STALL 9.54 0% 554 948 AUTOMATED CAR WASH '.PERTGSF 12.12 0% 12.12 950 'TRUCKSTOP 'PERTGSF 13.63' 0% 13.63 NOTE. TGSF= Thousand Gross Square Feet TSFGLA=Thousand Square Feet Gross Leasable Area DU = Dwelling Unit SERV. POS. = Service Position VEH, FUEL. POS. = Vehicle Fueling Position City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-5 1.3 Wastewater System Cost of Service: 1.3.1 Local Wastewater System Cost of Service Determination of Flow Estimation Formula for Residential Development Graphical comparison of water consumption per month to square foot of living area results in a slope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 gallons per month. Cost per sq 8000 Cost perGaUDay $3.5030 Base Charge = 7000 $462.40 GPD x Cost per Gal. 6000 F 5000 GaAonsperMonth 4000 3000 2000 1000 0 370 1195 1977 2780 4000 0 816 1585 2382 3280 Tota/Area Living Space ❑ Projected �E Sampled Actual Data Base Flow Intercept, 3,946 --30 day month-- Slope Gal. /Month Gal. /Day (GPD) 132 0.951 gal/mo/sq ft Days per Month 30 Cost per sq Cost perGaUDay $3.5030 Base Charge = $462.40 GPD x Cost per Gal. Slope Gal. /Month Gal. /Day (GPD) 132 0.951 gal/mo/sq ft Days per Month 30 Cost per sq The implementation of this rate structure results in each new single family dwelling being charged a local wastewater SDC that is comprised of a base rate of $462.40 plus an additional charge of $0.1121 applied to the total proposed living space area of the dwelling. City of Eugene SDC Methodologies Fee Schedule &Formulas, Page F-6 Non -Assessable System Valuation (Value of Existing + Value of Planned) = Cost per Unit of Capacity Build -out Capacity (mgd) Per Unit of Capacity X Flow per PFU for Development Type X Number of PFUs for Development = SDC for Development $156.249662 + $15.324095M ------------------------------------ - $3.5030 per Gallon per Day 49.0 mgd $3.5030 X Gallon per PFU (varies by development type) X Number of PFUs = SDC for Development 1.4 Stormwater System Cost of Service: SDC eligible costs Total additional impervious surface area using capacity (sq. ft) Reimbursement: $17,073,927 155,770,560 sq. ft. = Unit cost per square foot of impervious surface area _ $0.1096 per sq. ft. impervious surface area City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-7 provement: I System Capacity $18,800,662 --- _ $0.1207 per sq. ft. 155,770,560 sq. ft. impervious surface area System Capacity $8,513,629 --- _ $1.8309 per sq. ft. 4,650,000 sq. ft. impervious surface area I System Capacity Total Unit Cost per Sq. Ft. Impervious Surface Area = irsement + Improvement) = $0.1096 + $0.1207 = $0.2303 Unit Cost per Sq. Ft. Impervious Surface Area with LID System Capacity = ibursement + Improvement + LID) = $0.1096 +$0.1207 +$1.8309 = $2.0612 1.5 Parks System Cost of Service: Residential — costs and equivalent population densities per dwelling unit type vary Cost per person X Persons per Dwelling Unit Type = Cost per DU Nonresidential — costs and equivalent population densities per development category type vary Cost per Person X Persons per TGSF = Cost per TGSF Ce . Cost per Person X Persons per Room = Cost per Room TGSF = Thousand Gross Square Feet of floor area Calculations: Vary; see Table 17 City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-8 2.0 Adopted SDC Fee Schedule: Current Rates 2.1 Transportation System: Cost per trip $3,272.00 2.2 Local Wastewater System: Residential dwelling unit base fee $462.40 Residential dwelling unit total living area multiplication factor $0.1121 Non -Residential rate per gal/day per land use type per PFU Varies 2.3 Regional (MWMC) Wastewater System: Residential dwelling unit $1709.67 Non -Residential rate per gal/day per land use type per FEU Varies 2.4 Stormwater System General System Capacity Small Residential (building footprint < 1,000 sq. ft.) $414.54 Medium Residential (building footprint> 1,000 sq.ft. and < 3,000 sq. ft.) $667.87 Small Duplex (unit building footprints < 1,000 sq. ft.) $829.08 Medium Duplex (unit building footprints >1,000 sq. ft. and < 3,000 sq. ft.) $1,335.74 Manufactured Home Park Per space (assumes 1,684 sq. ft. per space) $387.83 plus Per sq. ft. actual impervious surface area, addt'I common areas $0.2303 All Other Development Per sq.ft. actual impervious surface area and/or equivalent $0.2303 LID System Capacity Small Residential (building footprint < 1,000 sq. ft.) $3,710.16 Medium Residential (building footprint> 1,000 sq.ft. and <3,000 sq. ft.) $5,977.48 Small Duplex (unit building footprints < 1,000 sq. ft.) $7,420.32 Medium Duplex (unit building footprints>1,000 sq. ft. and < 3,000 sq. ft.) $11,954.96 Manufactured Home Park Per space (assumes 1,684 sq. ft. per space) $3,471.06 9 LLLI Per sq. ft. actual impervious surface area, addt'I common areas $2.0612 All Other Development Per sq.ft. actual impervious surface area and/or equivalent $2.0612 Continuation of Current Rates on next page. City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-9 2.5 Parks System: Residential (per Dwelling Unit) Single Family $4,246.00 Duplex/Town Home/Mobile Home/Accessory DU $3,442.00 Multifamily $2,686.00 Nonresidential (unit varies — see Table 19 for Class description) Class A (per Room) $1,697.00 Class B (per thousand gross square feet or TGSF) $1,134.00 Class C (per TGSF) $694.00 Class D (per TGSF) $413.00 Class E (per TGSF) $167.00 2.6 AdministrationCharges: City of Eugene if based on percentage 9.0% City of Eugene if based on flat rate $80.00 2.7 Appeal Fee: City of Eugene per SDC appeal $100.00 City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-10