HomeMy WebLinkAboutOrdinance No. 20259
ORDINANCE NO. 20259
AN ORDINANCE AMENDING THE WEST EUGENE
WETLANDS PLAN TO REDESIGNATE PROPERTY WITHIN
THE MODIFIED PROJECT ALIGNMENT OF THE WEST
EUGENE PARKWAY FROM PROTECT AND RESTORE TO
PLANNED TRANSPORTATION CORRIDOR; ADOPTING A
SEVERABILITY CLAUSE; AND PROVIDING AN
EFFECTIVE DATE.
The CiW Council of the City of Eugene finds that:
A, On May 20, 1992, the Eugene City Council adopted Ordinance No. 19853 adopting
the West Eugene Wetlands Special Area Study, a refinement plan to the Eugene-Springfield
Metropolitan Area General Plan, subsequently amended in part by Ordinance No. 19867 adopted
by the Cky Council on August 10, 1992.
B. On March 6, 1995, the Eugene City Council adopted Ordinance No. 20002 amending
the West Eugene Wetlands Special Area Study and changing the name to the West Eugene Wetlands
Plan.
C. OnMay 20, 1998, the City Council enacted Ordinance No. 20119, amending the West
Eugene Wetlands Plan to establish the new Planned Transportation Corridor and Utility Corridor
wetland designations: on July 8, 1998 enacted Ordinance No. 20126, adopting new or revised Plan
policies and text; on February 22, 1999 enacted Ordinance No. 20147, adopting Planned
Transportation Corridor ~wetland designations for City of Eugene properties located within the West
t 8~h and West 11th Avenue Road Improvement Projects; on October 11, 1999 enacted Ordinance No.
20171 amended Ordinance No. 20126 to adopt new and revised policies related to the criteria for
wetland designations consistent with Board Ordinance No. PA 1133; on July 26, 2000 enacted
Ordinance No. 20200, adopting new or revised wetland designations for various sites within the Plan
boundary and related policy and text amendments; on August 7, 2000 enacted Ordinance No. 20201,
adopting new wetlands designations for the Hyundai site and related text amendments; and on
September 11, 2000 enacted Ordinance No. 20208, adopting new wetlands desigmations for the
Speedway site and related text amendments.
D. Following a joint public hearing with the Lane County and Springfield Planning
Commissions and the Lane County Roads Advisory Cormmktee on February 20~ 2002, the Eugene
P~anning Commission met on March 18, April 8 and April 15, 2002 and recommended to the
Eugene City Council that the amendments to the West Eugene Wetlands Plan to redesignate property
wkhin the modified prqiect alignment of the West Eugene Parkway from protect and restore to
planned transportation corridor, not be adopted (motion to adopt failed, 0:6).
Ordinance- 1
E. On May 29, 2002, the City Council conducted a joint public hearing with the Lane
County Board of Commissioners, Springfield City Council, and Lane Transit District Board of
Directors on these an~endments and is now ready to take action based upon the above
recommendations and the evidence and testimony already in the record as well as the evidence and
testimony presented at the public hearings held on adopting revisions to the West Eugene Wetlands
Plan.
SUbstantial evidence exists within the record that the proposal meets the requirements
of Chapter 9 of the Eugene Code, 1971 and the requirements of applicable state and local law as
deSCribed in the findings adopted in support of this Ordinance.
NOW~ THEREFORE,
THE CITY OF EUGENE DOES OP, DA~[N AS FOLLOWS:
Section 1. The West Eugene Wetlands Plan, as adopted by Ordinance No. 19853 and
amended by Ordinance No. 19867, Ordinance No. 20002, Ordinance No. 20119, Ordinance No.
20126 (as amended by Ordinance No. 20171), Ordinance No. 20147, Ordinance No. 20171,
Ordinance No. 20200, Ordinance No. 20201 and Ordinance No. 20208 is hereby further amended
as set forth in Exhibit A attached and incorporated herein by this reference.
Section Z Although not part of this Ordinance, the findings in attached Exhibit B are
adopted in support of this Ordinance.
Section 3. If any section, subsection, sentence, clause, phrase or portion of this Ordinance
is fbr any reason held invalid or unconstitutional by any court ofcompetentjurisdiction, such portion
shall be deemed a separate, distinct and independent provision, and such holding shall not affect the
validity of the remaining portions hereof.
Section 4~ Notwithstanding the provisions of the Eugene Charter of 1976, amendments to
the West Eugene Wetlands Plan adopted by Exhibit A to this Ordinance shall not become effective
until identical provisions are adopted by the Lane County Board of Commissioners.
Passed by the C~ty Council this
Approved by the Mayor this
8~~ day of July, 2002
8th day of Julys 2002
City Recorder
Ordinance - 2
Exhibit A
page1 of 2
Exhibit A
Exhibit A
Page 2 of 2
E~hibit B
Findings of Consistency of West Eugene Wetlands Plan Amendments
with Refinement Plan Araendment Criteria
The West Eugene Wettands Plan was adopted as a refinement plan to the Eugene-Springfield
Metropolitan Area General PIan (Metro Plan) by the Eugene City Council and Lane County
Board of Commissioners in 1992. The West Eugene Wetlands Plan was amended by these
oftlcials in 1995~ 1998, 1999 and 2000. The amendments are incorporated in the
November 2000 West Eugene Wetlands Plan.
The West Eugene Wetlands Plan is an approved wetland conservation plan as defined in ORS
196.800(15). Approval for the plan as a Wetland Conservation Plan was originally gr~anted by
the Oregon Division of State Lands in September 1994. DSL's approval was amended by Final
Order 97-003 in September 1997. In 1999~ as required by ORS 196.684~ DSL conducted a five-
year review of plan ~mplementation and issued Modified Final Order 99-003. On April 18, 2002,
Division of State Lands Final Order 02-001 approved the amended West Eugene Wetlands Plan
(November 2000), ~rith conditions, as a Wetland Conservation Plan under ORS 196.678 to ORS
196.684. Generally, conditions relate to Plan reporting and implementation; additional
conditions related to Plan amendment and five-year DSL review cite ORS 196.684 requirements.
Section 9.8424 of the Eugene Land Use Code and Section 9.145(2) of the Lane Code
le Area Land Use and Zoning list the criteria for refinement plan amendments. The
Eugene Land Use Code applies within the Eugene City limits; the Lane Code Urbanizable/Xmea
Land Use and Zoning applies within the area between the Eugene city' limits and the urban
growth botmdary. In the findings below, text from the Eugene Land Use Code is printed in bold;
text from the Lane Code Urbanizable Area Land Use and Zoning (where there is comparable
text) is printed directly under the Eugene Land Use Code text and is underlined.
The findings below demonstrate that the amendments to the West Eugene Wetlands Plan to apply
the Planned Transpor~tion Corridor wetland designation to specific properties along the West
Eugene Park-~ay Modified Project alignment are consistent with the criteria for refinement plan
amendments. The planned transportation corridor policy in the West Eugene Wetlands Plan
(%~WP) was analyzed for consistency with the Statewide Planning Goals, all applicable policies
from the Metropolitan Area General Plan (Metro Plan) and the remaining policies o£the WEWP
at the time of adoption of the policy in 1998. Therefore, site designations that are consistent with
the planned transpor~tion corridor policy are considered consistent with the Statewide Planning
Goals, Metro Plan and remaining WE~v? policies as well. Even though demonstration of
consistency with this WEWP policy would be sufficient to establish consistency with the
Statewide Planning Goals and Metro Plan, findings of consistency with the Statewide Plauning
Goals and the Metro Plan are provided below to fi. trther establish authority for the proposed
amendments.
West Eugene Wetlancks Plan Amendments
Exhibit B ~ Findings
P~el
Section 9.8424 (1)
The plan anaendmen~ is cons~s(en~ wi~h all of ~he following:
..... the gr~posed change is_cons a
{a} Statew[de Planning Goals
cri~rion not included in Lane Co0¢Urbanizab!¢ Area
L~d..UsCand
The Eugene-Springfield Metropolitan Area General Plan is a local comprehensive plan
acknowledged by the state's Land Conservation and Development Commission, and the West
Eugene Wetlands Plan is an adopted refinement plan to the Metro Plan~ The West Eugene
Wedands Plan is also an approved wetland conservation plan as defined in ORS 196.800(1
These amendments to the West Eugene Wetlands Plan affect properties wbfich have received the
Protect or Restore wetland designations ~ough previous pkarming actions. These amendments
are changes to the Wetland Designations Map (Map 3} of the West Eugene Wetlands Plan. This
map applies one or more of several defined wetland designations to each inventoried wetland in
the stud}, area. These amendments only involve the application of the "Plarmed Transportation
Corridor" designation. This designation is applied to areas previously designated for restoration
or protection to allow needed roadway improvements.
Findings s exceptions to Statewide Planning Goals 3, 4, 11 and 14 for the West Eugene
Parkway Modified Project and demonstrating project consistency with other applicable Statew/de
Planning Goals, prepared for the Oregon Depaxtment of Transportation, are incorporated by
reference in this document andattached as ...... ~xmm~s "~l, ~tz-z, and "C-3' to the findings for
the s to TransPlan, the Metro Plan and the Lane County Rural Comprehensive Plan
and are incorporated herein by this reference. The Exhibk "C-l,' "C-2,' and "C-3' findings
address only that portion of the West Eugene Parkway that is west of Belfline, as portions east of
Belttine have already been acknowledged as consistent with the Statewide Planning Goals.
G~[ I; Citiz¢~ Involvement
To develop a citizen involvement program that insures the opportunity for citizens to be involved
m all phases of the planningprocess.
Chapter 9 of the Eugene Code, 1971 establishes procedures for refinement plan amendments.
Under the August 1, 2001 Land Use Code, notice requirements for refinement plan amendments
exceed the notice requirements for Metro Plan amendments. On Jam~y 4, 2002, notice of the
proposed amendments to TransPlan, the Metro Plan and the Lane County Rural Cornprehensive
Plan and the West Eugene Wetlands Plan was delivered to the Department of Land Conservation
and Development. An amended notice, ~ncludkng revised date of final heating, was delivered to
the Department of Land Conservation and Development on February 1, 2002. On January 4,
2002, notice of the proposed amendments to TransPlan, the Metro Plan and the Lane County
Rural Co ire Plan and the West Eugene Wetlands Plan was delivered to the Department
of Land Conservation and Development. Am amended notice, including revised date of final
heating, was delivered to the Department of Land Conservation and Development on February 1,
2002. Section 9~7520 of the Eugene Code requires that written notice of the refinement plan
West Eugene Wetlands Plan Amendments
Exhibit B ~ Fkadkngs
Page 2
amendment heating and the nature of the request be mailed at least 30 days before the planning
commission public heating to the Lane County and Springfield planning directors, all
rhood groups officially by the city council and community organizations that
have submitted written requests for notification. On January 18~ 2002, written notice of the
February 20, 2002 joint public heating of the Eugene, Lane County and Springfield planning
commissions and the Lane County Roads Advisory Committee (LCRAC) was mailed to a
consolidated list of interested parties provided by the Oregon Department of Transportation
(West Eugene Parkway list), Lane Council of Governments (TransPlan testimony list) and
staff (West Eugene Wetlands Plan agency list and other interested parties).
Approxknately 1,5t90 notices were mailed. The Eugene code also requires that a legal ad be
published at least 20 days in advance of the public hearing. The legal ad was published in the
Eugene Register-Guard on January 30, 2002. In addition, the city has developed a West Eugene
Parkway web site. The public heating notice and maps and the staff report were published on the
web site. This notification exceeds the requirements of the Eugene Code. The refinement plan
amendment process includes two public hearings: the first before the planning commissions and
roads advisory committee and the second before the adopting officials. Those who provided
their address with their written or oral testimony to the plamfing commissions and
LCRAC received written notice of the joint adopting officials public heating. These hearings
ample ity for public involvement consistent wSth Goal i. Therefore, these
nts to the West Eugene Wetlands Plan comply with Goal 1~
Goal__2;~ Land Use Planning
Goal 2, Land Use Plar~rfing includes two parts. Part I, Planning, addresses general planning and
coordination requirements; Part II, Exceptions, addresses exceptions to statewSde planning goals.
Goal 2 requires that plans be coordinated with the plans of affected governmental un/ts and that
ies be provided for review and comment by affected units. The Goal
defines "Affected Governmental Units" as'~2tose local governments, state and federal agencies
and special districts which have programs, land ownerships~ or responsibilkies within the area
included in the plan." To comply with the Goal 2 coordination requirement~ the City coordinated
the adoption of these amendments with all affected governmental units. Specifically, notice was
ma~led to: Lane County, Springfield and Lane Transit District, which are parties to the decision;
the Lane Council of Governments; the following Federal agencies: Federal Highway
Administration, Bureau of Land Management, U.S. Army Corps of Engineers, U.S. F~sh and
Wildlife Service, Environmental Protection Agency, National Marine Fisheries Service, National
Park Service, Federal Aviation Admkfistmtion~ and Department of Housing and Urban
Development; and the followdng state agencies: Department of Transportafion~ Department of
Land Conservation and Development, Division of State Lands, Department of Environmental
Quality, Department of Energy, Department of Agriculture and State Historic Preservation
Office~
Findings demonstrathag an adequate factual base supporting the shift in West Eugene Parkway
from the 1990 Approved Design to the Modified Project and justifying exceptions to
Planrfing Goals 3, 4, 11 and 14 are set forth in the following documents provided by
West Eugene Wetlands Plan Amendments
Exhibit B ~ Fk~dh~gs
P~e3
the Oregon Department of Transportation, which are attached to the findings for the amendments
to TransPlan, the Metro Plan and the Lane County Rural Comprehensive Plan and are
irtcorporated herein by this reference:
Exhibit C4 . West Eugene Parkway Modified ProJect -- Consistency with the Statewide
Planning Goals and Transportation Planning Rules prepared for ODOT by Mark J.
Greenfiel&
Exhibit C~2. Alternatives Considered ~ West Eugene Parkway, prepared for ODOT by Jay
McRae, CH2M Hilt
Exhibk "C~3~: Incompatible Adjacent Land Uses in the ~rEP Project Area~ prepared for ODOT
by Sheryl Chfistensen
Therefore~ the amendments comply wkh Goal 2.
~ A ands
To preserve and maintain agricultural lands.
Findings justifying an exception to Goal 3 for the portion of the West Eugene Parkway Modified
Project al located outside the urban growth boundary are set forth in the folloMng
provided by the Oregon nt of Transportation, which are attached to the
findings for the amendments to TransPlan, the Metro Plan and the Lane County Rural
C nsive Plan and are incorporated herein by this reference:
Exhibit "C* 1": West Eugene Parkway Modified Project ~ Consistency wSth the Statew4de
Planning Goals and Transportation Planning Rule, prepared for ODOT by Mark J.
Exhibit "C-2': Alternatives Considered West Eugene Parkway, prepared for ODOT by Jay
McRae, CH2M Hill
Exhibit "C~3": Incompatible Adjacent Land Uses in the WEP Project Area, prepared for ODOT
by Sheryl Chfistensen
Lands
To conserve forest lands.
F~ndings justifying an exception to Goal 4 for the portion of the West Eugene Parkway Modified
Project alignment located outside the urban growth boundary are set forth in the follow4ng
documents provided by the Oregon Department of Transportation, which are attached to the
findings for the amendments to TransPlan, the Metro Plan and the Lane County Rural
Comprehensive Plan and are ktcorporated herein by this reference:
Exhibit "C4~: West Eugene Parkway Modified Project -- Consistency with the State~,~4de
Plamning Goals and Transportation Planning Rule, prepared for ODOT by Mark J.
Crreenfield.
Exhibit "C-2': Alternatives Considered ~ West Eugene Parkway, prepared for ODOT by Jay
McRae, CH2M Hill
Exhibit "C-3~: Incompatible Adjacent Land Uses in the WEP Project Area, prepared for ODOT
by Sheryl Christensen
West Eugene Wetlands Plan Amendments
E~b~t B ~ Fh~dktgs
Page 4
._Scenic andHistoric Area& and Natural Areas_
To conserve open space and protect natural and scenic resources.
The Goal 5 natural resource inventory for the Eugene-Springfield Metropolitan Area General
Plan acknowledged in 1982 is shown on Map 3~ Metropolitan Area General Plan Background
Report, Natural Features & Airport Limitation Areas. Follow~ng acknowledgment of the Metro
Plan, in 1992, Eugene and Lane County adopted the West Eugene Wetlands Plan (WEWP),
~vhich expanded the wetlands inventory for this area. The WEWP was subsequently amended in
1995, 1998~ 1999 and 2000.
The West Eugene Wetlands Plan is an approved wetland conservation plan as defined in ORS
196.800(15). Approval for the plan as a Wetland Conservation Plan was originally granted by
the Oregon Division of State Lands in September 1994 and was amended by Final Order 9%003
in September 1997. In 1999, as required by ORS 196.684, DSL conducted a five-year review of
plan implementation and issued Modified Final Order 99-003. On April 18, 2002, Division of
State Lands Final Order 02-001 approved the mnended West Eugene Wetlands Plan (November
2000), with con~tions~ as a Wetland Conservation Plan under ORS 196.678 to ORS 196.684.
, conditions relate to Plan reporting and implementation; additional conditions related
to Plan amendment and five-year DSL review cite ORS 196.684 requirements.
The amendment to the West Eugene Wetlands Plan to apply the Planned Transportation Corridor
to prope~ withha the West Eugene Parkway Modified Project alignrnent does not amend the
policies of the West Eugene Wetlands Plan. Rather, it implements Policy 3.22 which states the
es under which the Planned Transportation Corridor wetland designation can be
applied.
ORS 19&684(8) specifies the relationship between Wetland Conservation Plan approval and
c with Goal 5:
"Wetland conservation plans approved by the D~rector of the Division of State Lands
pursuant to ORS 196.668 to 196.692 shall be deemed to comply v~4th the requirements of
any statewide planning goals related to wetlands, other than estuarine wetlands, for those
areas, ~zses and activities which are regulated by the plan." [See also, ORS 197.279]
Approval of the kVest Eugene Wetlands Plan by the Oregon Division of State Lands (DSL) as
provided by law, satisfies all the requirements of any applicable statew~de planning goal related
to wetlands (including Goal 5) for those areas, uses and activities wl~fich are regulated by the
plan.
The findings of goal compliance made as paw of initial adoption of the WEWP and of adoption
of subsequent amendrnents remain essentially unaffected by these amendments. The 1992 West
Eugene Wetlands Plan designated the wetlands along .the West Eugene Parkway Approved
Design for development. As a result, this project was anticipated and incorporated in the West
Eugene Wetlands Plan. The Planned Tra~pt~rtation Corridor wetland designation, adopted and
acknowledged in 2000, has also been approved ,Mth other amendments to the West Eugene
West Eugene Wetlands Plan Amendments
Exhibit B ~ F~ndings
Page 5
Wetlands Plan by DSL Final Order 02~001, April 18, 2002. The northern alignment studied in
the draft SDEIS was selected as the Preferred Alternative because it reduced impacts to high-
quality . As a result of these factors, previous findings of Goal 5 compliance remain
essentially unaffected by shining the alignment from immediately south of the railroad tracks to
immediately north of the railroad tracks.
The fundamental program developed for Goal 5 compliance essentially remains unchanged. The
policies and criteria of the '¢,rEWP operate as a tool to fixther Goal 5 compliance by assisting in
determining the significance of wetland resources, the conflicts and the economic, social,
e and energy values involved in protecting the resource. That analysis approaches
the wetlands of West Eugene as part of an interconnected natural system rather than as separate,
discrete sites. The focus remains inside the West Eugene Wetlands Plan boundao~, keeping in
mind that the larger system of which these wetlands are a part extends beyond this and other
political boundaries.
The West Eugene Wetlands Plan was developed in coordination with several key state and
t~deral agencies involved in wetlands regulation and planning: Division of State Lands (DSL),
Army Corps of rs (ACOE), Environmental Protection Agency (EPA), and the United
States Fish and Wildlife Service (USFWS). The Plan was also coordinated with local offices of
other applicable local, state and federal agencies. ODOT has requested comments from these
on the August 1997 Draft Supplemental Environmental Impact Statement for the West
Eugene Parkway.
In 2000, the Bureau of Land Management was offered cooperator status in preparation of the
Supplemental Final Environmental Impact Statement for the West Eugene Parkway. In October
2000 BLM accepted formal cooperator status and has submitted comrnents on the August 1997
Draft Supplemental Statement.
F dernonstrating compliance of the West Eugene Parkway Modified Project alignrnent
with Goal 5 are set forth in Exhibit "C-i,' which is attached to the findings for the amendments
to TransPlan, the Metro Plan and the Lane County Rural Comprehensive Plan and is incorporated
herein by this reference: West Eugene Parkway Modified Project Consistency v~Sth the
StatewSde Planning Goals and Transportation Planning Rule, prepared for ODOT by Mark J.
Greenfield.
The amendments are consistent with the applicable policies of the Metro Plan and the November
2000 West Eugene Wetlands Plan, which has been adopted as a Wetland Conservation Plan by
the Oregon Division of State Lands. Therefore, these amendments to the West Eugene Wetlands
Plan comply with Statewide Planning Goal 5.
To maintain and improve the quality of the air, water and land resources of the state.
Findings demonstrating compliance of the West Eugene Parkway Modified Project alignment
with Goal 6 are set forth in Exhibit "C-I,' which is attached to the findings for the amendments
West Eugene Wetlands Plan Amendments
Exhibit B ~ Findings
Page 6
to TransPlan, the Metro Plan and the Lane County Rural Comprehensive Plan and is incorporated
herein by this reference: West Eugene Parkway Modified Project --- Consistency w/th the
Statewide Planning Goals and Tr~sportation Planning Rule; Prepared for ODOT by Mark J.
Greenfield.
Goal 7~: A .to Natural Disasters and Hazards
To protect life and p;°Perty-f~--~-m'~natura} disasters and hazards~
Findings demonstrating compliance of the West Eugene Parkway Modified Project alignment
with Goal 7 are set forth in Exhibit "C-i~' which is attached to the findings for the amendments
m TransPlan~ the Metro Plan and the Lane County Rural Comprehensive Plan and ~s
~ncorporated herein by this reference: West Eugene Parkway Modified Project Consistency
w~th the Goals and Transportation Planning Rule~ prepared for ODOT by
Mark J. Greenfield.
Recreatio ed_s
7~o Satisfy the reCreational needs of the citizens qf the state ami visitors and, where appropriate,
to provide for the siting of necessary recreational facilities including destination resorts.
In July 2001, the Bureau of Land Management approved the Recreation, Access, and
Envkonmenml n Plan for the West Eugene Wetlands. This Plan was prepared jointly by
the Bureau of Land City of Eugene and Lane Council of Governments. Following
page 5 of the Plan is a map entitled "All Proposed FaciFrfies." The West Eugene Parkway
Modified Project alignment is shown as "Planned Parkway ?' The West Eugene
P Modified Project alignment is also shown on the map entitled "Management Areas"
follow~ng page 20 of the Plan as "Planned West Eugene Parkway."
Page 20 of the report states: "In the event that the West Eugene Wetland Plan is amended in the
future to allow for new or plarmed roadways or other project, the management areas Map would
be refined accordingly." Therefore, although the Planned Transportation Corridor wetland
designation had not been applied to the Modified Project alignment at the time the Recreation,
Access, and Envko~xnental Education Plan for the West Eugene Wetlands was approved, this
Plan acknowledged the West Eugene Parkway Modified Project alignment as a planned project
and provided for ftmher refinement of the plan following amendment to the West Eugene
Wetlands Plan to apply the Planned Transportation Corridor wetland designation.
,,F~.i~ndings demonstrating compliance of the West Eugene Parkway Modified Project alignment
th GOal 8 are set forth in Exh/b~t "C-l," which is attached to the fmdk~gs for the amendments
to TransPtan, the Metro Plan and the Lane County Rural Comprehensive Plan, and is
~ncorporated here~n by this reference: West Eugene Parkwcay Modified Project[ Consistency
with the Statewide Planning Goals and Transportation Planning Rule, prepared for ODOT by
Mark J. Greenfield.
~conomic Developm_e_n._.t
To provide adequate opportunities throughout the state for a variety of economic activities vital
West Eugene Wetlands Plan Amendments
Exhibit B ~ Findings
P~e7
to the health, we~fare, and prosperity of Oregon's citizens.
Since these amendments only apply the Planned Transportation Corridor designation to non-
buildable areas (i.e., wetlands designated for protection or restoration) and the designation only
allows road improvements~ they do not affect the buildable land inventory. This finding is also
based upon these facts:
The areas designated by these amendments for Planned Transportation Corridor are
vacant, undeveloped areas. Therefore, these amendments wilt not apply to existing
development~ and do not apply new land Use restrictions to existing development.
There are no impacts to the buildable lands inventory resulting from these amendments
since they/nvOlve a change in designation fforn a non-developable category ("Protect" or
"Restore") to another category alloMng only roadway improvements ("Planned
Transportation Corridor").
I Lands: These amendments to the West Eugene Wetlands Plan will not reduce the
of land currently available for industrial , since they affect only land that
was sly able for development. Consequently, they leave adequate developable
industrial land vdthin the Eugene-Springfield metropolitan area within the 20-year
pefio& Therefore, these amendments are consistent with Goal 9 ,Mth respect to industrial land.
Commercial Lands: These amendments do not include any land designated ibr commercial use
in the M Area General Plan.
~sing
To provide for t[~-e housing needs of citizens of the state.
The West Eugene Parkway does not directly impact any area identified for housing. Theretbre~
these amendments do not affect compliance w/th Goal 10.
._Publ~c..Facd~[~es and Sermces
To plan and deVe timely, orde/l~and efficient arrangement of public facilities and services
to serve as a framework for urban and rural development
Findings demonstrating compliance of the West Eugene Parkway modified project located inside
the urt~n growth boundary aTnd justifying an exception to Goal ~ 1 for the porti;n of the West
Eugene Parkway Modified Project alignr~ent located outside the urban growth boundary are set
forth in the fbllow'ing documents provided by the Oregon Department of Transportation, which
are attached to the findings for the amendments to TransPlan: the Metro Plan and the Lane
County Rural Co ive Plan and are incorporated herein by tb2s reference:
Exhibit"Cq~: West Eugene Parkway Modified Project ~ Consistency ,~4th the Statevdde
Planning Goals and Transportation Planning Rule, prepared for ODOT by Mark
J. Greenfield.
"C-2": Considered West Eugene Parkway, prepared for ODOT by Jay
West Eugene Wetlands Plan Amendments
EXhibit 1~ ~ F~dk~gs
Page 8
Exhibit
McRae, CH2M Hill
Incompatible Adjacent Land Uses in the WEP Project Area, prepared for ODOT
by Sheryl Christensen
To provide and encourage a safk, convenient and economic tramportation system.
The West Eugene Parkway was first proposed as the "6tk/7th Extension" in the T-2000 Plan
adopted in 1978 by Eugene, Springfield, Lane County and the Lane Transit District. The public
reviewed and commented on a draft Environmental Impact Statement (EIS) for the project in
1985~8& That process determined the general route of the proposed 4-lane roadway, which was
remamed the West Eugene Parkway. Under the provision of the City' Charter that reqtfires a vote
on alimited-access throughway, the City Council placed a measure on the ballot in November
1986 asking ,~Vhether or not the West Eugene Parkway should be constructed along the east-west
route preferred by the City Council. The voters approved the measure.
The project-was included in the 1986 TransPlan, which superseded the T-2000 Plan, Although a
final EIS was issued in 1990, subsequent funding constraints and environmental concerns
resulted in phasing the project in four distinct phases, and additional environmental studies to
augment the original ElS work. A draft supplemental EIS ,,vas issued for public comment in
1967, mad the final supplemental EIS is penr~ing.
On December 2000~ Eugene received a letter from ODOT specifying land use actions necessapy
to move forward wSth the conclusion of the final supplemental Environmental Impact Statement
for the West Eugene and construction of Ur& 1-A of that project, Although state
administrative rules do not require completion of land use actions tbr future phases of a project
prior to issuance of an Enviromuental Impact Statement, both the federal Bureau of Land
Management (BLM) and the Federal Hig-hway Adminisl~ation (FHWA) had submitted letters to
ODOT stating that all land use actions must be completed prior to issuance of the final
supplemental Em, ironmental Impact Statement for the West Eugene Parkway.
In November 2001, Eugene voters approved a ballot measure directing the City "to pursue
funding and transportation and land use approvals to facilitate construction of the West Eugene
Parkway."
the Planned Transportation Corridor wetland designation to the Modified Prqiect
alignment will complete the West Eugene Wetlands Plan wetland designation changes required
to allow conclusion of frae final supplemental Envkonmental Irnpact Statement and construction
of the West Eugene Parkway. Therefore, these amendments comply ;~5th Goal 1Z
To conserve energy.
Findings demormtrating compliance o~ the West Eugene Parkway Modified Project alignment
wSth Goal 13 are Set forth in Exhibit C-I'' provided by the Oregon Department of
West Eugene Wetlands Plan Amendments
Exhibit B ~ Fhndkngs
Page 9
Transportation, which is attached to the findings fbr the amendments to TransPlan, the Metro
Plan and the Lane County Rural Comprehensive Plan are is incorporated herein by this
reference:: West Eugene parkway Modified Project -- Consistency with the Statew/de Planning
Goals and Transportation Plarmk~g Rule~ prepared for ODOT by ~ark J. Greenfield.
U~_~nization
To provide.for an orderly and efficient transition from rural to urban land use.
Findings demonstrating compliance with Goat 14 fbr the portion of the West Eugene Parkway
Modified Project alignmem located within the urban grov~th boundary and justif~fng an
exception to Goal t4 for the portion of the West Eugene Parkway Modified Project alignment
located outside the urban growth boundary are set forth ~n the following documents provided by
the Oregon Depm-tment of Transportation, which are attached to the findings for the amendments
to TransPlan, the Metro Plan and the Lane County Rural Comprehensive Plan and are
incorporated herein by this reference:
Exhibit "C~i~': West Eugene Parkway Modified Project Consistency wSth the Statewqde
Planning Goals and Transportation Planning Rule, prepared for ODOT by Mark J.
Greenfield.
Exhibit "C~2~: Alternatives Considered West Eugene Parkway, prepared for ODOT by Jay
McRae, CH2M Hill
Exhibit "C-3': Inc le Adjacent Land Uses in the WEP Project Area, prepared for ODOT
by Sheryl Christensen
Goal J 5 : Willamett¢~RiEer~Greenwa?~
Goal 16: Estuarine Resources
: Coastal Shore~ands
Goal Oce '
These goals do not apply.
(b)
Applicable provisions of the Metro Plan
..umendment is consistent w/th the Metropolitan Area General Plan;
The thrust of the West Eugene Wetlands Plan has been to attempt to balance development within
wetland areas with protection of the most valuable wetlands, and replacement of lost wetlands
through mitigation. These amendments are consistent vdth that apl~roaclk in that any wetlands
filled Within the planned Transportation Corridor would be replaced through mkigation.
re, tiffs approach is supported by Metro Plan policies listed below, which call for
protection of wetlands as well as maintaining adequate land fbr development. The process of
designating wetlands for protection and development is, in part, directed by state and federal
law~, which set forth guic~elines fbr determining whether a given wetland can be filled and
developed. Within this regulatory context, the proposed amendments are appropriate and
consistent with Metro Plan policy.
West Eugene Wetlands Plan Amendments
Exhibit I~ ~ F~nd[ngs
Page I0
1t~e Metropolitan Plan contahns the follov, dng policies which address the proposed amendments
(related findings follow each policy):
E onomlc Policy 18, page III-B-5. Encourage the development of transportation facilities
which would improve access to industrial and commercial areas and improve freight movement
capabilities by implementing the policies and projects in the Eugene-Springfield l~etropolitan
Area Transportation Plan (TransPlan)...'
The primary purposes of the West Eugene Parkway, as stated in the Supplemental
Envirom-nental Impact (August 1997), include:
- Provide a major access-controlled east-west connecting arterial for intra- and inter~
regional and city,Mde travel through the western half of the City of Eugene, between
Highway 126 to the west and the I-5~-105 corridor to the east~
Improve access to the West Eugene industrial area via direct connections with only
strategic crossroads, thereby supporting orderly and planned growth.
These amendments will facilitate consWaction of the West Eugene Parkway and are
therefore consistent vdth this policy.
En imnmental Resources Policy 18, page III-C-9. Local governments shall develop plans and
programs which Carefully manage development on hillsides and in water bodies and restrict
development in wetland~ in order to prot~ct the scenic quality, surface water and grotmdwater
quality, ibrest values, vegetafmn, and wildlife values of those areas.
The West Eugene Wetlands Plan was developed to manage deYelopment in and around
wetlands in West Eugene, which is sufficient to meet this policy. This policy does not
give direction for protection of resources on individual sites.
Resources Policy 28, page III-C-10: "Local governments shall protect endangered
and threatened plant and w~Idlife species, as recognized on a legally adopted statewide list, after
notice and opporttmity for public input."
Findings in quotations were provided by the Oregon Department of Transportation:
~e Approved Destgn for the West Eugene Parkway was selected ~n the 1990 Reco of
Dec~sion (ROD) after completion of a Final Environmental Impact Statement.
Subsequent to ~ssuance of the FEIS in 1990, new inventow ~nformation was developed~
and pro~,4sions codified, regardh~g wetlands and rare plant species in West
Eugene. Specifically, it became apparent that the Approved Design co}l,d result in
substantial impacts to rare wetlands and to "endangered" or "threatened plant species
that are concentrated in the west end of the project and south of the railroad tracks. These
new circumstances prompted the need ~o reevaluate the WEP alignment west of Terry
Street t° the Highway 126 connection.
To address this new information, and other issues related to traffic operations, a Modified
W'est Eugene Wetlands Plan Amendments
EXhibit B ~ Fhndhlgs
P~ell
Project was developed. The Modified Project was evaluated through a Supplemental
Environmental Impact Statement publiShed in 1997.
"The Modified Project was selected as the Preferred Alternative over the Approved
Design for the following reasons:
The Modified Project has less impacts on state and federally listed species~ The
Approved Design would have required removing 22 plants of the Willame~e Valley
Daisy and 17 clumps w/th 2,200 stems of the White-topped aster. The Modified
Project will require removal of no Willamette Valley daisies and 3 clumps with 517
stems of the White-topped aster. The Modified Project is "likely to adversely affecf'
Fender'sblue because of the possibility of incidental takes resulting from
butterfly [mpacts w~th vehicles using the facility. The Approved Design would have
had similar or greater impacts to the butterfly since the alignment of that alternative is
closer to the nearest population of Kincaid's lupine known to be serving as a host to
the butterfly.'
~Three species found in the area of the West Eugene Parkway were federally listed as
d or endangered render the Species Act on January 25, 2000~ after
release of the Supplemental Draft Environmental Impact Statement: Fender's blue
butterfly, its host ~lant ~ncaid's lUPine~ and the Willamette Valley Daisy~
"A Biological Assessme~ was prepared in 1996 to evaluate project impacts to the
federally listed Bradshaw s lo~ati~m, the Willamette Valley d~isy (which was proposed
for listing at that time), and ed aster (a species of concern). ODOT ~nitiated
informal consultation w4th U.S. Fish and Wildlife Service (USFWS) and received
concurrence from USFWS that the project would have no effect on those species m a
letter dated March 26, 1997.
"ODOT a Biological Assessment of project impacts to Fender's blue butterfly
and Kincaid~s lupine and initiated formal consultation with USFWS in December 1999,
prior to the formal listing of those species. USFWS prepared a Biological Opinion (June
6~ 2000) which concurred with ODOT TMs determination that the project would have no
effect on s lupine and was likely to adversely- affect but not jeopardize Fender's
blue butterfly. The Biological Opirfion reiterated USFWS's early concuxrence that the
[Modifiedl project would have no effect on Bradshaw's lomatium~ the Willamette Valley
daisy, or ~ite-topped aster."
Under these amendments the majorit3' of known populations oflisted rare plants in the
Plan area would be protected and Fender's blue butterfly~ while likely to be adversely
affected, will not be jeopardized. Therefore, these amendments are consistent with this
policy~
Environmental Design Policy 2, page III-E-3: "Natural vegetation, natural water features, and
drainageways shall be protected and retained to the maximin extent practicable, considering the
economic, social, environmental and energy consequences in the design and construction of
West Eugene Wetlands Plan Amendments
Exh~bk B --- Fk~d~gs
Page 12
urban development and landscaping shall be utilized to enhance those atural features.
n
The overall impact of the West Eugene Wetlands Plan, including these amendments, is to
protect themajority (over 1100 acres out of approximately 1500 acres) of wetlands and
waterways in the Plan area. This includes protecting natural vegetation on these sites and
restoration of native habitat on several hundred acres. When the West Eugene Wetlands
Plan was adopted in 1992, within the West Eugene Parkway Approved Design
were designated for development. Since the Planned Transportation Corridor wetland
designation was not added to the Plan until 1998, the only wetland designation option
available at that time to allow construction of the West Eugene Parkway was "Develop.~'
The "Develop" ation, however, would also aP~ow other private development as well
as roadway construction. Concurrent with the preparation of amendments to the West
Eugene Wetlands Plan, a West Eugene Parkway Modified Project was also being
developed, and was proposed in the August 1997 Supplemental Enviropanental ~pact
Statement, which would reduce impacts to rare wetlands and to "endangered?' or
"threatened'' plant species that are concentrated in the west end of the project and south of
the railroad t~aCks.
Reco that retaining the "Develop" designation for property along the Approved
Design route would allow for a full-range of private development, not just roadway
con , this was redesignated to "Protect" in 2000 by Eugene Ordinance
No. 20200 and Lane County Ordinance No. PA 1107, adopth~g new or revised wetland
designations for various sites within the Plan Boundary. The elected officials were
advised at that time that amendments to apply the Planned Transportation Corridor
des for the Modified Project alignment would be processed follo~Ang selection of
the Modified as the preferred alternative. Exhibit A to these ordinances provides
an asteriSk footnote in the table listing the existing and proposed designations for sites
hich reads. The Eugene and Lane County Plmmmg Commissions recommended that
these sites be designated wholly or in part for Planned Transportation Corridor to
accommodate the proposed northern alignment of the West Eugene Parkway (~P).
However~ the s for the WEP w~ll be processed at a later date~ and are therefore
not included in this ordinance." The Modified Project has now been selected as the
Preferred Alternative, allowing these amendments to move forward. The shift in the
West Eugene Parkway alignment has reduced the impacts of this transportation project on
high-quality wetlands. These apply the Planned Transportation Corridor
designation to wetlands currently designated for protection or restoration along the
Modified Project route. The Planned TranSportation Corridor policy requires that ~f the
West Eugene Parkway is not consWacted, the area cannot be filled for any other purpose~
Therefore, these arnendments are consistent with this policy.
Remaining port~ons of the refinement plato
ent is consiStent~-Mth ~e rema~nin&po~ions of the refinement plan:
As stated in the Introduction to the West Eugene Wetlands Plan (November 2000), the Platt
"provides a framewoFk for balancing natural resource protection and urban development."
West Eugene Wetlands Plan Amendments
Exhibit B ~ F~dh~gs
Page 13
Almost 1,500 acres ofj~sdictional-wetlands are included in the study area. These amendments
will result in the redesignation of 41 acres to planned Transportation Corridor. These acres are
c ly designated in the Plan as Protect or Restore.
This change in designation from Protect and Restore to Planned Transportation Corridor for the
West Eugene Parkv~ay Modified Project is offSet, in part, by the prevk~us Plan amendments
redesign~ting 16.4 acres from Devel~p to Protect for,wetlands }l;ng the
We2
Eugene
Par~k, way
Approved Design. These acres are included under the Protect row in the Current Acres
column in the table below~
The change in acres for each wetland designation category in the Plan due to the proposed
arnendments for the West Eugene Parkway is shown in the table below.
Wetland Designation
Transportation Corridor
Current Acres Proposed Acres
8.4
Protect 720.3
49.4
705.2
418.7
Restore 444.7
Change in
Acreage
41
- 15.0
- 26.0
304.3 304.3 0.0
l 13.2 13~2 0~0
orridor~ Total 1,491 1,49 t
* Current acres includes property which received the Planned Transportation Corridor wetland designation through
the 1999 and 2000 amendments to the West Eugene Wetlands P!~ap~. This wetland ~,esi. ~gp~ation is no~ curr}?y
applied to my prope~ within either the West ~ugene ~ay Approve~.Design o; Modified Project
a~ignments. Property within the West Eugene Parkway Approved 6esign atigment south ogthe railroad tracks
designated Develop in the 1992 Plan were redesignated Protect through the 2000 amendments to the Plan.
The West Eugene Wetlands Plan contains several goals for resource protection. As defined on
page iv of th~ West Eugene Wetlands Plan (November 2000), the goals are not mandatory and
~n~d[ngs of consistenW w4th the goals are therefore not required.
The Wes~ Eugene Wetlands P1an (November 2000) contains the following applicable policies
(zelated findings follow the polic~es):
PoI~cy 3.22:
"Future fill wSth~n the Planned Transportation Corridors as shown on Wetland
Designations Map (Map 3) si:mil be l~mited to those areas granted state and/or
federal wetland fill permits for the construction of planned public roadway
~mprovements. New roadway constxucfion shall be limited to those projects listed
~n TransPlan as of August I0~ 1992~ excluding those projects listed ~n Appendix
B; no other new roads or streets are permitted. Road vddening and other
improvements to existing roads or streets shall be limited, to those listed in
TransPlan (i992) or in an adopted capital improvement plan (CIP) as of June 30~
West Eugene Wetlands Plan Amendments
Exhibit B ~ FLnd~gs
Page 14
1998. Road widening and other improvements to existing roads or streets within
wetlands designated ~or protection ~r restoration shall require an amendment of
this plan to change the designation to "Plarmed Transportation Corridor" if the
project is not listed in Trans Plan (1992) or in an adopted CIP as of June 30, 1998.
In no case shall more than 1 acre (cumulative) of protected wetland be re-
designated to Planned Transportation Corridor for improvement to an existing
road or street."
The West Eugene Parkway was listed in TransPlan in 1986, was listed in TransPlan as of August
10, 1992, an~ constitutes &new roadway construction." When the West Eugene Wetlands Plan
was adoPted in 1992, wetlands within ihe West Eugene Parkway Approveci Design were
designated for development. Since the Planned TranSportation Co~idor wetland designation was
not added to the Plan until 1998, the only wetland des, lgnation o,ption a,~ailable a,~ that ~ime to
allow Construction of the West Eugene ~arkway was ~evelop. The Develop designation,
hoWever, would also allow other private development as well as roadway construction.
conCurrent With the preparation (~f amendment~ to the West Eugene Wetlands Ptam a West
Eugene Parkway Modified Project was also being developed, and was proposed in the August
1997 Supplemer~,tal Enviro~enm,1 Impact St,ater~ent, wl~ich would reduc~ impacts to rare
wetlands ~d to endangered or threatened' plant species that are concentrated in the west end
of the project and south df the railroad tracks.
nizing that retaining the "Develop" designation for property along the Approved Design
route would allow lbr a full-range of ~,rivate development, not just roadway construction, this
property was redes~gnated to Protect m 2000 by Eugene Ordinance No. 20200 and Lane
County Ordinance No. PA 1 t 07, adopting new or revised wetland designations for various sites
within the P1an Boundary. The elected officials were advised at that time that amendments to
apply the Planned Transportation Corridor designation for the Modified Project alignment would
preferred alternative. Exhibit A
asterisk footnote in the table listing the existing and proposed
Commissions
~ese sites be designated wholly or in part for Plarmed Transportation
proposed northern alignment of the West Eugene Parkway (WEP).
late, and are therefore not
in this ordinance." The Modified Project has now been selected as the Preferred
The shift in the West Eugene
apply the Planned Transportation Corridor designation to wetlands
or restoration along the Modified Project route. The Planned
Corridor policy requires that if the West Eugene Parkway is not constructed, the
area cannot be filled for any other purpose. Therefore, these amendments axe consistent with this
policy.
Policy 3.14:
Implement wetland protection policies that prohibit development on wetlands
de for protection after those wetlands are acquired by a public agency or
nonprofit organization (e.g., The Nature Conservancy).
West Eugene Wetlands Plan Amendments
Exhibit B ~ Findings
P~el5
Since some of the land within the West Eugene Parkway Modified Project alignment has been
acquired by BLM through Land and Water ConserVation Fund (LWCF) appropriations~ the
Eugene Planning commission asked whether this policy is applicable to ~ at}plication of the
planned Transportation corridor wetlands designation to the ~est Eugene Parkway modified
project alignment.
Policy 3.14 was intended to address the issue of timing for implementing development~
prohi¢itive wetland protection policies. Such policie~ ~re not to be applied until after the subject
wetlands haVe been acquired by a public or non-profit agency. The p~licy ,,vas not intended
require the use of such protections~
Policy 3.14 is not applicable to the application of the Planned Corridor wetland designation tYr
the following reasons:
1. Policy 3.22 establishing the Planned Transportation Corridor wetland designation and
Policy 3.21 establishing the Utility Corridor wetlands designation allow these wetland
designations to be to publicly-owned . The findings for Eugene City
Counci l Ordinance No. 20119 and Lane County Ordinance No. PA 1117 amending the
West Eugene Wetlands Plan to establish these new wetland designations did not include
Policy 3.14 as an applicable policy.
2. The findings for Eugene City Council Ordinance No. 20147 and Lane Count3, Ordinance
No. PA 1129 which applied the Planned n Corridor wetland designation to
City-owned property along West 11~h and West 18t~ Avenues did not include Policy 3.14
to be an applicable policy.
3. Policy 3.14 directs implementation of policies which prohibit development on certain
protected wetlands. Since the Planned Transportation corridor policy specifically allows
fill of publicly-owned land for roadway constracfion in specific, limited circumstances
Lh/s policy does not prohibit development.
Policy 3.8
"Establish, maintain and protect physical and hydrologic linkages between
protected wetlands and adjacent transitional and upland wildlife habkat and
natural areas.'
ODOT has Completed an hydrologic analysis for the project. The analysis noted that surfhce
hydrology has already bee~ substantially ~hanged by deCel°pment in ~he area, including the dike
uPon which the railroad is built and existing city, coUnty, and state roads. The ditches that
parallel these features and divert sur{hce flows to waterways fm'ther modified surface hydrology.
;Fhe analysis concluded that the WEP would not have a noticeable impact on hydrology because
the railroad already acts as a barrier to overland flow of water and channels overland flow to
ditches. Consideration of impacts to subsurface hydrology determined tlmt the soils in the area
were not prone to compaction and placement of fill for construction of the V~rEp would not affect
subsurface hydrology.
The West Eugene Parkway roadwa~v would be elevated to approximately the same level as the
railroad from Amazon Creek to west of Green Hill Road, a distance of abont 1~3 miles. A
railroad grade parallels that 1.3-mile section of the WEP. The railroad creates a hydrologic
West Eugene Wetlands Plan Amendments
Exhibit B ~ Fkndings
Page 16
barrier. Ditches mn along both sides of the railroad that collect water and funnel them to two
culverts under the railroad. Those waters then flow to Amazon Creek in Dead Cow Creek and to
an unnamed channel near Green Hill Road. The ~P provides large culverts for the continued
floTM of Dead COw Creek and the unnamed channel.
ODOT worked with ODFW to design elements to minimize fragrnentation effects on wildlife
and roached an agreement on those elements in November 1994. All of the elements ODFW
requested are included in the current design. 72aese include:
3-foot high fencing imbedded in a concrete base along both sides of the roadway in the
1.3-mile kection a~d along the south side of the highv~ay at Bertelsen slough. Tl~e fence
would keep small animal ~ffthe road and direct tl~m t(;ward the undercrdssing that would be
provided
RaiSed walkways along the sides of waterway culverts to provide drive passage for small
animals
2 dry sings thru provide additional small animal crossings under the
hi SFWS and approved these elements as appropriate to minimize
fragmentation
Section 9.8424(2) The plan amendment is found to address one or more of the following:
Secti~.!45(c~ The plan amendmem is fbund to address one or more of the followin~
An error in the publication of the plato
An error in the publication of the ~
TbJs criterion is not applicable.
(b) New ~nVentory material which relates to a statewide planning goal.
!nc into the~vlan of new inventor, relates to a statew[de
gg~ah
This criterion is nor applicable.
(e) New or amended eommunlty policies A.
The 1986 TransPlan provided for development of the West Eugene Parkway along the route of
the Approved Design selected in the 1990 Record of Decision of the Final Environmental Impact
Statement. The subsequent, re-evaluation of the Approved Design route resulted in a
SUpplemental Environmental Impact Statement and selection of the Modified Project route as the
preferred alternative.
In Decernber 2000, Eugene received a letter from the Oregon Department of Transportation
(ODOT) speci~ing land use actions necessary to move forward with the conclusion of the final
st Eugene Wetlands Plan Amendments
ibit ~ ~ F~dings Page 17
supplemental Environmental Impact Statement for the West Eugene Parkway and construction of
Unit I-A of that project. Although state administrative rUles do not require completion of land
use actions for future phases of a project prior to iss~.mnce of an Environmental Impact Statement,
both the federal Bureau of land Management (BLM) and the Federal Highway Administration
(FHWA) had submitted letters to ODbV stath~g thai all land use actior~ mus~ be c°mpleted prior
to issuance of the final supplemental Environmental Impact Statement fbr the West Eugene
On December 11 and 13, 2000, the Eugene City Council considered a request by ODOT to
initiate land use actions and amend TransPlan (still in draft form at that time) to comply wkh the
BLM and FHWA requirements. On December t 3, 2000~ the Council directed the City Manager
not to irfitiate the P1an amendments.
In August 2001, City Council passed Resolution No. 4678, calling a special election for
November 6, 2001. That resoi~tion placed two measures Concerning transportation alternatives
for west Eugene on the November ballot. Measur~ 20-53 "Transportation Improvements in West
Eugene, Not Including the West Eugene Parkway asked- ~Shall Cit work ~th overnment
. y g
p rs to pursue comprehensive transportation and land use strategies and pro~ects for west
ugene. Measure 20-54 West Eugene Parkway asked voters: Shall C~ty pursue funding and
~ansportafion and land use appro~vals to facilitate construction of the West Eugene Parkway?"
In adopting TransPlan followSng the August 2001 decision to call a special election but prior to
the Nd~e~ber 6, 2001 election, ~e Tra~Plan adopting officials reco}n~zed that amendments to
lan would need to be considered if either of the ballot measures passed.
On November 6, 2001, Eugene voters approved Ballot Measure 20-54; Ballot Measure 20-53
failed. Although the voters had already approved the route of the West Eugene Parkway in
November 1986~ the November 2001 ballot measure asked whether the City should pursue
~ing and transportation and land use approvals to facilitate construction of the W~st Eugene
Parkway. As such, the November 2001 ballot measure was a refinement of the November 1986
ballot measure and represents an "amended commurfity policy~ or "change in public policy."
On November 28~ 2001, the Eugene City Council passed Resolution No. 4694, initiating
amen~entS to the West Eugene Wetl~ds Plan, ~ugene~Springfield Metropolitan Are~ General
Plan (Metro Plan) and Eugene-SPringfield Metropolitan Area Transportation Plan (TransPlan) to
facilitate cons~ction of the West Eugene Parkway. This action by the C~ty Council was in
dkect response to the November 6~ 2001 vote approving Ballot Measure 20-54.
~ending the West Eugene Wetlands Plan to apply the Planned Transportation Corridor wetland
designation to sPecific property along the West Eugene Parkway modified project al~gnment
addresses this refinement plan amendment criterion.
West Eugene Wetlands Plan Amendments
Exhibit B __ F~nd~ngs
Page 18
(d) New or amended provisions in a federal law or regulation, state statute, state
regulation, statewide planning goal, or state agency land use plato
ble refinement r~lan amendment criterion not included in Lane Code Urbanizable Area
Land use and~Z .l
This criterion does not apply.
A change of circumstances in a substantial manner not anticipated in the plan;
A change of circumstances in a substantial manner not anticipate.d in the plan:.
This criterion does not apply.
ccordWEWPexhB7102fnl.wpd
West Eugene Wetlands Plan Amendments
Exhibit B -- Findings
Page 19