HomeMy WebLinkAboutAdmin Order 58-19-11-FADMINISTRATIVE ORDER NO. 58-19-11-F
of the
INFLATIONARY
CHARGES FOR
WASTEWATER
SYSTEM.
City Manager of the City of Eugene
ADJUSTMENTS TO SYSTEMS DEVELOPMENT
REGIONAL WASTEWATER SYSTEM, LOCAL
SYSTEM, STORMW ATER SYSTEM, AND PARKS
The City Manager of the City of Eugene finds as follows:
A. Section 2.020 of the Eugene Code, 1971 (EC), authorizes the City Manager of the
City of Eugene to determine and set fees and charges to be imposed by the City for services , goods,
use of municipal property, and licenses and permits. EC 7.710(5) and Section 2.4 of the Systems
Development Charge (SDC) Methodologies authorize the City Manager to adopt by administrative
order pursuant to EC 2.020, a change in the amount of a reimbursement fee or an improvement fee
if the change in amount is based on: (1) the periodic application of an adopted specific cost index
(inflationary adjustment); or (2) a modification to any of the factors related to rate that are
incorporated in the established methodologies, so long as the fees are not increased by more than
five percent within any 12-month period.
B. The SDC Methodologies were adopted by Resolution No. 4900 effective May 7,
2007, and have subsequently been amended. Inflationary adjustments to Regional Wastewater
System SDCs have been adopted, most recently by Administrative Order No . 58-18-09-F, effective
July 1, 2018. Inflationary adjustments to the Local Wastewater System, Stormwater System, and
Parks System have been adopted, most recently by Administrative Order No. 58-17-19-F effective
September 1, 2017.
C. Section 2.4 and Appendix C-2 of the City of Eugene System Development Charge
Methodologies provide for periodic inflationary adjustments to the Regional Wastewater SDC rate
schedule by applying the Engineering News Record (ENR) 20-City National Average
Construction Cost Index to determine the current value of the existing system and of future
projects.
D. Section 2.4 of The City of Eugene System Development Charge Methodologies
provides for periodic inflationary adjustments to SDC rates for the Local Wastewater and
Stormwater Systems by applying the ENR 20-City National Average Construction Cost Index.
E. Section 2.4 and Appendix E of the City of Eugene System Development Charge
Methodologies provide for periodic inflationary adjustments to the Parks SDC rate schedule by
applying the ENR 20-City National Average Construction Cost Index to determine the current
development and renovation costs for proposed park improvements. No inflationary adjustment
to the land acquisition costs for parks is proposed.
F. Based on the Engineering News-Record 20-City National Average Construction
Cost Index of 2.96% (April 2017 through April 2019), these increases will not result in a 5% or
greater fee revision within a 12-month period.
Administrative Order -Page 1 of 2
G. Pursuant to Sections 2.020 and 7.710(5) of the Eugene Code, 1971, and Section 2.4
of the SDC Methodologies, and the recommendation of the Metropolitan Wastewater Management
Commission, on June 27, 2019, I issued Administrative Order No. 58-19-11 directing that public
Notice be given advising the public of an opportunity to submit comments on my proposal to
implement inflationary increases to the Systems Development Charges for Regional Wastewater
System, Local Wastewater System, Stormwater System, and Parks System, effective August 1,
2019, or as soon as legally permissible thereafter. In making the determination to implement the
inflationary adjustments, I have considered the applicable policies, enactments and directives of
the City Council, the amount charged by the City in the past, the full costs of providing these
services supported by the fee, the amounts charged by other comparable providers, and the revenue
needs of the City as determined by the adopted City budget.
H. Notice of the proposed amendments was given by providing copies of
Administrative Order No. 58-19-11, including Exhibit A (the current rates and proposed
amendments) and Exhibit B (the Notice), to the Mayor and City Councilors; making those
documents available to persons who had requested such notice; making the documents available
for review at the Eugene City Engineer's Office, Public Works Department, 99 East Broadway,
Suite 400, Eugene, Oregon; and, on July 9, 2019, posting the documents at two City Hall locations.
In addition, persons who requested notice of the amendments were mailed informational postcards
as notification of the proposed amendments and, on July 9, 2019, a copy of the Notice marked as
Exhibit B to the Administrative Order was published in the Register-Guard Newspaper.
I. Notice provided that written comments would be received for a period of 15 days
from the date of posting and publication. No comments were received within the time or in the
manner set forth in the Notice.
J. I find that the inflationary adjustments set forth in Exhibit A to this Order are
consistent with adopted policies of the City, are in conformity with applicable state law, are
authorized by Section 7. 710( 5) of the Eugene Code, 1971, and should be implemented effective
August 1, 2019.
On the basis of these findings, I order that:
1. The adjusted Systems Development Charges for Regional Wastewater System,
Local Wastewater System, Stormwater System, and Parks System set forth in Exhibit A attached
to this Order are to be implemented effective August 1, 2019.
2. The unamended Systems Development Charges for Regional Wastewater System,
Local Wastewater System, Stormwater System, and Parks System remain in full force and effect.
Dated this~day of July, 2019.
)JJ~~ . ~
Jon R. Ruiz ~
City Manager
Administrative Order -Page 2 of 2
TABLE 6
Local Wastewater System Development Charge Analysis
1. Analysis of System Value
Total Replacement Cost -P ipe $663 ,482 ,975
Total Replacement Cost -Pumping Stations $25 ,328,400
City Cost of future projects within UGB $15 ,860 ,051
Other Wastewater Components $5 ,198 ,817
Total Cost of Existing Wastewater System $709,870,243
2. Analysis of Assessable Amount
Size Total Cost
6-inch $15 ,066 ,285
8 to 48-inch $501 ,628 ,130
Total Assessable Cost $516,704,415
3. Capacity Information
Total City System Capacity in mgd 49.0
4. Calculation of Wastewater SDC
Total System Valuation , existing and planned $709 ,870 ,244
Cost per unit of capacity per gallon $3.60
Residential Rate Structure $462.40 per RDU + $0.1121 per sq. ft. of living area
Non-Residential Rate Structure
5. Calculation of Reimbursement Percentage
City System Capacity (EDUs) in mgd
Existing Use in mgd
Percent Available for New Development in mgd
Total Value of Reserve Capacity (value of system)
Value of Increased Capacity (cost of future projects UGB-Master P lan )
Value of Re imbursable Capacity (previously paid value-existing users)
City of Eugene SDC Methodologies
Exhb ii t A to Administrative Order No . 58-19-11 -F
Page 1 of 17
See Table 7
49 .0 100.00 %
21.4 43.7%
27.6 56.3%
$99 ,267,431 100.00%
$15 ,77 ,688 15.98%
$83,407 ,515 84.02 %
Wastewater, Page C•4
TABLE 7
Local Wastewater Plumbing Fixture Unit Rates
Eugene Local
Wastewater Description Average Daily Flow per Cost per PFU
soc PFU (Flow per PFU x $3.60*)
Use Code*
1F Single-Family/ Duplex Housing $476.09 + (Sq. Ft. Living Area x $0.1154)
1X Mixed Use with Residential $476 .09 + (Sq. Ft. Living Area x $0.1154)
11 Multi-Family Housing $476.09 + (Sq . Ft. Living Area x $0.1154)
12A,B,&C Elderly Housing Attach , Detach , & Group/Retirement Home $476.09 +(Sq.Ft. Living Area x $0 .1154)
13 Residential Hotel $476 .09 0 + (Sq. Ft. Living Area x $0.1154)
14 Mobile Home Park $476.09 + (Sq. Ft. Living Area x $0.1154)
15 Hotels , Motels , Lodging 19 .05 $68 .71
21 Beverage/Food Mfg 39 .87 $143 .68
24 Wood Products 47.93 $172.87
2X Light Mfg./Printing 56.62 $204.21
3X Manufacturing 58 .65 $211.53
4X Transportation & Utilities 18.22 $65.71
41 Fire Station 7.75 $27.95
51 Wholesale Trade 21 .37 $77 .08
54 Retail Trade / Grocery 55.46 $196.56
55 Retail Trade Automotive 7.83 $28.24
59 Retail Trade Other 39.91 $143.94
5A Restaurant -Fast Food 25.44 $91 .76
5B Restaurant -Low to Med Turnover 62.47 $225 .31
5C Restaurant -Higher Turnover 22.45 $80 .97
5D Drinking Establishments 54.98 $198.29
5E Take/Bake & Pick Up/Delivery Establishments 26.49 $95 .54
5X Retail Trade / Clothing & Dry Goods 12 .35 $45 .54
61 Financial Offices / Banks 16 .99 $61.28
62 Other Services 28 .51 $102 .83
63 Rental/Storage Services 6.49 $23.40
64 Automotive & Other Repair Services 16 .17 $58 .32
65 Medical Services 28.75 $103 .69
66 Construction Trade Services 13.69 $49.38
67 Government Services , Office/Business Parks Based on specific use of development
68 Education / Cultural 15.66 $56.48
69 Churches/Clubs/Organizations 15 .70 $56 .63
6A1 Laundry Services (Linen , Uniform) 538.96 $1 ,943.85
6A2 Laundry, Self-Service 299.64 $1080 .70
6A3 Dry Cleaning Service (with or w/out laundry services) 36 .30 $130 .92
6B Car Wash 264.54 $954 .11
6X Professional/Real Estate/Insurance 67.76 $244.39
7X Entertainment, Recreation & Sports 88.42 $318 .90
82 Veterinarian Service 24 .79 $89.41
*The unit cost of capacity for the local wastewater system is $3 .50 per gallon per day.
The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use.
Land use types that do not fit into the above categories will rece ive a default flow assignment based on the sample average.
The default flow is 47.93 gal/day x $3.50 = a cost per PFU of $167.76.
A rate per PFU may be assigned by the City Eng ineer should a proposed use not be represented by one of the publ ished SOC use
codes and fo r w h ich a default flow assignment is not representative of the proposed flow . In the case of those proposed
developments that are determ ined to have a potential for exceptional water usage , the City Eng ineer may require that the Owner(s)
enter into an agreement w ith the City to review water usage or wastewater discharge at such time the development is in full use or
production as the final basis of the local wastewater SOC . A complete list of wastewater SOC/HUD BPR use codes is provided in
Table 8 .
City of Eugene SDC Methodologies
Exhb iit A to Administrative Order No . 58-19 -11 -F
Page 2 of 17
Wastewater, Page C•S
ii
w~ ::;
""is:
3 5'
?a
ii!
~·
0
i
~
0,
CD
<O
"Tl
Metropolitan W as tewater Management Commission
Regional Wastewater SDC Fee Schedule -Effective July 1, 2019
Was tewater Eugene I
Use Code _ Type of Establishment
4X TRUCK TERMINAL
63 MINI WAREHOUSE
4X UTILITIES
1X OTHER RES IDENTIAL (SFD W/OTHER USES)
11 OTHER RESIDENTIAL· MULTI FAMILY
13 OTHER RESIDEN TIAL . RESIDENTIAL HOTEL/MOTEL
14 OTHER RES IDENTIAL· MOBILE HOME PARK
11 OTHER RESIDENTIAL· SMALL HOME <= 800 SQ FT
1 F SFD / DUPLE X
15 MOTEL/ HOTEL
7X PUBLIC PARK
7X MULTIPURPOSE RECREATION FACILITY (Indoor)
7X THEATER
7X OUTDOOR ATHLETIC COMPLEX
7X TENNIS COURT
7X RACQUET CLUB
7X HEAL TH CLUB
7X BOWLIN G ALLEY
7X RECREATIONAL CENTER
u
u
u
u
u
y
y
y
y
y
~
y
y
~
~
~
~
~
~
~
D
D
D
D
~
~
~
5D
5D
64
55
6B
55
INDUSTRIAL PROCESS LOW STRENGTH
INDUSTRIAL PROCESS MEDIUM STRENGTH
INDUSTRIAL PROCESS HIGH STRENGTH
INDU STR IAL PROCESS VERY HIGH STRENGTH
INDU STR IAL PROCESS SUPER HIGH STRENGTH
ELE MENTARY SCHOOL
MIDDLE SCHOOL
HIGH SCHOOL
COMMUNITY COLLEGE
UNIVERSITY
CHURCH
DAY CARE CENTER
LIBRARY
FRATERNAL ORGANIZATION
SERVICE STATION/ MARKET
HOSPITAL
NURSING HOME
CLINIC, MEDICAL OFFICE
FAST FOOD RESTAURANT
VETERINAR IAN SERVICES
OFFICE PARK
BUSI NESS PARK
GOVERNMENT BUILDING
US POST OFFICE
RETAIL
QUALITY RESTAURANT
HIGH TURNOVER RESTAURANT
EATING PLACE WITH MINIMAL FOOD PREPARATION' ..
DRINKING PLACE WITH MINIMAL FOOD PR EPARATION"""
DRINKING PLACE WITH RESTAURANT LIKE FOOD PREPARATION
DRINKING PLACE
AUTO CARE
NEW CAR SALES
CAR WASH
TIRE STORE
METROPOLITAN WASTEWATER MANAGEMENT COMMISSION (MWMC)
REGIONAL WASTEWATER
SYSTEM DEVELOPMENT CHARGE (SOC) SCHEDULE
Flow Base Flow Average Flow Dry Season Max Wet Season Peak
I I
DrySeason I I I
Unit (FEU) (gal/FEU/day) (ga l/F EU/day) (gal/FEU/day) (gal/FEU/day) Stren gth (mg/I) I Es!imation Impact Imp act Month Im pact flow Impact 800/TSS Strength
TGSF 100 137 205 398 150 low
Low
low
Low
low
Low
low
low
Low
TGSF
TGSF
DU
DU
TGSF
DU
DU
DU
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TG SF
TGALEF
TGALEF
TGALEF
TGALEF
TGALEF
TGSF
TGSF
TGSF
TG SF
TGSF
TGSF
TGSF
TG SF
TG SF
TGS F
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
TGSF
30
100
175
150
200
150
150 -160
160
160
160
160
160
160
160
160
1000
1000
1000
1000
1000
w
w
w
w
w
w
w
w
w
180
150
150
150 --100
100
100
100
w ------~
w -w
41
137
239
205
273
205
205
239
273
219
219
219
219
219
219
219
219
219
1,366
1,366
1,366
1,366
1,366
68
68
68
68
68
68
68
68
68
246
205
205
205
683
273
137
137
137
137
68
683
683
410
464
683
464
55
68
683
68
61
205
359
307
410
307
307
359
410
328
328
328
328
328
328
328
328
328
2,049
2,049
2,049
2,049
2,049
102
102
102
102
102
102
102
102
102
369
307
307
307
1,024
410
205
205
205
205
102
1,024
1,024
615
697
1,024
697
82
102
1,024
102
119
398
696
597
796
597
597
696
796
636
636
636
636
636
636
636
636
636
3,978
3 ,978
3,978
3,978
3,978
199
199
199
199
199
199
199
199
199
716
597
597
597
1,989
796
398
398
398
398
199
1,989
1,989
1,193
1,353
1,989
1,353
159
199
1,989
199
Page 1 of2
150
150
150
150
150
150
150
150
300
150
150
150
150
150
150
150
150
150
Medium
Low
Low
Low
Low
low
low
Low
low
Low
150 Low
300 Medium
500 High
700 Very High
900 Super High
150 Low
150 low
150 Low
150 low
150 low
150 Low
150 low
150 Low
150 Low
150 Medium
150 Medium
150 Low
150 Low
500 Very High
150
150
150
Low
Low
Low
150 Low
150 Low
150 Low
500 Very High
500 Very High
150 Low
150 Low
150 Very High
150 Low
150 Medium
150
150
150
l ow
Low
Low
Proposed
July 1, 2019
I BOD I TSS I Reimburse-men!\ Improvement I Compliance \ 6m~~tm;~t I Total Cost per
(lbs/FEU/day) • (lbs/FEU/day) • Cost per FEU Cos t per FEU Cost per FEU r"s~p;~rt 8 e FEU
0.111 · 0.171 $77.67 $1,068 .83 $13.04 $142 .63 $1,016.91
0.051
0.171
0.299
0.256
0.342
0.256
0.256
0.299
0.684
0.274
0.274
0.274
0.274
0.274
0.274
0.274
0,274
0.274
1.710
3.419
5.699
7.979
10,258
0.085
0.085
0,085
0.085
0.085
0.08 5
0.085
0.085
0,085
0.615
0.513
0.256
0.256
3.989
0.342
0.171
0.171
0.171
0.171
0.085
3.989
3.989
0.513
0.581
3.989
0.581
0.137
0.085
0.855
0.085
0.051
0.171
0.299
0.256
0.342
0.256
0.256
0.299
0.684
0.274
0.274
0.274
0.274
0.274
0.274
0.274
0.274
0.274
1.710
3.419
5.699
7.979
10.258
0.085
0.085
0.085
0.085
0.085
0.085
0.085
0.085
0.085
0.615
0.513
0.256
0.256
3,989
0.342
0.171
0.171
0.171
0.171
0.085
3.989
3.989
0.513
0.581
3.989
0.581
0.137
0.085
0.855
0.085
$23.30
$77.67
$135 .93
$116,51
$155.35
$116 .51
$116 .51
$135 .93
$257,77
$124 .28
$124 .28
$124.28
$124 .28
$124 .28
$124 .28
$124 .28
$124.28
$124 .28
$320.65
$1,068.83
$1,870 .45
$1,603.24
$2,137 .65
$1,603 .24
$1,603.24
$1,870.45
$2,951.10
$1,710.12
$1 ,710.1 2
$1,710.12
$1,710.12
$1,710.12
$1,710.12
$1,710.12
$1,710 .12
$1,710.12
$776 .73 $10,688 .27
$1,288.87 $14,755.48
$1 ,971 .72 $20,178.43
$2,654 .57 $25,60 1.38
$3,337.42 $3 1,024.33
$38 .84 $534.41
$38.84 $534.41
$38.84 $534.4 1
$38 .84 $534.41
$38 .84 $534.41
$38.84 $534.41
$38.84 $534.41
$38 .84 $534.41
$38.84 $534.41
$232.00 $2,655.99
$193.33 $2,2 13.32
$116.51 $1,603.24
$116 .51 $1,603.24
$1,327.29 $12,800.69
$155 .35
$77.67
$77.67
$2,137.65
$1,068 .83
$1,0Y.83
$77.67 $1,068.83
$77 .67 $1,068.83
$38 .84 $534.41
$1,327 .29 $12,800.69
$1,327 .2g $12,800.69
$233.02 $3,206.48
$264.09 $3,634 .01
$1,327.29 $12,800.69
$264 .09 $3,634 .01
$5 1.55 $590.22
$38.84
$388.37
$38.84
$534.41
$5,344 .13
$534.41
$3 .91
$13.04
$22,82
$19 .56
$26.08
$19 .56
$19 .56
$22 .82
$36.49
$20.86
$20.86
$20 .86
$20.86
$20 .86
$20.86
$20.86
$20.86
$20.86
$130 .38
$182.45
$251.89
$321.32
$390.75
$6.52
$6.52
$6 .52
$6 .52
$6.52
$6 .52
$6.52
$6 .52
$6 .52
$32.84
$27 .37
$19.56
$19.56
$160.66
$26.08
$13.04
$13.04
$13.04
$13.04
$6 .52
$160 .66
$160.66
$39.11
$44.33
$160.66
$44 .33
$7.30
$6.52
$65.19
$6.52
$42 ,79
$142 .63
$249 .60
$2 13.94
$285.25
$213.94
$213 .94
$249 .60
$381.47
$228 .20
$228.20
$228 .20
$228.20
$228 .20
$228 .20
$228.20
$228.20
$228.20
$305.07
$1,016.91
$1,779.60
$1,525.37
$2,033.82
$1,525.37
$1,525.37
$1,779.60
$2,863.90
$1,627.06
$1,627.06
$1,627.06
$1,627 .06
$1 ,627.06
$1 ,627 .06
$1 ,627 .06
$1,627 .06
$1,627.06
$1,426.27 $10,169.12
$1,907.33 $14,319.48
$2,548.75 $19,853.29
$3,190.17 $25.387 .10
$3,83 1.59 $30,920 .92
$7 1.31 $508.46
$71 .31 $508.46
$71.31 $508.46
$71.31 $508.46
$71 .31 $508.46
$71 .31 $508 .46
$71 .31 $W8.46
$71 .31 $508 .46
$7 1.31 $W8.46
$343.32 $2,577.51
$286.10 $2,147 .92
$213 .94 $1,525.37
$2 13.94 $1,525.37
$1,595.08 $12,693.55
$285.25
$142,63
$142 .63
$2,033.82
$1,016.91
$1,016.91
$142.63 $1,016.91
$142 .63 $1,016.91
$71 .31 $W8.46
$1,595 .08 $12,693 .55
$1,595.08 $12,693.55
$427.88 $3,050.73
$484.93 $3,457.50
$1,595.08 $12,693.55
$484 .93 $3 ,457.50
$76 .29 $572.78
$7 1.31
$713.13
$71.3 1
$508.46
$5,084.56
$WB.46
Ii
.::..~ :: ;
....,)>
3 5·
~ ~-
0
i
~
0,
CD
<D
"Tl
Metropolitan Wastewater Management Commission
Regional Wastewater SDC Fee Schedule -Effective July 1, 2019
Eugene I
Wastewater
Use Code Type of Establishment
54 SUPERMARKET
54 CONVENIENCE MARKET
5X DISCOUNT MARKET
5X FURN ITURE STORE
7X VIDEO ARCADE
61 FINANCIAL INSTITUTION
12 B ELDERLY HOUSING-DETACHED
12A ELDERLY HOUSING -ATTACHED
12C CONGREGATE ELDERLY CARE FACILITY
21 HEAW INDU STRY/INDUSTRIAL••
2X HEAW INDUSTRY/INDUSTRIAL••
24 HEAW INDU STRY/INDUSTRIAL"•
3X HEAW INDUSTRY/INDUSTRIAL••
3X HEAW INDU STRY/I NDUSTRIAL
6X GENERAL OFFICE BLDG
51 WHOLESALE TRADE
5X CLOTHING/ DRYGOODS / HOUSEWARES
6A LAUNDRY
62 OTHER SERVICES
66 CONSTRUCTION TRADE
68 OTHER EDUCATIONAUCULTURAL
7X OTHER ENTERTAINMENT
Varies SHOPPING CENTER
ABBREVIATIONS
TGSF -THOUSAND GROSS SQUARE FEET
TSFGLA -THOUSAND SQUARE FEET GROSS LEASABLE AREA
DU -DWELLING UNIT
TGALEF -THOUSAND GALLONS ESTIMATED FLOW
VFP -VEHICLE FUELING POSITIONS
METROPOLITAN WASTEWATER MANAGEMENT COMMISSION (MWMC)
REGIONAL WASTEWATER
SYSTEM DEVELOPMENT CHARGE (SOC) SCHEDULE
Proposed
July 1, 2019
I I D~ Season I I I I I BOD I TSS I Reimburse-men! I Improvement I Compliance I Improvement I Total Cost per Flow Base Flow Average Flow Ory Season Max Wet Seas.on Peak BODfTSS
Estimation Impact Impact Month Impact Flow Impact Strength (mg/1) Strength (lbs/FEU/day) • (lbs/FEU/day) • Cost per FEU Cost per FEU Cost per FEU Cre~~;~~~ate FEU
Unit (FEU) (gal/FEU/day) (gal/FEU/day) (gal/FEU/day) (gal/FEU/day)
TGSF 180 246 369 716 300 High 1.026 1.026 $354 .9 1 $3,632.12 $45.34 $458.77 $3,573.59
TGSF 180 246 369 716 150 Low 0.308 0.308 $139 .81 $1,923.89 $23.47 $256.73 $1,8 30.44
TGSF 30 41 61 119 150 Low 0,051 0.051 $23.30 $320.65 $3 .91 $42.79 $305.07
TGSF 30 41 61 119 150 Low 0.05 1 0.051 $23 .30 $320.65 $3 .91 $42.79 $305.07
TGSF 160 219 328 636 150 Low 0.274 0.274 $124.28 $1,710.12 $20.86 $228.20 $1,627.06
TGSF 110 150 225 438 150 Low 0.188 0.188 $85.44 $1 ,175.71 $14.34 $156.89 $1,118.60
TGSF 100 137 205 398 150 Low 0.171 0.171 $77.67 $1 ,068.83 $13.04 $142.63 $1,016 .91
TGSF 100 137 205 398 150 Low 0.171 0.171 $77.67 $1,068.83 $13.04 $142 .63 $1,016.91
TGSF 100 137 205 398 150 Low 0.171 0.171 $77 .67 $1,068.83 $13.04 $142.63 $1,016.91
TGSF 50 68 102 199 150 Low 0.085 0.085 $38 .84 $534.41 $6 .52 $71.31 $508.46
TGSF 50 68 102 199 150 Low 0.085 0.085 $38.84 $534.41 $6.52 $71.31 $508.46
TGSF 50 68 102 199 150 Low 0.085 0.085 $38 .84 $534.41 $6 .52 $71.31 $508.46
TGSF 50 68 102 199 150 Low 0.085 0.085 $38.84 $534.41 $6.52 $71.31 $508.46
TGSF 50 68 102 199 150 Low 0.085 , 0.085 $38 .84 $534.41 $6.52 $71 .31 $508.46
TGSF 100 137 205 398 150 Low 0.171 0.171 $77 .67 $1,068.83 $13.04 $142 .63 $1,016.91
TGSF 50 68 102 199 150 Low 0.085 0.085 $38.84 $534.41 $6.52 $71.31 $508.46
TGSF 30 41 61 119 150 Low 0.051 0.051 $23 .30 $320.65 $3.91 $42 .79 $305.07
TGSF 100 137 205 398 150 Low 0.171 0.171 $77 .67 $1,068.83 $13.04 $142 .63 $1,016.91
TGSF 100 137 205 398 150 Low 0.171 0.171 $77.67 $1,068 .83 $13.04 $142.63 $1,016 .91
TGSF 100 137 205 398 150 Low 0.171 0.171 $77.67 $1,068.83 $13.04 $142 .63 $1,016.91
TGSF 50 68 102 199 150 Low 0.085 0.085 $38 .84 $534.41 $6.52 $71.31 $508.46
TGSF 160 219 328 636 150 Low 0.274 0.274 $124 .28 $1,710.12 $20.86 $228.20 $1,627.06
TGSF 100 137 205 398 150 Low 0.171 0.171 $77 .67 $1,068.83 $13.04 $142.63 $1,016 .91
NOTES
• Calculated as average now X 8.345 X strength
"* Process flow is in addition to other flow
.... Minimal food preparation -food is assembled from prepackaged food products and cooking, other than warming, is not -required
,.. ... Includes coffee houses and juice bars where appropriate
Page 2 of 2
TABLE 8
Stormwater Drainage Systems Development Charge Analysis
1. Existing Stormwater Drainage System Value &SOC-Eligible Costs (Reimbursement Fee)
Total Replacement Cost -Existing Pipe System $355 ,937,543
Total Replacement Cost -Existing Open Channel Systems $101,742,736
Total Replacement Cost, Existing (Replacement Cost New) $457,680,279
Percent of Existing Pipe System to be Used by New Development 4.27%
Percent of Existing Open Channel system to Used by New Development 2.34%
Total SOC-Eligible Cost -Existing Pipe* $15,198 ,534
Total SOC-Eligible Cost -Existing Open Channel Systems* $2 ,380,781
Total SOC-Eligible Cost, Existing System $17,579,315 * Based on percent available capacity per hydraulic model
2. Future Stormwater System SOC-Eligible Project Costs (Improvement Fee)
Total Est. Cost, Future System (SOC-Eligible Projects) (From Table 9) $44,814,477
SOC-Eligible Portion of Project Cost, Future System (excluding LID capacity) (From Table 9) $19,353,505
SOC-Eligible Portion of Project Cost for Future System LID Capacity (From Table 9) $9,077,288
3. Stormwater System Calculation Details
Single-Family Dwelling (SFD), estimated average impervious surface area
Small Residential (building footprint~ 1,000 sq. ft.) 1,800 sq . ft.
Medium Residential (building footprint >1 ,000 sq. ft. and < 3,000 sq.ft.) 2,900 sq. ft.
Mfg . Home Park Space, estimated average impervious surface area 1,780 sq . ft .
Total Additional Impervious Surface Area within UGB (build-out) 155,770,560 sq. ft.
Total Additional Impervious Surface Area within UGB (build-out) requiring LID capacity 4,650,000 sq. ft.
4. Calculation of SDC*
Unit Cost per Square Foot, Improvement Fee [$19 ,357,162/ 160,381 ,369] $0 .1207
Unit Cost per Square Foot, Improvement Fee for LID capacity component [$8 ,765 ,632/4,787 ,640] $1.831
Unit Cost per Square Foot, Reimbursement Fee [$17 ,579,315 / 160,381,369] $0.1096
Total Unit Cost per Square Foot for General Capacity [Improvement+ Reimbursement] $0.2371
Total Unit Cost per Square Foot with LID component [Improvement+ LID + Reimbursement] $2.122
Small Residential SDC (building footprint < 1,000 sq. ft.) 1,800 sq. ft . x$0.2371] $426 .78
Medium Residential SDC (building footprint >1,000 sq. ft. and < 3,000 sq .ft.) [2 ,9 00 sq . ft. x$0.2371] $687.59
Small Duplex SDC (unit bu ilding footprints< 1,000 sq . ft.) [$426 .78 x2] $853.56
Medium Duplex SDC (unit building footprints >1,000 sq . ft. and < 3,000 sq .ft.) [$687 .59 X 2] $1,375.18
Mfg . Home Park SDC per Space (portion of total charge) [1 ,684 sq . ft. x$0.2371] $399.28
Small Residential SDC with LID (building footprint < 1 ,000 sq. ft.) 1,800 sq. ft. x$2 .122] $3 ,819.60
Medium Residential SDC with LI (building footprint >1 ,000 sq . ft. and < 3,000 sq .ft .) [2 ,9 00 sq. ft x$2 .122] $6 ,153.80
Small Duplex SDC with LID (unit building footprints< 1,000 sq. ft.) [$3 ,819.60 x2] $7,639.20
Medium Duplex SDC with LID (unit building footprints >1 ,000 sq . ft. and < 3,000 sq.ft .) [$6 , 156.8 0x 2] $12 ,313.60
Mfg. Home Park SOC per Space (portion of total charge)with LID [1 ,684sq .ft.x$2.122] $3 ,573.45
*See Appendix F for complete rate schedule .
City of Eugene SDC Methodologies Stormwater, D-7
Exhbiit A to Administrative Order No . 58-19-11-F
Page 5 of 17
TABLE 9
City of Eugene
2003 Stormwater SOC-Eligible Project List
Project Name
Martin Drive Pipe Improvements (02-07 CIP )
Mt. Cavalry Pipe Improvements
Frederick Court Pipe Dayliqht
43rd Avenue Pipe Improvements
Morse Park Ranch Park Pipe Improvements
Laurelwood Flood Control Fae/Pipe Imps
Jackson Street Pipe Improvements
Windsor Circle Pipe Improvements
West Hawkins Lane Water Quality Facility
Bell Avenue (Increase Pipe Sizes Along )
Empire Park Pond Retrofit
Royal Node Stormwater Infrastructure
Greenh ill Tributary Storm Improvements Ph 2
Greenhill Tributary Water Quality Facility
Roosevelt Channel -Culvert Improvement
A-1 Main Channel Culvert & Open Waterway Improvements
Lynnbrook Drive Open Waterway & Culvery Improvements
Spring C reek Bridge Construction & Waterway Improvements
Sanders Street Water Quality Facility
Spring C reek Drive Water Quality Facility
Kirsten Street Pipe Improvements
Hunsacker -Open Channel Improvements (02-07 CIP )
Lenox/Salty -Culvert Replacement (02-07 CIP)
Hunsacker Culvert Replacement (02-07 CIP)
Division Avenue Tip-Up Pipe Replacement
Irvington Drive Water Quality Facility
St. Peter School Culvert Replacement
R iver Po int Pond Outlet Channel
Gilham Road System Culvert Replacement
Gilham Road System Water Quality Facility
Ascot Park Open Waterway Modification
3rd-4th Connector Stormwater Improvements (02-07 CIP)
Beaver St & Hunsaker Ln Stormwater Improvements
Greenhill Rd Stormwater Improvements
Irvington Drive -Sto rmw ater (02-07 CIP)
Kinney Park Flow Di v ersion & Restoration
River Road -Storm w ater (02-07 CIP)
Royal A ve., Terry to Greenhill
Services for New Development ($100 ,000/year)
Streambank Stabilization ($ varies/year)
Total for General System Capacity Projects
LID Facilities in conjunction with Pa vement Preservation Progra m
LID Facilities in conjunction with Drywell Elimination Program
Total for LID System Capacity Projects
City of Eugene SDC Methodologies
Exhbiit A to Adm inistrative Order No . 58-19-11-F
Page 6 of 17
Estimated Project Cost
$154 ,997
$1 ,271 ,986
$197 ,165
$3 ,592 ,46C
$1 ,757 ,482
$3 ,347 ,294
$128 ,998
$1 ,531 ,65C
$1 ,042 ,155
$1 ,324 ,318
$641 ,659
$2 ,333 ,30€
$623 ,326
$1 ,247 ,987
$226,497
$857 ,990
$803 ,991
$232 ,165
$1 ,245,485
$394 ,328
$638 ,324
$663 ,323
$286 ,663
$43 ,336
$18 ,152
$1 ,060 ,984
$92 ,391
$622 ,159
$45 ,001
$1 ,089 ,822
$120 ,333
$199 ,998
$83 ,333
$166 ,668
$166 ,668
$1 ,033 ,322
$83 ,333
$166 ,668
$5 ,666 ,602
$8 ,166 ,574
$44,814,477
$6 ,512 ,215
$2 ,565 ,073
$9 ,077,288
Total SOC-Eligible Cost
$151 ,338
$309,402
$90 ,696
$1 ,149 ,588
$193 ,323
$502 ,094
$32 ,249
$984 ,632
$843 ,649
$609 ,187
$128 ,331
$2 ,333 ,306
$212 ,497
$374 ,397
$71 ,525
$137 ,279
$241 ,197
$53 ,398
$62 ,274
$78 ,865
$185 ,114
$398 ,328
$171 ,665
$26 ,668
$4 ,175
$152 ,552
$27 ,718
$255 ,085
$45 ,001
$108 ,982
$79,420
$199 ,998
$83 ,333
$166 ,668
$166 ,668
$764 ,658
$83 ,333
$166 ,668
$5 ,666 ,602
$2 ,041 ,643
$19,353,505
$6 ,512 ,215
2 ,565 ,073
$9,077,288
Stormwater, D-8
-om ru >< co ::J"
(I) O"
-...J ~
0 )> --->.Q
-...J )>
a.
3
::5"
~
?1. <' (I)
0 a.
~
z
~
01
Cf>
->.
~
->.
"Tl
Table 13
Reimbursement Fee Cost Basis
Existing Inventory
Developed Total Acres Acres
Park Type
Neighborhood Parks
na 210.63 95.82
Urban Plazas
Subtotal 1.10 1.10
Community Parks
na 219 .17
Metropolitan Parks
Subtotal 654.45 191.40
Natural Area Parks
Subtotal 1,487 17
Linear Parks / Greenways
Subtotal 201 .13 7.40
Special Use Facilities
Bloomberg 20.80
Campbell Center 1.43 1.43
Cuthbert Amphitheater
Hilyard Community Center
Lamb Cottage
Morse Ranch House
Owen Rose Garden 8 .30 5.20
Prefontaine Memorial 1.28
Shelton McMurphey Johnson 1.12 1 .12
South Eugene High School
Subtotal 130.71 80.53
TOTAL 2,903.96 393.05
Units Needed For Growth Unit Costs ($/Unit)
Development Acquisition Faciliti es Trails Development Acquisition Facility (Acres) (A cres) (Number) (mile s)
18 .21 40 .02 $92 ,931 $131 ,664
0 .23 0 .00 0.34 $0 $0 $0
0 .00 0 .00
19 .55 134.93 1.41 1.78 $102,670 $82,290 $997 ,182
3.49 0.00 0.61 $3 ,065 $8 ,339
0.00 31.49 2 .30 $68 ,026
4 .32 $3,216
0 .16 $6 ,456
0 .16 $129 ,071
0 .16 $6,454
0.21 $38,721
0.21 $64 ,535
0.41 0.26 0 .05 $646 $40 ,194 $193 ,606
0.27 0.21 $40 ,194 $12 ,907
0 .23 0 .23 $646 $40 ,194
0.64 5 .08 1.16
42.12 211.52 2.90 4.69
Facilities
[ V) V) > ,;::-~ ~ Q) Q)
'O ro E I e, ~-E-ni Cf) ~
'O
Growth Cost (Cost ro l9 Q) ·~ ·~ i :, 'O
Trails rj g t-LL C
Basis) .0 t-~d, w ~ ~ Ol LL -"'-·c C u V) "' .g ~ ·~ :?:-cu 0 0 ~ (l) (l) Q) :5 CL :::;; n:: '#.
$6 ,961,681 48% 48%
$0 0 0 1 0 .00 0 .00 0% 0%
$0
$100 ,330 $14,733,883 2 3 4 5.00 5 .36 42 % 30 %
$153,330 $104,496 # --3 -38% 38%
$76,826 $2,319,135 0 0 0 8 .80 3 .60 25 %
$13 ,896 8%
$1 ,041 1 8 %
$20,802 1 8%
$1,040 1 8%
$8 ,048 8%
$13 ,688 8%
$20 ,428 1 8% 8%
$13,372 8% 8%
$9 ,780 8% 8%
$0
$101 ,540 0 1 3 0.00 0.00
$24,322,830 2 4 8 16.80 8.96
-om
Ol >< (0 :::,
(D !:!.
ex,;::;:
0 )> ---' 0
-...J )>
0.
3 s·
~
iil <" (D
0 a.
~
z
~
(J1
~
'f
~
Table 14
Improvement Fee Cost Basis
New Parks and Open Space
Acquire a neighborhood park site to serve this area (B3)
Acquire a neighborhood park site to serve thi s area (B4)
Acquire a neighborhood park site to serve this area (B5)
Acquire neighborhood park to serve this area (S6)
Acquire a neighborhood park site (R1)
Acquir e neighborhood park site (R2)
Acquire a neighborhood park site (R3 and R4)
Develop F erndale Park Site
Develop Rosetta Place as neighborhood park
Acquire land for combined neighborhood park and Ridgeline
"Gateway" (W C1)
Acquire land for combined neighborhood park and Ridgeline
"Gateway" (WC3)
Acquire land for neighborhood park (WC5)
Develop Hawki ns Heights as a neighborhood park (WC4)
Develop neighborhood park (WC5)
Develop Videra Park to serve W C-6
A cquire land for neighborhood park (W11 }
Develop Willakenzi e school site as neighborhood park , with play
area and ballfields
Acquire a n eighborhood park site to north, adjacent to Golden
Gardens (B 1)
Develop Royal/Danebo
Develop neighborhood park site (B3)
Develop neighborhood park site (B4}
Develop neighborhood p ark site (B5)
Develop neighborhood park site (B1)
Develop neighborhood park site (S6)
Develop Terra Linda Park as neighborhood park
Develop Lone Oak park site as neighborhood park with athletic fiel ds
Develop Wendover Park site as neighborhood park
Develop recreational amenities along Amazon Greenway to serve
neighborhood park needs (WC2}
Dev elop Creekside Park as neighborhood park
Acquire a neighborhood park (W4)
Develop Chase Commons as neighborhood park
Develop neighborhood park site (R1}
Develop n eighborhood pa rk site (R2}
Develop n eig hb orh ood park si te (R3 and R 4}
Develop Ridgeline "Gateway" park (WC1) as both !railh ead and
outdoor recreation area wi th picnic, play ar ea , basketball , etc.
Develop Ridgeline "Gateway" park (WC3) as both !railh ead and
outdoor recreation area with picnic, play area , basketball , etc.
Develop neighborhood park site (W1 1)
Neighborhood Park Total
City of Eugene SOC Methodologies
Park
Type
NP
NP
NP
NP
NP
NP
NP
NP
NP
INP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
INP
INP
NP
N P
NP
INP
NP
INP
INP
NP
Units Quantity Acquisition Cost Development
Cost
.?
i
1 acres 4 $1,097,200
1 acres 4 $1,097,200
1 acres 4 $1 ,097,200
1 acres 4 $1 ,097 ,200
1 acres 4 $1 ,097 ,200
1 acres 4 $1,097 ,200
1 acres 4 $1,097 ,200
1 4 $777,72 0
1 acres 1 $193 ,680
1 acres 4 $1,097,200
1 acres 4 $1 ,097,200
1 acres 4 $1,097,200
3 acres 3 $581,040
12 acres 2 $387,360
1 acres 2 $387 ,360
1 acres 4 $1,097,200
1 acres 5 $968,400
1 acres 4 $1 ,097,200
1 acres 2 $322 ,800
4 acres 4 $774,720
1 acres 4 $774 ,720
3 acres 4 $774,720
4 acres 2.3 $445 ,464
14 acres 4 $774 ,720
12 acres 4.3 $832 ,824
3 acres 3.9 $755 ,352
14 acres 1 $193 ,680
3 acres 4 $774 ,720
1 acres 3.17 $6 13 ,966
1 acres 4 $1 ,097 ,200
3 acres 4 $774 ,720
14 acres 4 $77 4 ,720
3 acres 4 $774 ,720
14 acres 4 $774 ,720
5
14 acres 5 $968,400
5
126.67 $14,263,600 $14,397,526
Other Other
Other
Acquisition
Development Renovation Funding-Funding -
Funding•· Net Project Growth Share Growth Cost
Totals Partner Costs (Cost Basis) City Partner (Ownership)
$1,097,200 $0 $0 $0 $0 $1,097,200 49% $537,628
$1,097,200 $0 $0 $0 $0 $1,097,200 49% $537,628
$1,097,200 $0 $0 $0 $0 $1,097,200 49% $537,628
$1,097 ,200 $0 $0 $0 $0 $1,097,200 49% $537,628
$1,097 ,200 $0 $0 $0 $0 $1 ,097,200 49% $537,628
$1 ,097,2 00 $0 $0 $0 $0 $1,097,200 49% $537 ,628
$1,09?,200 $0 $0 $0 $0 $1,097 ,200 49% $537,628
$774,720 $0 $0 $0 $0 $774,7200 19% $1 47,197
$193,680 $0 $0 $0 $0 $193,680 19% $36,79 9
$1,097 ,200 $0 $0 $0 $0 $1 ,097 ,200 49% $537 ,628
$1 ,097,200 $0 $0 $0 $0 $1,097,200 49% $537,628
$1,097,200 $0 $0 $0 $0 $1,097 ,200 49% $537,628
$58 1,040 $0 $0 $0 $0 $58 1 ,040 19% $110 ,398
$387,360 $0 $0 $0 $0 $387 ,360 49% $189 ,806
$387 ,360 $0 $0 $0 $0 $387,360 49% $189 ,806
$1 ,097 ,200 $0 $0 $0 $0 $1 ,097 ,200 49% $537,628
$968 ,400 $0 $0 $0 $0 $968 ,400 19% $183,996
$1 ,097 ,200 $0 $0 $0 $0 $1 ,097 ,20 0 49% $537,628
$322 ,800 $0 $0 $0 $0 $322,800 49% $158 ,172
$774 ,720 $0 $0 $0 $0 $774.720 49% $379 ,613
$774 ,720 $0 $0 $0 $0 $774,720 49% $379,613
$774 ,7200 $0 $0 $0 $0 $774,720 49% $379,613
$445 ,464 $0 $0 $0 $0 $445,464 49% $218,277
$774 ,720 $0 $0 $0 $0 $774,720 49% $379 ,613
$832 ,824 $0 $0 $0 $0 $832,824 19% $158,237
$755,352 $0 $0 $0 $0 $774,720 19% $1 43,5 17
$193 ,680 $0 $0 $0 $0 $193,68 0 19% $36,799
$774,720 $0 $0 $0 $0 $752,160 49 % $379,613
$613 ,966 $0 $0 $0 $0 $613 ,966 19% $116,653
$1,097 ,200 $0 $0 $0 $0 $1,097,200 49 % $537 ,628
$774,720 $0 $0 $0 $0 $774,720 19% $147.197
$774 ,720 $0 $0 $0 $0 $774,720 49% $379 ,613
$774 ,720 $0 $0 $0 $0 $774,720 49% $379,613
$774 ,720 $0 $0 $0 $0 $774,720 49% $379,613
$ 968 ,400 $0 $0 $0 $0 968,400 49% $47 4 ,516
$35,633,606 $0 $0 $0 $0 $28,661,126 43% $12,337,437
Parks, Page E-9
""Om
Cl) >< co ::,
CD Q: c.o;:;:
0 )> --...>. 0
--.,J )>
0.
3 s·
~
?1. <' CD
0 a.
~
z
~
(J'1
~
'£
"Tl
Acquire 100+ acr es surro unding Gold en Gard ens ponds for
community p ark
Acquire Amazon Park inh oldin gs along Hilya r d fo r communi ty park
use
Acquire co mmunity park site t o se rve Sa nta Clara
D ev elop Sa nta Cl ara Community P ark, inclu ding li ghted ballfi elds
D eve lop Golden G arden s and acqu ired prop erty as community p ark
with signifi ca nt n atu ra l ar ea co m ponent and trai ls
Acquire porti on of Uni on Pacifi c area fo r neighb orhood and
co mmunity park, in clu din g improved conn ectio ns, rec reation and
open sp ace
1~ommun1ty Park 1 otal
Acquire land to provide urban open space wi thin Courthouse
neighborh ood
Acquire land for urba n plaza to be dev eloped in pa rtn ership wi th
transit
Acquire land to expand p ark bl ocks
Acquire land fo r an urban pl aza in Sa nta Clara
1uroan Plaza Total
Acquire land fo r Amazon Creek Greenway (W C2)
Implem ent plan fo r Jefferson Area Green way and lin ea r par k
D ev elop millrace lin ea r park
Implement gree n way/lin ear park pl an fo r Amazon Creek fr om
H eadwaters to Fairgrounds in partnership wi th ACO E
Implem ent Rasor Park Maste r Pl an
Acquire linear park along R oosevelt drainage channel
ILmear Park Total
~~~~'.inli
I
~~:~£\~o rity st or mwater corridors tha t link wi th develop ed
Acquire addition al ri ver frontage, in clud in g property to th e n orth
A cq uire land for n atural areas wi thin Willamette/McKenzie River
co nflu ence
Acqui re l and fo r n atural areas and access to Gill esp ie Bu tte
A cq uire natural ar eas to con nect Ri dgeline system east to Pisgah
and Will amett e Ri ve r syste m
Acquire natural areas to co m pl ete Moon M oun ta in to Spencer Butte
segm ent
Acqui re addition al ri dgelin e to co mplete Fern Ri dge to W est Eu ge n e
W etl ands
Acqui re addition al ri dgelin e to co mplete Willow Creek to Bail ey Hill R
City of Eugene SOC Methodologies
Park
Typ e
f
~r:.
C P 2
C P 1
C P 1
C P 2
3
C P 4
UP 4
UP 4
UP 4
UP 4
LP 2
LP 3
LP 5
LP 4
LP 2
LP 4
NA 1
NA 1
NA 4
NA 1
NA 3
NA 1/2
NA 2/3
NA 1/2
Units Quantity Ac quisition Cost De velopment
Cost
acres 100 $ 4 ,388,800
acres 1.5 $ 2 ,194 ,399
ac res 40 $ 10 ,972,000
ac res 40 $5,6 41,200
acres 40 $5,641 ,200
acres 20 $ 5 ,486 ,000
241.5 $23,041 ,199 $ 11,282,400
ac res 0.75 $ 1,23 4,350
ac res 0 .5 $ 932,620
ac res 0.5 $ 932 ,620
acres 0.5 $ 932,620
2.26 $ 4,032,210 $
acres 4 $ 1,097,200
ac res 4 $ 752,16 0
acres
ac res 3.97 $ 1,567,000
acres 2 $ 376 ,080
acres 10 $ 438,880
23 .97 $ 1,536,080 $2,695,240
acres 30 $ 1 ,3 16 ,640
acres 6 0 $ 5 ,92 4 ,880
acres 100 $ 2 ,19 4,400
ac res 1.7 $ 466,310
acres 55 $ 1,206,92 0
acres 32 5 $ 7 ,131 ,8 00
acres 500 $ 10 ,972,000
acres 300 $ 6 ,583,200
Other Other Other
Acquis ition Funding --Net Project Growth Cost
Development Renovation Funding -Funding -Growth Share Partner Costs (Cost Basis) Totals City Partner (Ownership)
$ 4 ,388,800 $0 $0 $0 $0 $4,388 ,800 4 9% $2,149,3 5
$ 2,194 ,399 $0 $0 $0 $0 $2,194,399 4 9% $1 ,074,671
$ 10,972,000 $0 $0 $0 $0 $10,972 ,000 49% $5,37 3,38
$ 5,641 ,200 $0 $0 $0 $0 $5,641 ,200 52% $2,91 9,3 2
$ 5,6 41 ,200 $0 $0 $0 $0 $5 ,6 41 ,2 00 52% $2 ,919,32,
$ 5,486,000 $0 $0 $0 $0 $5 ,4 86 ,000 49 % $2,6 86 ,69
$ 34,323,599 $0 $0 $0 $0 $34,323 ,599 50 % $17 ,122,749
$ 1,23 4 ,3 50 $0 $0 $3 0 8 ,588 $0 $925 ,763 35% $327 ,75 '
$ 932,620 $0 $233,155 $466 ,3 10 $0 $233 ,15 5 35% $82,54
$ 932,620 $0 $0 $233,155 $0 $699,465 35% $247,641
$ 932,620 $0 $0 $23 3,155 $0 $6 99 ,46 5 35% $247 ,641
$ 4,03 2,210 $0 $233,155 $1,241,208 $0 $2,557,848 35 % $905,587
$ 1,09 7 ,2 00 $0 $274 ,300 $274 ,30 0 $0 $54 8,600 100% $548,60(
$ 752,16 0 $0 $188,040 $376 ,08 0 $0 $188,040 40% $7 5,3 41
$0 $0 $0 $0 $0 40 % $(
$ 1,567,000 $0 $78 3 ,500 $783,500 $0 $0 40 % $(
$ 376 ,0 80 $0 $0 $0 $0 $3 76,08 0 40% $150 ,68!
$ 438 ,880 $0 $21 9,440 $0 $0 $2 19,440 100% $2 19 ,44(
$4,231,320 $0 $1,465,280 $1,433,880 $0 $1,332,160 75 % $994,074
$ 1,316 ,640 $0 $658 ,32 0 $65 8,320 $0 $0 36% $(
$ 5,924 ,880 $0 $2,962,440 $1,4 8 1,220 $0 $1,481 ,2 20 36% $532,00 ,
$ 2,194 ,400 $0 $1 ,0 97,200 $1,0 97,200 $0 $0 36 % $
$ 466 ,3 10 $0 $0 $0 $0 $466,3 10 36% $167,4 8•
$ 1,2 06,920 $0 $0 $301 ,730 $6 03,4 60 $301 ,730 36% $108,3 7
$ 7,131,800 $0 $0 $0 $0 $7,131 ,8 00 36 % $2 ,56 1,51 1
$ 10,972,000 $0 $0 $5 ,4 86,000 $2,743,000 $2,743,000 36% $985,191
$ 6,583,200 $0 $0 $0 $0 $6 ,5 83,200 36% $2,364,4 71
Parks, Page E-10
-o m
Ill X co :::r ~g
0 )>
0 ...... -o
~ 6'.
3 s·
~
~ <' (1)
0 a.
~
z
~
<.n
({)
'£
....>.
"Tl
Acquire additiona l ridgeline to complete Ba il ey Hill Road to Blanton
Heights
Acquire natural area within Royal Mixed Use area
Acquire land for natural areas al ong McKenzie River (Rivers to
Ridges)
Acquire additional Amazon Headwaters property
Expand Ridgeline Trai l natural area park to include Spencer Creek
area
Acquire land for natural areas to complete Rivers to Ridges farmland
co nnections
Develop and implement restoration plan for Green Isl and wit h
partner agencies
!Natu r al Area Total
Acquire l and to provide significant riverfront open space with in
courthouse/cannery neighborhood
Devel op Prefonta ine Memorial Park as a metropoli tan park
IMetropo11ta n 1-'a rK I ota1
Acquire land in front of SMJ House
Acquire land at 4J Admin site to expand River House and Rose
Garden for specia l event site
Acquire land for park with agricultu ra l character, possible living
history farm
special Fac111ty Total
New Parks and Open Space Total
Develop spray parks at Washington and or Monroe Parks
Develop soccer fie lds at Bethel Community Park
Develop a running trail to serve the Bethel area
Develop soccer fie ld at N. Westmoreland
Develop Striker Fields as community park with significant athletic
fie lds, li ghting, within sports complex model
Provide major community center on west side of Be ltline to serve
Bethel
Provide synthetic surface fie ld to serve Bethel/Danebo in partnership
1M th school district
Provide additional dog off-leash facilities north of beltline (WK)
Dev elop an off leash dog area in Bethel/Danebo
Develop pedestrian trails within Golden Gardens
Develop tennis courts at Bethel Community Park (4)
Develop an off leash dog area in City Cen tra l
Develop an off leas h dog area in River Road/Santa Clara
D evelop a disc golf faci lity to serve Santa Clara and River Road
Develop off-leash dog area to serve Willow Creek
Develop spray park at Ascot
Develop multi-use path to Fern Ridge
City of Eugene SOC Methodologies
Park Unit s Ty pe
~ 't:
0
'f,
NA 1/2 acres
NA 3 acres
NA 3 acres
NA 1 acres
NA 3/4 acres
NA 5
NA 5
M P 1 ac res
MP 5
SF 1 acres
SF 5
SF 5
NP 1 ea
CP 3 ea
CP 2 If
CP 4 ea
CP 3 acres
SF 5
1 ea
CP 4 ea
CP 5
CP 3
CP 5
CP 5
CP 5
CP 5
CP 5
CP 5
LP 5
Acqui sit ion
Quant ity A c quisit ion Cost Deve lopment Development Cost Tot als
300 $6,583,200 $6,583 ,200
50 $1 ,097 ,20 0 $1 ,097 ,200
80 $1,755,520 $1,755 ,520
50 $1,097,200 $1,097,200
500 $10 ,972,000 $10 ,972 ,000
$
$
23 51.7 $ 57,301,270 $ $57,301 ,270
1.76 $3,291,600 $3,29 1,600
1.76 $3,2 91 ,600 $ $ 3,2 91,600
0.3 $375,242 $375,242
0 ,3 $375,242 $ $375 ,242
2748.2 $103,841 ,202 $ 27,955,907 $131 ,797,109
r ew Rec reation F a cmues
2 $242,100 $242 ,100
2 $710,160 $7 10,160
2600 $71 ,399 $71,399
1 $355 ,080 $355,080
40 $ 8,070,000 $8,070,000
4 $6,456,000 $$ 6 ,456 ,00 0
1 $242,100 $242,1 00
$192,120 $192 ,120
Other Othe r Other
Reno va tion Fund i ng -Funding -Funding--Net Project Growth Share Growth Cost
Partne r Co st s (Co st B as is) Cit y Partn er (Own ershi p)
$0 $0 $0 $0 $6,583,200 36% $2,364,476
$0 $548,600 $0 $0 $548,600 36% $197,040
$0 $877,760 $877,760 $877,760 $0 36% $0
$0 $274 ,300 $274,300 $0 $548,600 36% $197,040
$0 $0 $5 ,486 ,000 $2,743,000 $2,743,000 36% $985,198
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $6,418,62 0 $15,66 2,530 $6,967,220 $29,1 30,660 36 % $10,46 2,806
$0 $493,740 $822,900 $0 $1,974 ,960 100% $1,97 4,960
$0 $0 $0 $0 $0 0% $0
$0 $4 93 ,740 $82 2,900 $0 $1,974,960 100% $1,974,960
$0 $0 $0 $0 $375,242 21% $77,965
$0 $0 $0 $0 $0 0% $0
$0 $0 $0 $0 $0 0% $0
$0 $0 $0 $0 $375,242 21% $77,965
$0 $8,610,795 $19,160,518 $6,967,220 $97,936,336 45% $43,719,835
$0 $0 $0 $242,100 54 % $130,784
$0 $0 $0 $710,160 42% $295,102
$0 $0 $0 $71,399 100% $71 ,399
$0 $0 $0 $355 ,080 42% $147,551
$0 $0 $0 $8,070 ,000 42% $3,353,431
$0
$0 $0 $0 $6,456,000 42% $2,682,745
$0 $0 $0 $242,100 83% $201,206
$0
$0 $0 $0 $192,120 28% $36,389
$(
$(
$(
$1
$1
$1
$1
Parks, Page E-11
-om
Cl) >< co ::r
(D g:
~ ;::;:
....>. )>
o--. 0
~ 6'.
3 5 ·
~
~
~-
0 a.
~
z
~
CJ1
CfJ
....>.
'£ .....
~
Develop pedestrian trails along Greenhill Tributary
Develop trails within West Eu gene Wetland sites
Develop primary Ridg elin etrails
Provide !railheads and interpretive facilitie s within ex isting WEW
sites
Develop trails, !railheads, and interpretive facilities throughout
Ridgeline
Develop mountain biking trails and fre eridin g designated areas
Develop tra ils, !railheads, and interpretiv e faci lities in WEW
Dev elop trail facilities throughout th e Ridgeline system
Provide cov ered centrall y l ocated skate park with bicycle faci lities
Provide interpretive facilities and trails at Skinn er Butte P ark,
enh ance accessibility
Provide children's pl ay area in downtown area
Dev elop regional pl ay area in Alton Baker P ark
Dev elop multi-cultural community ce nter/aquatic center in
Whiteaker/Skinner Butte ar ea
Dev elop m ajor indoor/o utdoor aquatic facility an d co mmunity ce nter
Develop Environmental Edu ca tion Ce nter
Develop environmen tal ed u ca ti on site behind River House
Acquire Civic Stadium for renova ti on and expanded commu nity use
Develop a major com munity/a qu ati c center to serve Santa Cl ar a
Develop visual arts ce nter
Provide full service South Eug ene community center by upgrading
Amazon Community Cent er
Develop a V ell odrom e
Develop a second W ill amette River boat l au n ch
INew Recreation Fac111t1es Total
Improving Existing Facilities
Upgrade State Street Park
Upgrade Monroe Park
Upgrade Charnel Mulligan
Upgrade Tu gm an Park
Enh ance Crest Heights prairie habitat
Upgrade Acorn Park
Upgrade B ond Lan e park
Upgrade Brewer P ark
Upgrade Slad den Park
Upgrad e L afferty P ark
Implem ent Frank Kinn ey Park pl an
Upgrade Fairmount P ark
Upgrade W as hburne Park
Implem en t Fri endly P ark plan
City of Eugene SOC Methodologies
Park
Type
LP
NA
NA
NA
NA
NA
NA
NA
MP
MP
MP
MP
SF
SF
SF
SF
SF
SF
S F
SF
SF
X
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
Deve lopment Unit s Quant ity Acquisition Cost Cost
·[
f
5
3 If 10000 $258,240
3/4 miles 15 $2,178,240
4 ea 3 $290 ,5 20
3 mile 8 $1,162,680
5
4 ea 1 $96,840
4 miles 5 $726 ,300
1 ea 1 $322,800
3 ea 1 $877,700
2 ea 1 $209,820
3 ea 1 $1,614,000
4 ea 1 $16 ,140,000
2 ea 1 $ 22,596,000
1 ea 1 $2,824,500
4 ea 1 $322,800
5
5
5
5
5
4 ea 1 $629,460
$66,535,859
1 ea 1 $322,800
5
1 acres 1.2 $242,1 00
4 ea 1 $443 ,850
4 acres 3 $121 ,050
5
1 ea 1 $322,800
5
4 acres 1.2 $242,100
2 ea 1 $161 ,400
5
5
5
1 ea 1 $161,400
Other Other Other
Acquisition Funding•· Net Growth Cost Dev elopment Renovation Funding -Funding -Partner Project Growth Share (Cost Basis) Total s City Partner (Ownership) Costs
$0
$258,240 $0 $0 $129,120 $129,120 28% $36,389
$2,178,240 $0 $0 $544 ,7253 $1 ,586,588 28% $460,553
$290 ,52 0 $0 $0 $145,260 $145 ,26 0 35% $51,176
$$ 1,162,680 $0 $0 $290 ,52 0 $871 ,560 28% $245 ,628
$0
$96,840 $0 $0 $48,420 $48,420 28% 13,646
$726,300 $0 $0 $0 $726 ,3 00 28% $204,690
$322,80 0 $0 $0 $0 $322,800 73% $234,740
$877 ,7 00 $0 $0 $0 $877 ,7 00 28% $249 ,740
$209 ,820 $0 $0 $0 $209,820 54% $1 41 ,01 7
$1,6 14 ,000 $0 $0 $0 $1,614,000 54% $877,051
$16,1 40,000 $0 $0 $0 $16 ,140,000 52 % $8,383,578
$ 22,596,000 $0 $0 $0 $22,596,000 52% $1 1 ,7 37,010
$ 2,824 ,5 00 $0 $0 $0 $ 2,824 ,500 2 1% $586 ,8 50
$322,800 $0 $0 $0 $322,800 2 1% $67,069
$0
$0
$0
$0
$0
$629 ,460 $0 $0 $0 $629,460 21 % $130 ,784
$66,535,859 $0 $0 1,158,045 $65,377,814 46% $30,311 ,264
$322,800 $322,800 $0 $0 $0 0% $0
$0
$242,100 $242 ,100 $0 $0 $0 0 % $0
$443 ,850 $443,850 $0 $0 $0 0 % $0
$121 ,050 $121 ,050 $0 $0 $0 0% $0
$0 $0 $0 $0
$322,800 $322,800 $0 $0 $25,000 54% $13,419
$0
$242 ,100 $24 2,1 00 $0 $0 $0 0% $0
$161,400 $161 ,400 $0 $0 $25 ,000 54% $13,4 19
$0
$0
$0
$161 ,400 $161 ,400 $0 $0 $0 0% $0
Parks, Page E-12
""CJ m
OJ >< co ::,
(1) g
-l.;:::::.:
N )>
0 --o
->. )>
-....J C.
3 s·
~
?1. <' (1)
0 a.
~
z
~
(J1
~
~
+i
Upgrad e Kincaid Park
Upgrad e University Park
Enhance natural area at Bramblewood
Complete Arrowhead Park
Complete Awbrey Park
Upgrad e Berkeley Park
Complete Skyview Park
Comp lete Irwin Park
Complete development of Candlelight Park
Upgrade Seabert Gardens
Complete Milton Park
Provide play area at Shadow Wood park
Complete Oakmont Park
Complete Gilham Park
Complete Petersen Barn Park, including parking revisions
Develop play area at Ascot
Renovate Sheldon Community Center and pool
Improve Echo Holl ow Pool
Impl ement Amazon Park master plan
Impl em ent Westmoreland Park master plan
Enhance Spencer Butte Trail system
Implement Wild Iri s Ridge Habitat Enhancement Plan
Restore Willow Creek between 11th & 18th
Impl ement Ridgeline master Plan
Enhance and develop Sorrel Ponds site
Impl ement Skinne r Butte Park Master Plan
Provide accessible trails within Hendricks Park Forest
Implement Hendricks Park Forest Management Plan
Replace aging infrastructur e at Alton Baker Park
Renovate Alton Baker Canoe Canal for kayaking , recreation , and
natural resource benefits
Complete Alton Baker Park, update WASP Deve lopm ent Plan and
EABP Master Plan
Implem en t Morse Ran ch master plan
Expand Petersen Barn Community Cen ter
Upgrade Campbell Center with fitne ss center
Develop parking and access to Laurelwood "Back 9" and Ribbon
Trail south end
Enclose portion of Amazon Pool for year round use
Replace Maintenance Buildings at Laurelwood
Improve Tennis Courts at WHS in partnership with Bethel School
Di str ict 52
City of Eugene SOC Methodologies
Park
Type
NP 4
NP 4
NP 4
NP 5
NP 5
NP 4
NP 5
NP 5
NP 5
NP 5
NP 5
NP 5
NP 5
NP 5
CP 2
CP 2
SF 3
SF 4
GP 3
GP 4
NA 1
NA 3
NA 4
NA 4
NA 5
MP 3/4
MP 4
MP 3
MP 2
MP 2
MP 3/4
MP 4
SF 5
SF 3
SF 2
SF 5
SF 2
SF 4
Development Units Quantity Acquisition Cost Cost
>,
·t:
0
'R-
ea 1 $161,400
ea 1 $242,100
acres 4 $161,400
ea 0.53 $16 1,400
ea 2 $645 ,600
ea 1 $121 ,002
ea 1 $ 9,361 ,200
ea 1 $ 7,263 ,000
ea 1.5 $4 ,436 ,886
ea 14.43 $807 ,000
ea 1 $807 ,000
acres 123 $992 ,610
acres 60 $484,200
ea 1 $8 07 ,0 00
acres 22.52 $ 9,235 ,308
LF 3500 $245 ,732
acres 2 $1 ,129,800
acres 2 $322,400
$ 8,070 ,000
acres 30 $5,913,696
acres 3 $968 ,400
ea 1 $4,196,400
acres 2 $645,600
ea 1 $1 ,532,616
ea 1 $161,400
Acquisition Other Other Other
Funding•· Net Project Growth Cost Development Renovation Funding -Funding-Growth Share
Totals Partner Costs (Cost Basis) City Partner (Ownership)
$161 ,400 $161,400 $0 $0 $50,000 54 % $27,170
$242,100 $2 42,100 $0 $0 $0 0% $0
$161 ,400 $161 ,400 $0 $0 $0 0% $0
$0
$0
$161 ,400 $121,050 $0 $0 $40 ,350 49% $19,771
$0
$0
$0
$0
$0
$0
$0
$0
$645 ,600 $484 ,200 $0 $0 $16 1,400 52 % $83,525
$121 ,002 $69 ,525 $0 $0 $51 ,480 54 % $27 ,170
$9,361 ,200 $9 ,361,200 $0 $0 $0 0% $0
$7,263,000 $7,263 ,000 $0 $0 $0 0% $0
$4 ,436 ,886 $4,436 ,886 $0 $0 $400 ,000 66% $264 ,523
$807 ,000 $605 ,250 $0 $0 $201,750 52 % $104,4 06
$807,000 $605 ,250 $0 $201,750 $0 0% $0
$992 ,610 $496,305 $0 $496 ,305 109,187 36 % $39,217
$484 ,200 $0 $242 ,100 $242,10 $0 0% $0
$8 07 ,000 $807 ,000 $0 $201,750 $0 0% $0
$0
$9 ,235,308 $4,155,899 $0 $0 $5,079,419 100% $5,079,419
$245,732 $245 ,732 $0 $0 $0 0% $0
$1 ,129,800 $896 ,900 $0 $282 ,450 $0 64 % $0
$322,4 00 $322,400 $0 $0 $0 0% $0
$8 ,0 70 ,000 $4,035,000 $0 $4 ,035,000 $0 0% $0
$5 ,741 ,488 $5 ,591,488 $0 $1,435,372 $0 28 % $0
$968 ,400 $774,720 $0 $0 $193,680 100% $193 ,68 0
$0
$4,196,400 $503 ,568 $0 $0 $3 ,692 ,832 0% $0
$6 45 ,600 $322,400 $0 $0 $322,800 21% $67,069
$0
$1,532 ,6 16 $1 ,532 ,616 $0 $0 $0 0% $0
$16 1,4 00 $161,400 $0 $8 0 ,669.16 $0 0% $0
Parks, Page E-13
-om
Ill >< co :;y
CD 5!.
-lrr.;::::::;.:
w )>
0 ,-+ -o
....l. )>
-...J a.
3 s·
§:
§.
<" CD
0 a.
~
z
9
c.,,
Cf
'±:
.;,
Complete second phase of River House Master Plan
Implement SMJ Hou se plan, including parking and access across
railroad tracks
Improve Cuthbert Amphitheater
Provide for replacement of synthetic surface fields in partnership with
Implemen t Rose Garden master plan
Replace irrigation at Laurelwood
Restore Bloomberg
Renovate park restrooms
Develop ch ildren's play area renovation program
Decommission wading pools
Renovate park irrigati on systems
Renovate park li ghting systems
Renovate tennis co urts, including resurfacing
Redevelop W. University
Implement habitat management plans
Improving Ex1stmg Fac111t1es Total
Access Improvements
Improv e access to Friendly & Lafferty Parks (See S2 on Map 3)
Improve access to Kincaid and Milton (See S4 on Map 3)
Develop access improvements to meet neighborhood park needs
(See 82 on Map 3)
Develop access improvements to serve this neighborhood (See 86
on Map 3)
Improve access to Frank Kinney, Edg ewood and S6 (See S7 on map
3)
Improve access to Fairm ount and Laure l Hill Park (See S1 on Map
3)
Improve access to Amazon Park (See S3 on Map 3)
Improve access to Tugm an Park (See S5 on Map 3)
Imp rove access to ex isting parks (See R5 on Map 3)
Improve access to existing parks (See R6 on Map 3)
Enhance access to Striker Fields (See W3 on Map 3)
Enhance access to Brewer & Bond Lane parks (See W5 on Map 3)
Improve conn ectivity to Sh eld on (See W6 on Map 3)
Enhance access to Crescent Park (See W7 on Map 3)
Improve access and parking at Cal Young Sports Park (See W2 on
Map 3)
Enhance access to Willakenzie school and Ascot Park (See W9 and
W10 on Map 3)
Enhance access to Churchill Sports Park (See WC2 on Map 3)
Enhance access to Oakmont Park (See W8 on Map 3)
Replace pedestrian bridges at Amazon Park, add new bridges where
needed
City of Eugene SOC Methodologies
Park
Typ e
SF
SF
SF
SF
SF
SF
NA
X
X
X
X
X
X
X
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
CP
Acquisition
Units Quantity Acquisition Cost Development Development Cost Totals >,
1:
j
4 ea 1 $1,936,800 $1,936,800
5
5
1 ,3,4 ea 10 $4,035,000 $4,035,000
5
5
5
1 ea 7 $ 1,355,760 $1,355,760
1 ea 1 $322,800 $313,400
2 ea 1 $807 ,000 $807 ,000
2 ea 1 $1,614,000 $1,614,000
1 ea 1 $807,000 $807,000
1 ea 1 $1,614 ,000 $1,614,000
1 $96,840 $96,840
2 ea 1 $1,61 4,000 $1,614,000
$75,085,298 $ 75,085,298
4 ea 1 $2 42,100 $242,100
4 ea 1 $242,100 $242,100
4 ea 1 $161 ,400 $161,400
4 ea 1 $40,350 $4 0,350
4 ea 1 $242,100 $242,100
4 ea 1 $2 42 ,100 $242,100
4 ea 1 $242,100 $242,100
4 ea 1 $2 42,100 $242,100
4 ea 1 $161,400 $161,400
4 ea 1 $161,400 $161,400
4 ea 1 $161 ,400 $161,400
4 ea 1 $161,400 $161,400
4 ea 1 $161,400 $161 ,400
4 ea 1 $80,700 $80 ,700
4 ea 1 $161 ,400 $161,400
4 ea 2 $16 1,400 $161,400
5
5
2 ea 1 $807,000 $807,000
Other Other Other
Funding --Net Project Growth Cost Renovation Fundin Funding -Growth Share Partner Costs (Cost Basis) g-City Partner (Ownership)
$968,400 $0 $0 $968,400 2 1% $201,20!
$(
$(
$4,035,00 0 $0 $2,017 ,500 $0 $(
$(
$(
$(
$1,355,760 $0 $0 $0 0% $(
$3 13,40 0 $0 $0 $0 0% $(
$807,000 $0 $0 $0 0% $(
$1,614,000 $0 $0 $0 0% $(
$807,000 $0 $0 $0 0% $(
$1,2 10,500 $0 $0 $403,500 81% $324,86•
$96,840 $0 0% $(
$1,614,000 $0 $403 ,500 $0 0% $(
$75,794,724 $242,100 $9,439,479 $11,723,319 55% $6,485,851
$0 $6 0 ,525 $0 $18 1,575 49% $88,97
$0 $6 0,525 $0 $181,575 49% $88,97
$0 $4 0,35 0 $0 $21 2,050 49% $59,31!
$0 $10,088 $0 $30,263 49% $14,82!
$0 $60,525 $0 $181 ,575 49% $89,97
$0 $6 0 ,525 $0 $181 ,575 49% $89,97,
$0 $60,525 $0 $18 1,575 49% $89,97
$0 $60,525 $0 $181,575 49% $89,97,
$0 $40,350 $0 $12 1,05 0 49% $59,3H
$0 $40,350 $0 $121,050 49% $59,31!
$0 $40,350 $0 $121,050 49% $59,31!
$0 $40 ,35 0 $0 $121,050 49 % $59,3 1'
$0 $40,350 $0 $121,050 49 % $59,31!
$0 $20 ,175 $0 $60,525 49% $2 9,65
$121,050 $40 ,350 $0 $0 49 % $(
$0 $40,350 $0 $121,0505 49% $9,31!
$(
$(
605,250 $20 1,75 0 $0 $0 0% $(
Parks, Page E-14
""CJ m
Ql >< co :::r
(!) 5!.
~;:::::.:
.j:>. )>
0 ---+, 0
~ 6'.
3 s·
~
?1. <' (!)
0
i3.
~
z
~
u,
~
~
71
Enhance access to Amazon Creek Gree nway and Fern Ridg e
Bike path in the Will ow Creek area
Develop access improvements between parks , schools and
neighbo rhoods to WEW sys tem and bike system
Develop connections from bike path to ridge line and pacific crest tra il
system and proposed W ill amalane riverfro nt system
Develop pedestrian improvements to li nk downtown with Skinner
Butte Pa rk, SM J house, and riverfront system (excluding pedestrian
bridge at tra in station)
Improve access north/s ou th of Beltline
Provide underpass via Delta Po nds to riv erfron t bike system
Complete comprehensive POS Sig nage System
Complete ADA improvements
Im prove Roya l Avenue to enhance park/school connectivity
Improve access to existing natura l resource areas
Develop pede strian and bike access improvements between River
Road/Santa Cla ra and Bethe l Danebo and Fe rn Ridge Res ervoir
Provi de access to Go lden Gardens
Acquire land to provide co nn ectiv it y north and east to Santa Clara
area
!Access Improvements Total
GRAND TOTAL
City of Eugene SOC Methodologies
Park
T ype
>, :i
"
LP 5
X 3
X 5
X 2/3
X 2
X Comp le
X 1
X 1
X 4
X 5
X 5
X 1
X 5
654
Acquisit i on
Units Q u antity A c qu i sition Cost Dev elopm ent Development Co st Totals
If 2000 $51 ,648 $51 ,648
ea 1 $2,259,600 $2 ,259,600
ea 1 $484 ,200 $484 ,20 0
ea
ea 1 $484 ,200 $$48 4 ,2 00
ea 1 $322 ,800 $322 ,800
ea 1 $161,400 $161 ,4 00
ea 1 $242 ,100 $2 42,100
$7,677,798 $7,677,789
$103,841 ,202 $178,093,562 $281 ,934,562
Other Other
Other
Funding -Renovati on Funding -Funding -Net Project Growth Share Growth Cost
Partner Costs (Cost Ba sis ) City Partner (Ownersh ip)
$(
$0 $12,912 $0 $38 ,736 21 % $8 ,04!
$(
$0 $1,129,8 00 $0 $1,129 ,8000 21 % $234 ,74(
$0 $484 ,200 $0 $0 0% $t
$t
$0 $0 $0 $484,2 00 21% $1 00,60
$0 $0 $0 $322,800 21% $67,06!
$0 $80 ,70 0 $0 $78 ,35 0 21% $16,76
$(
$(
$0 $0 $0 $242,100 21 % $5 0 ,3 01
$(
$726,3 00 $2,62 5,575 $0 $4,325,924 34% $1,471 ,041
$58,521 ,610 $11,507,610 $29,792,822 $6,967,220 $180,137,971 46% $82,298,64f
Parks, Page E-15
Table 16
System-Wide Unit Costs; Residential & Nonresidential Development per Component
83.6 % 43 ,819 16.4% 8 ,596
Residential Unit Nonresidential Un it
Residential Cost Nonresidential Cost
Cost Basis Share ($/New Person) Share ($/New Equiv. Pop.)
New Parks and Open Space Improvement Fee
Neighborhood Parks $12 ,337,437 $10 ,317 ,097 $235 $2 ,023,340 $23E
Community Parks $17 ,297 ,871 $14,461,020 $330 $2 ,836 ,851 $33(
Urban Plaza $905 ,587 $757 ,071 $17 $148 ,516 $1 i
Linear Parks $1 ,000 ,853 $836 ,713 $19 $164 ,140 $H
Natural Area Parks $10,462 ,806 $8 ,746 ,906 $200 $1 ,715 ,900 $20(
Metropolitan Parks $1 ,974 ,960 $1 ,651 ,067 $38 $323 ,893 $3i
Special Use Facilities $77 ,965 $65 ,178 $1 $12 ,786 $1
S u b-total $44 ,057,479 $36 ,832 ,052 $841 $7 ,225,427 $841
New Recreation Facil ities $30 ,311 ,264 $25 ,340 ,216 $578 $4 ,971 ,047 $57c
Improving Existing Facilities $6,485 ,856 $5 ,399 ,604 $123 $1 ,059 ,252 $122
Access Improvements $1,471 ,046 $1 ,229 ,795 $28 $241 ,255 $2E
Subtotal IMPROVEMENT $82 ,289 ,645 $68 ,801 ,667 $1 ,570 $13,496 ,978 $1 ,570
Existing Parks and Facilitie! Reimbursement Fee
Neighborhood Parks $6 ,961 ,681 $5,819 ,966 $133 $1 ,14 1,716 $13:
Community Parks $0 $0 $0 $0 $C
Urban Plaza $0 $0 $0 $0 $C
Linear Parks $2 ,319 ,135 $938,797 $44 $380 ,338 $44
Natura l Area Parks $104,496 $87 ,359 $2 $17 ,137 $2
Metropolitan Parks $14 ,733 ,883 $12 ,317 ,526 $281 $2,416 ,357 $281
Special Use Facilities $101 ,252 $84 ,647 $2 $16 ,605 $2
Subtotal REIMBURSEMENT $24 ,220,449 $20 ,248 ,295 $462 $3 ,972 ,154 $462
1 otal .:) , ;::, 1 c1v1 $106 ,519 ,094 $89 ,049 ,8oj $2 ,UjL $17,469 ,131 $2 ,USc
Less Credit $400 $1,142
Net Cost per Unit $1 , 1632 $89(
Table 17
SOC Schedule
Category Persons or Gross SOC Cred it per Unit Net SOC per
EP per Un it per Unit Un it
Residential per DU
Single-family 2.64 $5 ,365 $1 ,057 $4 ,308
Duplex/Town Hm/Mobile Hm/Access.DU 2.14 $4 ,349 $857 $3,492
Multi-tamily 1.67 $3 ,394 $668 $2 ,725
Nonresidential per Room
A 1.93 $3 ,922 $2 ,205 $1,718
Nonresidential per TGSF
B 1.29 $2 ,622 $1,474 $1 ,148
C 0.79 $1 ,605 $902 $703
0 0.47 $955 $537 $418
E U.19 $jl:$b $21/ $168
EP -Equ ivalent Population ; TGSF = Thousand Gross Squa re Feet; DU = Dwelling Unit
City of Eugene SDC Methodologies
Exhbiit A to Admin istrative Order No . 58-19 -11 -F
Page 15 of 17
Fee Schedule & Formulas, Page F-9
2.0 Adopted SOC Fee Schedule: Current Rates
2.1
2.2
2.3
2.4
Transportation System:
Cost per trip, effective 1/1/2019
Cost per trip, effective 1/1/2020
Local Wastewater System:
Residential dwelling unit base fee
Residential dwelling unit total living area multiplication factor
Non-Residential rate per gal/day per land use type per PFU
Regional (MWMC) Wastewater System:
Residential dwelling unit
Non-Residential rate per gal/day per land use type per FEU
Storm water System:
General System Capacity
Small Residential (building footprint::: 1,000 sq . ft .)
Medium Residential (building footprint> 1,000 sq .ft . and < 3,000 sq . ft.)
Small Duplex (unit building footprints.::: 1,000 sq . ft .)
Medium Duplex (unit building footprints >1 ,000 sq . ft . and< 3,000 sq .
Manufactured Home Park
Per space (assumes 1,684 sq . ft . per space)
plus
Per sq. ft. actual impervious surface area , addt'I common areas
All Other Development
Per sq.ft. actual impervious surface area and/or equivalent
LID System Capacity
Small Residential (building footprint.::: 1,000 sq . ft .)
Medium Residential (building footprint> 1,000 sq .ft. and< 3,000 sq . ft.)
Small Duplex (unit building footprints.::: 1,000 sq . ft.)
Medium Duplex (unit building footprints >1 ,000 sq. ft . and < 3,000 sq. ft .)
Manufactured Home Park
Per space (assumes 1,684 sq. ft . per space)
~
Per sq. ft . actual impervious surface area , addt'I common areas
All Other Development
Per sq.ft. actual impervious surface area and/or equivalent
Continuation of Current Rates on next page.
$2 ,692.63
$3,272.00
$476.06
$0.1154
Varies
$1,752.14
Varies
$426.78
$687.59
$829.08
ft.) $1,375.18
$399.28
$0.2371
$0.2371
$3,819.60
$6,153.80
$7,639.20
$12,313.60
$3,471.06
$2.1222
$2.1222
City of Eugene SOC Methodologies Fee Schedule & Formulas, Page F-9
Exhbiit A to Administrative Order No . 58-19-11-F
Page 16 of 17
2.5 Parks System:
Residential (per Dwelling Unit)
Single Family
Duplex/Town Home/Mobile Home/Accessory DU
Multifamily
Nonresidential (unit varies -see Table 19 for Class description)
Class A (per Room)
Class B (per thousand gross square feet or TGSF)
Class C (per TGSF)
Class D (per TGSF)
Class E (per TGSF)
2.6 Administration Charges:
2.7
City of Eugene if based on percentage
City of Eugene if based on flat rate
Appeal Fee: City of Eugene per SOC appeal
$4,308.00
$3,492.00
$2,725.00
$1,718.00
$1,148.00
$703.00
$418.00
$169.00
9.0%
$80.00
$100.00
City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-10
Exhbiit A to Administrative Order No . 58-19-11-F
Page17of17