Loading...
HomeMy WebLinkAboutResolution No. 5278COUNCIL RESOLUTION NO. 5278 A RESOLUTION APPROVING A MULTIPLE -UNIT PROPERTY TAX EXEMPTION FOR RESIDENTIAL PROPERTY LOCATED AT 1040 AND1050 FERRY STREET, EUGENE, OREGON (APPLICANT RNS MANAGEMENT, LLC). PASSED: 5:3 R CTED: OPPOSED: Taylor, Semple, Zelen" ABSENT: CONSIDERED: September 11, 2019 RESOLUTION NO. 5278 A RESOLUTION APPROVING A MULTIPLE -UNIT PROPERTY TAX EXEMPTION FOR RESIDENTIAL PROPERTY LOCATED AT 1040 AND 1050 FERRY STREET, EUGENE, OREGON (APPLICANT RNS MANAGEMENT, LLC). The City Council of the City of Eugene finds that: A. RNS Management, LLC (980 Willamette Street, Suite 200, Eugene, Oregon), is the owner of real property located at 1040 and 1050 Ferry Street, Eugene, Oregon (Assessor's Map Number 17-03-32-23 Tax Lots 9400 and 9500) ("the Property"). B. RNS Management, LLC ("the applicant") submitted an application pursuant to the City's Multiple -Unit Property Tax Exemption Program (Sections 2.945 through 2.947 of the Eugene Code, 1971 ("EC")), with respect to residential units to be constructed on the property ("the project"). C. The proposed project consists of the development of 35 studio units and 15 one - bedroom units, for a total of 50 residential units. As proposed, the project is not designed for the leasing of individual rooms or beds, for transient or vacation uses, or otherwise designed primarily for individuals attending college. D. An independent outside professional consultant was retained and reviewed the project's financial pro -forma A Review Panel was convened and reviewed the independent consultant's conclusions, and also reviewed the application in order to make a recommendation as to whether the application met the criteria in EC 2.946. The Review Panel's recommendation was submitted for the City Manager's review. E. After considering the Review Panel's conclusions and recommendation, the Executive Director of the Planning and Development Department ("the Executive Director") as designee of the City Manager, prepared the Report and Recommendation attached to this Resolution as Exhibit A and incorporated herein by reference. The Report and Recommendation sets forth findings demonstrating that the project meets the criteria described in EC 2.946 and the conditions set forth in Multiple -Unit Housing Property Tax Exemption Rule R-2.945 ("Rule R- 2.945"). F. Based on the findings in the Report and Recommendation, the Executive Director recommends that the application be approved and the exemption granted. In making that recommendation, the Executive Director found that the applicant submitted all materials, documents, and fees required by EC 2.945, EC 2.946, and Rule R-2.945, and the applicant is in compliance with the policies contained therein. Resolution - Page 1 of 5 G. City Council has concluded that the application meets the criteria described in EC 2.946 and Rule R-2.945. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. Based upon the above findings which are adopted, and upon the City Council's review of the Report and Recommendation of the Executive Director of the Planning and Development Department attached to this Resolution as Exhibit A and incorporated herein by reference, the City Council approves the application of RNS Management, LLC for an ad valorem property tax exemption under the City's Multiple -Unit Property Tax Exemption Program for the residential units to be constructed at 1040 and 1050 Ferry Street, Eugene, Oregon (Assessor's Map Number 17-03-32-23 Tax Lots 9400 and 9500), subject to the following conditions: 1.1 Compact Urban Development. The project will consist of the development of 35 studio units and 15 one -bedroom units, for a total of 50 residential units, none of which may be used for transient use or vacation occupancy. The Property is located in the R-4 High Residential Zone, which requires a density of at least 20 units per acre and a maximum of 112 units per acre. The applicant will develop 50 dwelling units on the property which will result in a density of 103 units per acre and which meets the requirements of section 1.1.1.1 of Rule R -2.945-C. The development will be constructed in accordance with the schematic drawing showing the site plan and major features and dimensions of the proposed development, and schematic drawings showing side, front, and back elevations of the proposed development which are attached to this Resolution as Exhibit B. 1.2 Green Building. The project will perform at least 10% more efficiently than the performance established in the Oregon Energy Efficiency Specialty Code. Applicant will provide to the City of Eugene's Building and Permit Services an energy model with applicant's permit application. Within 18 months after receiving a Certificate of Occupancy, the applicant shall submit to the City a commissioning report pursuant to Section 1.2 of Rule R -2.945- C demonstrating compliance with this requirement. For the duration of the tax exemption, RNS Management, LLC will report multi- family occupancy energy use data to the City of Eugene's Building and Permit Services. The project's on-site parking will include installation of conduit for future electric vehicle charging stations. Resolution - Page 2 of 5 1.3 Local Economic Impact Plan and Compliance with Laws. The applicant submitted a plan demonstrating that more than 50% of the dollar volume of professional services and construction contracts will be from a business organization or individual residing or doing business primarily in Lane County. After construction, the applicant will submit a list of the home city or zip code of the construction labor workers. RNS Management, LLC will ensure that qualified minority and women business enterprises have been given an equitable opportunity to compete for development related contracts by: (1) accessing lists of such enterprises from the Oregon State Office of Minority, Women and Emerging Small Business Program website; (2) search for Qualified Rehabilitation Facilities from whom to procure products and services via the Oregon State Qualified Rehabilitation Facilities Program website; and (3) advertise in general circulation, trade association, and minority focused media about prime subcontracting opportunities. The applicant will post information about the City's Rights Assistance Program in English and Spanish on the job site during construction of the project. The applicant shall ensure that the developer, its contractors and subcontractors comply with wage, tax and licensing laws. The applicant will have in place methods for ensuring that all contractors performing work are licensed and performing in compliance with state law. The applicant will provide the City's Building and Permits Services Department with a list of all contractors performing work on the project. Prior to performing work on the project, contractors must have valid, current licensing, insurance, bonding and workers compensation coverage, and be on the list of contractors provided to the City. The applicant will require that each contractor provide an affidavit attesting to the fact that (1) the contractor, owner, or responsible managing individual for the contractor does not have any unpaid judgments for construction debt, including unpaid wages; and (2) the contractor is in compliance with Oregon tax laws. 1.4 Moderate -Income Housing Contribution. The applicant will include 15 moderate income studio housing units (30% of the total number of units) with rents less than or equal to 30% of Area Median Income as defined in Rule R -2.945-A. 1.5 Project Design and Compatibility. The applicant shall adhere to the following design elements, as well as the actual square footages included in Exhibit B unless the City Manager approves a deviation from the plan pursuant to EC 2.946(2)(e)2: Resolution - Page 3 of 5 The design elements of the building include a south facing lobby entry with abundant glazing. A prominent elevator tower provides accent against symmetrically proportioned bays punctuated with large windows. High quality, durable materials include, ground face CMU, stucco, and metal wall panel cladding over a wood framed structure. The cladding is accented with colored and matte finish metal detailing. During the design process and before the final design drawings are completed, the owner shall hold at least one neighborhood engagement opportunity to allow members of the West University neighborhood and others to provide comments on the proposal. At least one of the applicant's principals shall attend that meeting. After the final design is completed and before it is submitted for permits, the final design shall be submitted to the City to review for conformance with the design approved by this resolution. The neighborhood shall also have an opportunity to review and comment on the final design. After the comment period, the City shall determine if the design is consistent with the requirements of this Resolution, and if not, whether the City Manager will approve a deviation pursuant to EC 2.946. 1.6 At the time of completion, the project shall conform with all local plans and planning regulations, including special or district -wide plans developed and adopted pursuant to ORS Chapter 195, 196, 197, 215, and 227 that are applicable at the time the application is approved. 1.7 During all phases of development, the project shall comply with wage, tax and licensing laws. 1.8 The project shall not contain any units for transient use or vacation occupancy. 1.9 The project will be completed on or before January 1, 2022, unless an extension of the deadline is requested by the property owner and approved by Council resolution pursuant to EC 2.947(5). 1.10 The public benefits of the project that will extend beyond the period of the tax exemption include Green Building (energy performance), Project Design and Compatibility, and Compact Urban Development. Section 2. Subject to the conditions in Section 1 of this Resolution, 100% of the residential units described in Section 1 are declared exempt from local ad valorem property taxation beginning July 1 of the year following issuance of a Certificate of Occupancy and continuing for a continuous period of ten years unless earlier terminated in accordance with the provisions of Section 2.947 of the Eugene Code, 1971. Resolution - Page 4 of 5 Section 3. The City Manager, or the Manager's designee, is requested to forward a copy of this Resolution to the applicant within ten days, and to cause a copy of this Resolution to be filed with the Lane County Assessor on or before April 1, 2020. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution adopted and effective the I I" day of September, 2019. City Recorder Resolution - Page 5 of 5 REPORT ) RECOMMENDATION The Executive Director of the Planning & Development Department of the City of Eugene Finds that: Eugene,1. The Ferry St. Manor rtments will be developed on real property located at 1040 and 1050 Ferry St., y -g-• • .•, 13-32-23, tax lots 09411 and 1.1 RNS residentialManagement, LLC is the current owner of the subject property. RNS Management, LLC submitted an application pursuant to the City's Multiple -Unit Property Tax Exemption ("MUPTE") Program (Sections 2.945 and 2.947 of the Eugene Code, 1971), with respect to r•- constructed on -• op 2. As the City Manager's designee, I have reviewed the application and find that: 2.1 The project will provide 35 studio units and 15 one -bedroom units, for a total of 50 residential units, none of which will be used for transient use or vacation occupancy. There is no commercial space in the building. 2.2 The project is not designed to be student housing, meaning it will be leased by the unit (rather than by individual rooms or beds) and the unit configuration does not include several bedrooms with individual bathrooms and sparse common space or include amenities and location selected primarily for individuals attending college and offer limited viability as potential housing for the general population. Additionally, the project does not designate any of the units for transient use or vacation occupancy. 2.3 Construction is expected to be complete on or before January 1, 2022. 2.4 The project is located in the downtown area described in subsection (1) of Section 2.946 of the Eugene Code, 1971. 2.5 The applicant submitted all materials, documents and fees required by the City as set forth in Section 2.945 of the Eugene Code, 1971, and the administrative rules adopted by Administrative Order No. 53-18-03-F. 2.6 The applicant responded to the Required Public Benefit criteria as follows: 2.6.1 Compact Urban Development. The project will be built in the R-4 High Density Residential zone, which requires at least 20 housing units per acre and a maximum of 112 units per acre. Ferry St. Manor includes 50 dwelling units that would result in a density of 103 units per acre which is more than 175% of minimum density as required by section 1.1.1.1 of Rule R -2.945-C. 2.6.2 Green Building Features. The project will utilize the City of Eugene Building and Permit Services Pathway in order to meet the MUPTE green building requirement and exceed the 10% energy efficiency threshold. Ferry St. Manor Report and Recommendation -- Page 1 of 4 will be requiredo submit an energy model with theirdevelopment perm application i'd a commissioning report due 18 months after certificateI i p, rig; y p: !^ l;:r �l��', conduit for !' electric iecharging stations. a Plan.1 plan lace for more0% of thc project's dollar volume of professional services and construction contracts to be local to Lane County (estimated at 67%). The applicant is committed to promoting open competitive opportunities for Minority, Women, and Emerging Small Businesses, and is committed to complying with wage, tax, and licensing laws. 2.6.4 Moderate -Income Housing Contribution. The project will provide a minimum of 30% of the residential units (15 units) with rents that qualify as moderate - income units during the MUPTE period. (Moderate income is defined in the ordinance as affordable to households at 100% of the area median income.) 2.6.5 Project Design and Compatibility. The project will address basic design concepts in the context of the project location and will be designed and permitted for construction as shown in the resolution (should City Council approve the MUPTE). The basic design concepts include: the scale, form, and quality of the building; the mix of project elements; the relationship to the street and surrounding uses; and parking and circulation. The building is being constructed as an infill addition on an existing developed site. The lot includes an existing residential building that will provide scale and proportion for the infill project. The new building is five floors of residential use providing 50 units of both market rate and moderate -income units. Placed at the back of the lot, neither the building nor the site has street frontage. The south facing lobby provides a highly visible connection to site circulation. The design elements of the building include a lobby entry with abundant glazing. A prominent elevator tower provides accent against symmetrically proportioned bays punctuated with large windows. High quality, durable materials include, ground face CMU, stucco, and metal wall panel cladding over a wood framed structure. The cladding is accented with colored and matte finish metal detailing. The building meets City requirements for vehicle parking and bicycle parking, and it provides pedestrian accommodations to access the site and surrounding street grid through internal pedestrian paths and an access gate to Ferry Alley. The project design is intended to harmonize with the scale, form and quality of onsite and adjacent development. The project meets the design intent of designing for the human scale, appropriate to the local climate and natural Page 2 of 4 Report and Recommendation promote transparency,-ir define a sense of place, fit the neighborhood, and employ high-quality materials and color. 2.6 .6 Historic and Existing Housing SensitiyU. The projectadjacent one historic locale, but it is not affected by the Ferry St. Manor redevelopment. The project includes no direct,r o demolitions,to any of •- -r resources. No historic structures or existing housing a demolished or r ^r from the property prior r the date application. 2.6.7 Project Need. The project's pro -forma and financial information was analyzed by Johnson Economics, an independent, real estate economics consultant who found that the project as proposed could not be built but for the benefit of the tax exemption. The financial information Ferry St. Manor submitted in their application is based on projections prior to finalizing financing, construction, and tenanting. It includes assumptions regarding rents, vacancy rates, operating costs, lender underwriting criteria, interest rates, and reasonable rate of return. Johnson Economics, the Review Panel, and staff reviewed the assumptions. The Johnson Economics analysis concludes that the project would not be viable without the availability of the MUPTE, using the reasonable assumptions outlined and concludes that MUPTE is critical to the success of the project from a financial feasibility perspective. See Section 4 below for the Review Panel's conclusions. 2.6.8 Public Benefit beyond Period of Exemption. The public benefits of the project that will extend beyond the period of the tax exemption include Green Building (energy performance), Project Design and Compatibility, and Compact Urban Development. 2.7 A neighborhood engagement meeting on Ferry St. Manor was held on December 18, 2018. As the West University Neighborhood is not currently active, the applicant provided notice of the meeting to adjacent property owners and tenants. 2.7.1 Future Neighborhood Engagement. Prior to completing final drawings, Ferry St. Manor will hold another neighborhood engagement meeting. Before submitting for permits, Ferry St. Manor will submit the design to staff to review conformance with the design attached to the MUPTE resolution (should City Council approve the MUPTE). Staff will also give interested parties an opportunity to review and comment on that final design. 3. A display ad soliciting recommendations or comments from the public regarding this project was published in the Register -Guard on April 14, 2019. The period for comment expired on May 14, 2019 and resulted in 21 written comments. Additional comments were submitted to staff or directly to City Council after the official comment period. All 21 comments received as of August 14 will be provided to City Council with the materials for the September 11 work session. Page 3 of 4 Report and Recommendation 4. The community member MUPTE Review Panel considered the project application, including compliance with program criteria and the independent consultant's financial review, during 3 meetings held on May 29, July 10, and July 29. The majority of the Review Panel concluded that the project meets the Required Public Benefit criteria. The Panel noted that Project Need involves many variables that are hard to predict, The majority of the Panel concluded that project need was demonstrated. Six of the panel members agreed that a ten-year exemption was warranted. One member advocated for an eight-year exemption, another for a five-year exemption, and one member advocated for no exemption. See the enclosed Panel Conclusions document for a full summary of their conclusions. Therefore, based upon the above findings, the project is, or will be at the time of completion, in conformance with all applicable local plans and provisions of the Eugene Code, 1971, planning regulations, the Metropolitan Area General Plan, and the criteria set forth in the City's adopted administrative rules, and I recommend that the application be approved conditioned upon the project moving forward as proposed. Dated this il day of 4U C4 Ut 20190 DennyvB%r-a/ud Executive Director Planning & Development Department Page 4 of 4 Report and Recommendation i i 1 PUBLIC R.O,W 1 1 1 1 1 END OF 1 ALLEY PAVING 1 M 1 M M W \_0 #9gp0 1 0 0 0 Z 1 1� w Iw a Q \0 LU LL Ln \0 #�0pp0 Exhibit B Page 1 of 8 TOTAL BUILDING AREA INCREASE: EXISTING PROPOSED TOTAL OF ALL PERCENTAGE BUILDINGS: BUILDING: BUILDINGS: INCREASE: 56,694 31,195 87,899 55% TOP OF PAW 5223' (FOP OFI VALL) 1 F J 07 J/ WV V V 1 0 1 .vL fit) i,yrr HLUu,L viN,yu�,y�eiN i rmurmi i II 1 1 1 u �0T #930p i �0 #920p 1 ' FERRY ST 1 66.00' R.O. /38.0' PAVE 1 � 1 1 � ARCHITECTURAL SITE PLAN FERRY STREET MANOR MUPTE Application 05 August 2019 \0 #8,p0 0 10' 20' 40' Exhibit B Page 2 of 8 FIRST FLOOR FERRY STREET MANOR MUPTE Application 05 August 2019 0 4' 8' 16' Exhibit B Page 3 of 8 (4) @ 18" SECOND &THIRD FLOORS FERRY STREET MANOR MUPTE Application 05 August 2019 0 4' 8' 16' Exhibit B Page 4 of 8 (4) @ 18" FOURTH & FIFTH FLOOR FERRY STREET MANOR MUPTE Application 05 August 2019 0 4' 8' 16' Exhibit B Page 5 of 8 L U L L v=i d Z d V) J = J LLL L Z J V J Z 0 0 g o U U F V) F F F V) FERRY STREET MANOR MUPTE Application 05 August 2019 z 0 Q LU J W 0 F cc: U O w QC U C7 o0 oc LL O .oO + - �.,0 + oC O0 LL _ �LL + 0 O -j LL 2 �,� + O _ LL — + Q w c O LL O z Z O —U + U.)Q J L 0 Q D U m O w �w Q w O LL o �+I LL J L U L L v=i d Z d V) J = J LLL L Z J V J Z 0 0 g o U U F V) F F F V) FERRY STREET MANOR MUPTE Application 05 August 2019 z 0 Q LU J W 0 1 ��■�■�I A -MIN I IN *r P, H I T U R■ Exhibit B Page 7 of 8 FERRY STREET MANOR MUPTE Application 05 August 2019 z 0 a W J W �27 0 z ■ ■ ■ ■il: mm r 1 r� ■ �IMM� ISI IIIIML In I= so" Im U