Loading...
HomeMy WebLinkAboutAgenda Packet 10-30-19 Work SessionOctober 30, 2019, Work Session EUGENE CITY COUNCIL AGENDA October 30, 2019 12:00 p.m. CITY COUNCIL WORK SESSION AND WORK SESSION OF THE EUGENE URBAN RENEWAL AGENCY Harris Hall, 125 East 8th Avenue Eugene, Oregon 97401 Meeting of October 30, 2019; Her Honor Mayor Lucy Vinis Presiding Councilors Betty Taylor, President Emily Semple, Vice President Mike Clark Greg Evans Chris Pryor Claire Syrett Jennifer Yeh Alan Zelenka 12:00 p.m. CITY COUNCIL WORK SESSION AND WORK SESSION OF THE EUGENE URBAN RENEWAL AGENCY 1.WORK SESSION: Downtown Fiber Project Update 2.WORK SESSION: Town Square Project Update October 30, 2019, Work Session For the hearing impaired, an interpreter can be provided with 48 hours' notice prior to the meeting. Spanish-language interpretation will also be provided with 48 hours' notice. To arrange for these services, contact the receptionist at 541-682-5010. City Council meetings are telecast live on Metro Television, Comcast channel 21, and rebroadcast later in the week. El consejo de la Ciudad de Eugene agradece su interés en estos asuntos de la agenda. El lugar de la reunión tiene acceso para sillas de ruedas. Se puede proveer a un intérprete para las personas con discapacidad auditiva si avisa con 48 horas de anticipación. También se puede proveer interpretación para español si avisa con 48 horas de anticipación. Para reservar estos servicios llame al 541-682-5010. Las reuniones del consejo de la ciudad se transmiten en vivo por Metro Television, Canal 21 de Comcast y son retransmitidas durante la semana. For more information, contact the Council Coordinator at 541-682-5010 or visit us online at www.eugene-or.gov. October 30, 2019, Work Session – Item 1 EUGENE CITY COUNCIL AGENDA ITEM SUMMARY Work Session: Downtown Fiber Project Update Meeting Date: October 30, 2019 Agenda Item Number: 1 Department: Planning and Development Staff Contact: Anne Fifield www.eugene-or.gov Contact Telephone Number: 541-682-5451 ISSUE STATEMENT This work session is an update on the downtown fiber project, a publicly-owned fiber network now known as EUGNet. The fiber network has been constructed and has positively impacted the number of jobs in the downtown core. BACKGROUND Expanding Eugene’s telecommunications capacity has long been identified as critical to growing our technology sector and tech-enabled businesses. The 2013 City of Eugene Broadband Strategic Plan identified the development of a downtown fiber network as a strategic goal. Beginning in FY2014, the City of Eugene used the Telecom Fund for a pilot project to connect three buildings in the downtown to the Willamette Internet eXchange (WIX) using fiber optics installed in EWEB’s existing underground electrical infrastructure. The pilot project demonstrated that using underground electrical conduit was a feasible method to bring fiber to individual buildings. In 2016, the City Council, in its role as the Urban Renewal Agency Board, approved an ordinance amending the Downtown Urban Renewal Plan, which identified funds to support the construction of a high-speed fiber network in the downtown. The Telecom Fund supported construction costs outside the Urban Renewal Districts. In addition, the City and its partners were awarded a grant from the federal Economic Development Agency to support the project. The City has worked in close partnership with the Eugene Water & Electric Board, Lane Council of Governments, and the Technology Association of Oregon to implement this innovative project. EWEB completed the installation of the fiber network throughout the designated footprint of the project boundary in October 2019. At this time, 82 buildings have connected to the EUGNet fiber network. The EUGNet system established a competitive landscape for telecommunications in the downtown. It is an ‘open access’ network, which means that the publicly-owned fiber infrastructure can be leased by any internet service provider. There are now multiple ISPs competing to be downtown businesses’ service provider. Telecommunications customers in the downtown have seen their internet speeds grow by a factor of ten and prices have declined by a factor of two. October 30, 2019, Work Session – Item 1 The network has had a positive impact on our local economy. Existing businesses have been able to grow and hire more staff, new businesses have chosen to locate in the EUGNet service area, and out-of-town firms have located secondary offices in Eugene. Staff will update City Council on construction status, project costs, economic impacts, and potential next steps at the work session. PREVIOUS COUNCIL DIRECTION June 13, 2016, Agency Board Meeting The Downtown Urban Renewal Agency Board amended the Downtown Urban Renewal Plan to include the fiber network as a new project. September 28, 2016, City Council Work Session City Council authorized the submittal of a grant application to the federal Economic Development Agency for funds to construct a publicly-owned fiber network in the downtown. COUNCIL OPTIONS Information only. No options identified at this time. CITY MANAGER’S RECOMMENDATION Information only. No recommendation identified at this time. SUGGESTED MOTION No motion required. ATTACHMENTS None FOR MORE INFORMATION Staff Contact: Anne Fifield Telephone: 541-682-5451 Staff E-Mail: afifield@eugene-or.gov October 30, 2019, Work Session – Item 2 EUGENE AGENCY BOARD AGENCY BOARD AGENDA ITEM SUMMARY Work Session: Town Square Project Update Meeting Date: October 30, 2019 Agenda Item Number: 2 Department: Planning and Development Staff Contact: Will Dowdy www.eugene-or.gov Contact Telephone Number: 541-682-5340 ISSUE STATEMENT This work session is a progress check-in on Eugene’s Town Square Project, which combines the Park Blocks improvements, permanent Farmers Market space, and City Hall building. BACKGROUND The City of Eugene is working to accommodate the current and future needs of Eugene’s City Hall and the Lane County Farmers Market, while reimagining the existing Park Blocks and restoring the Town Square with the recovery of the northwest block (occupied today by the Butterfly Lot). The vision is to locate efficient and accessible government services, provide a permanent location for a year-round public Farmers Market, create a central gathering space for both the immediate neighborhood and broader community, strengthen 8th Avenue as downtown’s connection to the river, and continue the momentum of downtown revitalization. In June 2017, City Council, in partnership with the Lane County Board of Commissioners, announced the agreement for the City to acquire the Butterfly Lot property as the future home of the Farmers Market and City Hall. In May 2019, City Council gave further endorsement to the Town Square project by authorizing the design work for a City Hall on the Butterfly Lot site as part of the planning for the Town Square. Project Status The Town Square Project has completed the Concept Design phase after months of stakeholder engagement and collaborative design. The Concept Design includes consideration of the relationships between the different project components; determining basic program, massing and key features; establishing a common palette and other unifying design elements; and specific design concepts with cost estimates. The City, in partnership with the design consultant team led by Cameron McCarthy Landscape Architecture & Planning, has hosted a series of public events focused on developing a Eugene Town Square that reflects community needs. These public events, along with three online surveys and meetings with key stakeholders such as the Lane County Farmers Market and the Eugene Saturday Market, has allowed the design team to gather close to 3,000 pieces of feedback that October 30, 2019, Work Session – Item 2 were used to inform a draft concept for the Eugene Town Square. By gathering this input, Cameron McCarthy has proposed a concept plan that creates an overarching narrative for a Town Square that embraces Eugene’s community, culture, history, values and civics. The design of City Hall has been the most conceptual of any part of the Town Square Concept Design. This is due largely to the significant work already completed by council, staff and community members around City Hall values as well the need to have the project architect selected before taking the initial design too far. The City of Eugene is ready to move forward to the next phase of design and is assembling the right project team. Cameron McCarthy Landscape Architecture & Planning and FFA Architecture and Interiors join Sheils Obletz Johnsen (the Owner’s Representative for the project), with a Contractor to be selected to provide early feedback on cost, schedule and constructability. If so directed, the team is prepared to take the project design through the schematic level, which will include specificity about the design and project cost. Proposed Next Steps and Timeline Related to the Town Square Project o Work session in December to review goals and key design characteristics of the City Hall. o Work sessions in early 2020 to review refined designs and cost estimates. o Construction drawings for the Park Blocks and Farmers Market completed in summer 2020; and construction drawings for the City Hall completed in fall 2020. o Council/Agency Board makes final decisions on project in 2020. o Construction for the Park Blocks and Farmers Market completed in spring 2021; and construction for the City Hall completed in spring 2022. PREVIOUS COUNCIL / AGENCY BOARD DIRECTION June 13, 2016, Agency Board Meeting The Downtown Urban Renewal Agency Board amended the Downtown Urban Renewal Plan to include the Park Blocks and Farmers Market as new projects. December 14, 2016, Work Session Following the Coordinated Downtown Development report by Cameron McCarthy, which explored location options for City Hall, the Lane County Courthouse and Farmers Market, City Council deliberated over the preferred option of the three scenarios described in the analysis. At this work session, council directed the City Manager to negotiate the purchase of the Butterfly Lot and sale of the former City Hall site, for the purpose of implementing “Scenario C,” a City Hall and Farmers Market on the site of the Butterfly Lot. June 26, 2017, City Council Work Session and Agency Board Meeting City Council authorized the City Manager to purchase the Butterfly Lot from Lane County to be the site of the new City Hall. Immediately following this action, a meeting of the Urban Renewal Agency Board was convened, and the Board directed the Agency Director to purchase the Butterfly Lot to be the site of an expanded Farmers Market. October 30, 2019, Work Session – Item 2 May 15, 2019, City Council Work Session City Council authorized the City Manager to take the necessary next steps to design City Hall for the Butterfly Lot in planning for the Town Square. AGENCY BOARD OPTIONS 1. Direct the Agency Director to advance the Town Square design based on the proposed Concept Design and return for work sessions in early 2020. 2. Direct the Agency Director to schedule another work session on the Town Square Concept Design before further refining the design. AGENCY DIRECTOR’S RECOMMENDATION Direct the Agency Director to advance the Town Square design based on the proposed Concept Design and return for work sessions in early 2020. SUGGESTED MOTION Direct the Agency Director to advance the Town Square design based on the proposed Concept Design and return for work sessions in early 2020. ATTACHMENTS A. Town Square Concept Design package o Diagram: “How was one design created?” o Concept Design o Perspectives FOR MORE INFORMATION Staff Contact: Will Dowdy Telephone: 541-682-5340 Staff E-Mail: wdowdy@eugene-or.gov ?HOW WAS ONE DESIGN CREATED? LITTLE CHANGE • NATURAL/ ACTIVE FOUNTAINS • EVENT SPACE ACROSS OAK ST AND 8TH AVE • RESTROOMS AND STORAGE IN FARMER’S PAVILION LANE COUNTY FARMERS MARKET & SATURDAY MARKET MEMBERS PREFERRED KEEPING AS MANY EXISTING TREES AS POSSIBLE FROM CONCEPT 1 RESPONDENTS UNDER 25 AND LOCAL BUSINESSES LIKED ACTIVE/VARIABLE FOUNTAIN FROM CONCEPT 3 THOSE IDENTIFYING WITH A DISABILITY PREFERRED MODEST PARKING REDUCTION IN CONCEPT 2 COMMUNITIES OF COLOR PREFERRED MORE LAWN SPACE AS SHOWN IN CONCEPT 2 & CONCEPT 3 1 C O N C E P T SOME CHANGE2C O N C E P T MOST CHANGE3C O N C E P T TOP PREFERENCES DEMOGRAPHIC PREFERENCES: The team worked closely with key downtown and project stakeholders, reviewed feedback from two surveys and public events and held in-person conversations with a wide diversity of people to shape the three concepts into a final draft. R E S PONSES PER C O N C E P T P U B L I C I N V O L V E M E N T STAGE INFO KIOSK LAWN WITH STORAGE & RESTROOMS FOUNTAIN TREES MARKET PAVILION ADJUSTABLE WITH NATURAL FEEL MORE PERMANENT SE BLOCK CLOSE SOME PARKING PRESERVE EXISTING & ADD NEW E L E M E N TS OF A FINAL D E SIG N strongly liked strongly liked Key Findings: Keep healthy, existing trees, permanent stage on SE Block, Natural fountain. Key Findings: Remove parking around edges of Park Blocks and provide temporary stage on SW Block Key Findings: Increase area of lawn and overall number of trees, paving to make all blocks feel like one park [18%] strongly liked[20%] [34%] JULY 18TH BLOCK PARTY DOWNTOWN STAKEHOLDERS EMAIL & SOCIAL MEDIA OVER 7,000 CONNECTIONS WITH ALL TYPES OF PEOPLE FROM ALL THROUGHOUT EUGENE ONLINE SURVEY DIRECT OUTREACH 500+ ATTENDEES 6,500+ 10 MEETINGS 75+ PEOPLE 1,014 RESPONSES 18+ EVENTS 675+ PEOPLE ATTACHMENT A October 30, 2019, Work Session – Item 2 EXISTING TREES NEW TREES RAISED STREET (at grade with existing walk) LAWN STORMWATER PLANT BED STANDARD PAVING SPECIALTY PAVING WATER FEATURE LEGEND E RESTROOMS SERVING / DEMO COUNTER COVERED STAGESUPPORT SOUTH PARK STREET SOUTH PARK STREET EA S T P A R K S T R E E T 8TH AVENUE WE S T P A R K S T R E E T OA K S T R E E T NORTH PARK STREET 7TH AVENUE WE S T P A R K S T R E E T CITY HALL FARMER’S MARKET LANE COUNTY COURTHOUSE WAYNE MORSE FREE SPEECH PLAZA LANE COUNTY SERVICE BUILDING CITY HALL & FARMERS MARKET BLOCK SOUTHWEST PARK BLOCK SOUTHEAST PARK BLOCK October 30, 2019, Work Session – Item 2 THURSDAY in JUNE SATURDAY in AUGUST SUNDAY in SEPTEMBER SATURDAY in JULY WEDNESDAY in OCTOBER TUESDAY in MARCH Fun in the fountain! Farmers Market Fall Fest on the plaza Saturday Market Sing along Pavilion performance Rainy play dayOctober 30, 2019, Work Session – Item 2