HomeMy WebLinkAboutTownSquare Presentation 2-10-20The Town Square
February 10, 2020
1
2
3
4
CITY HALL MASSING CONCEPTS
Decision Points
5
ADDITIONAL COMMUNITY USES
Do you want to build additional floors of leasable real estate, beyond the needs of the City Hall?
UNDERGROUND PARKING
Do you want the Town Square to include underground parking beneath the Farmers Market and
City Hall?
ENVIRONMENTAL SUSTAINABILITY
Should the City Hall be designed in keeping with the current standard of achieving LEED Silver certification?
SEISMIC STANDARDS
What seismic standard should the City Hall be designed to meet?
Additional Uses
Do you want to build additional floors of leasable real estate, beyond the needs of the
City Hall?
Decision Points
6
Do you want the Town Square to include underground parking beneath the Farmers
Market and City Hall?
Underground Parking
Decision Points
7
Should the City Hall be designed in keeping with the current standard of achieving
LEED Silver certification?
Environmental Sustainability
Decision Points
8
9
Certification “Designed to”
LEED Silver standard
LEED Silver
equivalent
LEED Silver
Certified
•Project team uses the LEED
scorecard as a best practices guide
•No monitoring or field verification;
no confirmation that sustainable
practices are implemented
•USGBC is not involved (City &
consultants document sustainability
measures)
•Project team uses the LEED
scorecard as a best practices guide
•Commitment to monitoring and field
verification; commitment to
implementing sustainable practices
•USGBC is not involved (City &
consultants document sustainability
measures)
•Project team completes and submits
LEED scorecard to USGBC
•Monitoring and field verification are
essential to demonstrating
compliance to USGBC
•USGBC reviews application and
determines if project qualifies for
certification
Tracking /field verification No Yes Yes
LEED Certification No No Yes
Admin/monitoring Baseline + $40,000 + $40,000
Fee for USGBC Registration
&Pre-Certification $0 $0 + $5,000
Total Baseline + $40,000 + $45,000
Alternatives to Certification
10
Program/Tier LEED
Certified
LEED
Silver
LEED
Gold
LEED
Platinum Green Globes
CORE Green
Building
Certification
Cost $$$$$$$$$$$$$$$$$
Stringency Lowest Medium High Highest Low-High High-Highest
Team familiarity
with the program High High High High Low Low
Public familiarity
with the program High High High High Low Low
Alternatives to LEED Silver
What seismic standard should the City Hall be designed to meet?
Seismic Standards
Decision Points
11
12
focus of further study
Performance Life Safety Immediate Occupancy Operational
Typical for:Conventional new office Essential facilities
(e.g., police, fire, EOC)
Uncommon
Performance Life Safety “Life Safety plus”Immediate Occupancy Operational
•Safe exit
•Structure may be
compromised
•Rebuilding may be cost-
effective option
•Limited damage to
Structure & Envelope
•MEP likely to sustain some
damage
•Most damage should be
repairable
•Operations should resume
after repairs
•Minimal damage to
Structure, MEP & Envelope
•All damage should be
repairable
•Operations should quickly
resume
Cost Difference Baseline + $1,050,000 –1,650,000 + $2,250,000 –3,250,000
13
new hybrid option
Today City Hall Council direction
Apr Park Blocks & F.Mkt.Agency Board decision on finishing design
May/June City Hall Council decision on finishing design
Summer/Fall Park Blocks & F.Mkt. Agency Board decision on starting construction
Fall/Winter City Hall Council decision on starting construction
Spring 2021 Park Blocks & F.Mkt.Construction Completed
2022 City Hall Construction Completed
Town Square Mileposts
14
ADDITIONAL COMMUNITY USES
Do you want to build additional floors of leasable real estate, beyond the needs of the City Hall?
UNDERGROUND PARKING
Do you want the Town Square to include underground parking beneath the Farmers Market and
City Hall?
ENVIRONMENTAL SUSTAINABILITY
Should the City Hall be designed in keeping with the current standard of achieving LEED Silver certification?
Decision Points
SEISMIC STANDARDS
What seismic standard should the City Hall be designed to meet?
15
16
B’way
South
363
B’way
North
369
Pearl
Street
262
Overpark
598
Hult
Center
510
Parcade
439 TOWN
SQUARE
13th &
Olive
200*17