Loading...
HomeMy WebLinkAboutTownSquare Presentation 2-10-20The Town Square February 10, 2020 1 2 3 4 CITY HALL MASSING CONCEPTS Decision Points 5 ADDITIONAL COMMUNITY USES Do you want to build additional floors of leasable real estate, beyond the needs of the City Hall? UNDERGROUND PARKING Do you want the Town Square to include underground parking beneath the Farmers Market and City Hall? ENVIRONMENTAL SUSTAINABILITY Should the City Hall be designed in keeping with the current standard of achieving LEED Silver certification? SEISMIC STANDARDS What seismic standard should the City Hall be designed to meet? Additional Uses Do you want to build additional floors of leasable real estate, beyond the needs of the City Hall? Decision Points 6 Do you want the Town Square to include underground parking beneath the Farmers Market and City Hall? Underground Parking Decision Points 7 Should the City Hall be designed in keeping with the current standard of achieving LEED Silver certification? Environmental Sustainability Decision Points 8 9 Certification “Designed to” LEED Silver standard LEED Silver equivalent LEED Silver Certified •Project team uses the LEED scorecard as a best practices guide •No monitoring or field verification; no confirmation that sustainable practices are implemented •USGBC is not involved (City & consultants document sustainability measures) •Project team uses the LEED scorecard as a best practices guide •Commitment to monitoring and field verification; commitment to implementing sustainable practices •USGBC is not involved (City & consultants document sustainability measures) •Project team completes and submits LEED scorecard to USGBC •Monitoring and field verification are essential to demonstrating compliance to USGBC •USGBC reviews application and determines if project qualifies for certification Tracking /field verification No Yes Yes LEED Certification No No Yes Admin/monitoring Baseline + $40,000 + $40,000 Fee for USGBC Registration &Pre-Certification $0 $0 + $5,000 Total Baseline + $40,000 + $45,000 Alternatives to Certification 10 Program/Tier LEED Certified LEED Silver LEED Gold LEED Platinum Green Globes CORE Green Building Certification Cost $$$$$$$$$$$$$$$$$ Stringency Lowest Medium High Highest Low-High High-Highest Team familiarity with the program High High High High Low Low Public familiarity with the program High High High High Low Low Alternatives to LEED Silver What seismic standard should the City Hall be designed to meet? Seismic Standards Decision Points 11 12 focus of further study Performance Life Safety Immediate Occupancy Operational Typical for:Conventional new office Essential facilities (e.g., police, fire, EOC) Uncommon Performance Life Safety “Life Safety plus”Immediate Occupancy Operational •Safe exit •Structure may be compromised •Rebuilding may be cost- effective option •Limited damage to Structure & Envelope •MEP likely to sustain some damage •Most damage should be repairable •Operations should resume after repairs •Minimal damage to Structure, MEP & Envelope •All damage should be repairable •Operations should quickly resume Cost Difference Baseline + $1,050,000 –1,650,000 + $2,250,000 –3,250,000 13 new hybrid option Today City Hall Council direction Apr Park Blocks & F.Mkt.Agency Board decision on finishing design May/June City Hall Council decision on finishing design Summer/Fall Park Blocks & F.Mkt. Agency Board decision on starting construction Fall/Winter City Hall Council decision on starting construction Spring 2021 Park Blocks & F.Mkt.Construction Completed 2022 City Hall Construction Completed Town Square Mileposts 14 ADDITIONAL COMMUNITY USES Do you want to build additional floors of leasable real estate, beyond the needs of the City Hall? UNDERGROUND PARKING Do you want the Town Square to include underground parking beneath the Farmers Market and City Hall? ENVIRONMENTAL SUSTAINABILITY Should the City Hall be designed in keeping with the current standard of achieving LEED Silver certification? Decision Points SEISMIC STANDARDS What seismic standard should the City Hall be designed to meet? 15 16 B’way South 363 B’way North 369 Pearl Street 262 Overpark 598 Hult Center 510 Parcade 439 TOWN SQUARE 13th & Olive 200*17