Work Session: City Council Goal - Arts and Outdoors Action Plan Update
Meeting Date: June 27, 2007 Agenda Item Number: A
Department: Library, Recreation and Cultural Services Staff Contact: Renee Grube
www.eugene-or.gov Contact Telephone Number: 682-5067
ISSUE STATEMENT
The City Council is asked to provide guidance to staff and approve the updated action plan for
implementing its “Arts and Outdoors” goal.
BACKGROUND
In January 2007, the City Council set its goals for the community for 2007-2008. Of the 10 goals
identified, six were extended from 2005-2006, including the goal regarding arts and outdoors. The
council adjusted the language of the goal slightly to, “Strengthen our commitment to community arts
and outdoors assets.”
The purpose of this goal, as articulated in the original action plan approved by the City Council in July
2005, is to strengthen and promote Eugene’s unique combination of arts and outdoors assets as a
community-wide, sustainable, economic development strategy. Strengthening the City’s arts and
outdoors resources and presenting a cohesive “arts and outdoors” theme will produce a significant
twofold benefit: 1) increased sustainable economic activity through enhanced tourism and commerce;
and 2) improved community livability for area residents with expanded access to arts and outdoors
amenities.
Following City Council approval of the action plan, the interdepartmental staff team began
implementation of the plan and, in September 2005, the City Council approved the slogan, “World’s
Greatest City of the Arts and Outdoors,” to be used in promoting the Eugene as a center for arts and
outdoors activities.
The last City Council work session to review progress on the arts and outdoors goal was in November
2006. The attached updated action plan includes information on progress since November and outlines
next steps in implementation of the plan’s continuing action items.
RELATED CITY POLICIES
Both the Parks, Recreation and Open Space Comprehensive Plan and the Cultural Policy Review
provide significant policy direction, as well as specific work plans, related to the Arts and Outdoors
action plan. The goal also relates directly to the Eugene Downtown Plan and the 1% for Arts policy,
and to the goals of the Sustainable Business Initiative.
L:\CMO\2007 Council Agendas\M070627\S070627A.doc
COUNCIL OPTIONS
The City Council may approve the action plan as recommended, approve the action plan with changes as
directed by the council, or postpone approval to a later date.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends approval of the updated action plan as recommended by the staff team.
SUGGESTED MOTION
Move to approve the Arts and Outdoors Updated Action Plan as recommended.
ATTACHMENTS
A. Arts and Outdoors Updated Action Plan – June 2007
B.Arts and Outdoors staff team roster
FOR MORE INFORMATION
Staff Contact: Renee Grube
Telephone: 682-5067
Staff E-Mail: renee.l.grube@ci.eugene.or.us
L:\CMO\2007 Council Agendas\M070627\S070627A.doc
ATTACHMENT A
Strengthen Our Commitment to Community Arts and Outdoor Assets
2007-2008 City Council Goal
Updated Action Plan – June 2007
The purpose of this goal, as articulated in the original action plan approved by the City Council
in July 2005, is to strengthen and promote Eugene’s unique combination of arts and outdoors
assets as a community-wide sustainable economic development strategy. This will increase
sustainable economic activity with enhanced tourism and commerce, and improve community
livability through expanded access to arts and outdoors amenities.
A. Planning Horizon and Focus
The focus of this updated action plan is reflected by the four major elements remaining from the
original plan:
2) Resource Assessment
3) Arts and Outdoors Identity
4) Opportunity Identification
5) Project Development and Implementation.
Project Initiation, Element 1 in the original action plan, has been completed.
The plan recommends activities that can occur over the remainder of the two-year goal period,
although work on many will continue into the future. A three- to five-year time frame is a
reasonable period to envision and project possible actions.
B. Goal Outcomes
The overall outcome for this goal is that Eugene more fully becomes the World’s Greatest City
of the Arts & Outdoors. Progress toward the outcome will be evident in three primary ways:
™
?
Increased economic activity and tourism related to arts and outdoors.
?
Greater access to arts and outdoors amenities and activities for area residents.
?
Eugene’s renown as a great place for the arts and outdoors.
C. Progress to Date
Significant progress has been made on many aspects of the action plan in the two years since it
was first approved—much of which has been recorded in quarterly goal progress reports.
Progress on key activities since November 2006, when the Council last held a work session on
this goal, is reported here.
Element 1. Project Initiation – Completed.
Element 2. Resource Assessment
An extensive inventory of existing public resources related to art and outdoor assets in Eugene is
available through City program areas in the Cultural Services, Parks and Open Space, and
Facilities Management divisions. These resources, described below, have been identified and
collected to support further action items as needed.
?
Visual Arts Facilities
As part of the Cultural Policy Review (CPR) process, an inventory was developed for
facilities offering regular, publicly-accessible art exhibition opportunities through registered
nonprofit agencies. Eight facilities were identified. Commercial galleries and retail settings
were not included in the inventory.
?
Performing Arts Facilities
The CPR process also identified 17 performing arts facilities including a variety of
permanent, dedicated music and theater venues. Music venues associated with restaurants
and other commercial establishments, as well as temporary venues related to events, were not
included in the inventory. Both the visual arts and performing arts inventories are managed
by the Cultural Services Division, and are available online at www.eugene-or.gov (Cultural
Services / Cultural Policy Review).
?
Public Art Collection
The City of Eugene hosts a significant collection of public art installations, which are
cataloged online at www.eugene-or.gov (Facilities Management / Public Art Gallery). An
extensive database containing information about the art is administered by the Facilities
Management Division. In addition, a significant amount of public art has been
commissioned and installed—outside of the 1% For Art program—as part of park
development projects. These installations have been recently identified and cataloged.
?
Outdoor Recreation Facilities
A thorough inventory of public outdoor recreation facilities was completed in 2005 as part of
the Parks, Recreation and Open Space Comprehensive Plan process. The inventory contains
detailed information regarding the number and type of facilities, distribution, acreage, and
condition. Administered by the Parks and Open Space Division, the inventory is available
online at www.eugene-or.gov (Parks and Open Space / PROS Comp. Plan / PROS Appendix
B – Existing Resources). Private recreation facilities, and natural features utilized for public,
outdoor recreation that are not actively managed by the City, are not included in the
inventory.
Element 3. Arts and Outdoors Identity
City departments cooperated to fund a two-page spread in the new CVALCO Visitor’s Guide
highlighting Eugene’s exceptional arts and outdoors amenities. CVALCO referred to the
slogan several times throughout the guide. The Cultural Services Division uses the “world’s
greatest” slogan and an arts and outdoors theme on its website, and in ads, publications, etc.
Other community partners including CVALCO and the Eugene Chamber of Commerce have
used the identity and slogan. The Saturday Market uses the arts and outdoors theme in its
radio ads. Additional City uses are referenced in other sections of this report.
Element 4. Opportunity Identification
?
Cultural Policy Review
The Cultural Policy Review was initiated in June 2006 to examine conditions, services and
gaps in the cultural sector, to identify goals and strategies to strengthen that sector, and to
assist the City in defining its role in support of Eugene’s art and culture. The review was
concluded at the Mayor's CPR committee meeting on June 11 where the committee reviewed
and unanimously accepted the draft consultant report. Following the Mayor's committee
meeting, a public session was facilitated by the consultants, Committee Chair Tina Rinaldi
and Vice Chair David Kelly. Community members gave feedback and acknowledged the
consultants and committee for a job well done.
The CPR Report focuses on a number of core issue areas including: Leadership and
Resources; Cultural Organizations, Participation and Audiences; Education and Lifelong
Learning; Communication; and Downtown and the Built Environment. Public input into the
review process exceeded expectations with participation from more than 3,000 people.
The final document will be posted on the City's website on July 6. The City Council Work
session on this initiative is scheduled for July 25.
?
Parks, Recreation and Open Space (PROS) Comprehensive Plan
On November 7, 2006, Eugene voters passed the Parks, Recreation and Open Space bond,
Measure 20-110. The measure authorizes a maximum of $27,490,000 for the following:
purchase of land for neighborhood and community parks in areas throughout the city;
purchase of natural area parks along the Ridgeline Trail corridor, Willamette River and
Gillespie Butte; expansion and construction of facilities at Golden Gardens Park; support for
development of the West Eugene Wetland Education Center in partnership with other
agencies; and restoration and development of synthetic-surface athletic fields and related
facilities in partnership with the Eugene and Bethel school districts. These acquisitions and
projects over the next several years will significantly enhance Eugene’s outdoor resources
and recreation assets.
?
2008 Olympic Track and Field Trials – Eugene 08
Several City staff members chair or participate on a variety of committees that are preparing
the community to host this major sport and tourism event, including Transportation, Security,
Sustainability, Entertainment, Hospitality, Marketing and Media Services, and Community
Programs and Services, as well as the overall Steering Committee.
City personnel also support related activities to build community interest in track and field
and to help youth develop healthy lifestyles. These include providing KidZones at the Road
to Eugene 08 and other University of Oregon meets, and organizing visits from elite track
athletes to local schools in the Be A Champion program.
th
Countdown to Eugene 08, to be held on Saturday, June 30, at the 5 Street Public Market, is
the community kick-off celebration marking one year until the beginning of the Olympic
Trials. Mayor Piercy will be among those helping to unveil the Countdown Clock, which
will tick off the days until the Olympic Trials. The free public event will feature a band,
visits from Olympians, a KidZone with track-related activities for youngsters, and other
surprises.
?
Downtown Development
Eugene’s Downtown Plan calls for strengthening downtown as a cultural and entertainment
center. The City Council has placed a high priority on downtown renewal by adding a
Council goal to “facilitate significant revitalization of the downtown core.” The Cultural
Policy Review report highlights the importance of downtown as the “center of cultural and
artistic expression for Eugene.” The report proposes strategies to sustain and expand arts and
cultural activities downtown, and to enhance Eugene’s physical environment through public
art and the use of architecture and streetscape design downtown. Both the CPR process and
downtown redevelopment will generate some opportunities to enhance the role of downtown
as a center for arts and culture in the community.
EWEB Substation
The new downtown EWEB substation will be built on the site of the existing one just
across from the intersection of 8th Avenue and the new Hilyard Extension. This site will
be the terminus of 8th leading to the river, located between the railroad tracks and the
riverfront path. While the design of the substation is primarily driven by functional
requirements, it presents a significant public art opportunity. The substation design
includes both columns and flat panels that could be the canvas for public art. Staff
members from both the City and EWEB are moving forward with the goal of identifying
funding possibilities and design ideas to ornament this important piece of public
construction.
West Broadway Redevelopment
As plans for the redevelopment of West Broadway unfold, the interface of public and
private design needs to be a part of the conversation. To further the goals for Art and the
Outdoors, the City will work with the selected development teams on opportunities for
creating inviting streetscapes and public art installations compatible with the anticipated
development.
Pedestrian & Bicycle Strategic Plan
The City is developing a Pedestrian & Bicycle Strategic Plan to guide efforts by staff,
community organizations, and other groups to make Eugene an even better city for walking and
biking. The plan will guide the City’s work over the next several years to implement pedestrian,
bicycle, and transportation demand management elements of TransPlan and the Regional
Transportation Plan. The planning process was kicked off with a Walking and Biking Summit in
October 2006 that attracted over 225 participants. Since then, there have been a wide variety of
activities to get public input into the plan including three community workshops, youth input
sessions, focus groups, stakeholder interviews, sessions with other City departments, and a
Departmental Advisory Committee that meets once a month. The plan is targeted for completion
this fall and will eventually be adopted as an Administrative Order by the City Manager. More
.
information is available at www.eugene-or.gov/walkbike
Element 5. Project Development and Implementation
?
Public Art Plan/Public Art Committee
The interim Public Art Committee has developed a work plan covering its chargesto review
proposals for donated public art, compile an inventory of City-owned sites, seek resources
for the City’s on-line public art catalogue and to provide feedback on projects that offer
opportunities for additional public art placement. With the completion of the Cultural Policy
Review, the committee is moving on to begin development of a public art master plan. A
University of Oregon master's student is serving as an intern with the committee to conduct
research on public art plans and on-line public arts catalogues.
Dedication of the Japanese American Memorial was held on February 19—the official Day
of Remembrance of the forced removal of 120,000 Japanese Americans to internment camps
during WWII. The site on the north east side of the Hult Center is visited frequently.
?
Celebrating Hult 25
Celebration of the Hult Center’s quarter-century anniversary is providing many opportunities
to further the “arts” in the World’s Greatest City of the Arts & Outdoors. A number of
™
“firsts” are under way:
Funding the Celebration
- The eight Resident Companies have agreed to participate in
raising money from the private sector to help fund Celebrating Hult 25 activities. This
will support staff members who continue to solicit sponsorships and personal gifts from
businesses and individuals. The detailed sponsorship “tree” for Hult 25 events was
completed with input from community business leaders. Fundraising efforts continue to
be an exciting, interesting and sometimes challenging endeavor. Support Hult Operations
(SHO), the Hult Center’s volunteer organization, is preparing grant applications and has
secured $10,000 from the Oregon Community Foundation and $75,000 from the Hult
Endowment. In addition, $15,000 has been contributed by The Register-Guard, and the
Tykeson and Woodard Family Foundations.
“Only in Eugene” -
The Eugene Symphony and the Oregon Bach Festival collaborated
with Hult Presents on the cooperative marketing program, “Only In Eugene”, funded by
a $10,000 Lane County tourism grant. Reneé Fleming and the Philadelphia Orchestra
both occurred in May, and The 5 Browns will perform on July 13. All are world-class
performances that are only taking place in Eugene. The campaign focused on a very
targeted market in Portland Metro with two direct post card mailings, an accompanying
radio campaign, strong web and electronic marketing, and intense media outreach around
the state. Three Eugene hotels are offering “Only In Eugene” special room rates for out-
of-town visitors. The Philadelphia Orchestra alone yielded 219 tickets sold (equaling
$9,636) in towns more than 70 miles away. Both the Eugene Symphony and the Oregon
Bach Festival shared equally in implementing this campaign and all partners are enthused
with this first-ever marketing collaboration.
Summer @ the Hult
- Five summer events are planned—all free to the public. Four will
take place in the Hult Center Plaza, meeting the goal to generate more activity and energy
outside the building. Thanks to a partnership with the Public Works department, free
valet bike parking will be available at the Henan-China Performing Arts. Another event
will specifically focus on the development of youth artists and audiences for the future—
one of the primary goals of Celebrating Hult 25. The Talents of Tomorrow events will
showcase performing, visual and literary youth artists. Auditions were held at Roosevelt
Middle and Willamette High Schools in June.
Another Evening of Memories -Resident Companies In Concert
on Friday, September
28, will feature all eight Resident Companies in the Silva Concert Hall in one evening.
An event to commemorate and celebrate Opening Night 25 years ago, this special
performance will also be free to the public. The ticket distribution plan being
implemented specifically targets the goal of audience development.
Another Evening of Memories: Eugene Rocks!
– a dance party in The Studio will take
P
place on September 28 at the same time as Resident Company In Concert. rogrammed
to attract youth in grades 6, 7 and 8, the party is designed to develop another generation
of Eugene residents to be supporters, appreciators, and leaders in the arts. The youth of
today are the future citizens of this culturally-rich community who will have exciting
memories to share when the Hult Center turns 50 in 2032!
Club Hult – “Dance @ our house under a ceiling of laser lights” -
On Saturday,
September 29, after a full day of free activities during the Open House and Community
Celebration, the Hult Center Lobby will be transformed into Club Hult. This activity is
programmed to attract another highly-desired new audience demographic group—the 21-
30 year olds.
ENCORE magazine -
The premiere issue of ENCORE, The Register-Guard’s special
publication dedicated to the arts in Eugene, was published April 20. Cultural Services
staff is proud to work with many community members on the successful launch of the
magazine to be published semi-annually. The second issue will come out September 14 ,
featuring more performing and visual arts stories and recollections of 25 years of world-
class entertainment at the Hult Center.
?
Ruth Bascom Riverbank Trail Enhancement Project
Each year thousands of residents and visitors enjoy Eugene’s trail along the river and utilize
this system as a key connection to surrounding areas. The Riverloop Connections project
aims to make the existing Riverbank Trail easier for local residents and visitors to use by
installing way-finding and map signage, and additional mileage markers, and by creating a
user-friendly hand-held map. The project is being carried forward by a partnership of
interested community members, the Eugene Parks Foundation, and the Parks and Open Space
Division. It is planned to be complete prior to the 2008 Olympic Trials in order to make the
most of this amazing community feature and to encourage the influx of visitors to bike and
walk between venues.
?
New Eugene Trails Map
Local hiking and walking trails continue to be among the most searched-for items on the
City’s web page. Visitors and residents are looking for challenging hiking opportunities,
scenic bike routes, and outdoor opportunities that are wheelchair accessible. In 2007 the
Parks and Open Space Division will create a comprehensive Eugene Trails Map that will
bring together walking, hiking, and biking opportunities in Eugene. Special care will be taken
to provide readers with an idea of what each trail is like in order to help them chose the one
that best fits their ability and interest. The map will be distributed online as well as at local
and regional visitors’ associations, hotels, and businesses.
?
Willamette River Water Trail project
On June 2, Governor Ted Kulongoski was in Portland to dedicate the completion of the
Willamette River Trail system and the Willamette River Trail Guide. The Water Trail is now
fully mapped from Eugene to Portland, making access to Oregon’s historic Willamette River
much easier. The Willamette Riverkeepers, Oregon Parks and Recreation Department, and
many other partners, including the City of Eugene, spent several years researching and
developing the Water Trail Guide. A free waterproof copy of The Water Trail Guide can be
obtained by calling Willamette Riverkeeper at 503-223-6418 or emailinfo@willamette-
.
riverkeeper.org
?
Out in the Artdoors - Urban Adventure Race
nd
Promoting the World’s Greatest City of the Arts & Outdoors to local citizens, the 2annual
™
Art in the Outdoors Urban Adventure Race was held on May 19. This year 29 four-person
teams competed in the event that highlights the many outdoor activities and artistic options
that Eugene citizens can enjoy within their own city limits. Just a few of this year’s activities
included rafting the Willamette River, tree climbing at Maurie Jacobs Park, performing a
short play at the Hult Center, climbing at the Skinner Butte Columns and sculpting clay at
Campbell Community Center.
?
Special Events Coordination
As a result of working with the new Eugene Marathon, staff identified the need for a more
coordinated review and approval process for large scale events. A interdepartmental team is
developing a more centralized, streamlined process in order to encourage and facilitate
community members to create fun, exciting events which add to the experience of Eugene’s
arts and outdoors.
D. Action Plan
Element 2 - Resource Assessment
City Assets
An extensive inventory of existing public resources related to art and outdoor assets in Eugene
has been developed through City program areas in the Cultural Services, Parks and Open Space,
Recreation Services and Facilities Management divisions. The components of this inventory --
Visual Arts Facilities, Performing Arts Facilities, Public Art Collection and Outdoor Recreation
Facilities – are described above in Section C. Progress To Date.
Private/Non-Profit Assets
While City assets have been documented through recent internal and community planning
efforts, information on non-City assets is more difficult to gather. Because the scope of this
effort is variable, it will be helpful to seek input from the marketing steering committee to
develop a vision of how the asset inventory will be used in future arts and outdoors development
and promotion efforts to guide next steps. In the interim, a list of CVALCO members in the
categories of both art and outdoor-related businesses has been generated. The list of 185 arts and
outdoors stakeholders compiled for the development of the marketing plan has also been
catalogued. These listings, along with the inventory of City-based assets, can be used as a
starting point for further development of an inventory of community-wide resources, and can
help set a baseline by which changes in the number and type of art and outdoor facilities, and
providers may be measured in the future.
Programming and Events
An inventory of public and private programming and events related to art and the outdoors is
equally valuable to this effort. As with physical assets, an effort to inventory community
programming and events should be guided by a clear definition of how it will be used.
Next Steps/Action Items
2.a. – Obtain input from Marketing Steering Committee on needs and uses for resource
inventory of non-public facilities and of public and non-public programs and events.
Complete resource assessment based on that input.
2.b. Make resource inventories available and useful to partners and public.
Element 3 - Arts and Outdoors Identity
Work toward implementing the marketing plan’s recommendation to create inventories of arts
and outdoor resources is in progress as described above. The Cultural Policy Review (CPR)
process and the Parks, Recreation and Open Space (PROS) planning process helped to strengthen
community alliances, one of the marketing plan’s key recommendations.
The Marketing Steering Committee, which includes community members representing key
stakeholder groups, has been formed and a first meeting is being planned for July. The staff is
also pursuing options for linking the “world’s greatest” slogan with Eugene 08 graphics and
marketing materials used for City purposes. Meanwhile, many efforts to promote the arts and
outdoors identity, such as a two-page spread in the CVALCO Visitor’s Guide, continue on an ad
hoc basis. Examples will be provided to the City Council at the meeting on June 27.
Next Steps/Action Items
3.a. – Convene the Marketing Steering Committee. Tasks include:
Confirm vision and direction for branding efforts, including slogan and graphics.
-
Develop plan for expanding alliances and involving stakeholders in collaborative
-
marketing.
Discuss strategies to co-brand or integrate multiple related identities–Eugene 08,
-
Track Town USA, Green Eugene.
Provide direction regarding needs and uses for community resource inventories.
-
Advise regarding organizational and funding needs for ongoing administration
-
and implementation of collaborative marketing strategies.
Assist in developing information regarding economic impact of arts & outdoors
-
activities and other outcome measures.
Element 4 - Opportunity Identification
A wide variety of gaps and opportunities for meeting arts and outdoors economic development
objectives has been identified in the first phase of work on this goal through the marketing plan,
the CPR process, the PROS Plan and other planning efforts. The next challenge will be to
prioritize the many ideas and possibilities and develop a set of strategies for collaborative action
that can have the maximum impact toward becoming a world-renowned city of the arts and
outdoors.
Next Steps/Action Items
4.a. - Obtain assistance from Marketing Steering Committee to prioritize strategies and
projects that will maximize progress toward Art and Outdoor objectives.
Element 5 - Project Development and Implementation
Following identification of highest priority collaborative community projects, a work plan will
be developed to implement them.
The staff will continue to implement and report on projects within the scope of the City of
Eugene’s existing programs which support the Arts and Outdoors goal.
Next Steps/Action Items
5.a. - Complete work plans for prioritized collaborative projects and work toward
implementation.
5.b. - Continue to implement and report on City of Eugene Arts and Outdoors projects.
ATTACHMENT B
Strengthen Our Commitment to Community Arts and Outdoors Assets
City Council Goal Staff Team
June 2007
Renee Grube – Library, Recreation & Cultural Services, Executive Manager lead
Jan Bohman - City Manager’s Office, staff lead
Kelly Darnell - Public Works, Parks and Open Space
Robin Hostick - Public Works, Parks and Open Space
Laura Niles - Library, Recreation and Cultural Services, Cultural Services
Amanda Nobel - Planning and Development, Community Development (tentative)
Billie Moser - Library, Recreation and Cultural Services, Cultural Services
Maureen Robeson - Library, Recreation and Cultural Services, Administration
Craig Smith - Library, Recreation and Cultural Service, Recreation
Glen Svendsen - Central Services, Facility Management