Loading...
HomeMy WebLinkAboutOrd. 20655 20655 - METROPOLITAN -04-25-41, -04-25- - -W REVIEW OVERLAY. ADOPTED:Ju21 SIGNED:July14,2021 PASSED:8:0 REJECTED: OPPOSED: ABSENT: EFFECTIVE:August14 ORDINANCE NO. AN ORDINANCE AMENDING THE EUGENE-SPRINGFIELD METROPOLITAN AREA GENERAL PLAN DIAGRAM AND THE WHITEAKER PLAN LAND USE LOT 100, FROM LIGHT MEDIUM INDUSTRIAL TO MIXED USE AND REZONE THE PROPERTY FROM I-2 LIGHT MEDIUM INDUSTRIAL WITH /SR SITE REVIEW OVERLAY TO S-W WHITEAKER SPECIAL AREA WITH /SR SITE REVIEW OVERLAY. The City Council of the City of Eugene finds as follows: A.On July 14, 2020, 1400 Cross Street, LLC submitted applications for a Type I amendment to the Eugene-Springfield Metropolitan Area General Plan (Metro Plan) plan diagram, an amendment to the Whiteaker Plan land use diagram, and a concurrent zone change to change from the Light-Medium Industrial designation to a Mixed Use designation. Approval of the Metro Plan amendment results in the automatic concurrent amendment of the Whiteaker Plan land use diagram, giving the subject property a Mixed Use designation under the Whiteaker Plan. The zone change requested by the applicant would rezone the subject property from I-2 Light- Medium Industrial with a partial /SR Site Review overlay to S-W Whiteaker Special Area with /SR Site Review overlay over the entire property. B.On January 26, 2021, the Eugene Planning Commission held a public hearing on the application. The Eugene Planning Commission recommended that the Eugene City Council adopt the proposed amendments to the Metro Plan plan diagram as shown in Exhibit A, and the Whiteaker Plan land use diagram as shown in Exhibit B. NOW, THEREFORE, THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The Eugene-Springfield Metropolitan Area General Plan land use diagram is Light-Medium Industrial to Mixed Use, as depicted on Exhibit A attached hereto and incorporated herein by reference. Section 2. Consistent with the provisions of section 9.7730(5) of the Eugene Code, 1971, the Land Use Diagram located between pages 36 and 39 of the Whiteaker Plan is amended to redesignate the property identified as Assesso Map 17-04-25-42, Tax Lot 100 from Light-Medium Industrial to Mixed Use, as depicted on Exhibit B attached hereto and incorporated herein by this reference. Section 3 oned from I-2 Light-Medium Industrial with a partial /SR Site Review overlay to S-W Whiteaker Special Area with /SR Site Review overlay as Ordinance -- Page 1 of 2 Metro Plan Designation C R O S S S T W 1 S T A V E ´ Mixed Use Taxlots Refinement Plan Designation C R O S S S T W 1 S T A V E ´ Mixed Use Taxlots Zone Change C R O S S S T W 1 S T A V E ´ S-W Whiteaker Special Area Zone with /SR Site Review Overlay Taxlots ExhibitD FINDINGS IN SUPPORT OF AMENDING THE EUGENE-SPRINGFIELD METROPOLITAN AREA GENERAL PLAN DIAGRAM AND WHITEAKER PLAN LAND USE DIAGRAM TO REDESIGNATE THE PROPERTY IDENTIFIED AS 41, TAX LOT 7000 AND A 42, TAX LOT 100, FROM LIGHT MEDIUM INDUSTRIAL TO MIXED USE AND REZONE THE PROPERTY FROM I-2 LIGHT-MEDIUM INDUSTRIAL WITH /SR SITE REVIEW OVERLAY TO S-W WHITEAKER SPECIAL AREA WITH /SR SITE REVIEW OVERLAY. APPLICATIONOVERVIEW Name(FileNumbers):1400CrossStreet(MA202/RA202/Z208) MapNo./TaxLots:17042541/7000and17042542/100 TheapplicantisseekinganamendmenttotheEugeneSpringfieldMetropolitanAreaGeneral Plan(MetroPlan)landusediagram,withaconcurrentRefinementPlanAmendment (WhiteakerPlan),andZoneChange.TherequestedchangesareoutlinedinTable1,below. 1400CrossStreetMetroPlan/RefinementPlanAmendment&ZoneChange Application(File#)CurrentProposedAcres MetroPlanAmendmentLightMedium MixedUse4.62 (MA202)Industrial RefinementPlanLightMedium MixedUse4.62 Amendment(RA202)Industrial ZoneChangeLightMediumSWWhiteakerSpecial 4.62 (Z208)IndustrialAreawith/SRSiteReview Table1:Current/ProposedPlanDesignationsandZoning ThesubjectpropertyislocatedwestofNorthPolkStreet,northeastofRailroadBoulevard,and southofCrossStreet.ThesiteiscomprisedoftwoTaxLots(Map17042541,TaxLot7000and Map17042542,TaxLot100)andis4.62acresinsize.Existingindustrialbusinessesare locatedonTaxLot100,andoneretailbusinesslocatedonTaxLot7000. FINDINGS ThisrequestforaMetroPlanAmendment(TypeI)andconcurrentapplicationsaresubjectto thelanduseapplicationproceduresintheEugeneCode(EC)9.77009.7735.TheMetroPlan AmendmentprocessatEC9.7730(5)alsotriggerstheneedforanamendmenttotheWhiteaker Plan,whichistheapplicablerefinementplanforthisarea.PerEC9.8005,therequested RefinementPlanAmendmentandZoneChangearebeingprocessedconcurrently. Thefollowingfindingsaddressdetailsoftheproposalinthecontextofcompliancewiththe applicableapprovalcriteriaatEC9.7735,EC9.8424,andEC9.8865.Thosecriteriaareprovided below(in boldedtext),includingfindingsaddressingcompliancewitheach. Findings MA202/RA202/Z208 METROPLANAMENDMENT TherequestedMetroPlanAmendmentproposestochangethelandusedesignation ofthesubjectpropertyfromLightMediumIndustrialtoMixedUse.ItqualifiesasaTypeI amendmentasitonlyinvolvesachangetothelandusediagramandnotextamendmentsto theplanareproposedorrequired.Thefollowingfindingsaddresstheapplicableapproval criteriafortheMetroPlanAmendmentrequest: EC9.7735(1):TheproposedamendmentisconsistentwiththerelevantStatewidePlanning Goals. Goal1:CitizenInvolvementTodevelopacitizeninvolvementprogramthatensures allphasesoftheplanningprocess. theopportunityforcitizenstobeinvolvedin Theprovisionsforcitizeninvolvementensuretheopportunityforcitizenstobeinvolved inallphasesoftheplanningprocessandsetoutrequirementsforsuchinvolvement.The proposaldoesnotincludeanychangestothecitizeninvolvementprogram. ThelandusecodeimplementsStatewidePlanningGoal1throughitsnoticing requirements,whichinclude: Apreapplicationneighborhood/applicantmeeting(01/23/2020) NoticetotheOregonDepartmentofLandConservationandDevelopment(12/22/2020) ReferralsandnoticesenttoLaneCountyandtheCityofSpringfield(01/06/2021) PublicnoticeforthePlanningCommissionpublichearingtoconsidertheapplications, whichincludes:mailingnoticetointerestedpartiesandadjacentpropertyowners (12/24/2020);postingofthenoticeonsite(01/08/2021);and,publishingthenoticeina localnewspaper(01/08/2021). ConsiderationoftheamendmentsandzonechangebeganwithaPlanningCommissionpublic hearingonJanuary26,2021,providinganopportunityformembersofthepublictoprovide verbaltestimonyinadditionaltowrittencomments.Followingconsiderationanddeliberations, thePlanningCommissionwillprovidearecommendationtotheCityCouncil.TheEugeneCity Councilwillthenholdapublichearingtoconsidertheproposal.Eachpublichearingwillpresent anopportunityforinterestedpartiestoprovidetestimonytothePlanningCommissionandCity Councilfortheirconsideration. Basedonthesefindings,theproposedMetroPlanAmendmentisconsistentwithStatewide PlanningGoal1. Goal2:LandUsePlanningToestablishalanduseplanningprocessandpolicy frameworkasabasisforalldecisionandactionsrelatedtouseoflandandtoassure anadequatefactualbaseforsuchdecisionsandactions. InaccordancewithStatewidePlanningGoal2,therequestedMetroPlanAmendmentisbeing processedaccordingtolandusecode,whichspecifiestheprocedureandcriteriafor Findings MA202/RA202/Z208 considerationoftherequest.TherequestedMetroPlanamendmentqualifiesasaTypeI amendmentasdefinedinEC9.7705becausetheonlyrequestedchangeistotheMetro landusediagram,forlandslocatedwhollywithintheCityofEugene.ConsistentwithEC 9.7715(1),therequestforanamendmentwasinitiatedbyarepresentativefortheproperty owners.PerEC9.7705(1),thisTypeIamendmentrequiresapprovalbyCityofEugeneonly.The subjectpropertyisentirelywithintheEugeneCitylimitsandthereisnoregionalimpact designation.Astheapplication associatedwiththisrequesttoamendtheMetroPlanlanduse followstheproceduralrequirementsestablishedbylandusecode,theamendmentis consistentwithStatewidePlanningGoal2. TheStatewidePlanningGoal2coordinationrequirementismetwhentheCityengagesinan exchange,orinvitessuchanexchange,betweentheCityandanyaffectedgovernmentalunit andwhentheCityusestheinformationobtainedintheexchangetobalancetheneedsofits citizens.TocomplywiththeGoal2coordinationrequirement,theCityprovidednoticeofthe proposalandopportunitytocommenttoLaneCounty,LaneCouncilofGovernments,Cityof Springfield,theOregonDepartmentofTransportationandtheOregonDepartmentofLand ConservationandDevelopment. TherearenoexceptionstoStatewidePlanningGoal2requiredforthisamendment.Therefore, theamendmentsareconsistentwithStatewidePlanningGoal2. Goal3:AgriculturalLandsTopreserveagriculturallands. Theamendmentisforpropertylocatedwithintheurbangrowthboundaryanddoesnotaffect anylanddesignatedforagriculturaluse.Basedonthisfinding,StatewidePlanningGoal3does notapply. Goal4:ForestLandsTopreserveforestlands. Theamendmentisforpropertylocatedwithintheurbangrowthboundaryanddoesnotaffect anylanddesignatedforforestuse.Basedonthisfinding,StatewidePlanningGoal4doesnot apply. Goal5:NaturalResources,ScenicandHistoricAreas,andOpenSpacesToprotect naturalresourcesandconservescenicandhistoricareasandopenspaces. TherearenoGoal5resourceslocatedonthesubjectproperty.Thisamendmentdoesnot createoramendthelistofGoal5resources,doesnotamendacodeprovisionadoptedin ordertoprotectasignificantGoal5resourceortoaddressspecificrequirementsofGoal5,nor doesitallownewusesthatcouldbeconflictingwithasignificantGoal5resourcesite. Therefore,StatewidePlanningGoal5doesnotapply. Findings MA202/RA202/Z208 Goal6:Air,WaterandLandResourcesQualityTomaintainandimprovethequality oftheair,waterandlandresourcesofthestate. TheproposedchangetotheMetroPlandoesnotimpacttheexistingregulationsthat implementtheair,water,andlandresourcesqualityprotections.Giventhisfact,anyfuture developmentwillbesubjecttoCityregulationsandotherstateandfederalrequirements, ensuringthatfuturedevelopmentswillbeconsistentwiththisGoal.Basedonthesefindings, theamendmentisconsistentwithStatewidePlanningGoal6. from Goal7:AreasSubjecttoNaturalHazardsToprotectpeopleandproperty naturalhazards. Goal7requiresthatlocalgovernmentplanningprogramsincludeprovisionstoprotectpeople andpropertyfromthefollowingnaturalhazards:floods,landslides,earthquakesandrelated hazards,tsunamis,coastalerosionandwildfires.TheGoalprohibitsadevelopmentinnatural hazardareaswithoutappropriatesafeguards.Thesubjectpropertyisnotlocatedwithinknown areasofnaturaldisastersorhazards.Thesubjectpropertyisoutsidethefloodzoneandisnot subjecttohazardsnormallyassociatedwithwildfiresortsunamis.Otherhazardscanbe mitigatedatthetimeofdevelopmentbasedonapplicablelandusecodeprovisions,building codesandbuildingtechniques.Themapamendmentdoesnotaffecttherestrictionson developmentinareassubjecttonaturaldisastersandhazards.Basedonthesefindings,the amendmentisconsistentwithStatewidePlanningGoal7. Goal8:RecreationalNeedsTosatisfytherecreationalneedsofthecitizensofthe stateandvisitorsand,whereappropriate,toprovideforthesitingofnecessary recreationalfacilitiesincludingdestinationresorts. Goal8ensurestheprovisionofrecreationalfacilitiestoOregoncitizensandisprimarily concernedwiththeprovisionofthosefacilitiesinnonurbanareasofthestate.The amendmentdoesnotaffecttheprovisionsfororaccesstorecreationareas,facilitiesor recreationalopportunities.Therefore,StatewidePlanningGoal8doesnotapply. Goal9:EconomicDevelopmentToprovideadequateopportunitiesthroughoutthe stateforavarietyofeconomicactivitiesvitaltothehealth,welfare,andprosperityof Oregon'scitizens. 9requirescitiestoevaluatethesupplyanddemandofcommercialand StatewidePlanningGoal industriallandrelativetocommunityeconomicobjectives.ThisMetroPlanAmendmentisonly relatedtolandsdesignatedasindustrial.TheAdministrativeRuleforStatewidePlanningGoal9 (OAR660Division9)requiresthattheCityprovideforatleastanadequatesupplyofsitesof suitablesizes,types,location,andservicelevelsforavarietyofindustrialandcommercialuses consistentwithplanpolicies. Findings MA202/RA202/Z208 TheEmploymentLandsSupplyStudy20122032(ELSS)isincludedasAppendixBinthe comprehensiveplan,EnvisionEugene,andcomplieswiththerequirementsofGoal9andthe correspondingAdministrativeRule. TheELSSclassifiesthesubjectpropertiesascommercialandindustrialSee Figure5,maptile11of18.Basedonthisclassification,the EmploymentLandSupply(2012) subjectpropertywasnotincludedintheinventoryofavailableordevelopableemployment landswithinUrbanGrowthBoundary.Therefore,whilethesubjectpropertymayhave somedevelopablearea,theproposedamendmenttotheMetroPlanwillhavenoimpactonthe adoptedavailableordevelopableemploymentlandcapacity. Further,OAR660009010(4)includesspecificrequirementsforchangesinplandesignation thatinvolvelandinexcessoftwoacreswithinanexistingurbangrowthboundaryfroman industrialusedesignationtoanonindustrialusedesignation,oranotheremploymentuse designationtoanyotherusedesignation.Goal9requiresthattheCityprovideforatleastan adequatesupplyofsitesofsuitablesize,types,locations,andservicelevelforavarietyof industrialandcommercialusesconsistentwithMetroPlanPolicies.OregonAdministrativeRule 660009000etseq.(Division9)establishestheapplicabilityofGoal9rules.OAR660009 0010(4)states: ForapostacknowledgementplanamendmentunderOARchapter660,division18,that changestheplandesignationoflandinexcessoftwoacreswithinanexistingurban growthboundaryfromanindustrialusedesignationtoanonindustrialusedesignation, oranotheremploymentusedesignationtoanyotherusedesignation,acityorcounty mustaddressallapplicableplanningrequirements,and: a)Demonstratethattheproposedamendmentisconsistentwithitsmostrecent economicopportunitiesanalysisandthepartsofitsacknowledgedcomprehensive planwhichaddresstherequirementsofthisdivision;or b)Amenditscomprehensiveplanstoincorporatetheproposedamendment,consistent withtherequirementsofthisdivision;or c)Adoptacombinationoftheabove,consistentwiththerequirementsofthisdivision. designationchangeoflandinexcessof TheproposedMetroPlanAmendmentinvolvesaplan fouracresfromaLightMediumIndustriallandusetoMixedUsedesignation.Forthepurposes oftheELSS,mixedusedesignationsaregroupedunderthebroadcategoryofcommercial uses.Therefore,becausetheproposedamendmentproposeschangestotheplandesignation oflandinexcessoffouracresfromanindustrialusetoanotheremploymentusedesignation, OAR660009010(4)applies. ForthepurposeofdemonstratingconsistencywiththeELSS,itisimportanttodiscusshowthe ELSScategorizesthesubjectsiteandtoreviewpastmeasurestheCityhasimplementedto increaseemploymentdevelopmentbasedontheELSSfindings.TheELSSdividesforecasted industrialemploymentgrowthintotaxlotsitesizesrangingfromlessthan10acresorlarger Findings MA202/RA202/Z208 than10acres.Atjustover4.5acres,thesubjectsitefallsintoforecastforsitesunder10acres. TheELSSidentified404acresofdevelopableindustriallandslessthan10acresinsize.Basedon forecastedlandneed,theELSSforecastcalculatedasurplusof121acres.Duetothisidentified surplusandincombinationwithdeficiencieswithotheremploymentlandtypes,theCity pursuedstrategiestoincreasethesupplyofemploymentlandcapacityandefficiencysuchas consolidatingsmallsitesintolargersitesandrezoningsomeareaszonedindustrialtoanewE2 Implementation:EmploymentandIndustrialZoneChanges MixedUseZone(EnvisionEugene andCodeAmendments;CityFilesCA134andZ138).Theseefficiencymeasuresresultedina deficiencyof26smallindustrialacres.TheCityaddressedthisdeficiencybyincludingsome smallerindustrialsitesintheClearLakeUGBexpansionarea. Asdiscussedabove,theELSSdoesnotidentifythesubjectpropertyintheinventoryofavailable ordevelopableindustrialemploymentlands.Intermsofpotentiallossofoverfouracresof designatedindustrialemploymentlands,theELSSsupportstheproposedamendmentfollowing ontheheelsoftheELSSmeasurestoincreasecapacityandefficiencyofemploymentlands broadlywithintheurbangrowthboundary.First,theproposedamendmentandzonechange wouldpermitamixtureofcommercialandindustrialuseswithanemphasisonemployment useflexibilitywhileavoidingcreatinganonconformingsituationregardingcurrentindustrial development.Further,byallowingformoreemploymentusetypesthanintheindustrialplan designationandzoning,theproposedmixedusedesignationandzoningallowsforgreater employmentcapacityandreducestheneedtoexpandtheUGBforemploymentlands. AdditionalfindingsaddressingtherelevantpoliciesoftheMetroPlanandEnvisionEugene, consistentwithOAR6600090010(4)(a),areprovidedbelowunderEC9.7735(2)and(3)and areincorporatedhereinbyreference. FurthercontextualanalysisdemonstratinghowtheproposedamendmentsupportsStatewide PlanningGoal9generallyisincludedinthenarrative. Giventhesefacts,therequestedMetroPlanAmendmentwillnotadverselyimpacttheabilityto provideopportunitiesforavarietyofeconomicactivities. Basedonthesefindings,theproposalisconsistentwithStatewidePlanningGoal9. Goal10:HousingToprovideforthehousingneedsofcitizensofthestate. residential Goal10requiresthatcommunitiesplanforandmaintainaninventoryofbuildable landforneededhousingunits.TheAdministrativeRuleforStatewidePlanningGoal10(OAR 660Division8)statesthatmixanddensityofneededhousingisdeterminedinthehousing needsprojection.TheEnvisionEugeneResidentialLandsSupplyStudy(RLS),whichincludes HousingNeedsAssessment(HNA),determinedthatEugenemeetsthedemandfor low,medium,andhighdensityresidentialland.Further,theBuildableLandInventory(BLI) recognizedthesubjectsiteasdevelopedanddesignatedforindustrialdevelopment. Findings MA202/RA202/Z208 TheRLSrecognizesthatEugenehassomeadditionalnewhousinglandsupplymadeavailable throughredevelopmentofcommercialland.Inthiscase,theproposed amendmentsandzonechangeprovideanopportunitytoadd4.62acresofmixeduseland whichallowsfortheabilitytodeveloplowtohighdensityresidentialusesthatwouldnot otherwisebeallowedundertheexistingindustrialplandesignationandzoning.Thisallowance wouldcreateadditionalhousingopportunitieswhichexceedHNAandBLIassumptions, consistentwithGoal10. TheproposedamendmentsdonotleavetheCitywithlessthanadequateresidentialland thetypes,locations,andaffordabilityrangesaffected.However,thefactremainsthat supplyin thesiteiscurrentlydevelopedwithexistingindustrialusesandnoplansforredevelopmentof thesiteareunderconsiderationatthistime. Basedonthesefindings,theproposalmeetstheGoal10requirementstotheextenttheycould beconstruedasbeingapplicableinthiscase. Goal11:PublicFacilitiesandServicesToplananddevelopatimely,orderlyand efficientarrangementofpublicfacilitiesandservicestoserveasaframeworkfor urbanandruraldevelopment. Theamendmentdoesnotaffecttheprovisionofpublicfacilitiesandservices.Basedon thisfinding,StatewidePlanningGoal11doesnotapply.However,asanote,allnecessarypublic servicesexistorarereadilyavailablenearthesubjectsite. Goal12:TransportationToprovideandencourageasafe,convenientandeconomic transportationsystem. StatewidePlanningGoal12requiresadeterminationofwhethertheproposedMetroPlan Amendmentwillsignificantlyimpactanexistingorplannedtransportationfacility.OAR660 0120060,theTransportationPlanningRule(TPR),implementsGoal12forproposed amendmentstotheMetroPlandiagram,suchasthisapplication.TheTPRcontainsthe followingrequirement: 0120060(1)Ifanamendmenttoafunctionalplan,anacknowledged OAR660 comprehensiveplan,oralanduseregulation(includingazoningmap)wouldsignificantly affectanexistingorplannedtransportationfacility,thenthelocalgovernmentmustputin placemeasuresasprovidedinsection(2)ofthisrule,unlesstheamendmentisallowed undersection(3),(9)or(10)ofthisrule.Aplanorlanduseregulationamendment significantlyaffectsatransportationfacilityifitwould: (a)Changethefunctionalclassificationofanexistingorplannedtransportationfacility (exclusiveofcorrectionofmaperrorsinanadoptedplan); (b)Changestandardsimplementingafunctionalclassificationsystem;or Findings MA202/RA202/Z208 (c)Resultinanyoftheeffectslistedinparagraphs(A)through(C)ofthissubsectionbased onprojectedconditionsmeasuredattheendoftheplanningperiodidentifiedinthe adoptedTSP.Aspartofevaluatingprojectedconditions,theamountoftrafficprojected tobegeneratedwithintheareaoftheamendmentmaybereducediftheamendment includesanenforceable,ongoingrequirementthatwoulddemonstrablylimittraffic generation,including,butnotlimitedto,transportationdemandmanagement.This reductionmaydiminishorcompletelyeliminatethesignificanteffectoftheamendment. inconsistentwiththefunctional (A)Typesorlevelsoftraveloraccessthatare classificationofanexistingorplannedtransportationfacility; (B)Degradetheperformanceofanexistingorplannedtransportationfacilitysuch thatitwouldnotmeettheperformancestandardsidentifiedintheTSPor comprehensiveplan;or (C)Degradetheperformanceofanexistingorplannedtransportationfacilitythatis otherwiseprojectedtonotmeettheperformancestandardsidentifiedintheTSPor comprehensiveplan. KellySandow,PE,ofSandowEngineering,preparedaTPRanalysisonbehalfoftheapplicantto demonstrateconsistencywithStatewidePlanningGoal12requirementsandtheEugene2035 TransportationSystemPlan(TSP).Theanalysiscalculatedanassumedcase scenariofortheexistingandproposedlandusedesignationsandzoningto quantifypotentialtransportationimpactsfora20yearplanninghorizon.Theassumptionwas basedonthetotalsitearea,arateofdevelopmentbasedonproposedzoningandahightraffic impactuseallowedintheexisting(I2)andproposed(SW)zone.Citystaffconcurredwiththe scopeofthestudy,andtheanalysiswasinitiallyfoundtobeconsistentwiththeagreedupon scopeofwork. TheTPRanalysisconcludedthattheproposedamendmentandzonechangewillnot significantlyaffecttheoperationofthestudiedintersections,inaccordancewithOAR660012 0060(1).Thisissupportedbyfindingsincludedwithintheanalysisthatverifytheproposed amendmentandzonechangedoesnotsignificantlyaffectanytransportationfacility,citing compliancewithOAR6600120060(1)(a)though(c).TheanalysisconcludesthatbecauseOAR 6600120060(1)issatisfiedandthereisnosignificanteffect,theremainingOARsubsections (2)through(11)donotapply. Whilestaffinitiallyconcurredwiththemethodologyandfindings,itwasfoundthat thereisasignificanteffectthatneedstobeaddressedundertheTPR,contrarytothe TPRconclusions.AsignificanteffectwastriggeredunderOAR6600120060(1)(c)(C) duetoimpacttotheintersectionatRiverRoadandRailroadBoulevard(alsoNWExpressway) andRailroadBoulevardandPolkStreet. Additionally,staffreevaluatedtheassumptionsandconclusionoftheTPRanalysis andfoundonekeyissuewiththeassumptions.Theworstcasescenario proposeda5,000squarefootconveniencestore,whichisonlyallowedintheI2zoneunder Findings MA202/RA202/Z208 certainlimitations.Onesuchlimitation,underEC9.2451(4)requiresconveniencestores(upto 5,000squarefeet)intheI2zonetobelocatedondevelopmentsiteswithfrontageonan arterialstreet(majororminor).However,thissitedoesnotfrontanarterialstreet.Railroad Boulevard,thehighestclassificationstreetfrontingthesubjectproperty,isclassifiedasamajor collector.Therefore,acannotbereasonablybeconsideredasanallowed useonthesubjectpropertyaspartoftheTPRassumptions. Thetrafficengineerprovidedrevisedreasonableworstcasescenariofindingson March1,2021(SandowEngineeringTPRTripCapMemorandum).Therevised assumptionseliminatedtheconveniencestoreuseanddecreasedthepercentageoflot coveragecommittedtolandscaping,stormwaterfacilities,andsetbacks.Theapplicantalso addedrepair,paint,andbodyasaproposedusewhichispermittedintheI2zone. Therevisedworstcasepeakhourtripgenerationcountdecreasedfrom453PMpeakhourtrips to328PMpeakhourtrips.Therevisionstothereasonableworstcasescenarioundercurrent zoningmoreaccuratelyreflectareasonableworstcasescenarioconsideringtheI2permitted usesanddevelopmentstandards.Thetrafficengineerfurtherdefendstherevised assumptionsbycomparinglocalprecedentsintheirMarch15,2021memorandum. Theproposedamendmentsandzonechangecontinuetoresultinaunder OAR6600120060(1)(c)(C)duetoimpacttotheintersectionatRiverRoadandRailroad Boulevard(alsoNWExpressway)andRailroadBoulevardandPolkStreet,asdiscussedfurther below. TheCityusesLevelofService(LOS)asourperformancestandardtodeterminesignificanteffect andtheadoptedperformancestandardisaminimumLOSE,atallintersectionsoutsideofthe downtownarea.LOScanbegenerallydescribedasameasureoftheamountoftimedelay expectedatagivenintersection.LOSrangesfromAtoF,withAindicatingthemostdesirable conditionandFindicatingthemostunsatisfactorycondition.Thetrafficstudy identifiedtwointersectionswithinthestudyareathatdonotmeettheminimumLOSstandard attheendoftheplanningperiodforthecurrentdesignationortheamendeddesignation.The intersectionofRiverRoadandRailroadBoulevard(alsoNWExpressway)isprojectedto performatLOSattheendoftheplanningperiod.TheintersectionofRailroadBoulevard alsoprojectedtoperformatLOSattheendoftheplanningperiod. andPolkStreetis Therefore,theincreasednumberofvehicletripsgeneratedbytheproposedamendmentwill furtherdegradetheperformanceofanexistingfacilitysuchthatitwouldnotmeetthe performancestandardsidentifiedintheTSP.Basedonthesefacts,therequestedchange triggersasignificanteffectunderTPRsubsection(1)(c)(C).Whenasignificanteffectis determined,aremedytomitigateincreaseddegradationisrequiredtoensurecompliancewith thesubsection(2). OAR6600120060(2)Ifalocalgovernmentdeterminesthattherewouldbeasignificant effect,thenthelocalgovernmentmustensurethatallowedlandusesareconsistentwith theidentifiedfunction,capacity,andperformancestandardsofthefacilitymeasuredat Findings MA202/RA202/Z208 theendoftheplanningperiodidentifiedintheadoptedTSPthroughoneora combinationoftheremedieslistedin(a)through(e)below,unlesstheamendment meetsthebalancingtestinsubsection(2)(e)ofthissectionorqualifiesforpartial mitigationinsection(11)ofthisrule.Alocalgovernmentusingsubsection(2)(e),section (3),section(10)orsection(11)toapproveanamendmentrecognizesthatadditional motorvehicletrafficcongestionmayresultandthatotherfacilityproviderswouldnotbe expectedtoprovideadditionalcapacityformotorvehiclesinresponsetothiscongestion. allowedlandusesareconsistentwiththe (a)Adoptingmeasuresthatdemonstrate plannedfunction,capacity,andperformancestandardsofthetransportationfacility. (b)AmendingtheTSPorcomprehensiveplantoprovidetransportationfacilities, improvementsorservicesadequatetosupporttheproposedlandusesconsistent withtherequirementsofthisdivision;suchamendmentsshallincludeafundingplan ormechanismconsistentwithsection(4)orincludeanamendmenttothe transportationfinanceplansothatthefacility,improvement,orservicewillbe providedbytheendoftheplanningperiod. (c)AmendingtheTSPtomodifytheplannedfunction,capacityorperformancestandards ofthetransportationfacility. (d)Providingothermeasuresasaconditionofdevelopmentorthroughadevelopment agreementorsimilarfundingmethod,including,butnotlimitedto,transportation systemmanagementmeasuresorminortransportationimprovements.Local governmentsshall,aspartoftheamendment,specifywhenmeasuresor improvementsprovidedpursuanttothissubsectionwillbeprovided. (e)Providingimprovementsthatwouldbenefitmodesotherthanthesignificantly affectedmode,improvementstofacilitiesotherthanthesignificantlyaffected facility,orimprovementsatotherlocations,iftheproviderofthesignificantly affectedfacilityprovidesawrittenstatementthatthesystemwidebenefitsare sufficienttobalancethesignificanteffect,eventhoughtheimprovementswouldnot resultinconsistencyforallperformancestandards. (A)Theproviderofthesignificantlyaffectedfacilityprovidesawrittenstatement thatthesystemwidebenefitsaresufficienttobalancethesignificanteffect,even thoughtheimprovementswouldnotresultinconsistencyforallperformance standards; (B)Theprovidersoffacilitiesbeingimprovedatotherlocationsprovidewritten statementsofapproval;and (C)Thelocaljurisdictionswherefacilitiesarebeingimprovedprovidewritten statementsofapproval. Neitherstaffnortheapplicantproposesmeasureslistedinsubsections(a)through(c)or(e). Thefollowingtripcapconditionisrecommendedasasimpleremedyandisamitigationtool consistentwithOAR6600120060(2)(d).Itlimitsfuturetransportationimpact Findings MA202/RA202/Z208 toalevelthesameasthecurrentplandesignationandzoning.Tocalculatethenumberoftrips forthetripcapcondition,theanalysisusesthemostreasonablebuildoutscenariounderthe currentplandesignationandzoning,whichwascalculatedintheupdatedtripcap analysis.Theresultofthetripcapisthatachangeinplandesignationandzoningwillhaveno greaterimpactonthetransportationsystemthanthecurrentdesignationandzone. RecommendedTripCapConditionofApproval Sitedevelopmentshallbelimitedsoastogeneratenomorethan328PMpeakhour vehicletripsasdeterminedbythemostcurrenteditionoftheInstituteof TransportationEngineersTripGenerationManual.TheCitymayallowdevelopment applicant intensitybeyondthismaximumnumberofpeakhourvehicletripsifthe submitstotheappropriateapprovingagenciesatransportationimpactanalysis demonstratingtheproposedintensificationofuseisconsistentwiththeTransportation PlanningRule(TPR)criteriaoutlinedinOregonAdministrativeRule(OAR)6600120060. Theapplicantshallseek,andtheCityshallconsidersuchapprovalusingtheTypeII landuseapplicationprocedure. Thistripcapconditionprovidesanenforceable,ongoingrequirementlimitingtrafficgeneration toalevelconsistentwiththecurrentMetroPlandesignation.Therefore,theproposedMetro Planamendment(andzonechange)willnotincreasetripgeneration,therebydemonstrating compliancewiththerequirementsoftheTPR.Withtheinclusionofthetripcapcondition,the proposalmeetstherequirementsofStatewidePlanningGoal12,theTransportationPlanning Rule,andtheTSP. Basedontheserevisedfindingsandproposedconditionofapproval,theproposalisconsistent withStatewidePlanningGoal12. Goal13:EnergyConservationToconserveenergy. TheproposedchangetotheMetrolandusediagramwillnotamendorotherwiseinvolve anylanduseregulationsthatimplementthisGoal.Therefore,StatewidePlanningGoal13does notapply. Goal14:UrbanizationToprovideforanorderlyandefficienttransitionfromruralto use,toaccommodateurbanpopulationandurbanemploymentinside urbanland urbangrowthboundaries,toensureefficientuseofland,andtoprovideforlivable communities. Theamendmentsdonotaffecttheprovisionsregardingthetransitionoflandfromrural tourbanuses.Basedonthisfinding,StatewidePlanningGoal14doesnotapply. Findings MA202/RA202/Z208 Goal15:WillametteRiverGreenwayToprotect,conserve,enhanceandmaintainthe natural,scenic,historical,agricultural,economicandrecreationalqualitiesoflands alongtheWillametteRiverastheWillametteRiverGreenway. TheamendmentsdonotcontainanychangesthataffecttheWillametteRiverGreenway locatedwithintheadoptedWillametteGreenway regulations,noristhesubjectproperty boundary.Basedonthisfinding,StatewidePlanningGoal15doesnotapply. Goals1619:EstuarineResources;CoastalShorelands;BeachesandDunes;and OceanResources Therearenoestuarine,beachanddune,coastal,oroceanresourcesrelatedtotheproperty affectedbytheseamendments.Basedonthisfinding,StatewidePlanningGoals16through19 donotapply. Basedonthefindingsabove,theMetroPlanAmendmentcomplieswithStatewidePlanning GoalsandtheapprovalcriterionatEC9.7735(1)ismet. EC9.7735(2):TheproposedamendmentdoesnotmaketheMetroPlaninternally inconsistent. NopolicieswithintheMetroPlanappeartoserveasmandatoryapprovalcriteria,nordoany appeartobedirectlyrelevanttothissitespecificamendment.Therefore,theproposed amendmentdoesnotpresentanyconflictwithMetroPlanpoliciesnormaketheMetroPlan internallyinconsistent.Basedonthesefindings,thiscriterionismet. EC9.7735(3):Whenthecityspecificlocalcomprehensiveplanalsoapplies,theproposed amendmentisconsistentwiththecityspecificlocalcomprehensiveplan. ThecityspecificlocalcomprehensiveplanfortheCityofEugeneistheEnvisionEugene ComprehensivePlan.ThefollowingpoliciesfromtheEnvisionEugene(EE)ComprehensivePlan providesrelevant,generalsupportfortheamendmenttotheMetroPlanDiagram: EEPolicy3.1Employmentgrowth.Planforanemploymentgrowthratethatisidentifiedin thecurrentadoptedEconomicOpportunitiesAnalysis.Strivetocaptureamajorityofthe employmentgrowthwithintheCityofEugene. EEPolicy3.21Parcelassembly.Facilitatereconfigurationofsmallervacantorunderutilized industrialparcelstocreateredevelopmentopportunitieswithintheurbangrowth boundary. EEPolicy3.35Neighborhoodvitality.Recognizethevitalroleofcommercialfacilitiesthat provideservicesandgoodsincomplete,walkableneighborhoodsthroughoutthe Findings MA202/RA202/Z208 community.Encouragethepreservationandcreationofaffordableneighborhood commercialspacetosupportabroadrangeofsmallbusinessownersacrossall neighborhoods. EachofthepoliciesabovecomefromEconomicDevelopmentChapteroftheEE ComprehensivePlan.Theapplicantcontendsthattheproposedamendmentwilldiversify usespermittedonthesiteaswellwhichcanbetterservethe industrialandcommercial WhiteakerNeighborhoodandbroaderEugenecommunity.Theproposedamendmentand concurrentzonechangewillexpandthevarietyofusespermittedonthepropertywhile applyingadditionaldevelopmentstandardsmeanttopromoteoverallneighborhood (i.e.lowdensityresidentialand compatibilitybetweenotherwisenoncompatibleuses industrial).Basedonthesefacts,theproposedamendmentandconcurrentzonechangeare generallysupportedbytheEEEconomicDevelopmentpoliciescitedabove. TheTransportationchapterofEnvisionEugenestatesthattheEugene2035Transportation SystemPlan(TSP)servesasthetransportationelementforthecomprehensiveplan.Asnotedin thefindingsrelatedtoStatewidePlanningGoal12,theMetroPlanDiagramamendmentis consistentwiththeTSP,andthereforeconsistentwiththetransportationelementof EnvisionEugene.Notransportationpoliciesappeartobedirectlyrelevanttothissitespecific MetroPlanAmendment,nordotheyserveasmandatoryapprovalcriteriafortheamendment. Basedonthesefindings,theproposedMetroPlanAmendmentisconsistentwithEnvision Eugene,thelocalcomprehensiveplan. REFINEMENTPLANAMENDMENT TheproposedMetroPlanAmendmentalsotriggerstheneedforanamendmenttothe WhiteakerPlan(WP),whichistheapplicablerefinementplanforthisarea.Thesubject propertyislocatedintheSouthSladdenSubarea,asidentifiedintheWP.Thelanduse diagramdesignatesthepropertyasLightMediumIndustrial.PerEC9.7730(5)(b),sincenotext amendmentisrequired,therefinementplandesignationwouldchangeautomaticallytoMixed UsetoremainconsistentwiththeMetroPlan.ThisonlyoccursiftheamendmenttotheMetro Planlandusedesignationisapproved.Thefollowingfindingsaddresstheapplicableapproval criteriafortherelatedrefinementplanamendment: EC9.8424(1):Therefinementplanamendmentisconsistentwithallofthefollowing: (a)Statewideplanninggoals. ThefindingsaddressingconsistencywiththeStatewidePlanningGoalsareincludedabove underMetroPlanAmendmentapprovalcriterionEC9.7735(1),incorporatedhereinby reference.Basedonthosefindings,theproposalisconsistentwiththeStatewidePlanning Goals. Findings MA202/RA202/Z208 (b)Applicableprovisionsofthecomprehensiveplan. PerthefindingsaboveunderMetroPlanAmendmentapprovalcriteriaEC9.7735(2)andEC 9.7735(3),incorporatedhereinbyreference,theproposalisconsistentwiththeprovisionsof thecomprehensiveplan. (c)Remainingportionsoftherefinementplan. Theproposedamendmenttotherefinementplanonlyincludestheautomaticamendmentto thelandusediagramthroughtheproceduresidentifiedatEC9.7730(5).Nootheramendments totheWPareproposed. ThesubjectpropertyislocatedintheSouthSladdenArea,Subarea9,oftheWP.Theplan designationsofthisarea,whichvaryconsiderably,includeadesignationofmixedusealong st West1AvenueandRailroadBoulevardadjacenttothesubjectproperty.Inthissubareathe followingpolicyisapplicable: 2. IntheSouthSladdenarea,changethezoningofparcelsdesignatedonthe WhiteakerPlanDiagramasmixedusetoWhiteakerMUW.Applythesitereview subdistricttoallpropertyzonedMUW. Thispolicywasoriginallyimplementedthroughthezoningoftheadjacentmixeduse designatedareas(previouslyknownasMUW,WhiteakerMixedUseDistrict).Thatzonewas subsequentlyreclassifiedaspartofthelandusecodeupdatein2001fromMUWtoSW, WhiteakerSpecialAreaZone.ForconsistencywiththisWPpolicy,theapplicanthasproposed toapplythe/SRSiteReviewoverlayzone.Theconcurrentproposaltorezonethe subjectpropertyfromI2toSW/SRisconsistentwiththeWPpolicynotedabove. TherearenootherpoliciesintheWPthatappeartoserveasmandatoryapprovalcriteriaor requirefurtheranalysisinthisinstance,andtheproposedplanamendmentisotherwise consistentwiththeWP. Basedontheavailableinformation,EC9.8424(1)ismet. EC9.8424(2):Therefinementplanamendmentaddressesoneormoreofthefollowing: errorinthepublicationoftherefinementplan. (a)An (b)Newinventorymaterialwhichrelatestoastatewideplanninggoal. (c)Neworamendedcommunitypolicies. (d)Neworamendedprovisionsinafederallaworregulation,statestatute,state regulation,statewideplanninggoal,orstateagencylanduseplan. (e)Achangeofcircumstancesinasubstantialmannerthatwasnotanticipatedatthe timetherefinementplanwasadopted. Findings MA202/RA202/Z208 TheconcurrentamendmenttotheplandesignationontheMetroPlandiagramconstitutesa oramendedcommunityperEC9.8424(2)above.Perthefindingspertainingtothe MetroPlandiagramamendmentatEC9.7735,incorporatedhereinbyreference,the designationchangeisconsistentwithallStatewidePlanningGoalsandtheexistingMetroPlan policies.Therefore,iftherequestedMetroPlanAmendmentisapproved,therefinementplan mustrespondtoremainconsistent.Basedonthesefindings,thiscriterionismet. ZONECHANGEEVALUATION TherequestincludesaconcurrentzonechangerequestfromI2LightMedium IndustrialtoSWSpecialWhiteakerMixedUsewith/SRSiteReviewoverlay,tobringthezoning intoconformancewiththeproposedMixedUseplandesignation.Thefollowingfindings addresstheapplicableapprovalcriteriafortherelatedzonechangerequest: EC9.8865(1):TheproposedchangeisconsistentwithapplicableprovisionsoftheMetro Plan.ThewrittentextoftheMetroPlanshalltakeprecedenceovertheMetroPlandiagram whereapparentconflictsorinconsistenciesexist. AccordingtoEC9.3905,therequestedSWWhiteakerSpecialAreaZoneimplementsthemixed usedesignationoftheWhiteakerPlan.Theanalysisandfindingsundertherefinementplan amendmentcriteria,incorporatedhereinbyreference,providepositivefindingsforconsistency betweentheSW,WhiteakerSpecialAreazoningandthemixedusedesignationoftheMetro Plan.Therefore,asthecurrentMetroPlandesignationisLightMediumindustrial,consistency withthisprovisioniscontingentupontheapprovaloftheMetroPlanAmendmenttoamend landusedesignation.WithrespecttoMetroPlanpolicies,thereappeartobenopoliciesthat wouldserveasmandatoryapprovalcriteriaforthiszonechangeorrequirefurtheranalysis beyondthatprovidedabovefortherequestedplanamendment. Basedonthesefindings,andwithapprovaloftheproposedMetroPlanAmendment,this criterionismet. EC9.8865(2):Theproposedzonechangeisconsistentwithapplicableadoptedrefinement plans.IntheeventofinconsistenciesbetweentheseplansandtheMetroPlan,theMetro Plancontrols. ThesubjectpropertyiswithintheboundariesoftheWhiteakerPlan(WP),whichisthe applicableadoptedrefinementplanfortheareaofthisrequest.TheWPidentifiesthesubject propertyasbeingdesignatedforLightMediumIndustrial.However,accordingtotheMetro PlanAmendmentproceduresatEC9.7730(5)(b),iftherequestedplandiagramamendmentis enactedandnotextintherefinementneedstobeamended,thenthelandusediagramis automaticallyamendedtoremainconsistentwiththeMetroPlan.Therearenotext amendmentsproposedorotherwiserequiredinthisinstance.Therefore,iftheconcurrent MetroPlanAmendmentisapproved,thelandusediagramwillautomaticallybeamended andbeconsistentwiththeproposedzoning.OtherthanthepolicyaddressedatEC9.8424(1)(c) Findings MA202/RA202/Z208 above,nootherpoliceslistedintheWPappeartoserveasmandatoryapprovalcriteriaforthis zonechangeorrequirefurtheranalysisbeyondthatprovidedabovefortherequestedplan amendment. Basedonthesefindings,andwithapprovaloftheproposedplanamendment,thiscriterionis met. Theusesanddensitythatwillbeallowedbytheproposedzoninginthe EC9.8865(3): locationoftheproposedchangecanbeservedthroughtheorderlyextensionofkeyurban facilitiesandservices. KeyurbanfacilitiesandservicesaredefinedintheMetroPlanas:wastewaterservice, stormwaterservice,transportation,waterservice,fireandemergencymedicalservices,police protection,Citywideparksandrecreationprograms,electricservice,landusecontrols, communicationfacilities,andpublicschoolsonadistrictwidebasis(seeMetroPlan,pageV3). Thefollowingsummaryaddressestheavailabilityofthesekeyurbanservicesandfacilitiesas requiredunderthiscriterion. Wastewater:Adjacenttothesubjectpropertyinthenorthwestcornerisa54inchpublicsewer lineflowingeastfromMH9255to9373and9292onCrossStreet.Additionally,thereisan8 inchpublicwastewaterlineatMH10274alongPolkStreetfromRailroadBlvdtoCrossStreet. Stormwater:PublicStormwaterfacilitiesexistwithintherightofwayofbothPolkandCross Streetsviaweepholesinthecurbandexistingstormdrains.Theredonotappeartobeany downstreamcapacityissueswithintheareaandanyfuturedevelopmentwillberequiredto meetstandardssetforthintheStormwaterManagementManualandChapter9oftheEugene Code. Streets:ThepropertyhasprimaryfrontageonRailroadBlvdwhichisidentifiedasamajor collector,aswellasaccessconnectionstoboththelocalstreetsPolkStreetandCrossStreet. AllroadwaysareownedandmaintainedbytheCityofEugeneandarefullypaved,with sidewalks,curbandgutter,andadditionallystreettreesandstreetlightsinseveralareas berequiredtobeaddressedatthetimeofany surroundingtheproperty.Streetstandardswill futuredevelopment SolidWaste:Collectionserviceisprovidedbyprivateentities.Regionaldisposalsitesandthe ShortMountainLandfillareoperatedbyLaneCounty. WaterandElectric:Waterandelectricalservices,operatedbyEugeneWaterandElectricBoard (EWEB)areavailableforextensiontotheproperty.Anyfuturedevelopmentwillrequire coordinationwithEWEBstafftoensurethatwaterandelectricservicescomplywithCity standardsandEWEBrequirements. Findings MA202/RA202/Z208 PublicSafety:Policeprotectionforthesubjectpropertyisconsistentwithserviceprovision throughtheCity.FireprotectionwillbeprovidedbytheEugene/SpringfieldFireDepartment. EmergencymedicalservicesarecurrentlyprovidedonaregionalbasisbythecitiesofEugene andSpringfield. Transportation:Thesubjectpropertyisaccessibletopedestrians,bicycles,andvehiclesviathe surroundingstreetnetwork.Threepublictransitstopsarelocatedadjacenttothesubject property.Sidewalksarepresentalongallstreetfrontagesofthesubjectproperty. ParksandRecreation:ParksandrecreationprogramsareprovidedonaCitywidebasis.The inclusionofthesubjectpropertyintheCityissufficientevidencetodemonstratetheminimum levelofthiskeyurbanserviceismet. PlanningandDevelopmentServices:Planningandbuildingpermitservicesareprovidedforall propertieslocatedwithintheurbangrowthboundarybytheCityofEugene.TheEugeneCode, Chapter9,willprovidetherequiredlandusecontrolsforfuturedevelopmentofthesubject property. Communication:Avarietyoftelecommunicationprovidersoffercommunicationsservices throughouttheEugene/Springfieldarea;therefore,theseservicesareavailable,andthiskey urbanservicerequirementismet. PublicSchools:ThesubjectpropertyiswithinEugeneSchoolDistrict4J.Asaccesstoschoolsis evaluatedonadistrictwidebasis,thelocationwithintheschooldistrictissufficient evidencetodemonstratetheminimumlevelofthiskeyurbanserviceismet. Basedonthesefindings,thiscriterionissatisfied. EC9.8865(4)Theproposedzonechangeisconsistentwiththeapplicablesitingrequirements setoutforthespecificzonein: (o)EC9.3905WhiteakerSpecialAreaZoneSitingRequirements. TheapplicanthasrequestedachangetotheSWWhiteakerSpecialAreazone.Thespecific sitingstandardsforSWarelistedunderEC9.3905andprovidedforeaseofreferencebelow. EC9.3905:SWWhiteakerSpecialAreaZoneSitingRequirements.Inadditiontothe approvalcriteriaatEC9.8865ZoneChangeApprovalCriteria,thesitemustbeplannedfor aspecialmixofusesintheWhiteakerNeighborhoodPlan. AsthesitingrequirementsstatethatSWislimitedtoareasdesignatedformixeduseinthe WP,compliancewiththisprovisioniscontingentupontheapprovaloftheconcurrentplan amendment.Therefore,theproposalcomplieswithEC9.3905. Findings MA202/RA202/Z208 Basedonthesefindings,withapprovaloftheproposedplanamendment,thesiting requirementswillbesatisfied,andthiscriterionismet. EC9.8865(5)IncaseswheretheNRzoneisapplied ThiscriteriondoesnotapplybecausetheproposedzonechangedoesnotincludetheNRzone. OAR6600120060TransportationPlanningRule WhilenotanapprovalcriterionincludedinEugeneCode,zonechangeapplicationsarerequiredto demonstratecompliancewiththeTransportationPlanningRuleunderOAR6600120060. ConsistentwiththefindingsundertheStatewidePlanningGoal12,incorporatedhereinby reference,theproposedzonechangeisconsistentwiththeTransportationPlanningRule. CONCLUSION Basedontheavailableinformationandevidence,andtheprecedingfindingsofcompliance withtheapplicableapprovalcriteria,theproposedMetroPlanAmendment,RefinementPlan Amendment,andZoneChangecomplywiththeapplicableapprovalcriteria,subjecttothe followingconditionofapproval: TripCapConditionofApproval Sitedevelopmentshallbelimitedsoastogeneratenomorethan328PMpeak hourvehicletripsasdeterminedbythemostcurrenteditionoftheInstituteof TransportationEngineersTripGenerationManual.TheCitymayallow developmentintensitybeyondthismaximumnumberofpeakhourvehicletrips iftheapplicantsubmitstotheappropriateapprovingagenciesatransportation impactanalysisdemonstratingtheproposedintensificationofuseisconsistent withtheTransportationPlanningRule(TPR)criteriaoutlinedinOregon AdministrativeRule(OAR)6600120060.Theapplicantshallseek,andtheCity shallconsidersuchapprovalusingtheTypeIIlanduseapplication procedure. Findings MA202/RA202/Z208