HomeMy WebLinkAboutOrdinance No. 19680ORDINANCE N0. I ~ ~ U
AN ORDINANCE LEVYING ASSESSMENTS FOR
PAVING, SIDEWALKS, STORM~AND SANITARY SEWERS IN ROOSEVELT
BOULEVARD BETWEEN HxGHWAY 99 AND MAPLE STREET.
The City Council of the City of Eugene finds that:
On the 14th day of March, 1984, as authorized in the Eugene Code.
1.160~5~ the City Council initiated the proposed local improvement consisting
of paving, sidewalks, storm and sanitary sewers in Roosevelt Boulevard between
• Highway 99 and Maple Street by Resolution Number 3842.
After due notice and a public hearing thereon .before the hearing
official, and no remonstrances having been filed, an the 15th day of November,
1981, the City Council formed the local improvement district and authorized
construction of the local improvement.
The actual cost of the local improvement is ascertained to be
$171,905.37 and the amounts to be assessed to be borne by the City or others
has been determined in accordance with applicable provisions of the Eugene
• Code, 1911 and as set forth in.
Items 1 to 13 from Page 1 on Exhibit A attached hereto and incorporated
herein by reference.
The City Council has established the method of calculating local im-
provement assessments in Sections 1.110 and 7.175 of the Eugene Code, 1911.
A notice containing the information required by Section 1.185 of the
Eugene Code, 1971 has been posted on a bulletin board at City Hall and given
by certified mail to the owners of the parcels of real property subject to the
assessment more than ten days prior to the public hearing before the hearing
ORDINANCE - 1
~Y
official. At the time and place specified therein, a hearings official heard
all evidence and argument presented, has fully considered the same, and no
remonstrances having been filed, has reported his or her adopted findings to
the City Council ,
The Council has reviewed and considered the assessment report of the
City Engineer and Finance Officer and the hearings official's findings and
summary of the hearing, and based thereon,
THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS:
Section I, The Summary of the hearing conducted by the hearings
.official are hereby made apart of the Council's record in these proceedings,
and the hearings official's findings, including those regarding compliance
with Sections l.1GO to 7.190 of the Eugene Code, 1971, attached hereto as
Exhibit Band incorporated herein by reference, are hereby adapted.
Section 2. The actual cost of the local improvement comprising paving,
sidewalks, storm and sanitary sewers in Roosevelt Boulevard between Highway 99
and Maple Street is $I11,9o5.31 which is hereby assessed against the parcels
of property hereinafter described in the amounts set apposite, respectively.
Section 3. The City Council does hereby determine and assess each lot
and part of lot being within the described local improvement district as set
forth on the assessment roll attached as Exhibit C hereto and incorporated
herein by reference.
Section 4, The City Council does hereby determine that each parcel of
land or lot hereinabove described is specially benefitted to the extent of the
assessment set forth. The Finance Officer shall give notice of the assess-
ments to the owners of the assessed parcels advising them the assessment may
~be paid in full, without interest, within ten days of the date of adoption of
ORDINANCE - ~
this ordinance. Assessments that remain unpaid after the ten day period are
declared to be liens upon the respective lots, parts of lots or parcels of
land against which said several amounts are assessed, and may be paid in up to
twenty semi installments, including principal and interest at the rate set by
the City Manager as provided in Section 2.oZZ thru 2.04 of the Eugene Code.
The City Recorder is directed to enter in the docket of City liens a statement
in connection with each unpaid assessment containing the fallowing:
4,1 A descri pti on of each 1 ot, part of 1 of or acreage special 1 y
benefitted by the local improvement;
4.2 The name of the owner or reputed owner thereof, that the name
of the owner is unknown; and
4.3 The sum assessed upon said property, the amount and date from
which interest accrues, and the date of entering the same in the docket
of City Liens.
Section 5. Upon enactment of this ordinance, the City Finance
Officer shall send notice of the assessments by first class to the owners of
the assessed parcels containing the information required by Section 7,I90 of
the Eugene Code, 191I, and enclose therewith an application for paying the
assessment in installments according to the terms set forth in Section 4 of
this ordinance.
Passed by the City Council this
day of ` , I99~
!•~
City ecarder
Approved by the Mayor this
day of 199 ~
~'t
Mayor
ORDINANCE - 3
~, ..
:~
interest on this assessment
~ri
}
[L begin
ExHIBI~T :~A~,
ASSESSMENT ~1ORKS~iEET
In the City of Eugene, Lane County, Oregon, an ordinance levying assessment s for:
Paving, sidewalks, storm and sanitary sewers in Roosevelt Boulevard between Highway
99 and Maple Street.
ITEM ~. Amount paid to Contractor: Contract # 58~-501 $ ~ ~4-
Jab # 2030
Capital Project # 925404
Ordinance #
ITEM 2. Li uidated lama es:
q 9 $ _p~
ITEM 3. Other costs:
Due back
*Ceardr # Date Description to Fund:
- - --
.,_ ~
Unrecoverable by Grant 332 $ 172,697.87
State
Less amount not billed by $ 8,97 .
_
$
• ~ $
$.
ITEM 4. Total: Items ~ through 3 ~$ 163,719.40
ITEM 5. Basis for 5°/o Finance Administration fee calculation . -
.Total of Item 4: $ 163 719.40
City construction costs Item llc~: -~ }
ITEM 5a. Non-City costs: $_163,7J9..40
ITEM 6. I9°/a Engineering charge ~ I9°lQ x Item 4~ : $ -0-
ITEM 7. 5% Finance Administrative fee ~5°/~ x Item 5a}: $ 5,185.97
ITEM S. Interest on short-term construction financing: $
ITEM 9. Due to sewer fund far 2 I/2 cent levy: $
ITEM 1D. TOTAL ASSESSMENT per ordinance $ 171,905.37
ITEM lI. Cit 's share of cost for com feted contract:
~a~ ~b~ ~c~ €d} fie} ~f~
~Jork T e Acct.Control Ke ACK Dir.Costs En .Fee Interes t Total
$ $ $ ~
$ $ $ ~
$ $ $ $
$ $ $ ~
$ $ $ ~
$ $ $ ~
$ $ $ $
Total - City's share: $ $ $ $
*ceordr # M/vM/MA/Mw.IAA.V..A~A-/VIU.V/V.V.VA-eM /Yw~IMw.w+wvnv tititi~wr~.rArNrMwr~yr~wr~kwyr
ITEM I2. Deferred Assessments included in Item I0. Eugene Code 7.I9 7}.
TYPE
Advanced from Fund , AJE #NIA ~ 19,756.88
ITEM I3. ~~
Extraterritorial assessments included in Item lo.
Funded by City accounts ACK: ~
U , ~~%
:
sk/b:wkshee t.ord ,~
a ~ N''
~XH~B~T "B"
FINDINGS AND RECOMMENDATIONS
SUBJECT: PAVING, SIDEWALKS, STORM AND SANITARY SEWERS IN
ROOSEVELT BOULEVARD BETWEEN HIGRVV'AY 99 AND MAPLE
STREET CONTRACT 88-~01~
BACKGROUND
Roosevelt Boulevard improvements from Maple Street to Highway 99 North is the final
phase of a multi-year project from Beltline Highway to Garfield Street. Similar to prior
projects, the City of Eugene and the Dregon State Highway Division have entered into.
agreements such that the City share for the improvements will be funded by Federal Aid
TJrban ~FAU} funds. Properties fronting the improvement will be assessed per Chapter 7
Municipal Code guidelines. Those properties fronting the newly created roadway and not
taking access will have a deferred assessment until such time as access is requested.
Gn March 14, 1984, the City Council initiated the project by Resolution No, 3542.
Property owners were notified of the pending award hearing 11~ days prior to the award,
hearing. The project was authorized far the construction by the City Council on November
1,1987. The law bid was submitted by Wildish Corvallis Construction Co., for an amount
of $592,295.25.
Upon completion of the project notice of assessments were sent to affected property
owners, as of Thursday, March 22, 1990 the City has not received any written objections.
PROTECT
The project improvements includes 70-foot paving, curbs, gutters, sidewalks, bake lanes,
street lights and signals.
ASSESSMENT
Under City of Eugene assessment policy, much of the cost is assessed to the abutting
property owners. The costs to be assessed are shown below:
20-foot paving $ 35.751front foot
2S-foot paving $ .48.971front foot
3b-foot paving $ 59.30/front foot
44-foot paving $ 72.421front foot
5~foot sidewalk $ 13.571front foot
Commercial driveway $ 23.181square yard
Residential driveway $ 15.01/square yard
8-inch sanitary sewer $ 39.59~lineal foot
Sanitary service $ 713.231each
10-inch storm sewer $ 1b.S01lineal foot
.~~
12-inch storm sewer $ 18.20/lineal foot
18-inch storm sewer $ 26.39/lineal foot
Break in $ 479.88/each
Costs listed below are the Engineer's estimate and preliminary casts quoted to property
owners at the award hearing following bid opening.
20-foot paving $ 24.50/front foot
28-foot paving $ 46.75/front foot
36-foot paving $ 47.25/front foot
44-foot paving $ 66.60/front foot
5-foot sidewalk $ 10.00/front foot
5-foot concrete driveway $ 2.25/square foot
7-foot concrete driveway $ 3.00/square foot
Sanitary sewer $ 625.0%ach
FINDINGS AND RECOMMENDATIONS
The final costs are slightly higher than preliminary costs quoted at the award hearing and
are less than typical projects of this size. Staff recommends appropriation of the
assessment distribution.
A hearing was scheduled for the above matter for March 26, 1990, at 7:0o p.m. Since na
persons indicated an interest in attending the hearing it was cancelled. The Hearings
Official received a Memorandum from the City Engineer, outlining the above information.
The Hearings Official recommends that the City Council adopt an ordinance approving
the assessment distribution as set forth above.
' r r.
~~~~~~ ~. 1 ~ ~~ L ~~.
Jack A. Billings, Heari s ~]fficial
Final Assessment Roll not attached; it is on file and
available by written request to the Eugene City Recorder's
Office.