HomeMy WebLinkAboutOrdinance No. 19684ORDINANCE N0. ~ ~ ~ ~~!
AN ORDINANCE LEVYING ASSESSMENTS FOR
SANITARY SEWERS IN MORSE STREET FROM BETHEL DRIVE TO 644-FEET
WEST.
The City Council of the City of Eugene finds that:
On the 14th day of duly, 1989, as authorized in the Eugene Code 7.1608}
the City Engineer initiated the proposed local improvement consisting of
sanitary sewers in Morse Street from Bethel Drive t4 640-feet West.
After due notice and a public hearing thereon before the hearing
official, and no remonstrances having been filed, on the 6th day of November,
1989, the City Council formed the local improvement district and authorized
construction of the local improvement.
The actual cost of the local improvement is ascertained to be
$41,139.19 and the amounts to be assessed to be borne by the City or others
has been determined in accordance with applicable provisions of the Eugene
Code, 1911 and as set forth in.
Items 1 to 13 from Page 1 on Exhibit A attached hereto and incofrporated
.herein by reference.
The City C4unci 1 has established the method of .calculating local im-
provement assessments in Sections 7.170 and 7.115 of the Eugene Code, 1971.
A notice containing the infvrmatian required by Section 7.185 4f the
Eugene Code, 1911 has been pasted on a bulletin board at City Hall and given
by certified mail to the owners of the parcels of real property subject to the
assessment more than ten days prior to the public hearing before the hearing
official. At the time and place specified therein, a hearings official heard
ORDINANCE _l
all evidence and argument presented, has fully considered the same, and no
remonstrances having been filed, has reported his or her adopted findings to
the City Council.
The Council has reviewed and considered the assessment report of the
City Engineer and Finance Officer and the hearings official's findings and
summary of the hearing, and based thereon,
THE CITY 4F EUGENE DOE5 ORDAIN AS FOLLOWS:
Section 1. The Summary of the hearing conducted by the hearings
official are hereby made apart of the Council's record in these proceedings,
and the hearings official's findings, including those regarding compliance
with Sections 1.60 to 1.I90 of the Eugene Code, 197I, attached hereto as
Exhibit Band incorporated herein by reference, are hereby adopted.
Section ~. The actual cost of the local improvement comprising sanitary
sewers in Morse Street from Bethel Drive to 600-feet west is $4I,I39.19 which
is hereby assessed against the parcels of property hereinafter described in
the amounts set opposite, respectively.
Section 3. The City Council does hereby determine and assess each lot
and part of lot being within the described local improvement district as set
forth on the assessment roll attached as Exhibit C hereto and incorporated
herein by reference.
Section 4. The City Council does hereby determine that each parcel of
land or lot hereinabove described is specially benefitted to the extent of the
assessment set forth. The Finance Officer shall give notice of the assess-
ments to the owners of the assessed parcels advising them the assessment may
be paid in full, without interest, within ten days of the date of adoption of
this ordinance. Assessments that remain unpaid. after the ten day period are
ORDINANCE • 2
declared to be liens upon the respective lots, parts of lots or parcels of
land against which said several amounts are assessed, and may be paid in up to
twenty semi-installments, including principal and interest at the rate set by
the City Manager as provided in Section ~,0~2 thru 2.04 of the Eugene Code.
The City Recorder is directed to enter in the docket of City Liens a statement
in connective with each unpaid assessment containing the following:
4.1 A description of each lot, part of lot ar acreage specially
benefitted by the local improvement;
4,~ The name of the owner ar reputed owner thereof, that the name
of the owner is unknown; and
4.3 The sum assessed upon said property, the amount and date from
which interest accrues, and the date of entering the same in the docket
of City Liens.
Section 5, Upon enactment of this ordinance, the City Finance
Officer shall send notice of the assessments by first class to the owners of
the assessed parcels containing the information required by Section 1'.190 of
the Eugene Code, 1911, and enclose therewith an application far paying the
assessment in installments according to the terms set forth in Section 4 of
this ordinance.
Passed by the City Council this
li~i
day o f 19~9~
~~- ~ ~
City ecorder
Approved by the Mayor this
~~day of ~ 199
~`
ayor
ORDINANCE - 3
EXHIBIT "~A"
ASSESSMENT WORKSHEET
interest nn this assessment
will begin
In the City of Eugene, Lane County, Oregon, an ordinance levying assessments for:
Sanitary sewers l~n Morse Street from Bethel Drive to 600-feet West
ITEM ~, Amount paid to Contractor: Contract # 59-34 $ 25,104.68
Job # 2501 ~ .
Capital Project #
Ordinance #
ITEM 2. liquidated damages: $
ITEM 3. Other casts:
Due back
*Ceordr # Date Descri tion to Fund:
94~-1$583 l /26J94 Lab testl ng 351 $ 15 23
90-19583 1126190 Lab testin 351 $ 31.89
90-19583 1 26 9o Lab testi nq _ _ __ 351 $ l 11.38
90-19583 1 26 90 Lab testes ng - __..^. ._ $ 27.50
Contract Latera sewer eq o r .sewer $ 2 785,00
ITEM 4. Total: Items I through 3 $ ~S x55.68
ITEM 5. Basis far 5°lo Finance Administration fee calculation.
Total of Item 4: $ 28~D85.65
City construction casts Item Il c}: -~~ }
ITEM 5a. ~~on~City costs: $,251085.68
ITEM 5 . 19°/e Engineering charge ~ 19% x Item 4} : $ . , 5 X336 , 28 ,.,,,.____
ITEM 7. 5°/e Finance Administrative fee ~5% x Item 5a}: $ 1,404.28
ITEM S. Interest an short-term construction financing: $ 451.00
ITEM 9. Due to sewer fund for 2 1/2 cent le vy: $ 5 562.55
ITEM 1D. TDTAL ASSESSMENT per ordinance $ 41,139.79
ITEM 11. Cit 's share of cost for com feted contract:
~a~ ~b~ ~c} ~d} ~e~ ~F~
~~ork T e Acct.Control Ke ACK Dir.Costs En .Fee Interest Total
~ $ $ S
~ $ ~ S
$ $ $ ~
$ $ $ ~
$ $ $ ~
$ $ $ ~
$ $ $ $
Tata City's share: $ $ $ S
ITEM I2. Deferred Assessments included in Item 10. Eugene Cade 7.197},
Advanced from Fund AJE ~ TYPE ~
ITEM 13.G Extraterritoria] assessments included in Item 14.
Funded by City accounts ACK: ~
sk/b:wksheet.ord
r
EXHTBiT "B"
FINDINGS AND RECUMMENDATIDNS
SUBJECT: SANITARY SEWER IN NI~RSE STREET FRAM BETfl"EL DR1YE TD
6~0-FEET WEST ~CDNTRACT # $9.34}
BACKGROUND
This project was initiated by a petition of properties within the area of Bethel Drive and
Morse Street. Sewers were to be constructed in Morse Street from Bethel Drive to 600-
feet west.
Based on a 33 percent petition, and recent septic system failures, the project was initiated
by order of the City Engineer dated July 14, 19SS, as provided for in the Eugene Code
7.1605}. The property owners were notified of pending award hearing 10 days prior to
the hearing. The project was authorized for construction by the City Council on August
S, 1988. The IoW bid was submitted by Eugene Sand & Crravel, Inc. far an amount of
$24,70.00.
Upon completion of the project notice of assessments were sent to affected property
owners, as of Thursday, March 22,1990, the City had not received any written objections.
PROJECT
The project improvements include 531 lineal feet of S" PVC sanitary sewer pipe, two
manholes, and service lines.
ASSESSMENT
Under City of Eugene assessment policy, 100 percent of the cost is assessed to the
abutting property owners. The casts to be assessed are shown below:
Lateral sewer $ 0.219/square foot
Sanitary service $ 531.1/each
Trunk levy $ .025/square foot
Casts listed. below are the Engineer's estimate and preliminary casts quoted to property
owners at the award hearing following bid. opening.
Lateral sewer $ 0.22/square foot
Sanitary service $ 527.00%ach
Trunk levy $ 0.025/square foot
a ~,
.~,.
~al~rGS ~~ ~ECaMNrE~A~ro~yS
The final costs are slightly lower than preliminary costs quoted at the award hearing and
are less than typical for projects of .this size. Staff recommends appropriation of the
assessment distribution.
A hearing concerning this project was scheduled far March 2G, 1994 at 7:~0 p.m. The City
Engineer received a communication from Dan Gleason of the Southern Pacific Credit
Union. Mr. Gleason thought that the credit union may have paid some form of sewer
assessment in 1979 when they took out the building permit to construct a new building.
Upon review, it appears that the credit union did pay a systems development charge at
that time. However, this project involves other costs which were not covered by the
previous charge. That information was explained to Don Gleason by City staff. Mr:
Gleason indicated that he did not desire to participate in a hearing. Na other persons
indicated an interest in the hearing and it was .cancelled. The Hearings Gfficial received
a Memorandum from the City Engineer, outlining the above information, except the
information concerning Mr. Gleason. A copy concerning Mr. Gleason's call is attached
as Exhibit "A".
The Hearings Gfficial recommends that the City Council adopt an ordinance approving
the assessment distribution as set forth above.
..,
. ,
~L . - 4 .~
Jack A. Billings, Hearin:' s Gfficial .
Final Assessment Roll not attached; it is on file and
available by written request to the Eugene City Recorder s
Office.