Loading...
HomeMy WebLinkAboutOrdinance No. 19638~, . ORDINANCE N0. ~~I~a,3 ~ AN ORDINANCE LEVYING ASSE5SMENTS FOR sewer pump station on Walton lane, 1300 feet north of Honeywood Street, to serve Sterling view Estates Phase II and contiguous property currently outside City limits in the City of Eugene, Lane County, Oregon. The City Counci 1 of the City of Eugene finds that On the 25th day of April, 1988, as authorized in the Eu ene Code g 7.1608} the City Engineer initiated the proposed local improvement consisting. of sewer pump station on Walton Lane, 1300 feet north of Honeywood Street, to serve Sterling view Estates Phase II and contiguous property currently outside City limits. After due notice and a public hearing thereon before the hearing official, and no remonstrances having been filed, the Cit Council authorized Y the execution of a contract for the construction of the local improvement o.n the 26th day of June, 1988. The actual cost thereof is ascertained, and the initial amount to be assessed in accordance with applicable provisions of the Eugene Code, 1911 has been determined to be: Items 1 to 24 from Page 1 of PW ordinance} The City Counci 1 has _establ i shed the method of calculating 1 ocal improvement assessments in Sections 7.170 and 1.175 of the Eugene Code, 1971. A notice containing the information required by Section 1.185 of the Eugene Cade, 1911 has been posted on a bulletin board at City Hall and given by certified mail to the owners of the parcels of real property subject to the assessment mare than ten days prior to the public hearing before the hearing official. At the time and place specified therein, a hearings official heard ORDINANCE - 2 all evidence and argument presented, has fully considered the same, and no remonstrances having been filed, has reported his or her adopted findings to the City Cauncil. The Council has reviewed and considered the assessment report of the City Engineer and Finance Officer and the hearings official's findings and summary of the hearing, and based thereon, THE CITY 4F EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The Summary of the hearing conducted by the hearings official are hereby made apart of the Council's record in these proceedings, and the hearings official's findings, including those regarding compliance with Sections 7.160 to 7.190 of the Eugene Cade, 1911, attached as Exhibit A hereto and incorporated herein by reference are adopted. Section 2. That the actual cost of sewer pump station on Walton Lane, 1300 feet north of Haneywood Street, to serve Sterling view Estates Phase II and contiguous property currently outside City limits, a local improvement in the City of Eugene is the sum of $113,550.03 which is by this ordinance .assessed against the parcels of property hereinafter described in the amaunts set opposite, respectively. Section 3. That the City Council does hereby determine and assess each lot and part of lot being within the described local improvement district as set forth on the assessment roll attached as Exhibit B hereto and incorporated herein by reference. Section 4. That the City Cauncil does hereby determine that each parcel of land or lot hereinabove described is specially benefitted to the extent of the initial assessment set forth. The Finance gfficer shall give notice of the assessments to the owners of the assessed parcels advising them the assessment may be paid in full, without interest, within ten days of the date ORDINANCE ~ 3 of adoption of this ordinance. assessments that remain unpaid after the ten day period are declared to be liens upon the respective lots, parts of lots ar parcels of land against which said several amounts are assessed, and may be paid in up to twenty equal semi-annual installments, including principal and interest at the rate set by the City Manager as provided in Section 2.422 thru 2.42 of the Eugene Code. The City Recorder is directed~to enter in the docket of City Liens a statement in connection with each unpaid assessment containing the following; 4.1 A description of each lot, part of lot ar acreage liable for such improvement; 4.2 The name of the owner or reputed owner thereof, that the name of the owner is unknown; and 4.3 The sum assessed upon said property, the amount and date from which interest accrues, and the date of entering the same in the docket of City Liens. Section 5. Upon enactment of this ordinance, the City Finance Officer shat 1 send notice of the assessments by first ci ass to the owners of the assessed parcels containing the information required by Section 7.190 4f the Eugene Code, 1911, and enclose therewith an application far paying the assessment in installments according to the terms set forth in Section 4 of this ordinance. Passed by the City Council this day o f ~ e ber , 198 City ecorder Approved by the Mayor this ~~ day of ~~ ~m~er', 198 Mayor 4RD~NANCE - 4 oRD~NANCE N0. in the City of Eugene, Lane County, Oregon, an ordinance levying assessments far: - ~ Sewer pump station on wal tan Lane, ~ 1300 feet north of Honeywood Street, to serve Sterling view Estates Phase I I and contiguous property currently outside City 1 imi is . ITEM I. Amount paid to Contractor: Contract # 8808 $ 80,145.04 Job # .2392 Capital Project # ITEM 2. Liquidated damages: - $ 1 ,650.00 _~~ ITEM 3, other costs: ~~~ ~. Due back *Ceordr # Date Descriation to Fund: .$ ~ • $ $ ~~ - Lateral s ewer eQ of trk sewer $ ' ITEM 4. Total: Items 1 through 3 - ~ - - $ $1,825.00 ITEM 5. Basis 'for 5/ Finance Administration fee calculation. Total of Item 4: $ S~,SZ5. 00 • City construction costs {Item lI ~ c}: -{~ 649.45 } - ITEM 5a. Non-City costs: $.8~.,~75.55 ITEM fi. I9% Engineering charge {19°/° x Item 4}; $ 15_, 546.75 ITEM ]. 5% Finance Administrative fee {5% x Item 5a}: $ 4. _0.58.18 ITEM 8. Interest on shart-term construction financing: ~ ,$ 6, 42g:0.p ~, ITEM 9. Due to sewer fund for Z- 1/Z cent le vy: $~~~ 691,5Q _~~- ITEM Io. TOTAL ASSESSMENT per ordinance $113 554.03 ITEM II. Cit 's share of cost for com feted contract: {a} {b} {c} ~d} {e} {f~ Work Acct.Control Ke ACK Constr. En rn Interest Total 53Z-9332-61139-995565 $ 649.45 ~ 123.40 $ $ 71Z.S5 $ ~ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ ~ Total - City's share: $ 649.45 $ 123.40 - $ $ 71Z.S5 *ceordr ~ A.MTV/rM~~~•~••.,.~/....,.....,..,,..,.... ...., ~....~.,..~~....,,. .. M,/`/.VMMA/.YNN/r ~/wA ITEM I2. Deferred Assessments included in Item Io. {Eugene Code ].I91j. Advanced from Fund 532 , AJE # ~ 88,956.90 • FINDINGS AND RECOMMENDATIONS PROJECT: SEWER PUMP STATION ON WALTO~T LANE, 130a FEET NORTH aF HONEYWOOD STREET, TO SERE STERLING vIEW ESTATES PHASE II AND CONTINGUOUS PROPERTY CURRENTLY OUTSIDE CITY LIMITS ~ CONTRACT 88--08 ~ BACKGROUND This project was initiated by a petition from the developer for an existing undeveloped subdivision. The properties petitioning for the improvements will bear 27.4 percent of the improvement costs. Since the initial petition five lots have been Bald, the new property owners have been notified of the assessment hearing. The developer will bear the cost of improvements for the other properties within the subdivision. Based on the petitions, the City Engineer initiated the project, as provided for in the Eugene Code 7.10 ~ 8 ~ , on April Z5 , 1988 Property owners were notified of the pending award hearing 10 days prior to the hearing. The project was authorized for construction by the City Council on June 27, 1988. The low bid was submitted by EMK Contractor ; Inc . , for an amount of $81,900.00. PROJECT The project includes sewer pump station and 2 1/2 cent levy charges. ASSESSMENT Under City of Eugene assessment policy, most of the cost is assessed to the abutting property owners, The costs. to be assessed are shown below: Pump Station $239.98 per lot Levy charge (2 1/2¢> $150.01 per lot Costs listed below are the Engineer's estimate and preliminary costs quoted to the property owners at the award hearing following bid opening, Pump Station $550.00 per lot Levy Charge (2 1/2¢> $195.00 per lot ~`INDING AND RECOMMENDATION Costs are comparable to projects of similar size and are lower than prelimiary costs quoted at the award hearing. Staff recom- mends appropriation of the assessment distribution. -~ 1- i . A hearing was scheduled concerning the above matter for September 11, 1989, at 7:00 P,M, No persons indicated an interest in attending the hearing and it was cancelled. The Hearings Officer has received a Memorandum from the City Engineer, setting forth the above information. It is respectfully recommended by the Hearings Officer that the City Council adopt an ordinance distributing the assessments as set forth herein, M Jack A, Billin Hearings official 2 .~