Loading...
HomeMy WebLinkAboutOrdinance No. 19348ORDINANCE NO. 19348 AN ORDINANCE ADOPTING AMENDMENTS TQ THE EUGENE-SPRINGFIELD METROPOLITAN AREA GENERAL. PLAN; AND DECLARING AN EMERGENCY. The City Council of the City of Eugene finds that: 1. The Eugene-Springfield Metropolitan Area General Plan Metro Plank was adapted by the Eugene City Cauncil on July 28, 1984 and amendments thereto were subsequently adopted on February 8- 1982 by Eugene Ordinance No. 18927, on Fe bruray 15. 198 4 b y Eugene Ordinance No, 19229, on October 22- 1984 by Eugene Ordi- nance No. 19293, and on July 17- 1985 by Eugene Ordinance No. 19341. 2. In 1984 the City Council adopted a work program and citizen involvement process far studying property of the Univer-~ sity of Oregon near the Willamette River. A nine member committee was appointed to draft a Riverfront Park Study. 3. The objectives of the Riverfront Park Study were to develop short--term and long-term directions for land use develop- ment in the study area. 0n April 4. 1985 the Draft Riverfront Park Study issued. 4. 0n May 20, 1985 the Eugene Planning Commission conduct- ed a public hearing on the draft Riverfront Park Study. Work sessions of the Planning Commission were held on May 30, June 3, June 14 - June 11, June 17 - June 24, and July 1. 198 5 o n i s s ue s concerning the Study, 5. On ,Tune 24, 1985 the Planning Commission voted to recommend to the City Council adoption of a modified Riverfront 1- Ordinance Park Study and early adoption of an amendment to the Eugene~- Springfield Metropolitan Area General Plan Metro Plank changing the designation far University-owned property within the Study area from "Open Space" and "Government/Education" to "University Research". 6. On July 17, 1985 the City Council conceptually approved the draft Riverfront Park Study and initiated an amendment to the Metro Plan as recommended by the Planning Commission, 7. Initiation of the plan amendment prior to completion of the mid--period review was because economic diversification i s a high priority for the City of Eugene, early processing of such an amendment will provide the opportunity for site development during the 1986 construction season, and an early amendment is needed as a prerequisite for forming a tax increment district in the Study area , $. Findings in .support of the adoption of this plan amendment are set forth in Exhibit A and are incorporated herein as though fully set forth, Additional findings and responses to issues raised in the public hearings are set forth in the draft Riverfront Park Study of April, 1985- the findings contained in Eugene Ordinance 19347 adopted contemporaneously herewith, the Memorandum of the Planning Department to the Mayor and City Council dated July 8. 1985, the Memorandum of the Eugene Planning Department to Interested Parties dated July 17- 1985, the Memo randa of the Eugene Planning Department to the Board of County Commissioners dated July 23, 1985 and August 12 ~ 1985 ~ and the Memorandum of the Eugene Planning Department to the Mayor and City 2- Ordinance Council of September 9, 1985 with attachments. All of these findings are adopted and incorporated herein as though fully set forth. 9. 0n September 9, 1985 a public hearing was held before the Eugene City Council on the proposed plan amendment. 14. Based on the above record and findings, the Eugene City Council concludes that the plan amendment set forth below is consistent with Land Conservation & Development Commmission Statewide Land Use Planning Goals, with the unamended portion of the Eugene~Springfield Metropolitan Area Plan, and with other applicable City plans and policies. Certain issues of Goal conformity, e.g, regulation of toxic wastes and appropriate height limitations within the Riverfront Park area, can and will be addressed in future more specific actions of the City such as adoption of implementing zoning districts, application of those zoning districts to the subject tracts, allowance of development through site review and conditional use permits, development of general legislation on environmental wastes and other matters, and siting and financing of public improvements on or near the subject tracts, Moreover, prior to development of this property as allowed by this plan amendment, other affected entities may need to take complementary actions such as amendment and modifica- tion of the North Campus Plan by the University of Oregon and the State Board of Higher Education. NQW, THEREFQREr THE CITY QF EUGENE DOES ORDAIN AS FQLLQWS: 3- Ordinance Section 1. The findings set forth above are adopted with the findings contained in the amendments and in the original Metro Plan which are incorporated herein by reference. Section 2. Pages II-E-2 through II-E-~16 of the Metro Plan describing various land use designations are amended to create a new category of "University/Research" and that text is amended to include the following language: "15. University/Research "This category represents property which is lcoated in proximity to the University of Oregon campus. It is primarily intended to accomodate light industrial, research and development, and office uses related to activities, research, and programs of the University of Oregon, The designation also allows for mixed use development, including a limited range of retail and service uses and multiple family dwellings. Commercial activities in this category are intended to serve the day-to-day needs of employees working in and nearby University/Research areas, Activities such as general retail and office will continue to be located in other appropriately designated areas, Development of land in this category can play a critical role in the diversif i- cation of the metropolitan area's economy by providing an opportunity to develop industrial activities which support and utilise research programs of the University of Oregon . " Section 3. The Plan Diagram in the Metro Plan is amended to designate the following properties as identified by their Tax Lot number, "University/Research": Map Lot 17033224 5300 17033221 300 17033214 100 17033214 201 17033214 1440 17433214 1600 17033214 1800 17033214 2000 17033214 2100 17033323 1900 17033323 1800 4- Ordinance 17033323 1441 17033323 1340 Such properties are as designated in the map marked "Exhibit A" to Lane County ordinance No . PA 904, which map is adopted and incorporated herein as though fully set forth. Section 4. If any section, subsection, sentence, clause, phrase, or portion of this ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdic- tion, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portions hereof. Section 5. That the matters contained herein concern the public welfare and safety. In order for the Land Conservation and Development Commission to consider this amendment for an amended acknowledgment of compliance at the earliest possible time, it is necessary for this Ordinance to be effective prior to the expiration of thirty days. Therefore, an emergency is hereby declared to exist, and this ordinance shall be effective immedi- ately upon its passage by the City Council and approval by the Mayor. and ratification by the Lane Council of Governments Board. Passed by the City Council. this 9th day of September, 1985 Q,tLt,~ ~ Gt~~ ~pu`~~ ~ • Ci y Recorder Approved by the Mayor this 9th da S to er, 1985 t Mayor 5~- Ordinance Findings Goal 1. Citizen Involvement A. Goal 1 is intended to ensure that citizens have an opportunity, `~to be i nvo1 ved i n all phases of the planning process." B, A nine-member committee, comprised of representation from the University of Oregon ~2}, the Chamber of Commerce, the Eugene dater and Electric Board, AGRIPAC, property owners in Study Area, residents of the Study Area, the Planning Commission, and the City Council developed the draft Riverfront Park Special Area Study over an appoximately eight month period. C. Five informational meetings were conducted to provide the community including residents of the Fairmount and West University neighborhoods and students and faculty of the University of Oregon} information about the draft Riverfront Park Study. A total of about 10D people attended all of these meetings. While these were not public hearings, the Planning Commission was made aware of comments made at these meetings prior to the Commission's more formal public hearing process. D. The Metropolitan Area Planning Advisory Committee ~MAPAC}, the designated citizen advisory committee for the Metropolitan Plan, conducted a review of the proposed Plan amendments on July 24, 1985. The meeting and agenda item were announced i n accordance with Oregon ` s Public Meetings Law. E. Public hearings on the draft Study and related amendments to the Metropolitan Plan were conducted by the Eugene Planning Commission on May 20, 1985. At the May 24th hearing, the Commission voted to leave the record open for written comments until May 29, 1985 at 5:04 p.m. Prior to closing the public record, nineteen groups or individuals submitted written testimony for the Commission's consideration, On July 8, 1985, the Eugene City Counci 1 conducted publ i c hearings on the Planning Commission's recommended actions on the draft Riverfront Park Study and related amendments to the Metropolitan General Plan. F. Gn August , 1985 the Lane County P1 anni ng Commission and Board conducted a joint public hearing on the proposed amendments to the Metropolitan Plan related to the Riverfront Park Study . . G. On July 24, 1985 the Springfield Planning Commission conducted a public hearing on the proposed amendments to the Metropolitan P1 an ref ated to the Riverfront Park Study. 0n August 5, 1985 the Springfield City Council conducted a public hearing on the Planning Commissions recommendations on related amendments to the Metropolitan Plan. H. Notice of meetings of planning commissions and elected officials from al 1 three jurisdictions occurred in accordance with State Law and individual jurisdictional notice requirements. I . Citizens of the metropolitan area have had apportuni ti es to be involved i n all phases of development and adoption of this Eugene-Springfield Metropolitan Area General P1 an amendment and aciopti on process. ~X~1161T.,_._,~ PAGE ~p~' J . Through the above processes, level apment of the draft Ri verf rant Study and related amendment to the Metropolitan Plan have met the intent of Goal 1, Citizen Involvement. Goal Z. Land Use Plannin A. Goal 2 establishes a consistent land use planning process throughout the State. B. The Metropolitan Plan was adopted by Eugene, Springfield, and Lane County by Ordinance i n 1982 as fol 1 ows: Eugene - Drdi Hance No . 18927 ~ 2-8-82 ~ Springfield - Ordinance No. 5024 (3-1-82) Lane County - Grdinance No. 856 ~Z-3-82~ By reference, those adopting ordinances also adopted the working papers which were developed as supporting documents to the Metropolitan Plan. C. That portion of the Eugene-Springfield Metropolitan Plan within the urban growth boundary was acknowledged by the Land Conservation and Development Commission ~ LCDC} i n August 19$2. D. The Metropolitan Plan page I-4~ identifies the role of refinement plans by noting that it is important to augment the General Plan by "mare detailed refinement plans, programs and policies." E. Fundamental Principle #1, Page II-1 of the Metropolitan Plan identifies i t as a 1 ong-range policy document providing the framework within which more detailed refinement plans are prepared. In accordance with this principle, to date, Eugene has adopted over fifteen refinement plans and special area studies. F. The draft Monitoring Report Table ~-1} for the Metropolitan Plan shows that in 1983 about 1,590 acres of undeveloped light industrial .land existed within the acknowledged urban growth boundary. Almost seventy percent ~1,11D acres} of land within this category was within the City of Eugene. G. The draft Monitoring. Report Table V-1~ for the Metropolitan Plan shows that in 1983 Eugene had about 180 acres of undeveloped land designated for commercial use and 460 acres of land identified for medium-density residential use. . H. With the exception of the Special Light Industrial 1 and use category, 1 and allocations in the acknowledged Metropolitan Plan correspond to anticipated future demand based on employment/population projections. In order to respond to policy direction within the Plan to make efforts to diversify the 1 acal economy, about 1, 000 acres of Special Light Industrial Land was identified to accommodate future locations of firms involved in high techno'1 ogy activities which also require 1 arge tracts of 1 and ~ see Page II-E-~8 of the Metropolitan Plan for discussion of the Special Light Industri a1 1 and use deli gnati one . EXHIBIT PAGE ~- OF~ ~. Policy 1~, page I1I-B~-5 of the Metropolitan Plan and econometric projections conducted for the City of Eugene by the firm of LeBI anc & Co . see "Markets & Services 1n Downtown Eugene", LeBlanc & Co., 1983} both anticipate continued growth of downtown Eugene as an important economic focus of the metropolitan area. J , The broad direction established i n the draft Study i s consistent with the Metropolitan Plan, e.g., local economic diversification, compact urban growth, efficient use of existing public facilities, Willamette Greenway and open space issues. However, recognizing that the "University Research" land use designation proposed on page 6 of the draft Study is i nconsi stem with the existing Metropolitan P1 an diagram, pot i cy A6 of the draft Study requires the City of Eugene to seek an amendment to the Metropolitan P1 an to rectify this i ncansi stency. ~. The modifications to the Metrapol i tan P1 an which would result from pot i cy 4, page 5 of the draft Riverfront Park Special Study, generally provide fvr additional land for: 1~ activities which are uniquely tied to research occurring at the University of Oregon campus and would benefit from the proximity involved in locating adjacent to the main campus area 2} ancillary commercial activities which would primarily service the operations within the Riverfront Park development area; and 3) multiple family housing to accommodate potenti a1 demands for employees of firms who wish tv 1 i ve i n proximity to their wank. L. Policy A6 of the draft Riverfront Study directs that the City of Eugene seek an amendment to the Metropolitan Plan to "designate a portion of the property within the Riverfront Park Study area owned by the University of Oregon for 'University/Research' activities" . M. The University of Oregon owns about 71 acres in the Study area, over half of which i s vacant or used for p1 ayi ng fields. N. Policy A5~e~, as modified by the Planning Commission, ensures that development i n the area wi 11 primarily be ref ated to University of Oregon activities and programs. f- O. The Riverfront Park Special Area Study requires an amendment to the Metropolitan Plan because of changes in land use designations within the Study area, and these changes are consistent with general direction established for the Eugene-Springfield metropolitan area in the Metropolitan Plan. P. Based upon existing Metropolitan Plan policies and these findings, the draft Riverfront Park Special Area Study and the proposed amendment to the Metropolitan General Plan satisfy the requirements of Goal ~, Land Use Planning. Goals~3. and 4. Agr~cultura~ and_Forest Lands A. Statewide Goals #3 and #4 are directed at preserving and maintaining identified agricultural and forest 1 ands . B. Goal #3 generally defines agri cut tural 1 and as predami nant1y C1 ass 1, II , 1IT and 1V soi 1 s i n western Oregon. ExH1B1T R PAGE ~ OF ~~,,. C. Goal #4 generally defines forest land as: ~1~ possesing existing or potential commercial timber value; ~2} property which provides needed watershed for wi 1 dl i f e and fisheries habitat and recreation; ~ 3~ 1 ands where extreme conditions of climate, soil and topography require the maintenance of vegetative cover irrespective of use; ~4~ other forested lands in urban and agricultural areas which provide urban buffers, wind breaks, wi 1 dl i fe, and fisheries habitat, 1 i vestock habitat, sceni c corridors and recreation use . D. The Metropolitan Plan "Agricultural Land Working Paper and Addendum", October 1981 and "Forest Lands Working Paper", September 1951 inventory agricultural and forest 1 and within the P1 an' s jurisdictional boundary. Land within the Riverfront area i s not identified i n this i nventary. E, The acknowledged Metropolitan Plan defines agricultural land page 11-E- 10~ and forest land page 1I-E-11~ as being outside the urban growth boundary. F. The Riverfront Park Study area is within the urban growth boundary acknowledged by the LCQC i n August 1982. G. Based on these findings, the requirements of Gaal #3, Agricultural Lands and Goal #4, Forest Lands are satisfied. Goal 5. open Spaces, Scenic and Historic Areas and Natural Resources A. Goal 5, is intended "To conserve open space and protect natural and scenic resources." B, None of the area within the Ri verf rout Study boundaries was identified i n the Metropolitan Plan, "Natural Assets And Constraints Working Paper", 1918 hand addenda} as containing significant Goal 5 ref ated areas. C. Environmental analysis conducted as part of the Riverfront Park Study shows that the riparian strip along the banks of the Willamette and i sal ated stands of trees within the interior of the area are the extent of significant habitat in the Study area. D. Policies 2 and 5, page I1I-E-3 and policy 25, page III-C-1a of the Metropolitan Plan directs protection of natural features i n the context of other planning policies. E. Policy C2, page 9 of the draft Study identifies the Millrace as an important historic and environmental feature, and directs that development occurring in the Riverfront area maintain or improve visual and pedestrian/bicycle access to i t. F. Pot i cy C1 of the draft Riverfront Park Special Area Study ~ as modified by the Planning Commissions directs implementation of an active management program for the riparian strip along the Wi 11 amette River and retention of the existing stands of significant trees in the interior of the Study area. G. Based on these findings, the draft Riverfront Park Study, the draft Study and the proposed Metropolitan Plan amendment complies with Goal #5, "open Spaces, Scenic, and Historic Areas, and Natural Resources" . EXHIBIT ~ PAGE ~_OF. l Goal 6. Air, Water and Land Resources Qualit ti A. Goal 6 addresses the quality of the State's air, water and land resources. B. The Metropolitan Plan "Natural Assets and Constraints Working Paper", 1978 hand addenda}, addresses Gaal 6 i ssues. C. .Policies ZO and Z3, page 111-C-9 and 111-C-10 of the Metropolitan Plan direct development of regulations, plans and programs concerning water quality. D. Sections 9.636 through 9.662 of the Eugene Code govern emissions which could impact air, water and 1 and quality. These provisions are appl i cabl e City-wide, including the Ri verf rant Park area . E. The Metropolitan area is a portion of the southern Willamette Valley air shed, and its ai r qual ity i s affected by outside sources. F. Development within the metropolitan area influences air quality through the combined effects of point source emissions, entrained road dust, and motor vehicle usage. G. Based on these findings, provisions in Eugene's land use code, and policies contained in the Metropolitan General Plan, the development envisioned i n draft Ri verf rant Park Special Area Study and the proposed General Plan amendment can occur whi 1 e maintaining compliance with Goal 6, Air, Water and Land Resources Quality. Goal 7. Areas Subject To Natural Disaster and Hazards A. Provisions cvntai ned i n Goal 7 are intended, "Ta protect 1 i fe and property from disasters and hazards." B, The "Natural Assets and Constraints Working Paper" of the Metropolitan Plan, addresses Goal 7 i ssues i n the metropal i tan area. C. Map A-1 of the "Natural Assets and Constraints Working Paper" and Map E of the draft Ri verf rout Park Special Area Study show that parti ons of the Study area 1 i e wi thi n the f 1 ood p1 ai n . D. Metropolitan Plan policies Z and 3, page 111-~C-7 directly address development standards i n f 1 oodway and f 1 oodway fringe areas . E. Sections 9.604 through 9.607 provide standards far new development in FH, Flood Hazard zoned land and prohibits development in designated floodways a1 ong the Wi 11 amette River throughout the• Ci ty. F. Existing pot i ci es and ardi nances, which apply to the Ri verf rout Park area, as well as other parts of the City, comply with Goal #7. Because the Ri verf rout Study and the proposed amendment to the Metrapol i tan P1 an wi 11 fol 1 ow these codes and pal i ci es, Goal 7, Natural Hazards i s satisfied. Goal S. Recreational Needs A. Goal S, Recreational Needs, i s intended to address "the recreational needs of citizens of the state and visitors." .; ~ r~ PAGE ., p~ B, The adopted diagram for the EugenewSpringfield Metropolitan Area General P1 an designates parks and open space areas, C. Table x of the working Paper on Parks and Recreation shawl that the metropolitan area has an inventory of about 5,DZD acres of Regional/Metropolitan Park and Open Space. D. vacant ,and underdeveloped land within the Riverfront Park Study area comprise about , 9% of that inventory. E. The Metropolitan Plan Working Paper inventory included only those lands used for park purposes or owned by a general purpose government for future park and open space purposes. F. Land wi thi n the Riverfront Park Study Area does not f al 1 within these categories and consequently none of the Study area was included in the Metropo1 i tan Plan inventory of park and open space . G. Some of the Riverfront Park Study area was designated for open space vn the Metropolitan Plan Diagram to reflect its use by the University of Oregon. H. ~n the context of potential redevelopment of University-awned property, policy D~, page 10 of the draft Study require the City to "work with the dni versi ty of Oregon and developers i n financing and developing amenities to serve the Riverfront Park area." I. A major east-west bicycle path the South Bank Trail}, which serves recreational as well as transportation needs, passes through the Study area. J. Policies Bl, page 8 and D4, page 10 of the draft Riverfront Park Special Area Study will require retention of the east-west bicycle facility and direct that it be relocated closer to the river as part of any development i n the area. K. Based on these findings, the draft Riverfront Study and the proposed Metropolitan Plan amendment comply with requirements of Goal #$, Recreational Needs. Goad 9. Econom A. Goal g of the Statewide Goals identifies the need to, "diversify and improve the economy of the state." B. The"Economic Working Paper" ~~918} and the "Economic - Addendum" X1981} of the Metropolitan Plan describe the area's economy. C. The Metropolitan Plan page ~iI--B_31} establishes the goal of diversifying the local economy. D. Policy 17, Page II~--B-6 of the Metropolitan Plan provided direction for establishment of "special light industrial sites" to accommodate new "large-scale, campus-~type, light manufacturing uses." E. The acknowledged Metropolitan Plan identifies seven individual special light industrial sites in the metropolitan area, with a total area of about 1,aD0 acres. ExH~B~T PAGE QE ~ ~ . ` f F. Industrial sites identified i n the Metropal i tan Plan are not i n proximity to the University of Oregon campus. G, Objective 1Z, Page III-B-~4 of the Metropolitan Plan provides direction to accommodate a mi xture of office, commercial and industrial uses. H. Policy 12, Page III-B-5 directs that efforts be maintained to stren t g hen the central business districts of Eugene . I. Policy 6.0, page 7 of the adapted 1984 Community Goals and Policies document, directs the City of Eugene to work with educational institutions and to coordinate research activities with 1 ocal efforts to attract firms . J, Policy 1.D, page 9 of the Community Goals and Policies document directs that the City support the University of Oregon's efforts in education, research, training, and technology development. K. The draft Riverfront Study (page Z~ indicates that, "development in the Riverfront Park is intended to play a critical role in the metropolitan area's economy by providing an unusual opportunity to develop an industrial area that supports and utilizes research activities of the University of Dregon." The draft Study a1 so notes that this type of development is envisioned as a critical factor in attracting and forming new industrial activities because of the potential for the exchange of concepts and techniques between University of Oregon researchers and industries which produce and market related technologies. L. Map A of the draft Study demonstrates that the Riverfront Park area is adjacent to across Franklin Bou]evard} the main campus of the University of Oregon . M. Policy AS~e~, and the proposed SD, S ecia1 Develo ment District to p p ~ be applied to portions of the Study areal direct that development in the Ri verfront Park be primarily related to University activities and programs. Discussion under Policy A5~e) emphasizes that general office development should be located in downtown Eugene, and that commercial development occurring i n the Ri verf rant Park i s intended to serve the day- to-day needs of employees working in and nearby the development. Consequently the draft Study and proposed implementing mechanisms respond to the goal to diversify the local economy while avoiding conflicts with other community-wide growth policies, N. Based on these findings, the policies contained in the draft Riverfront Study, the Study and the proposed amendment to the Metropolitan Plan comply with Goal 9, Economy. Goal 1Q,_Housing A. Goal 10 of the Statewide Goals is directed at providing for the housing needs of the state's citizens. B. Objective 3, page III~A-3 of the Metropolitan Plan calls for locating residential development in relation to the availability of employment, commercial services, publ7c utilities and facilities and transportation modes. EXHIBIT ~ PACE ~ OF. ! C. Objective 4, Page III-A-3 of the Metropolitan Plan calls for the promotion - of generally higher residential densities within the existing urban service area to encourage a compact urban growth form. D. Policy I7, page III-A-6 of the Metropolitan Plan encourages a variety of housing i n and near the downtown area. E. Policy 25, page III-A-6 suggests reducing on-site parking requirements for residential development near the downtown area. F. Policy 29, page III-A-7 encourages development of higher density residential devel opmen't near industrial and commercial centers . G. Policy A4, page 5 of the draft Riverfront Park Special Area Study, and standards contained in the proposed Special Development District provide the opportunity for multiple family housing to be i ncl uded i n development of the riverfront area. ' H. Standards in the Riverfront Park Special Development District provide for multiple family housing to be developed: I} without specifying a density limitation; Z} using the same height limitation that is applied to all development within the district; 3} using setback and coverage standards consistent with medium density residential districts; and 4} using parking standards lower than those required for less centrally-located multiple-family hausi ng. I. The Riverfront Park Study Area and the future employment center anticipated there is located within one mile of medium and high density residential development areas surrounding downtown. J. Pot i cy 2c, page III-F-5 of the Metropolitan Plan recommends that, i n order to address reductions in transportation related energy demands, medium and high density residential development be encouraged within one mile of downtown . Resi denti al. devel opment occurring within the Study Area wi 11 be located within one mile of the employment and commercial service resources of the downtown area. K. Future residential development will have access to the extensive existing bicycle/pedestrian system in the Riverfront Park Study Area. L. Based on these findings, the draft Riverfront Study, and the proposed Metropolitan Plan amendment, comply with Goal I0, Housing. Goal rt ~ . Public Facilities and Services A. Goal 1I of the Statewide Goals identifies the need to integrate land use p1 anni ng with the orderly and efficient provision of public services. B. Fundamental Principle 3, page I I-I of the Metropolitan Plan identifies the concept of compact urban growth as one of the basic themes of the document. C. Finding 2~d} , page I I--BwI of the Metropolitan .Plan i ndi cated that compact urban growth results i n "more efficient and 1 ess costly provision and use of uti ] i ti es, roads, and public services such as fire protection" . ~HIBIT ~ ~~ E F~OF -~.......~OF ~ k D, Partially in response tv Goal 11, Objective S, page II-B-3 of the Metropolitan Plan identifies the desirability of encouraging the use of underdeveloped and vacant 1 and where services are avai 1 abl e. E, Table 1 of the draft Riverfront Study shows that the entire study area encompasses about 148 acres. F. The draft Study concludes that the western portion of the study area has been part of the Gi ty of Eugene since the 1870' s and a f ul 1 range of urban services i s avai 1 abl a to the entire study area. G. The draft Riverfront Study, and the proposed amendment to the Metropolitan Plan are consistent with the direction established in the Eugene- Spri ngf i e1 d Metropvl i tan Area General P1 an, and complies with Goal 11. Goal 1Z. Transportation A, Goal 12, Transportation is intended to "encourage a safe, convenient and economic transportation system." B. The Eugene~Springfield Area 2000 Transportation Plan, the Metropolitan Bikeway Plan and the Transportation Chapter of the Metropolitan Plan address area-wide transportation issues and were considered in the LCDC's decision to acknowledge planning in the metropolitan area as being in compliance with Statewide Goals i n 1982 . C. T-2004 directs that development and transportation improvements be aimed at avoiding Level of Service "E" . D. T-2000 identifies Franklin Boulevard, which provides access to the Riverfront area, as a ma j or metropolitan-area arteri a 1. E. Franklin Boulevard i s under the jurisdictional responsi bi 1 i ty of the Oregon Department of Transportation ~ODOT} and transportation improvements affecting the street are controlled by that agency. F. Objective 8, page III-F-4 of the Metropolitan P1 an identifies the need to promote 1 and use arrangements which wi 11 opti mi ~e use of existing and planned transportation faci 1 i ti es. . G. Policies 1~f} and 6, page III-F-5 of the Metropolitan Plan direct that development and redevelopment which is served by the existing or planned transit system be encouraged and that new development include facilities which wi 11 accommodate urban public transit as wel 1 as other al ternati ave transportation modes, e.g., bicycles. H. The South Bank Bike Path described on page 56 i n the Metropolitan Bikeway Master Plan calls for development of an independent bike path to parallel the river bank between Ferry Street Bridge and I-5, I . Policy 1~ g} , page III-F-5 of the Metropvl i tan Plan directs that pedestrian facilities be developed in conjunction with major activity centers or in conjunction with other modes of travel . J. Appendix C of the draft Riverfront Study cantalns detailed analysis of the level of development which could be accommodated abased on a theoretical ~XH~B~T PaG~ ~ OF land use mix} in conjunction with various levels of alternative transportation mode usage ~inc1uding transit, bicycle, pedestrian, and carpool } , whi 1 e avoiding Level of Service "E" on Frankl i n Boulevard. K. Appendix C of the draft Study contains a detailed analysis of ca ital P improvements for street improvements and major pedestrian crossin of Franklin Boulevard and transit g• • ,• which would be involved ~n accommodating the max ~ mum theoret~ cal 1 and use m~ x. L. Criteria 2 of the SD, Special Development District, as ro osed b the P P y Planning Commission, directs that approval of a proposed develo ment include demonstration that "Bas P • •, ed.an technical analysis ~part~cularly with respect to transportation fac~l~tles}, planned public facilities can be shown to accommodate the requirements of the proposed develo ment" . P M. Policy B1, page 6 of the draft Study directs that the City of Eu ene work with the Dre on De artment o g . • •.g p f Transportation and Southern Pacific Railroad to increase the number of access points to undeveloped ra ert P P Y within the Study area. N. Pot i cy B2, page 7 of the draft Study directs that the City of Eu ene work with Lane Transit District t g he Uni verse ty of Dregon, and employers i n the Ri verf rant area tv maximize the use of alternate modes of transportation . 0. Policy B3, page ? of the draft Study directs that "The City of Eu ene use its Ca ital Im ravement Pro r 9 • • P p g amm~ng process to ~dent~fy projects, their ~mplementat~on schedules, and anticipated sources needed to provide transportation facilities to service development in the Riverfront Study Area. P. Policy B4, page 7 of the draft Study directs the City of Eugene to " ursue P construction, of pro j ects i mended, by design and timing, to avoid Level of Service "E" ~n the Franklin Boulevard corridor". Q. Policy B7 of the draft Study directs that the City of Eu ene in g cooperation with deve]opers and the University of Oregon, develo a cam rehensive tan for an inte P P P rnal bicycle system w~th~n new development 7 n the R~ verf rout Park. R. The draft Study and proposed General P1 an amendment complies with Goal I~ Transportation because: 1} emphasis is placed on encouragin and provi di n foci 1 i ti es far g 9 alternative modes of transportation; 2} direction i s provided to avoid Level of Service "E" on Franklin Bout evard • and 3} direction is established to expand the bicycle system in the development area. ~3. Goal 13. Ener Conservation A. Goal I3 of the Statewide Goals directs that "land and uses develo ed on the land shall be mono ed and contr P g o11ed so as to maximize conservation of al 1 forms of energy, based upon sound economic principles" . B. Fundamental Principle #3, Page I I•~1 of the Metropolitan Plan re ui res that urban develo ment occur in q p a compact conf~gurat~on w~th~n the urban service area. EXHIBIT _ ~k' PAGE ~ O OF l C. Goal 1, page II-B-2 of the Metropolitan Plan addresses growth mana ement g and the urban service area, cal 1 i ng for the efficient use of urban 1 ands . D. Objective 8, page II-B-3 of the Metropolitan Plan encoura es develo ment 9 p of vacant, uderdeveloped and redeve]opable land where services are avai 1 abl a and some publ ~ c expenditures have already been made . E. Objective H, page III-F-4 of the Metropolitan P1 an directs the ci t to Y promote land use arrangements which will optimize use of existing and planned transportation facilities and services and which will rovide choices i n usi n alternative trans p g portation modes. F. Policy #~, Page III-F-5 of the Metropolitan Plan contains recommendations aimed at reducing transportation energy demand and increasin opportunities for use of alternative modes i g nclud~ng: a~ medium and high density residential development wi thi n a mi 1 e of downtown Eugene; b} encouraging existing employment centers to grow and diversify b Y concentrating new commercial, governmental and light industrial uses ~in them; c~ encouraging medium and high density residential development within one-hal f mi 1 e of existing and future employment centers; d encouraging,deve1opment and redevelopment in designated areas which are relatively well seved by the existing or planned urban public transit system. G. Policy #13, page III-J -6 of the Metropolitan Plan encourages cooperation and communication between citizens, utilities, and local governments, concerning energy-related issues. H. Policies B6 and B7 page 8 of the draft Ri verf rout Park Special Area Stud y recognize th.e area's pr~oxi mi ty to existing alternative transportation faci 1 i ti es, particularly the ri verfront bike path system, exi sti n b~ cycl e- edestr~ an bri d e and rai g P g 1 road underpass. I. Policy B2 of the draft Study calls far a significant effort to incor orate transit facilities and i m r P p ovements into future development plans for the area. J. Cost estimates far planned public improvements to meet transit needs in the study area are included in Appendix C of the draft Study and identified as a component i n financial planning for the area. K. The Special Development District, which is part of the draft Stud requires that anal sis be conducted y' y to determine 7f planned public faci 1 i ti es can accommodate the requirements of the proposed develo ement. p L. Policies contained i n the draft Ri verfront Spei cal Area Stud cal 1 for an Y intensity of development that will make the most efficient use of the site, whi 1 e recagni zi ng environmental and open space needs of the area. h'1. Policy A4 and development standards contained in the Plannin Commission's ro osed SD S ecial Develo g P p ~ P pment District, provide for a EXHIDIT PAGE ~ ~ OF. 1 ~-~' mixture of uses including commercia] and multiple famil housin occur as art Y 9} to p of an overall deve]oprnent. N. Policy E2 in the draft Riverfront Park S ecial Area • direction fo P Study provide r cooperative work by the University of Oregon, Eugene Water and Electric Board and the City of Eugene on actions to im ro efficienc of the two stea ~ P Ve the Y m plants 1 orated ~ n the study area . D. In their discussion of alternative sites for Uni versi t Eu ene Plann' ~ ~ y Research, the 9 ing Commission concluded that the Riverfront Park Stud Area is well-located between the Universit of y y Oregon and downtown Eugene to provide an energy-efficient land use relationship for Universit -relit research and related ser ' Y ed vices. P. Objective 6, page III-F-4 of the Metropolitan Plan rovides d' "Improve the efficienc o P erection to y f energy use resulting from transportation demands. Q. Because of the Riverfront Park's proximity to other ma 'or a t' ' centers, and the o ortuni t t ~ c ~ vi ty pp y o ache eve an ~ ntegrated mixture of 1 and use, the draft Study and proposed Plan amendment are consistent with existin direction contained in the Metro o1itan Pla g p n and comply with Goal 13, Energy Conservation. Goal 14. Urbanization A. Goal 14, Urbanization contains direction "To rovide far an orderl efficient transi ti P „ Y and . , on from rural to urban 1 and use ,and provides direction concerning establishment of urban growth boundaries. B. The Metropolitan Plan Diagram establishes the urban rowth boundar ' was acknowl ed e g Y which g d as complying with Statewide Goals by the LCDC i n I982. C. Page I3 of the draft Study notes that the western ortion of the S p tudy area was part of the original incorporation of the City of Eugene, while the eastern portion was annexed to Eugene i n the 1920' s. D. The Metropolitan Plan Diagram establishes that the Stud area is ' the acknowl ed ed u Y wi the n g rban growth boundary. E. Goa ] 14, Urbanization i s not applicable . Goal 15. Willamette Greenwa A. In urban areas, Goal 15 is intended to rovide criteria withi ' p n which development can occur consistent with the ur ose of the Wiliam P p ette Greenway. B. Goal 15 directs that use management state ies be develo ed for r within the Green a g P p vperty w y Boundari es. C. Goal 15 directs that review of intensified uses in Greenwa Bo ' include fin Y undaries dings that to the greatest degree possible, the develo ment provide: 1) the maximum amount of o en p p space, vegetation or landscaped area between the acts vi ty and the river; and 2) necessary ubl i c access to and a l on the ri ver b a ro ri at P 9 y pp p e legal means. ~xH~s1T i I i PAGE pF ~ D. Policy 9, page III-D-4 provides for specific use management considerations and requirements of Goal I5, "Willamette Greenway," to be included in local refinement plans. E. Policy I0, page III-D-4 of the Metropolitan Plan directs that local and state governments continue to proivde adequate public access to the Willamette River. F. Policy 5, page III-D-4 of the Metropolitan P1 an directs that uses 1 ocati ng along river corridors be compatible with the natural, scenic and environmental qualities of those water features. G. Policy 9, page III-D-4 of the Metropolitan Plan provides the ability of local refinement plans and implementing ordinances to address specific management and use considerations. H. Section 9.26a of the Eugene Code provides local interpretation of Goal I5 and contains criteria which development occurring within Greenway boundaries must meet. I. Map A shows that in the area being proposed for diagrammatic change, the southern Greenway Boundary is located along the Millrace. J. Policies C1, C2, C3, C4, D2 pages 9 and 10~ of the draft Study, and the proposed Special Development District all contain provisions which address use management considerations. K. Policy D4, page 10 of the draft Riverfront Study addresses public access by requiring that in the context of any development occurring in the Ri verfront area, the existing bike-pedestrian path be relocated c1 oser to the river. L. Policy C4 of the draft Study directs that development in the Riverfront Park, when pvssi bl e, maintain and enhance public access to the river. M. Policy C1 has modified by the Planning Commissian~ addresses public access by establishing: l} minimum setbacks of thirty feet; 2~ two areas of deeper setbacks which will accommodate intensive public use, i.e., around the Autzen Bike Bridge and the east Millrace outfall; and 3) by acknowledging that certain public access improvements could extend to the river through the riparian strip. N. An environmental analysis conducted as part of the Riverfront Study identifies the existing riparian stri p along the riverbank as the most significant environmental asset in the area, D. Policy CI, page 8 of the draft Study has modified by the Planning Commission} directs that the riparian strip along the river be protected, and identifies development and implementation of a management plan as a method of achieving this objective. P. The SD, Special Development District has proposed by the Planning Cammi ssi one requires that: 1 ~ development i n the Greenway comply with the policies contained in the Metropolitan Plan, the Riverfront Study and other applicable plans; and 2~ land within the Willamette Greenway Boundaries comply with applicable criteria contained in Chapter 9 of the Eugene Cade. ~XH(B(T ~ .~ ..~..... . .. 4' ~, ~ r ~. Based on these findings, the draft Riverfront Study and the proposed amendment to the Metropal i tan General P1 an comply with Goal ~5, iii 11 amette Greenway. pljfine~c IrXH f BIT ~ ~ ~ ~ -T.w.~.w~..~ R~~I`~.~..._..~a~ 1