Loading...
HomeMy WebLinkAboutOrdinance No. 19418ORDINANCE NO. ~II~ AN ORDINANCE ADOPTING THE EUGENE ENTRANCE BEAUTIFICATION STUDY. The City Council of the City of Eugene finds that: 1. On September 10, 1984, the City Council enacted Reso- lution No . 3867 adopting the 1984 Eugene Community Goals and Policies. This document contained policies promoting the City of Eugene as a tourism destination point, beautification of the City, and developing attractive .entrances to the City, 2. In December, 1984, the City Council enacted Resolutian No. 3892 adopting the Sig Point Economic Diversification Program for the Fiscal Year 1984/85. This plan called for a series of actions, including the development of a program to enhance th e appearance of Eugene's entrances. 3. The Metropolitan Area General Plan encourages the planting of street trees and development of sites optimizing visual and personal accessibility. 4. In January, 1985, the Eugene Planning Commission adopt- ed a Work Program and Citizen Participation Component for the Entrance Beautification Study, directing an interdepartmental staf f team to develop the study and to wo r k with a variety o f agencies and citizen groups in developing recommendations. 5. In March, 1985, the City Council enacted Resolution No. 395 accepting the Mayorls recommendation for creation of a Tree and Beautification Commission to work with citizens in recommend- ing programs and policies for planting and maintenance of trees on Eugene's streets and other public lands. This Commission worked with staff in developing recommendations for the Entrance Beaut i- fication Study. 6. The Study was developed during 1986 with the help of the Tree and Beautification Commission and other community groups. A draft study was published in June. The draft study was mailed to individuals and groups indicating interest in the Study during its development. This same list received notice of subsequent public hearings and recommended revisions to the study. Public hearings were advertised in accordance with the Oregon Public Meeting Law and requirements of the Eugene Code, 1971. 7. On September 9, 1986, the Planning Commission held its public hearing and developed a series of recommended revisions to the draft for consideration by the City Council. 8. The City Council reviewed the Study and the recommenda- tions from the Planning Commission at an October 8, 1986 work ordinance - 1 session. A public hearing was held on October 13, 1986, Based on the recommendations of the Planning Commission, the public testi- mo ny and the previous findings, the City Council has determined that the Eugene Entrance Beautification Study is consistent with the Eugene-Springfield Metropolitan Area Plan and implements the Metropolitan Area Plan, the Six Point Economic Diversification Program, and the Community Goals and Policies. NOW, THEREFORE, THB CITY OF EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The findings set forth above are adopted. Section 2. The goals and policies contained in the Eugene Entrance Beautification Study as described in attachment A ~ the June, 1986 Draft Eugene Entrance Beautification Studyy, including changes as described in attachment B October 8, 1986 List of Recommended Changes to the Draf t Entrance Beaut i f i cat ion Study , Corrected Version}, and additional changes as adopted by the City Council as indicated in Exhibit C are adopted as City policy. Such policies and goals are intended to guide municipal policy- making and not to serve as standards for decisions in individual land use proceedings. Section 3, The Entrance Beautification Implementation Prior-~ ities and the Design Guidelines for Future Entrance Beautification Projects are recognized as potential means of implementing adopted policy, but are not adopted as City policy. Section 4. The C i ty Counc i 1 hereby adopts as additional findings, the supporting text, maps, graphs, and tables contained in the Eugene Entrance Beautification Study. Passed by the City Council this .27th. day of October, 1986 ~ ~ City R order ordinance - 2 Approved by the Mayor this r October S, ~98fi -- Corrected Version LIST OF RECOMMENDED CHANGE5 TO THE DRAFT ENTRANCE BEAUTIFICATION STUDY Note: Additions are highlighted and deletions are [bracketed].) A. Add the following new Policy #I1 to page 4 of the draft: 11. To distinguish Eugene from "anywhere U.S.A. , "" particular attention should be paid to incorporating bicycle and pedestrian facilities as part of the improvements to future entrance corridors ensuring adequate sidewalks and bicycle facilities, wherever they are needed. B. Revise the first paragraph on page 5 of the draft as fol 1 ows: Entrances to Eugene include both specific entry points like the Air ort and the Amtrak railroad static ~ p• nand has wel 1 ash entrance. carry dors 1 ~ ke I-1~5 and Franklin Boulevard which bring visitors into the city center . ~ Eugene from Interstate Five. A map ~ 11 ustrat~ ng Eugene's Entrance Points and Corridors is found on the following page and dis la s P Y psi xteen~ seventeen ..streets and facilities that serve as major entrances for Eugene. C. Revise the second paragraph on page 5 of the draft as fol]ows: As noted on this map, the Entrance Beautification Study [focusses on .. ~dentiftes major entrance points and corridors and designates "Preferred Routes" that bring travelers into Eugene from the air ort from Interstate 5 and fro P ' m the coastal areas [to they west of the city.. - ~:~ ~. Revise the paragraph concerning "Preferred" Entrance Corridors on a e 5 to distin ush between the e P g 9 ntrances from Interstate 5 north and south of town. ... a route from Interstate 5, including the preferred entry for visitors coming into Eugene from Interstate 5 both north (Preferred Route B-~} and south Preferred Route B-Z~ of town. E. Revise the Map on page 6, addi ng a ti tl e, Entrance Points and Corridors changing the legends to include a revised list of points and corridors to distinguish between Preferred Route B-I ~comi ng from the north and B } 2 coming from the south}, replacing references to City Center with Downtown, and graphically highlighting all entrance points and corridors, with emphasis an the "preferred routes." The revised legends will read: ,r"' r LEGEND 1. -Mahlon Sweet Airport ~. Airport Road, Greenhill to Hi hwa 99 9 Y 3. Highway 99, Airport Rvad to Beftl'rne 4. Beftfine Road and intersections between Highway 99 and Delta: . a. Beftfine Raad and Highway 99 Intersection .: b.. Beftfine Road and River Road Intersection c. Beftfine Road and Delta Highway Intersection 5. Delta Highway and Interstate 145, Beftfine to 7th Avenue fi. Highway 99 and intersections between Beftfine and Garfield a. Highway 99 and Roosevelt Boulevard Intersection b. Highway 99 Overpass c. Highway 99 and 5th Avenue Triangle d. Highway 99 at 7th, 7th Place and Garfield 1. River Road, and the Future Chambers Connector, Beacon Drive to ?th Avenue $, Railroad Boulevard, River Road to Van Buren St. 9. 6th/7th Avenue Couplet, Garfield to High Streets 10. Franklin Boulevard, Interstate 5 to the Ferry Street Brid e g 19 , f nterstate 105, Coburg Road and the Ferry Street Bride Interstate Five to fith g Avenue 12. West Eugene Parkway, yak Hill to Garfield Street 13. West 19th Avenue, Greenhill Road to Chambers Street 14. Coburg Road, Interstate 145 to Crescent Street 95. 3Qth Avenue, Interstate Five to Hilyard Street 1 fi. G reen h i l l Road, A i rpart Road to West 19 th A e v nue Z ~?. Amtrak Station RREFERRED ROUTES TO DOWNTOWN EUGENE A, From Eugene's Airport to Downtown B- ~ . ~ From interstate Five to Downtown, Arriving from the North B-2. From interstate Five to Downtown, Arriving from the South C. From the coast to Downtown ~ - F. Replace al ] other references to "Ci.ty Center" with Downtown ~~cluding -descriptions of Preferred Routes A, B and C on pa es ~' ~3 and ~fi; visitor si ni n rec g ~' g g ommendat~ ons on page ~S; and the l ~ st of ~ terns in the Table of Contents. ~ . G. .Revise the Entrance Beautification Project heading at the to of a e l as follows: p P ~ Entrance Corridors and Entrance Beautification Pro 'ects J H. Revise the first paragraph describing Preferred Route A -From Eu ene's Airport to Downtown on a e g p g 1, as fol 1 vws: .:.The intent of this strategy will be to sign a preferred route to the . ,. ~ central c~ty~ which includes [they downtown [mall], [the] Eugene Centre the University of Dregan, the Visitors and Convention Bureau, the Eu ene Chamber of Commerce the ri er g v front park system and rase gardens, and lodging foci 1 ities. ...The following [four] five projects. detai l improvements to areas along thi s preferred route. T. Revise project #2, Air ort Road ~m rovements changing its description p p . and adding a sentence to include design guidelines that recognize its level of improvements and status as a county road, as follows: 2. Airport Road [Improvements] -Greenhill to Highway 99 ...repeat the same species used in the tree rou in s for the . 9 P 9 Mahlon Sweet A~ rport project. Implementation of this. project will require a design that addresses liability and maintenance issues raised b plantin street trees alon a car i ~ y g g r dor which Encludes roadside drainage ditches and which lacks curb and gutter separation between the. rvadwa and the otentiai lantin area. y p ~ p g Other ,improvements that recognize this corridor s role as an entrance corridor to Eugene will likely be develo ed in con`unctian with landsca e a p 1 p nd buffer requirements far adjacent private development. 3 J. Add a reference to Highway 99 between Airport Road and Belt1ine Roa d, recognizing it as part of a major entrance corridor into Eugene as follows: ' 3. Highway 99, Airport Road to Beitline Road This section of the preferred route into Eugene from Mahlon Sweet Airport has not been identified for specific improvements within the p ub I is right-of -way. Any improvements that recognize its rate as a portion of an entrance corridor to Eugene will likely come in conjunction with landsca a and ~ buffe • ~ p r requirements for adjacent private development. Consideration will also be given to the need far ublic landscape buffers in strata is to ~ g cations to screen existing, unsightly views . K. Revise the numbering and heading for projects along Bel t1 i ne Road and its intersections as follows: 4. Beitline Raad and Intersections Between Hi h , g way 99 and Delta H rghway - Beitline Road farms a significant link in the preferred route from the ~~ Airport into Eugene. Improvement projects are called for alon this limited access facili in th g .ty a public right-of-way available at its intersections with H rghway 99, River Raad, and Delta Highway. Except at these intersections, improvements that recognize its role as part of a preferred route into ~ Eugene will be implemented in conjunction with landscape and buffer requirements associated with adjacent private development.. ~3]a. Bel t1 i ne Raad and Hi hwa 99 Intersection 9 y _~4]b. Bel t1 i ne Road and River Road ~5~c. Delta Highway and Beitline Road Intersection L. Add a project listing for Delta Hi hwa and Interstate - 105 9 y clar~fy~ng ~ is role as a 1 i nk ~ n Preferred Route A between the Airport and Downtown as follows: ' 5. Delta Highway and Interstate - 105, Beitline Road to lth Avenue Delta Highway serves as the final link in Preferred Route A, brin in visitors from the air ort ' ~ g g p into downtown Eugene, As noted above, it crosses a series of natural waterways that will be conserved and improved as part of the riverfront park system, enhancing Delta Highways role as an attractive entrance into the city. This segment of Preferred Route A also includes a section of Interstate 1~5 which crosses the Willamette River, with views of the extensive riverfront park s stem on the south side of the ri e - y v r, including Greenway Park, Skinner Butte Park and the prominent landmark of Skinner Butte itself. Dnce on the 4 c south side of ~ the river, this corridor intersects the park ~~ .stem, ., be innin at the Owens Mem Y 9 g oriel Rose Garden . At this point, the nature trees in Washington-Jefferson Park which lies below this section :of the ,: corridor) are visible from the overpass and surround the driver ~~ the .corridor comes down to street level. Finafl , the ~ corridor in . Y ~rsects wrth the fith/lth Corridor, itself undergoing a major reconstruct~a:n and landscaping, scheduled for completion in 19$x. - This last link in Preferred Route A offers an example of a ray a of significant landsca a treatm ~ g p ents, both planned Delta Pond improvements .and completed (the existing park system, which create an impressive and varied entrance into the city.... Beyond those ~,ublic projects associated with the . Delta Ponds and the fith/7th ~we:nue reconstruction, further improvements in this section of Preferred f~~oute A will come with landscape and buffer requirements associatedwith adjacent private development. M. Under Dther Entrance Beautification Projects Coming from the ~Ai r n~^t and Points North on a e 9 r •P • p g eve se the project descry pt~ons for H~ ~h~ay 99 and various points along the Highway 99 corridor south of Beltl~ne :Road on pages 9 - ~Z, clarifying the importance of sidewalks, incorp®rating material from pages 11 and 12 on the future reconstruction, iden~~~yin 9 the drawing on page 9 as Figure 1 and the drawing on page 1D as F~ ~~re ~ r and del eta ng the .existing description under the Future Hi ~hwa~ g9 Reconstruction Pro~ect:~ fi. Highway 99 and Intersections Between Beltline Road and Garfi~el d Street Highway 99 has been identified as the entrance corridor in ~ Eugene most rn need of improvement. The City will work with the State Department of Transportation between 198fi and 1988 to develop fundin for a reconstruction of H i h • ~ g way 99 between Beltl~ne Road and Garfield Street as part of the States 1989 to 1994 Six Year Highway lrnprovement .Program. Its current role as a major entrance to~the city from the north is seriously hampered by the lack of curbs and sidewalks, continuous . and , poorly-defined driveway .accesses to adjacent ~ businesses, prol~ferat~on of overhead..utlity wires, and total lack of si nificant landsca a amenities. ~ . ~ ~ g . p . . ,Design direction for the coming reconstruction of Highway 99 has been suggested by earlier plans, developed in 1974's, but never carried out, This design direction would involve shiftin the future im roved road to the g ~ p way . east within the existing right-of way, in order to provide sufficient landscape area and sidewalks on both sides of the roadwa as Y~ well as space for landscaped median islands. I n addition to deli n work i ncorporati n some e o g g typ f landscaped ~ median, existing above-ground utility lines should be buried as part of the Highway 99 improvement p ro~ect. 5 This reconstruction project will alsa need to address the existin~ lack of cuff icient ri ht-of - a • • g • g w y along ,Roosevelt Boulevard near tts tntersectton with Highway 99, Currently there is insufficient s ace for even c - . p urb side sidewalks and this heavily-traveled arterial should be improved with . set-back .sidewalks to meet both .pedestrian safety and entrance .beautification objectives , Because funding far the major reconstruction of Highway 99 is not expected to become available before ~99~, serious consideration should be given to short term improvements at four locations along the Highwa 99 corridor as outlined below. T y hese improvements should be designed as permanent improvements which could be retained as part of the future reconstruction of the Highway 99 corridor, enhancing its tale as a major entrance to the city in both the short and long term. ~6]a. Intersection of Highway 99 and Roosevelt Boulevard While these proposed improvements...Treatment of the intersection of Roosevelt and Highway 99 would require certain construction measures before 1 andscape p1 anti ngs can be instal 1 ed and sidewalks will be incorporated in the permanent improvements at each carnet of this intersection ~l]b, Highway 99 overpass ~8]c. Highway 99 and the 5th Avenue Tri angl e ~9]d. Highway 99 at 1th Avenue, lth Place and Garf i e1d . N. .Renumber and revise references to remaining material under ether Entrance Beautification Projects Coming From the Airport and Points North, v`n pages I2 and 13 as follows: ~ 10 . ]l. River Road and the Future Chambers Connector, ~ Beacon drive to 7th Avenue - A major reconstruction and widening of portions of River Road has already been completed by Lane County and further work on this corrtdor is anticipated in the next several years. Lane Coun and . ty Eugene will work with property owners on the design and implementation . of future improvements as part of the River Road widenin and reconstruction. Other im roe g p v ments that recognize this corridor's role as an entrance into Eugene will be implemented in conjunction with landscape and buffering requirements associated with adjacent private development. [11.]S. Railroad Boulevard from River Road to First Avenue River ]. Road to Van Buren Street ~. Revise the reference to the downtown mall in the last sentence on a e I3, as follows: P g 6 c ,Signing would direct ...downtown [mall ] and Chamber of Commerce visitors to exit at 8th .. . P. add a project and project description far the Gth/1th Avenue couplet, . recognising its role as an entrance corridor that completes the link ~. between a number of other entrance corridors and downtown, as follows: 9. 9th/lth Avenue Couplet, Garfield Street to Hi h Street g This couplet runs through the center of Eugene and links each of the . Preferred Routes into Eugene with the .city's downtown area. A major reconstruction and id ~ • • 1 w ening protect was approved by Eugene s citizens and funded by the Oregon Department of Transportation in 1984. This project has been implemented in two phases, with the downtown phase, from High Street to wash i ngton Street completed i n 198fi. The second phase, from Vvashington Street to Garfield Street, is .scheduled to be completed in 1987, Both phases have been designed to incorporate landscape amenities, including street trees throughout the project and special street lighting and paving treatments in the downtown section of the project, Once this project is completed, other improvements that recognize this corridor's role as a major link ~in the entrance corridor system for Eugene are expected to come primarily in conjunction with .landscape and buffer .requirements associated with adjacent private development, though public projects for screening of any existing unsightly views may be employed in strategic locations. Q. Revise the numbering and project titles to distinguish between entrances on the preferred route from interstate 5 coming from the north and the south as follows: [1~. Traveling North on ~~-5, Enteri n Eu ene on Franklin Boulevard Exi t 9 9 ~ 192}]1fl. Preferred Route B-1: Franklin Boulevard, interstate Five to .the Ferry Street Bridge .. ~ ~ - ., . Signing on the interstate will be implemented directin visitors usin . g 9 interstate Five and arriving rn Eugene from, the south to use Exit 192, entering the city on Franklin Boulevard. The proposal for this entrance carry or... ~ . X13. .Traveling South an I-5,~Entering Eugene vn ~~105 Exit ~94~] 11. Preferred Route B-2: l nterstate 105, Coburg Road and the Ferry Street Bridge, 1 nterstate Five to fith Avenue The primary focus of thi s entrance i s on traffic arriving from the north, using Exit 194 from Interstate 5, since traffic arriving from the south i s most 1 i kely to ente~^ Eugene on Franklin Boulevard. _ R. Revise the numbering, project titles and text on corridors along Preferred Route C, page ~6, as follows: 7 [14.]1. West Eugene Parkway ~Sth/lth Extension}, Oak Hill to Carfiel d Street . Landscape design features for this facility...usin the Desi n Guy del i nes for Futur g g e Entrance Beautification Projects. ~n acquiring right-of-way and developing final designs far this future entrance corridor, street trees planted as part of the project should be carefull Y located to ensure they can be retained in the event of future widenin s. Dther im rovements alon this corr' 9 P g ~ dor are 1 ~ kely to occur i n conk uncti on .with landscape and buffer requirements associated with adjacent rivate levelo meet or in ublic ro'e P • P p p ~ cts to screen any ex~ sty ng uns~ ghtly v7 ews ~ n strateg ~ c 1 ocat~ on s . , . [15.]13. West 11th Avenue, Greenhill to Chambers When the western section ... Thi s pro j ect involves [three four subel ements to improve West 11th as an entrance to Eugene: Improvements along the entire length of this entrance corridor should be .sure to incorporate construction of sidewalks, to fill in the gaps in the existing sidewalk system serving the area. ~. S, .Under Dther Entrance Points and Corridors on page 1? add material on . three additional entrance corridors inadvertently left~~out of the dra ft and renumber the remaining corridor Amtrak Station, as follows: 1~. Coburg Road, Interstate 105 to Crescent Street Coburg Road serves as a significant entrance corridor to points within Eugene, including points north of the downtown area. In li ht of the potential for visitors to enter g bath from the Preferred Entrance Corridor B-1, along 105, travelling north on Coburg Road, as well as the otential for their entrance an Beltline o p R ad, travelling ether north or south on Coburg Road, this section of the Coburg Road corridor has been added. With the establishment of a Special Light Industrial Site and subse uent q .planning work on property. north of Beltline and Cobur Road the ..northern bvundar of this ~~ ~ 'g y entrance corridor has been defined at Crescent Street. ~ This ~sectian of Coburg Road has not been identified for specific improvements within the public right-of-wa An improvements that reco nize y y . 9 its role as an entrance corridor to Eugene are likely to be Implemented ~n conjunction with landscape and buffer requirements for adjacent private development. 15. 30th Avenue, interstate Five to Hilyard Street This entrance corridor has been identified as one of the rural entrances into Eugene, usually for visitors with destinations in the southern art p of the community. As Hated in the introduction to the stud ublic efforts will come fare y~ p . g ly In the form of review of future development proposals along this corridor to ensure that existing natural landsca e p qualities and panoramic views can be retained along this entrance from S c ~- , Interstate 5. Where the corridor crosses city limits, close to the Spring Boulevard overpass, existing roadside trees should be retained, between the overpass and University Street. Because of the extra right-of-wa Y on 3Dth Avenue, between University Street and Alder Street, opportunities exist for punting large street trees within the existing parking street as part of a future public project. 1fi. Greenhill Road, Airport Road to 1~est 11th Avenue Like 3Dth Avenue, this entrance corridor traverses a largely rural landscape and forms the west boundary of the current Urban Growth Boundary. Rural landscape. qualities and panoramic views should be retained, as noted in the Introduction to this study. Landscape improvements far the forseeable future are likely to come in conjunction with landscape and buffer requirements far adjacent future private development. Yl~hile potential future public projects may involve screenin of existin unsi htl views in stra ~ g g g y teg~c locations. [16]17. Amtrak Station T. Revise the discussion under the Franklin Boulevard Maintenance Exchan e Implementation Pri on t as fo l ~ ~ g y, lows: ...investigate local as well as state sources...improvements for the Franklin Boulevard entrance to Eugene ~~Entrance Beautification Project 12)x. !n addition, because of its proximity to the Glenwood Solid Waste Facility and the resulting litter that can create, the maintenance agreement should address state and local responsibilities for litter pick- up.. U. ~ Expand the discussion under Imp1 ementati on Priority #Z-h, as fol 1 ows: . "Points of Interest" si gni ng, ~ di recti ng visitors to historic sites museums (such as University of Oregon Art Museum, WISTEC, Lane County Historical Museum, parks ~ i ncl udi ng the park system along the aver, ,Hendricks Park Rhododendron Garden and Dwens Memorial Rose . Garden}, and the City Centers Downtown, needs to be developed and sites identified. I~. Revise the description under Implementation Priority #3, as follows de]eting the present lead-in paragraph: Highway 99 [Demonstration Project] Improvement Projects Because of the high priority for improvements to this major entrance corridor and the need to obtain state funding for the contemplated reconstruction, the City, should proceed to budget funds for improvements at four locat:ans along the corridor, as soon as possible. These improvement projects should be designed to become a permanent part of the reconstructed roadway and should include: 9 a. Improvements at the intersection of Highway 99 and Roosevelt Baul evard; [~ Entrance Beautification Project 6}~ b. Improvements alon Hi hwa 99 over ass overt ' g 9 Y p he Southern PacTf~c . railroad tracks; ~t Entrance Beautification Project l~~ c. Improvements on the Highway 99/Fifth avenue Triangle;~Entrance Beautification Project 8}~ and d. Improvements on Highway 99, at 7th Avenue, 7th Place and Garfield Street.~Entrance Beautification Project 9}~ phi le these..,, improve the City's ima a far visitors from o' 9 pints north and residents al ~ ke. W. Revise and expand Implementation Priority #5, on page 19, to include the concept of a code amendment that requires additional landscape and buffering requirements for developments along designated entrance corridors, as follows: 5. .Street Tree Planting and Landscape Requirements Along Desi Hated 9 Entrances Adopt a code amendment requiring street tree planting within existin parking stri s i n con 'unction i g p ~ w th [already required] parking lot landscape buffers and incorporate requirements for landsca a and buffer treatments on the de p velopment site, far a!I future development along designated entrance corridors. Before this code amendment is adopted, standards wilt be developed and will be tailored to the character and role of .the entrance corridor (following the direction provided in .Design Guideline #Z) , These standards will be applied to future development during the plan review process, in much the same way the existing parking lot landscape and buffer requirements are administered... plpdebp4 la ENTRANCE BEAUTIFICATION STUDY -- EXHIBIT C The following revisions to the Draft Entrance Beautification Study were adapted by the City Council on actaber ~5, ~g85, supplementing the List of Recommended Changes recommended by the Planning Commission, additions in bold and deletions [bracketed } . ~. Revise language in Policy #~, on page 3 of the draft study, to read: 1. ~Desi grate "preferred entrance corridors" Identify the most direct and attractive routes i nto the city, encourage thei r use, and maintain and improve the character and quality of the entrance experience along these routes. Three preferred] routes have been identified as entrance corridars into the city from the airport, from the interstate system, and from the coastal areas and other communities to the west. These routes provide a focus for [entrance beautification projects and acitivities that can improve entrances tv Eugene that are used by a substantial share of the city's visitors. signing that directs visitors along the most direct and attractive routes into the city. 2. Revise the map an page 6 to show all entrance corridars into the city and to show the most direct and attractive routes from the airport in a different color or pattern. Routes A, B-1, B-2 and C will be called out simply as [Preferred Routes To The City Center, followed by the revised descriptions recommended by the Planning Commission Revision E, top of page 3 of the Recommended Changes. 3. Rewi se reference to "Preferred Entrance corridars" on page 5 of the draft study, incorporating the distinction between routes B-~ and B-2 already recommended by the Planning commission ~Revisian D on the Recommended Changes} with addi ti anal revisions as fol 1 ows: ~"Preferred" ] Entrance [Corti dars Routes The map of Entrance Points and Corridors includes three [preferred routes... These routes provide a focal point for signing that directs visitors along the most direct and attractive routes into the city and for entrance beautification projects that serve a substantial share of the city's visitors. 4. Eliminate all other references to "preferred" entrance corridars. 5. Revise Policy 7, page 3 of the draft study to eliminate requirements for site review for development along entrance corridors and make reference to the implementation of a future code amendment as follows: 1. As development activities are proposed along designated entranceways, apply site review procedures] provide a mechanism far additional landscape and buffer treatments on the site and along the street to ensure that the proposed developments respond to Eugene's entrance beautification policies, hand] projects, and priorities . Under this policy, [site review requirements would be applied to devel opments~ a subsequent code amendment will be pursued to apply to development 1 orated a1 ong entrance corridors, or at entrance points, in conjunction with other development processes. [This does not suggest that the city wi11 initiate a site review rezoning on all properties i n these 1 ocati ons, but that site review wi 11 be required i n conjunction wi th a zone change, conditional use permit, or other review process a1 ready i n progress. ~ This code amendment will be designed to provide standards far landscape and buffering tailored to the character and role of the entrance corridor and will apply those standards as part of the normal review process of building ar site development. This approach wi 11 provide an opportunity for future development in Eugene's entrance corridors to respond to entrance beautification [abjecti ves] goals. 6. Make additional revisions to the recommended text for Highway 99 page 6 of the Recommended Changes} as follows: Because funding far the major reconstruction of Highway 99 is not expected to become oval 1 abl a before I990, ] included in the State's current Six Year Highway Improvement Program, serious consideration... 1. Make additional revisions to the recommended text for Route B - ~ page 7 of the Recommended Changes, item Q ~ 1~}, adding more emphasis to the Ferry Street Bridge a s f o 11 ows The primary focus of this entrance i s on traffic arriving from the north, using Exit 194 from Interstate 5, since traffic arriving from the south is most likely to enter Eugene on Franklin Boulevard. ...There are a number of existing evergreens~...view of spencer Butte provided the driver on entering the off-ramp from the I-5 freeway onto I-105. The Ferry Street Bridge is a major facility along this entrance corridor, It is currently congested during peak hours and the need for widening or replacement has been projected in transportation planning documents. In future plans for widening or replacement of the Ferry Street Bridge, its .role as an important link in one of the primary entrances into the city should be addressed. Future designs should incorporate lighting and landscape amenities that respond to that role. 8. On the map and legend~on page 6, insert reference to the Northwest Expressway as follows: Z Northwest Expressway, Beltliine to chambers connector 9. Under other Entrance Beautification Projects Coming from the Airport and Points North on page 9, add a project description for the Northwest Expressway between Beltline and the Chambers Connector as follows: 7. The Northwest Expressway is expected to play an increasing role as an entrance corridor to Eugene, as the River Road corridor experiences additional development and traffic. Improvements that recogni=e this role should include wank with adjacent property owners to encourage street tree planting and planting of addit'ranal evergreen landscape materials to buffer the development on the east side of the expressway from the noise and visual impacts generated by the roadway and the Southern Pacific Railroad. 14. Make additional revisions to Implementation Priority #2, visitor Signing, to address the distinction between direct routes to the Downtown and business routes 1 i ke Highway 99 and west 11th, as fol 1 ows: fie. Move "Entering Eugene" signs on West 11th Avenue from Beltline Road west to actual city limits (currently green Hill Road} and direct visitors to Downtown to use the west Eugene Parkway and sign west 11th Avenue as the "business route;" 2 g . signing at Highway 99, directing visitors to Downtown to use Bel tl ~ ne Road and signing Highway 99 as the "business route;" 11. Add 1 anguage to Implementation Priority #4 and reverse the numbering for priorities four and five as indicated: [5] 4. Street tree planting and landscape requirements along designated entrances Revised as indicated on page 10, Item W of the Recommended Changes. [5.]5. Private Landscape Incentive Program An incentive program should be [developed within the next year] considered in the future by bath private groups and public agencies, [ to provide landscape materi ai s at 1 i ttl e or no cast]ta donate landscape materials without charge or at reduced cost to property owners along designated entranceways. Similarly, a grant or loan program using a private foundation or public funds should be developed to assist businesses in landscape improvements along entrance corridors. Priorities for the program.. . plpdebxc 3