Work Session: Eugene Comprehensive Lands Assessment
Meeting Date: February 23, 2009 Agenda Item Number: C
Department: Planning and Development Staff Contact: Jason Dedrick
www.eugene-or.gov Contact Telephone Number: 541-682-5451
ISSUE STATEMENT
This work session is an opportunity for the council to receive a project update, and discuss current status
and next steps associated with the Eugene Comprehensive Lands Assessment (ECLA).
BACKGROUND
The goal of this effort is to determine whether Eugene has a sufficient supply of land within the Urban
Growth Boundary (UGB) to meet the projected demand for residential, commercial, industrial, and non-
economic land over the next 20 years. This study addresses Oregon House Bill 3337, which directed the
cities of Eugene and Springfield to undertake a study of residential lands sufficiency. The scope was
expanded by council direction to assess employment and other land needs as well.
Project Update
The ECLA project was initiated by the City Council action and added to the Planning Division work
program in January 2008. The Planning Commission has since provided a review of the project scope of
work and the community engagement plan. ECONorthwest was hired as the project consultant in May
2008, and initial technical work began shortly thereafter.
A Community Advisory Committee (CAC) has met on a monthly basis since October 2008, for a total of
five meetings thus far. An Agency Technical Advisory Committee (TAC) has met twice. Products of
the technical analysis are distributed to the committees prior to each meeting, where members are asked
to provide comments and feedback on the analysis and results. Through these efforts, staff has
introduced portions of the three primary components of the analysis to the Advisory Committees:
·A Buildable Lands Inventory;
·An Economic Opportunities Analysis; and
·A Housing Needs Analysis.
Buildable Lands Inventory
The comprehensively assesses the current supply of vacant and developed
land within the UGB, as well as what constraints there are on these lands to accommodate future
development. A three-phase approach will be utilized to complete this assessment, including:
·Creation of the land base data layer including zoning and Metro Plan designations;
·Identifying limiting factors (constraints) such as Statewide Planning Goal 5 (natural resource)
regulations and FEMA floodways; and
Z:\CMO\2009 Council Agendas\M090223\S090223C.doc
·Classifying all lands into mutually exclusive categories based on their vacancy and constraints.
For example, this process includes designating a given tax lot as vacant or developed. It also
includes assigning a given tax lot into one of four categories of limiting factors: committed lands,
protected lands, constrained lands or unconstrained lands.
Economic Opportunities Analysis
The determines what the demand will be for commercial and
industrial lands over the next 20 years. This includes:
·An analysis of economic trends;
·Consideration of local conditions; and
·A forecast for employment growth.
Housing Needs Analysis
The determines what the demand will be for housing lands over the next 20
years. Key components of this analysis will include:
·Recent and anticipated trends that may affect housing mix and density;
·Provision of affordable housing;
·Projected needs for various housing types; and
·Integration of information from the Infill Compatibility Standards and Opportunity Siting
projects.
Next Steps
Key assumptions from the analysis are tentatively scheduled to be presented to the council this April.
These key assumptions and council direction will be utilized to model different scenarios associated
with growth over the next 20 years. The scenarios will then be presented to the community at public
workshops in May. Continued refinement of the scenarios and the preliminary findings will continue
through the summer and fall, culminating with the land need determination by the end of the year.
Additional council work sessions and/or updates are tentatively planned for July, September and
November as products become available and at critical project junctures. The CAC will continue to
meet monthly until August to provide comments and feedback on the development of technical analyses.
The TAC will continue to meet bi-monthly to help ensure that key information from agency partners is
incorporated into the analysis and regular check-ins with the Planning Commission will occur.
It is important to note that while the completion of the land needs analysis will address Eugene’s
compliance with HB 3337, it is only the technical phase of a larger planning process. If the study
determines that additional lands will be needed to accommodate projected growth, the City will need to
initiate a process for addressing these needs, either through infill and redevelopment policies, UGB
modifications or some combination of both.
RELATED CITY POLICIES
·The City Council has included ECLA as a priority item on the Planning Division Work Program.
·Most of the Growth Management Policies are related to ECLA, most notably policies 1, 2, and 5.
COUNCIL OPTIONS
No formal action is required at this time. Staff will be asking the City Council for input on scenarios at
a later date.
Z:\CMO\2009 Council Agendas\M090223\S090223C.doc
CITY MANAGER’S RECOMMENDATION
No action is required on this item; therefore, no recommendations are offered by the City Manager at
this time.
SUGGESTED MOTION
No action is required on this item; therefore, no motions are offered by the City Manager at this time.
ATTACHMENTS
A. Community Advisory Committee Members
B. Technical Advisory Committee Members
C. Project Timeline
FOR MORE INFORMATION
Staff Contact: Jason Dedrick
Telephone: 541-682-5451
Staff E-Mail: jason.p.dedrick@ci.eugene.or.us
Project Website: www.eugene-or.gov/ECLA
Z:\CMO\2009 Council Agendas\M090223\S090223C.doc
ATTACHMENT A
Community Advisory Committee Member List
Eugene Comprehensive Lands Assessment
Jon Belcher At-Large
Howie Bonnett Eugene Sustainability Commission
Merle Bottge Developed Parks Community
Norton Cabell Eugene Housing Policy Board
Paul Conte At-Large
Rick Duncan Eugene Planning Commission (non-CAC member attendee)
Kim Hyland At-Large
Carolyn Jacobs Eugene Neighborhood Leaders Council
Bill Kloos Eugene Area Chamber of Commerce
Kevin Matthews City-Wide Local Advocacy Group
Brent McLean Commercial/Retail Community
Laura Potter Home Builders Association of Lane County
Matt Powell Eugene Association of Realtors
Erik Riechers Investment Community
Jack Roberts Lane Metro Partnership
John Winquist Natural Resource Community
ATTACHMENT B
Agency Technical Advisory Committee Member List
Eugene Comprehensive Lands Assessment
Barb Bellamy Eugene 4J Schools
Neil Bjorklund Eugene PW Parks
Savannah Crawford ODOT
Terri Harding Eugene ICS & OS Projects
Pat McGillivray Bethel Schools
Ed Moore DLCD
Steve Nystrom Eugene PDD Planning
Jeannine Parisi EWEB
Linda Pauly City of Springfield
Chris Ramey University of Oregon
David Roth Eugene PW Engineering
Stephanie Schulz Lane County
Tom Schwetz Lane Transit District
Mike Sullivan Eugene PDD Development
Bob Warren Oregon Economic & Community Development Department
ATTACHMENT C
Project Timeline
Eugene Comprehensive Lands Assessment
2009
February
Draft Buildable Lands Inventory
Council Work Session
Community Advisory Committee Meeting
March
Draft Economic Opportunity Analysis
Draft Housing Needs Analysis
Planning Commission Work Session
Agency Technical Advisory Committee Meeting
Community Advisory Committee Meeting
April
Scenario Development
Council Work Session
Community Group Meetings
Community Advisory Committee Meeting
May
Public Workshops
Agency Technical Advisory Committee Meeting
Community Advisory Committee Meeting
June
Final Draft Buildable Lands Inventory
Planning Commission Work Session
Community Advisory Committee Meeting
July
Council Work Session
Agency Technical Advisory Committee Meeting
Community Advisory Committee Meeting
August
Final Draft Economic Opportunity Analysis
Final Draft Housing Needs Analysis
Planning Commission Work Session
Community Advisory Committee Meeting
September
Council Work Session
October
Planning Commission Work Session
November
Final Buildable Lands Inventory
Final Draft Economic Opportunities Analysis
Final Draft Housing Needs Analysis
Council Work Session
December
Final Land Need Determination
HB 3337 Deadline