HomeMy WebLinkAboutItem 5: FY2010-15 Draft CIP and attA ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Action: FY 2010-2015 Draft Capital Improvement Program Meeting Date: February 23, 2009 Agenda Item Number: 5 Department: Central Services Staff Contact: Pavel Gubanikhin www.eugene-or.gov Contact Telephone Number: 682-5512 ISSUE STATEMENT This item is a request for the council to take action on the Draft FY 2010 – 2015 Capital Improvement Program. BACKGROUND The Capital Improvement Program (CIP) is a planning document that forecasts the City's capital needs over a six-year period based on various City-adopted long-range plans, goals and policies. The Capital Improvement Program for the Airport, Parks and Open Space, Public Buildings and Facilities, Stormwater, Transportation and Wastewater totals approximately $499.8 million in funded and unfunded projects. The Financial Summaries on pages 29-47 of the document contain tables summarizing all CIP projects in the plan and a two-year funding summary. The goals of the CIP are to: ? Provide a balanced program for capital improvements given anticipated revenues over a six-year planning period; ? Illustrate unmet capital needs which are beyond the capacity of anticipated funding levels, and; ? Provide a plan for capital improvements which can be used in preparing the capital budgets for the coming two fiscal years. The underlying strategy of the CIP is to plan for land acquisition, construction, and major preservation of public facilities necessary for the safe and efficient provision of services. A critical element of a balanced CIP is the provision of funds to preserve or enhance existing facilities and provide new assets that will aid response to service needs and community growth. Funded Projects As drafted, projects with secured and identified funding in this CIP total approximately $182.2 million. The Airport is expecting to complete significant improvements during the CIP period totaling almost $44.6 million. A major project in FY10 is the construction of a replacement Aircraft Rescue and Fire Fighting (ARFF) facility. Other major Airport projects include Preservation and Maintenance, and Site and Facility improvements involving runway overlays, ramp rehabilitation and reconstruction, taxilane extensions and ramp expansions. Z:\CMO\2009 Council Agendas\M090223\S0902235.doc The Parks and Open Space program is anticipating about $11.2 million of improvements during the CIP period. Several of the Parks and Open Space projects funded through System Development Charges (SDC) have had their status changed from “Funding Secured” to “Funding Identified”, or had the SDC portion of the project funding reduced, due to a projected shortfall in SDC revenues. Several projects are also anticipated over the next six years in the Public Buildings and Facilities category. The approximately $29.6 million of funded projects in this category are mainly for preservation and maintenance of existing City facilities. This category also contains several placeholder projects, including City Hall Replacement, the Police Patrol Facility and the Police Special Operations Facility. $13.3 million of improvements to the Stormwater system are planned in this CIP. Several of the Stormwater projects funded through System Development Charges (SDC) have had their status changed from “Funding Secured” to “Funding Identified”, or had the SDC portion of the project funding reduced, due to a projected shortfall in SDC revenues. $69.4 million of anticipated spending on Transportation projects represents the largest portion of the CIP. Large projects with funding secured or identified include the Pavement Preservation Program, Delta Ponds Overpass, Elmira Road/Maple Street and Bertelsen Road upgrades to City standards. Several of the Transportation projects funded through System Development Charges (SDC) have had their status changed from “Funding Secured” to “Funding Identified”, or had the SDC portion of the project funding reduced, due to a projected shortfall in SDC revenues. The City’s Wastewater system is scheduled for almost $14.1 million of improvements in the next six years, with most of the capital spending designated for wastewater system rehabilitation. Several of the Wastewater projects funded through System Development Charges (SDC) have had their status changed from “Funding Secured” to “Funding Identified”, or had the SDC portion of the project funding reduced, due to a projected shortfall in SDC revenues. Unfunded Projects Also included in the CIP are projects totaling $103.7 million for which funding has not been identified. The CIP also contains $213.9 million in placeholder projects for which funding has not been identified and which are still in the decision process. Transportation projects continue to reflect significant need for additional funding. The CIP includes approximately $59 million of unfunded projects that would upgrade and enhance capacity and preserve and maintain existing assets, as well as build new bike paths, collectors and other improvements. The Public Buildings and Facility category contains approximately $31 million in unfunded projects. The Parks and Open Space category has $13.6 million in unfunded projects. CIP Development and Review During the summer and early fall of even-numbered years staff compiles the Draft CIP using input and requests from a variety of sources, including neighborhood groups, individual citizens, adopted plans and policies, etc. The draft CIP document was made available on the City’s web site in early December of 2008. On December 12, 2008, information about the draft FY 2010-15 CIP, capital projects specific to particular Z:\CMO\2009 Council Agendas\M090223\S0902235.doc neighborhoods, and the information on opportunities for providing public input on the draft CIP was mailed to all of the neighborhood association chairs and co-chairs, as well as the representatives of the Neighborhood Leaders Council (NLC). A hyperlink to the draft CIP document on the City’s website was sent to the neighborhood association leaders and NLC representatives during the week of December th 15. Neighborhood specific articles have been sent to each neighborhood newsletter editor with the request that they be included in their December-February editions. Printed copies of the draft FY 2010-15 CIP were sent to the members of the Budget Committee, neighborhood leaders, NLC representatives and other community stakeholders on January 8, 2009. They were also distributed to City libraries, and community and senior centers. On January 28, 2009, the Budget Committee reviewed and discussed the draft CIP. The Budget Committee approved a motion to recommend that the council adopt the Draft CIP with several staff- recommended amendments as described in Attachment A. A notice about the February 17, 2009, City Council Public Hearing on the CIP was sent via e-mail to all of the neighborhood association chairs and co-chairs, representatives of the Neighborhood Leaders Council (NLC), and citizens on the Budget Interested Parties e-mail group. On February 17, 2009, the City Council held a public hearing on the CIP. The City Council received public comments from three citizens regarding the draft FY 2010-15 CIP as summarized below: ? John Barofsky, Chairman of the City of Eugene Budget Committee, commented on the importance of adequate funding for the preservation of existing buildings and facilities through proactive repairs and maintenance. He also suggested that the annual year-end transfer of $900,000 from the General Fund to the General Capital Projects Fund should be a part of the adopted budget and not handled via a supplemental budget process. ? Mary Ann Holser, member of the City of Eugene Budget Committee, commented on the need to preserve the existing City Hall and retrofit it for seismic safety, and on the proposed Police Patrol Facility. ? Zachary Vishanoff seconded the comments made by the first two speakers. RELATED CITY POLICIES The City’s Financial Management Policies include a goal to have a capital improvement program that adequately maintains and enhances the public’s assets over their useful life. In part, the policies state that the City will plan for capital improvements over a multi-year period and the projects will directly relate to the long-range plans and policies of the City. COUNCIL OPTIONS There are two options, should the council choose to take action on this item at this time. 1. The council may choose to adopt the FY10-FY15 CIP incorporating the recommendations of the Budget Committee and City staff. 2. The council may choose to further amend the CIP by identifying changes in the projects and funding sources and subsequently adopt the FY10-FY15 CIP. Z:\CMO\2009 Council Agendas\M090223\S0902235.doc CITY MANAGER’S RECOMMENDATION The City Manager recommends that the council adopt the FY10-FY15 CIP including the recommended amendments of the Budget Committee and staff. SUGGESTED MOTION Move to adopt the FY10-FY15 Capital Improvement Program incorporating the recommendations forwarded by the Budget Committee and staff. ATTACHMENTS A. Staff recommended changes to the CIP FOR MORE INFORMATION Staff Contact: Pavel Gubanikhin Telephone: 682-5021 Staff E-Mail: pavel.e.gubanikhin@ci.eugene.or.us Z:\CMO\2009 Council Agendas\M090223\S0902235.doc ATTACHMENT A Staff Recommended Changes Staff has compiled a list of recommended changes to the Draft FY 2010-15 CIP. These changes were approved by the City of Eugene Budget Committee on January 28, 2009. Section/Project Title Page Draft FY10- FY15 CIP Changes Debt Capacity - Overview p. 27 Change the first sentence of the second paragraph to read “The City has used only about 6% of its more than $678 million of legal debt capacity for general obligation bonds as of June 30, 2008.” Debt Capacity - Overview p. 27 Change net direct debt as a percentage of real market value (row 1 of the Debt Affordability Ratios table) from 0.2% to 0.25%. Debt Capacity - Overview p. 27 Change percent of net direct debt retired within 10 years (row 2 of the Debt Affordability Ratios table) from 84% to 90%. Debt Capacity - Overview p. 27 Change annual debt service on all General Fund- backed debt as a percent of General Fund expenditures (row 3 of the Debt Affordability Ratios table) from 2.9% to 2.8%. Debt Capacity – Projected p. 28 Change the first sentence of the first paragraph to Debt Burden read “As of June 30, 2009, there will be about $165 million of additional capacity for debt issuance within the policy limits.” Financial Summaries Table of p. 29 Change page footer to read “City of Eugene 2010- Contents 2015 Capital Improvement Program”. Airport Table of Contents p. 61 Change page footer to read “City of Eugene 2010- 2015 Capital Improvement Program”. Neighborhood and p. 98 Change the Parks SDC portion of the project funding Community Park Acquisition as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $360 $330 $730 $735 $0 $0 $2,155 Ferndale Park Development p. 99 Change the Parks SDC funding for this project as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $0 $0 $438 $438 Z:\CMO\2009 Council Agendas\M090223\S0902235.doc Section/Project Title Page Draft FY10- FY15 CIP Changes Royal/Danebo Park p. 100 Change project status from “Funding Secured” to Development (Grasshopper “Funding Identified”. Meadow) Alton Baker Irrigation System p. 102 Change the Parks SDC funding for this project as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $212 $0 $0 $0 $0 $212 Alton Baker Park Renovations p. 103 Change the Parks SDC funding for this project as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $213 $0 $0 $213 Park Lighting Renovations p. 104 Change the Parks SDC funding for this project as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $213 $0 $0 $0 $213 PROS Priority 1 p. 106 Change the Parks SDC funding for this project as Neighborhood Park follows ($ in thousands): Renovations 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $0 $0 $192 $192 PROS Priority 1 Play Area p. 107 Change the Parks SDC funding for this project as Renovations follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $0 $192 $0 $192 Eugene Depot Phase 3 p. 159 Change the first sentence of the Project Description paragraph to read “The Depot Phase 3 project of $2.8 million is the City of Eugene’s portion of an estimated $17.3 million project to provide a layover facility for Amtrak trains”. Echo Hollow/Sheldon Pool p. 163 Change picture captioning from “Having fun in the Systems Preservation pool!” to “Echo Hollow Pool Deck”. Z:\CMO\2009 Council Agendas\M090223\S0902235.doc Section/Project Title Page Draft FY10- FY15 CIP Changes Streambank and Outfall p. 182 Change the Stormwater SDC portion of the project Stabilization funding as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $0 $0 $0 $0 Services for New p. 187 Change project status from “Funding Secured” to Development - Stormwater “Funding Identified”. Street Lighting (Arterials & p. 196 Change project status from “Funding Secured” to Collectors) “Funding Identified”. Traffic Operations p. 197 Change project status from “Funding Secured” to Improvement Program “Funding Identified”. Traffic Signal Improvements p. 198 Change project status from “Funding Secured” to and Upgrades “Funding Identified”. Pavement Preservation p. 200 Change the Transportation SDC portion of the project Program funding as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $530 $510 $500 $500 $500 $550 $3,090 Pavement Preservation p. 201 Change project status from “Funding Identified” to Program – Funding for Project “Funding Secured”. Backlog Services for New p. 203 Change the Transportation SDC portion of the project Development - Transportation funding as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $0 $0 $0 $0 $0 $0 $0 Bailey Hill Road, 450’ South p. 202 Change project name to “Bailey Hill Road, South of of Warren to 1,100’ South of Warren to South of Bertelsen, Prelim. Design.” Bertelsen Change project category from “Upgrades and Capacity Enhancement” to “Upgrade to City Standards”. Wastewater Table of Contents p. 219 Change page footer to read “City of Eugene 2010- 2015 Capital Improvement Program”. Z:\CMO\2009 Council Agendas\M090223\S0902235.doc Section/Project Title Page Draft FY10- FY15 CIP Changes Wastewater Services for New p. 223 Change the Wastewater SDC portion of the project Development funding as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $50 $70 $65 $60 $45 $45 $335 Wastewater System p. 226 Change the Wastewater SDC portion of the project Rehabilitation funding as follows ($ in thousands): 2010 2011 2012 2013 2014 2015 Total $30 $300 $270 $230 $300 $300 $1,430 Z:\CMO\2009 Council Agendas\M090223\S0902235.doc