HomeMy WebLinkAboutOrdinance No. 195840
ORDINANCE No.
AN ORDINANCE ADOPTING AMENDMENTS To THE
EUGENE-SPRINGFIELD METROPOLITAN AREA
TRANSPORTATION PLAN; AND PROVIDING AN
EFFECTIVE DATE.
The City Council of the City of Eugene finds that:
1. The Eugene-Springfield Metropolitan Area Transportation
Plan ~TransPlan} was adopted by the Eugene City Council on April
28, 198 by Eugene ordinance No. 19385, and in accordance with
the proviscions contained therein, subsequently endorsed on ~'ul
Y
27, 1987 by Resolution No. 4049.
2. The TransPlan is the basis for guiding surface
transportation improvements in the metropolitan area and should
accurately reflect current regulations and review procedures,
anticipated improvements projects, and include an amendment
process.
3. Amendments to the TransPlan have been prepared to
accomplish these objectives.
4. The Planning Commission held a public hearing on the
proposed amendments to the TransPlan on November 15, 1988 and
recommended tv the Council that they be adopted.
5. Based on the recommendation of the Planning Commission,
the evidence and testimony presently in the record, and the
evidence and testimony presented at the hearings before the
Planning Commission and Council, it appears that it would be in
the public interest and in conformity with adopted plans and
policies to adapt the proposed amendments to the TransPlan. Now
r
therefore,
THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS:
Section 1. Based on the above findings, which are adopted
herein, the amendments to the Eugene-Springfield Metropolitan
Area Transportation Plan ~TransPlan} set forth in Exhibit A
attached hereto and incorporated herein by reference, are hereby
adapted.
Section z. If any section, subsection, sentence, clause,
phrase or portion of the amendments adopted by this Ordinance is
for any reason held invalid or unconstitutional by any court of
competent jurisdiction, such portion shall be deemed a separate,
distinct and Independent provision and such holding shall not
affect the validity of the remaining portions thereof.
Section 3. That the matters contained herein concern the
Ordinance - 1 v
public welfare and safety, and an emergency is hereby declared to
exist, and this ordinance shall become effective immediately upon
its, passage by the City Council, approval by the Mayor, and
ratification by the Lane Council of Governments Board.
Passed by the City Council this
d y of November, 19SS
M
Ci Record
Approved by the Mayor this
day o Novembe , 1958
C
Ma r
ordinance - ~
PRaPDSED FY198S TRAN5PLAN AMENDMENTS
As part of the FY1988 Annual Review, amendments are proposed to four
sections of TransPlan:
- Element III. Goals, Gbjectives and Policies
- E1 ement IV. Street and Highway
'- E] ement V. Bicycle ~~
~- Appendix C. Annual Plan Endorsement
The amendments are specified in detail in the following pages. The
Transpartation Planning Committee developed these amendments based upon
the requests of Eugene and Springfield.
The proposed amendments to the Goals, Objectives and Policy Element and
Appendix C Annual Plan Endorsement are designed to discontinue the annual
endorsement process and to simplify the amendment process. Federal
regulations no longer require an annual endorsement of an area's long-
range plan. Action by any of the agencies which originally adapted the
plan will be required only at such time as the plan is amended. The
modifications proposed to Appendix C provide for policy direction by the
Metropolitan Policy Committee, because the Metropolitan Area
Transpartation Committee has been di sso~l ved.
Another key change proposed for the amendment process i s a provi si on which
would allow a single agency to amend the street and highway project list
for projects which are found not to be regionally significant. A
streamlined amendment process for minor projects would reduce the need for
amendments to be taken to all agencies for acti an.
Amendments to the project lists for Element IV. Streets and Highways and
E1 ement 1!. Bicycles are the results of additional study and analysi s
performed during the last year. The amendments to the Street and Highway
project list include deletions, modifications and additions.
Proposed Changes to TransPlan Element Ill. Goals, Objectives and Policies
The following, describes proposed modifications to TransPlan`s Element 1 I ! .
Goals, Objectives and Policies,
This section is prepared in. legislative format; deletions are indicated b
brackets • additions are i ~ ~ Y
~ ], ndlcate by .z~alYCS.
PCl, Provide far fan annual review and endorsement process for TransPlan
which includes eonsideration of amendments a process by which
TransPlan can he amended.
. ~
Proposed Changes to TransPlan Element IV. Street and Highway
The following describes proposed modifications to TransPlan's Street and
Highway Project List.
The following project is to be deleted from the Short-Range Phase;
191. ~ -
Beverly St Extension, Harlow to Gateway;
develop Beverly St Loop Road west of
Gateway from Beverly at Harlow to Gateway
provide curbs, sidewalks and bike lanes
-~ install signal at Harl aw and at Gateway
Cost: ~625,OD0
Distance : . 50 mi .
Justification: A, LQS, ED
Jurisdiction : Spr
Discussion: This project vas originally included in TransPlan to ensure
that that there Would be adequate access to the adjacent cammerciallp
paned land should this land be developed in a piecemeal fashion. The
anticipated development of this site as a regional shop;~ing center
Gateway Mall) makes this project unnecessary since the shopping center
provides its awn internal circulation system.
The following projects are to be added to the Short~Range Phase.
125.)
Riverfront Research Park Access:
-~ extend Agate, Qnyx, Broadway, Sth and Patterson onto site
construct local and minor collector streets tv serve new research park
streets to i nc1 ude vnwstreet bicycle 1 ones, curbs, sidewalks,
1 i ghti ng and 1 andscapi ng ~ .-
-- 1 ocati an and design to follow adapted master site p1 an
Co t: X6,500,404
Justification: A, ED
Jurisdiction: Eug,QDOT
Discussion : AI though the master site plan for the Riverfront Park has not
yet been adopted, the City and 4DOT have agreed upon a conceptual design
and financing partnership far access from Franklin Boulevard and internal
streets. Four basic access points are planned; the rest of the
description is general since the final design will have to conform to the
adopted site plan. Implementation of parts of this project will occur in
both the short-range and medium range phases.
12s. ~
~entenniai Boulevard, Patterson Slough to I«5:
provide curb, gutter and sidewai ks
-add center turn ~ anes
Cost: ~~,Da4,Daa
Distance : ~ . 6 rni .
Justi f i cati an : A, S, U
Jurisdiction: Eug
Discussion : This project was apparently 1 eft off the original List due to
an oversight . The C.z t y of Eugene plans to construct it in 1989 or .1990 and
recommends that it be included zn the Short-Range Phase.
152. ~ ..
H i lya rd St at ~ 3th ;
add east bound through lane
remove parking
Cost: limited capital cost
Distance : , afi mi .
Justification; LDS, S
Juri sdi cti an : Eug
Discussion : The need far this pra ject, which Will reduce air poll utian by
improving traffic flow, Was determined through the City of Eugene's
Central Area Transportation Study.
153.)
H i lya rd St, E ~ ~ th to E 13th
- remove parking/restri pe as 3 1 anes
Cost: limited capita] Bost
Distance :.14 mi .
Justification : LQS, S
Juri sdi cti an: Eug
Discussion : The need for this pra ject, which wi11 reduce a.rr pollution by
improving traffic flow, was determined through the City of Eugene's
Central Area Transportation Study.
154.)
Pearl/Amazon Parkway, 18th to 4th :
widen to provide two southbound lanes
Cast: $I85,0~a
Distance : 0.4 mi .
Justification:LaS,D
Jurisdiction; Eug
Discussion: The need for this project rags deter~rined through the City of
Eugene's Central Area Transportation Study. It is needed to alleviate
traffic congestion at the Pearl and 18th intersection.
155.E
Lenten n is t at 10th Street:
- instal traffic signal
Cost: ~~05,DDD
Justificatian: LQS,S,D
Jurisdiction: Spr
Discussion: The intersection already meets signal warrants. .It is in the
current TIP and is being processed for FAU funding and construction in
1989.
195.E
15th Avenue at Agate Street:
- install traffic signal
Cost: ~105,ODD
Justification: LQS,S,o
Jurisdiction : Eug
Discussion: The treed for this signal was determined through the.City of
Eugene's Central Area Transportation Study.
19fi. ~ w
Hilyard, between 1~th and 13th Avenues:
- install traffic signal
Cast: $15,000
Justification: 5,Q
Jurisdiction : Eug
Discussian: The need for this signal was determined through the City of
Eugene's Central Area Transportation Study.
197. ~
11th Avenue at Kincaid Street:
-install traffic signs]
cast: ~~o~, o00
Justification: LQS,S,Q
Jurisdiction : Eug
Discussion: The need for this signal was determined thraugh the City of
Eugene's Central Area Transportation Study.
198.}
South 5th Street, Main to South B :
-widen street
-' install curbs, gutters and side~alks
Cost: X600,000
Distance: 0.2
Justification: ED,A
Jurisdiction: Spr
Discussion; This project wil,~ provide access to the Booth-Belly center.
The following project from the Medium-Range Phase is to be modified.
The modification is identified by the addition in italics.
211.)
Franklin Blvd intersections:
- ,provide additional turn ~ ones and signal
improvements an Franklin.Blvd. at:
Broadway
Patterson
Halyard
Agate
~!i 1 ~ and
Dnyx
Cost: ~~,800,000
Justification: LDS,Q
Juri sdi cti on : ODOT
Discussion: The need for the addition of Dnyx to the intersections
inc.2uded in this project was determined through the City of Eugene's
Central Area Transportation Study.
The following projects are to be added to the Medium-Range Phase.
292.) -
18th Avenue at Agate Street:
- install traffic signal
Cost: X105,000
JustifiCatlOn: LDS,S,~
Juri sdi cti an : Eug
Discussion: The need for this signal Was determined through the City of
Eugene's Central Area Transportation Study.
293.
58th Street at Thurston Road:
- install traffic signal
Cost; $105,Q00
Justification: LO5,5
Juri sdi cti an: Spr
Discussion: Continued land development in the Thurston area will
necessitate this project Within 3 to 14 years.
~..
Proposed Changes to TransPlan Element v. Bicycle Element
The following describes proposed modifications to TransPlan's Bic cle
Project List, y
The following bicycle facility project is to be deleted:
Project 7'52
Beverly Street, Harlow to Postal way; striped lanes on street
Discussion: This project Was originally included irr TransPlan to ensure
that that there would be adequate bicycle access to the adjacent
cvmmerczally zoned Land should this land be developed in a piecemeal
fashion. The anticipated development of this site as a regional shopping
center (Gateway Mall} makes this project unnecessary since the shoppia
center provides an internal circulations stem, g
Y
Proposed Changes to TransPlan Appendix C
The following describes proposed modifications to TransPlan's Appendix
C; Annual Plan Endorsement, which would be renamed "Plan
Amendments,"
This section is prepared in legislative format; deletions are indicated by
brackets [ ]; additions are indicate by italics.
[iNITIATiON OF ENDORSEMENT PROCEEDINGS
[The TransPlan Annual Review shall initiate the Plan amendment and
endorsement process. The Lane Council of Governments' ~L-~COG}
Transportation Planning Committee TPC} sha11 prepare the Annual Review
before the end of the 1 ocal f i sca] year. The Annual Review wi 11 include a
review of all relevant transportation issues and their impact on the Plan;
progress on attar n~ ng the Plan ` s goals, including, but not 1 i mi ted to, the
transit ri dershi p goal ; areas of 1 ocal poi i cy conf 1 i ct with the P1 an;
recommendations on any amendments proposed as part of the Annual Review;
and a request far endorsement of the Plan as amended. ~
PLAN AMENDMENT
Submitting Plan Amendments
[Plan amendments will be processed at the time of the Annual Review.
. ~
Amendments may be c~ t~ zen-~~ n~ ti aced or may be proposed by 1 ocal governi n
bodies (Eu ene S rin field and g
g p g Lane County) , Lane Tran s~ t D~ str~ ct
LTD}, the Oregon Department of Transportation (GDGT} or their desi nees.
g
A citizen-initiated amendment shoal d be f i 1 ed with the planning or publ i c
works staff of the city whose incorporated area would be affected, or. with
County planning or public works staff for amendments that lie outside
incorporated areas. A proposed text change that has na apparent
geographical area impact can be filed with any of the three planning or
public works departments.
Plan amendments will be accepted at any time but wi]1 be processed at
least once annually [during the Annual Review, the timing of which shall
be determined by the Metropolitan [Area Transpartation~ Po~~cy Committee
[~MATC} EMPC1. The planning or public works staff of the jurisdiction
receiving the amendment will make a recommendation to TPC as to which
amendments should be processed during the [Annual Reviews current
amendment process and which should be processed during the next regularly
scheduled major Plan update.
Amendments initiated by 1 acal jurisdictions ~ Eugene, Springfield and Lane
County}, LTD ar ODDT will be submitted directly to TPC.
Screening of Amendments
TPC wit] review all proposed Plan amendments and [recommend to MATC make
. ~
a determination that they be dealt with ether during the current [Annual
Reviews amendment process or that they be delayed until the next ma 'or
a
Plan update.
TPC shall [recommend to MATCH determine that a proposed amendment be
delayed until the next major Plan update if:
~. The proposal involves a change to one or more of the Key Assumptions
of the Plan as specified i n Sect? on I Y of TransPl an, yr i f
2. The proposal is of insufficient importance to divert budgeted
planning resources from other scheduled activities, ar i f
3. The proposal is premature for consideration because of other related
Plan studies i n progress.
TPC shall refer all proposed amendments and its recommendations tv MATC~.~
~MATC shall review the recommendations of TPC and determine which of the
proposed amendments will be considered as part of the Annual Review and
which wi 11 be delayed unti 1 the next ma jar Plan update . ~
For those amendments wh.zch TPC determines should be considered during the
current amendment process, TPC sha11 further determine whether the
amendment is..af regional significance ar of non-regional significance.
Amendments proposed to Element I1'I. Gaa1s, Cbjectives and Policies
Element are presumed to be of regional significance. Amendments proposed
to other elements of TransPlan, including the project lfists in EI ernent IV .
Street and Kighway Element; Element ~, Bicycle Element; and VI. Transit
Element may be determined to be either non-regional or regionally
significant,
A determination by TPC that consideration of an amendment be delayed until
the next major plan update may be appealed by any of the adopting
jurisdictions or by the applicant who proposed the plan amendment.
Likewise, a determination by TPC that a project is regionally significant
or non-regionally significant may be appealed to MPC.
Review of Pro osed Amendments
TPC shall prepare background information and supporting materials for
each of the amendments preferred to it by MATC for consideration. TPC
shall also make recommendations on all proposed Plan amendments being
considered. TPC's recommendation for action on non-regionally
significant amendments shall be made to the governing body under whose
jurisdiction it falls. TPC's recommendation far action on regionally
significant amendments shall be made to Eugene, Springfield, Lane County,
LTD and OD4T .
The Metropolitan Area Planning Advisory Committee ~MAPAC~ may review
proposed amendments that MATC] TPC has determined should be considered.
MAPAC shall forward any recommendations on proposed Plan amendments to TPC
within 30 days of MATC's~ TPC's actions. TPC will consider MAPAC's
recommendations when preparing [the Annual Reviews its recommendations
for action on proposed plan amendments. Additional opportunities for
citizen review will occur during the public hearings phase of the Annual
Revi ewe the amendment process,
[ANNUAL REVIEW AND ENDORSEMENT]At1ENDttENT PROCEDURES
[Release~of Annual Review]
[MATC shall receive the Annual Review hand amendments from TPC and
}
authors ~e its release, as .appropriate, to 1 ocal jurisdictions LTD and
ODOT. MATC's referal of the Annual Review shall include a recommendation
far adoption of Plan amendments and a recommendation that each a enc
endorse the P1 an as amended, g y
]
Far proposed amendments Which TPC has determined not to be of re Tonal
significance, adoption b the overnin bod un g
Y ~ g y der Whose jurisdiction the
amendment falls and the L-COG Board will be required. Far proposed
amendments which TPC has determined to be regionally .significant,
adoption by Eugene, Springfield, Lane County and the L-CDG Board wi11 be
required.
Public Hearings
For those proposed plan amendments for Which Its action is required,
e[E]ach local jurisdiction shall conduct public hearin s an the sub'ect of
Plan endorsement a g ~
[ nd] proposed amendments, either at the lanni
commission level the overnin bod 1 p ng
9 g y evel , or both. Local jurisdictions
have the option of establishing procedures for additional citizen
participation (such as referral to neighborhood groups} as required b
local policy. LTD and DDaT can deal it y
w h the Annual Review as each deems
appropriate. All three local jurisdictions may, but are not required to
conduct joint or simul tanevus hearings.
Planning Commission Recommendations
A joint public hearing and deliberations by the three planning commissions
are recommended, but not required far amendments which are of regional
significance. If the three planning camr~issions, through their
individual deliberations and separate actions, reach concensus on their
recommendations far the regionally significant amendments, their
recomrnendat.ions shall be submitted to their respective governing bodies
for adoption. 1'f the planning commission's recommendations differ, their
recor~mendations shall be transmitted to ~lPC. I~PC will consider the
planning comissions' recommendations and make its .own recommendation to
the governing bodies of Eugene, Springfield, and Lane County.
Consensus Endorsement and Amendment
In the event that all three local governing bodies [endorse the existin
Plan or endorse the Plan as modified g
] amend the Plan by identical
amendment, and if no abjection is raised by either LTD ar DDQT, the MATC
[
and] the L-CQG Board of Directors shall be re wired to ratif the
q Y
[endorsement hand] amendment[}] without further action b an
~ urn sd~ cti on , y y
Lack of Consensus (First Stage)1
Tf consensus to endorse] amend the Plan in identical fashion is not
reached, or if LTD or DDDT objects to the [endorsements amendment, the
~MATC~ ~iPC shall convene within 30 days of the action of the last
jurisdiction to consider the ~endarsement~ amendment. [MATC] ~fPC shat l
consider the actions taken by local jurisdictions and shall ro ose
P P
recommendations that would eliminate differences between Chase actions.
~MATC~ tlPC shall submit its recommendations to 1 ocal jurisdictions, LTD or
DDDT as appropriate, If the ~MATC~ MPC process results in substantial
modifications to the Plan as ~endorsed~ amended by any local jurisdiction,
affected ~ur~sdict~ons shall conduct new hearings before Cendorsing~
amending the Plan as modified. -
?"he L-COG Board will be required to ratify non~reginnally significant
amendments adopted by the governing body under Whose jurisdiction they
fall and the regionally significant amendments adopted by Eugene,
Springfield and Lane County. Public hearings conducted by the L~C4G Board
shall not be required since public bearings must have been conducted by at
least one agency's planning commission or govern.zng body.
[Lack of Consensus (Second Stage)1
~If consensus to endorse the Plan in an identical fashion is still Hat
reached as described in the first stage, Lack of Consensus step, the
P1 anni ng and Public Forks Directors sha11 schedul e a joint meeti n of
elected officials from Eu ene S i g
g pr ngf~eld and Lane County for the purpose
of discussing the endorsement. LTD and DDQT may participate, if
appropriate, ~f LTD or DDDT is involved, the LTD Board and the Dregan
Transportation Commission or their designees shall participate in the
joint meetings. ~f resolution on the differences is reached, the Plan
sha11 be forwarded to MATC and the L-CDG Board for rati f i cati an . ~ ?.
jLack of Consensus (Third Stage)~
~If consensus to endorse the Plan in an identical fashion is Hat resolved
through joint meetings, the matter wi 11 be referred to the LwCDG Board.
The L-CDG Board shall endorse the Plan plus only those amendments that
have been adopted i n i denti ca 1 fashion by all three 1 oval jurisdictions .
This will insure that federal transportation fundin remains
g
uninterr~rpted.~ A recommendation from MATC for ~no endorsement could
jeopardize cvnti Hued federal and state transportation funding.
c 1 j rta r
GUIDELINES FAR PRC?JECT DETERMINATION
Guidance is provided in Appendix C to determine whether ro
p posa ~ s for
modification of TransPlan are appropriate for the amendment ro
sha 11 be de 1 ayed unti 1 the next ma 'or P cess or
~ update. The following provides
guidance as to the regional or non-regional significance of amendment
The regional ar non--reg~onal si nificance is s~
9 the factor which determines
which agencies are required to adopt the proposed amendments.
When making its determination on the regional si nifi
g cance of an
amendment, the Transportation Planning Committee will use the foil '
awing
as guidelines:
Pra used Amendments of Re Tonal Si nificance
Amendments in the following categories are presumed to have an im
pact on
more than one agency. Therefore, i t i s appropriate far al ~ a enci es which
originally adopted TransPlan to revi g
ew and formally adopt amendments with
the following characteristics,
- Modifications of Element III -Goals, Qbjectives and Policies.
- Modifications of Element VII -Parking.
- Modifications of Element UI I I - Air Quality.
- Madi fication of Appendi x C -Plan Amendment Process.
- Modifications of the project list in Element IV - Streets and
Highways, which propose the addition or deletion of rojects of the
P
following types:
- limited access highways or additional interchanges an existin
1 imi ted access foci 1 i ~i es ~ ~' ' g
- principal or minor arterial streets on new alignments;
- existing streets where the proposed facility is or will be
greater than three 1 apes;
- i ntersecti on improvements which require major channel i zati on or
turn 1 apes on more than two legs of the .intersection .
Modifications of the project list in Element U - Bicycles which
propose the addition or deletion of projects which are independent
paths or an-street ]ones for ar P
teri al streets.
- Modifications of E] ement VI -Transit, consisting of the addition or
deletion of major or minor transit stations.
Proposed Amendments Not of Regional 5i nificance
- Modi f i Kati on s .to Element IV -Streets and Highways, wh~i ch ro ose the
addition ar deletion vf: P P
- traffic signals or the addition of individual turn lanes an one
or two 1 cgs of an intersection;
- existing streets where the proposed foci 1 i ty i s or wi 11 be three
or fewer lanes;
- new co 11 ector streets with three or fewer 1 one s .
- Modifications to Element V - Bicycles, which propose the addition or
deletion of on-street lanes on collector streets or desi Hated
routes, 9
- Modifications to Element v~ - Transit, which pro ose non-
P
construction acts vi ti es .
~
TransP~an amendment Process
Citizen Initiated
Plan Amendment
E, 5, LC Planning '
or Public Works
Agency Initiated
Plan Amendment
TPC Makes Determination
of Timing and Significance
~ TPG Decision to Delay
until next major update
~ Process Ends I
MPC
~ TPC Decision to Consider
This Year as Regionally
Significant Amendment
TPG Analyzes and Makes
Recommendation to
E, S, LG, LTD, DDOT
Each PC Conducts Hearing
Joint Hearing Recommended}
Recommends Adoption
Develops Na PC Consensus ?
Recommendation
Yes
Agency Elected
D#fic':als Adopt Plan
Amendments
MPC ,_,_,
Develops ~ Agency Consensus ?
Recommendation
Yes
Elected D#f icials L.DDG Board
Reconsiders and Ado is Amendment
adopts Amendments p
~ TPC Decision to Consider
this Year as Non-Regional
Amendment
MAPAC TPC Analyzes and Makes
Review Recommendation to the
Agency with Jurisdiction
Agency PC Conducts
Hearing, Recommends
Adoption
Agency Elected Officials
Adepts Amendmeni
L-GDG Soard
Adapts Amendment
~ May be Appealed .
to MPC