Loading...
HomeMy WebLinkAboutOrdinance No. 19068.,-. _. i ORDI'~ANCE ND. y, ~ r r AN ORDINANCE LEVYING ASSESSI~iENTS FORpaVing and S1deWalk On NOrkenZie Road from Beltline Raad to 125 feet north of Balboa Sheet in the City of Eugene, Lane County, Oregon. RECITALS: ' The City Council of the City of Eugene did by Resolution No. 3 5 ~ ~ adopted EeY $ , 19~, determine to have street and construct sidewalk on P~orkenzi e Raad from Bel tl ~ ne Raad to 125 feet north of Balboa Street r The City Council authorized the execution of a contract for the construction of the lgcal improvements .. an May 24 ~ .. ,_,_.__,._,__~~ 19 82 The estimated cost thereof is ascertained, and the amount to be assessed in accordance with applicable provi sions of the Eugene City Code has been determined to be: ~~ Item 1. Contract Amount Contract # $~~06 ~ $ 132,303. $4 (including contingency: Contract #~ Item P. Maintenance Retainage Item 3. Other Costs (Describe) E,4~,E,B, ~ 1,]38.34 Item 4. Deferred Assessments Type) $ Item 5. Amount of Remaining Warrants Issued to Complete Contract Item. 6r Total Amount for Contract # 82-06 ~ $ 134,042,1$ Item 7.~ ~ Less - City's Share of Cost far Completed Contract -]0,]05, 30 Item ~ ~ P1 us - a. Due to GENERAL FUND far Liquidated Damages Item ~J. Amount to Which City Charges are applied ~ 53,335.$$ ' Item 1O. Pius - Unpaid Balance of City`s Share (See Item 24 Below) ] 0;] 0 5.3 0 l;~em 11. Less - Liquidated Damages F~cem 72. Less -Other Casts (Describe) E,)~,E,B, - 1,]38.34 Item 13. Plus - Overpayment to Contractor by Warrant Item 14. ASSESSMENT WORK IN PROCESS. 132,303.84 Item 15. Plus - Overpayment to Contractor in Cash Item 16. Plus - 15% City Charge for Engineering ~ $ 9,500.53 Plus - 5% City Charge for Internal Service 3,155.85 P] us -Warrant Interest Cha"rge ~ 3 ,155.85 TOTAL CITY CHARGE ~ ~ ~ 3 15 , $34. ~ 3 16a. DUE TO WARRANT REDEMPTION FUND Item ll. Plus DUE TO SEbJER UTILITY for 1/Z~ SPECIAL SE4JER LEVY Item 18. P1 us - DUE TO SEWER UTILITY for Lateral Sewer Equavalent of Trunk Sewer System Item 19. Plus - DUE TO WARRANT REDEMPTION FUND for Engineering 10,605. ]9 Charges on City's Share of Costs Item 20. Plus -"Other Costs (Describe) E,W,E.B. 1,]38.34 Item 21. Plus - Liquidated Damages Item Z?.. Less - DUE FROM CONTRACTOR far Overpayment Item 23. A`~SESSMENT RECEIVABLE - Total Assessments per Ordinance 150 482.20 Item 24, Cit 's Share of Cost for Com leted Contract: Account Contract No, Engr. Cost TOTAL .5 25 423.81 30 387.38 331-933 -6 39-906244 5 642.22 44 2$1,48 50,923.]1 TOTAL: $ 10,505,79 70,705..30 81,311. ORDINANCE - 1 P.W.£NGR.ADM. D1D 10182 • f ~ ~ .. I // ~...., 7 1906 ' The City Council has established the method of calculating local improvement assessments in Sections 7.170 through 7:i80 of the Eugene City Code; and Notice of the proposed assessment to the owners and reputed owners of the hereinafter designated parcel s.af real property has been heretofore duly and regularly given in compliance with the provisions of Chapter 7 of the Eugene City Cade, and the City Council has heard any and all protests, objections and remonstrances thereto and has fully considered them. THE CITY- OF E1IGENE DOES ORDAIN AS FOl.~.OWS: Section 1. That the esti:~ate.d east o~ paving and sidewalk an Norkenzie Raad from Beltline Raad to 125 feet north of Balboa Street in the City of Eugene, is the sum of ~ 160,482.2Q , aforesaid, which is by this ordinance assessed against the parcels of property hereinafter described in the amounts set opposite, respectively. Section 2. That the City Council of the City of Eugene, Oregon, does hereby determine and assess each lot and part of lot being in Eugene, Lane County, Oregon, to-wit: Ordinance - ~ f' ~. ~' ~ y H ~ ' H I F i• ~ ~ F ~ rt v' tD ~ ~ } ~ by ~ ~ O ~ I ~` v' w w Ov tc p a I `~ awe ~ ~ x Q' I ~ , o ~ ~ rt ~ H 0 w Q N I I h • H ~ ~ 0 I a~ rt ~ I w moo w b I rt ~ ~' ~ I V ~ a w ~ rt b H ~ ~ ~ I `~ pn~ w o a rt ff` I I ~ ~ a o ~ °` ~ ~' ~~ ~ ~ ~ "~~ ~ r I ~ n ~ a o rt n °° ~ I , o~ rt ~ H 1 a O x rt Q. ~ • ~ ~ I w ~ ~ N n ~ ~ ~' ~ N p z ' 4 ~ ~~~ I ~ ~ ~ n p ~ p. rt w ~~ ~ ~ ~ ~* ~ N ! C~i ~ rwr o ~ rt ~ d ! ~a rt 9Q ~ ~ o n I ~ ~ , ova o rt I Hn w. M ~ a. con ~ p ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o N w ~ ~ 0 ~ I ~ ~ ~ W ~ ~ I Q+ rt 0 ~ I d ~ ~v ~ ~ ~r 0 ~ ~ } ~ ~ UO fD h ~ ~' H no I h w~a o p . ~ 1 t O rt W ~ ~ ~ M ~ ~ V I ~ n ~ rt rc~rt rtd • r~ f-- ~ o m w b o+ ~ o ~ ~ I ~ v o ~ ~ ~ N I : ~ ~ w ' a ~ ~ N M N~ ~ t'' I N ~ ~ ~., tz ~ .. n r ~ ~ I ~o ~ ~, a N 1 n~ wt t ro I o~ r ~ ~ a a I N ~ I b M ( ~ T1 ~ I A+ µ ,'~ ~ I ~ ~ a fD W I °w o o ~~ ~ n I n I ~ ~ I o ~ ~ ~ f'' I ~' ~ 0 R~ 4 I ~ ~ y 1 ~ ~ I ~, r w 0 I ro rt ~ I ~ ~ 0 ~ I ~, a i a I Section 3. That the City Counci 1 of .the Ci t~ Hof Eugene does .; ry hereby determine that each parcel of land ar lot hereinbefore describ ed is specifically benefitted to the extent of the assessment herAinbefore set forth, and does hereby declare each and all of said assessments to be liens upon the respective lots, parts of lots or arcels of land p against which said several amounts are assessed, and orders and directs the ~~~nance officer . ~ to enter i n the docket of City Liens , a statement thereof containing the following: First: A description of each lot, part of lot ar acreage properly liable for such improvement. - Second; The name of the owner or reputed owner thereof, or that the name of the owner is unknown. . `f hi rd: The sum assessed upon said property and the date of entering the same in the said docket of city Liens. Sectian.,~4~ That these~pravisions concern the public welfare because of the necessity.to promptly record and ascertain the amount of each assessment and the lien arising therefrom, and the need to promptly notify affected property owners, and therefore an emergency is hereby declared to exist, and this ordinance shall become effective immediately . upon its passage by the Council and approval by the Mayor. Passe by t e Council on -~i i.`y ecor er Ord? Hance - 3 P.W.ENGR.ADM. 073 Final Assessment Roll not attached; it is on file and available by written request to the Eugene City Recorc}er's . Office.