ISSUE STATEMENT
The purpose of this work session is to establish policy direction for using a portion of the Facility
Reserve for acquisition of a Police Facility, and to establish policy direction for next steps in
addressing the deficiencies of the existing Eugene City Hall.
BACKGROUND
At the February 11, 2009, work session, the council unanimously passed a four-part motion
seeking additional analysis and information related to a potential Police Facility and next steps
on City Hall. Following is a recap of each of the four council directives followed by a summary
of the information subsequently gathered by staff. See Attachment A for a summary of project
costs related to City Hall upgrades and Police Facility options on City-owned sites.
1.Develop a conceptual plan and estimate for (a) making seismic upgrades to City Hall to meet
the life safety standard, and (b) expanding Municipal Court’s space to meet the court’s needs
a.Several options were studied as possible upgrade strategies including steel-braced frames,
concrete shear walls, steel moment frames, and energy dissipating damping devices.
Concrete shear walls appeared to be the most appropriate solution because they are cost-
effective, they would be compatible with the existing concrete materials and construction
at City Hall, and they have excellent strength and stiffness properties proportional to their
length. See Attachment B for a more complete conceptual seismic upgrade narrative.
The estimated total project cost for a seismic upgrade to meet the life safety standard at
City Hall is approximately $6.0 million.
b.An expansion of Municipal Court space to meet its short-term needs (approximately five
years) could be accomplished by moving Human Resources to a new location and
remodeling the vacated space to create a third courtroom and adjacent attorney/client
meeting rooms. The existing conference room could be utilized as an additional jury
room when needed. The estimated total project cost for such a remodel is approximately
$1 million, not including relocation costs associated with moving Human Resources.
2.Complete an analysis of potential sites owned by the City but limited to downtown, to
determine the most suitable site for a Police Facility and return to the council with a final
recommendation on that location
th
The analysis of potential sites was limited to the half-block south of City Hall across 8
Avenue, and the former Agripac cannery site to the east of the Federal Courthouse.
Z:\CMO\2009 Council Agendas\M090422\S090422A.doc
Although the cannery site is actually owned by the Urban Renewal Agency, it was
considered essentially a City-owned site for purposes of this analysis since the council has
decision-making authority over the site acting as the board of the URA. The only other City-
owned downtown site potentially suitable for a Police Facility is the former Sears site. But
since this site is part of an active development proposal, it was not included for analysis with
the other two sites.
As shown on the diagrams in Attachment C, a phased Police Facility could be accommodated
on both the south of City Hall site and the cannery site. The south of City Hall site has the
advantage of being closer to City Hall while the cannery site has the advantage of being a
larger site which offers more flexibility in layout and better vehicular access to surrounding
streets. A Police Facility on the cannery site would probably be less disruptive to adjacent
uses than on the south of City Hall site.
3.Develop a cost estimate for a phased Police Facility, rather than a Patrol Facility, with the
first phase consisting of space for the patrol function – but designed so that it can be
expanded into a building for the entire police department
The estimated total project costs for a phased Police Facility are very similar for both the
south of City Hall site and the cannery site, and the Phase 1 costs for patrol are consistent
with previous estimates presented to the council. The estimated Phase 1 project costs range
from approximately $15.8 million for the cannery site to approximately $17.0 million for the
south of City Hall site. The Phase 2 expansion costs to accommodate the rest of the police
functions from City Hall range from an estimated project cost of $17.3 million for the south
of City Hall site to $18.7 million for the cannery site. The estimated total project cost for the
completed Police Facility in today’s dollars is a little under $34.5 million at either site. The
actual cost would likely be much higher factoring in construction cost escalation between the
construction of the two project phases.
4.Investigate the willingness of EWEB to eventually sell its administration building to the City
for use as a city hall, and if there is such a willingness, undertake and bring back to council
a preliminary analysis of the pros and cons of using that building for city hall
EWEB’s current position can be characterized as being willing to sell their administration
building and associated parking for fair market value. Staff has a significant degree of
interest in the potential opportunity of the EWEB facility as a future city hall, and will
continue to be in ongoing dialogue with EWEB about the long-term financial and operational
possibilities inherent in this site. The EWEB facility would not be available for 5-7 years.
Given this time horizon, staff believes it is in the community’s best interests for EWEB to
continue the current master planning process so that all parties will have a clear and full
understanding of the property’s potential.
Consolidated Police Facility Option
Subsequent to the February 11, work session, City staff were contacted about an available
property located at 300 Country Club Road with potential suitability as a consolidated Police
Facility. Further investigation revealed that the property consists of a 66,000 square foot two-
story building with 70-75 secure covered parking spaces below and over 250 on-grade parking
Z:\CMO\2009 Council Agendas\M090422\S090422A.doc
spaces, all situated on a four-acre site. The property meets current space and parking
requirements for all police functions currently housed at City Hall and has future expansion
capabilities that would allow at least a doubling of current building area under existing planning
and zoning regulations.
The building was constructed in 1982 to house Pacific Northwest Bell, the precursor to what is
now Qwest. Because the building was designed to accommodate an emergency call center, it
was built to a higher seismic standard than was required by code at the time. A recent seismic
analysis performed by a licensed structural engineer determined that the building can be
upgraded to meet essential facility seismic requirements for approximately $500,000 in total
project costs. In addition, the building has a largely open floor plan with a multi-zone variable
air volume HVAC system making it relatively easy to remodel for use as a Police Facility.
Acquisition of the property plus remodeling and seismic upgrades to meet police requirements is
estimated to not exceed $16 million in total project costs. Facility Reserve funds could be used
for this purpose. Based on current costs at City Hall, ongoing annual operations, maintenance,
and utility costs for a Police Facility in this larger building would be approximately $876,000 in
2009 dollars, an increase of $368,000 over current police O&M costs at City Hall. However, the
building at 300 Country Club Road was upgraded in 1997-98 to be much more energy-efficient
than the current state of City Hall so utility costs on a per-square-foot basis should be reduced
significantly.
Next Steps for City Hall
If all police functions currently in City Hall were to move to a consolidated Police Facility on
Country Club Road, relocating the remaining City Hall functions becomes a viable option. One
way to accomplish this is for the City to leverage our interests in the Beam Development—and
possibly the WG Development as well—to move remaining existing functions in City Hall to
leased space in one or both of these developments. In the Purchase and Sale Agreement between
Beam Development and the Urban Renewal Agency, the City committed to lease up to 50,000
square feet in the building to be constructed on the vacant parcel adjacent to the Centre Court
building. The City's commitment is subject to Beam's demonstrating that they have used their
best efforts to secure tenants for the new building.
The remaining $6+ million in the Facility Reserve could be used to “buy down” the City’s cost
of occupancy. This could allow the City to control the ongoing costs of occupancy while
avoiding the tens of millions of dollars in capital costs that would be needed over the next 5-10
years to refurbish and update City Hall for continued use.
In this option, we would want to assure that any buildings occupied by City functions have a
civic presence appropriate to municipal government buildings. A downtown public safety
station could also be included in order to maintain a police presence downtown. Relocating City
Hall functions to these developments would help create a municipal government district focused
th
between the Beam Development at Broadway and Willamette and the Library at 10 and
Charnelton. This would be an improvement over the current dispersion of City offices that
stretches from the Library to City Hall.
Z:\CMO\2009 Council Agendas\M090422\S090422A.doc
Options need to be assessed for the existing City Hall, but the site should be retained either as the
future home of a new consolidated City Hall or as a valuable site for future development. In
addition, the option should be retained to move some City offices to the EWEB administration
building at some future date when EWEB is ready to consolidate all operations on its west
Eugene site.
RELATED CITY POLICIES
Addressing the deficiencies of the existing City Hall and providing safe, adequate space for the
Police Department relates to the council values of effective, accountable municipal government,
a safe community, and sustainable development. The council has maintained a continuing goal
to adopt an implementation plan for resolving the issues related to City Hall and a police facility.
The City Hall Complex Action Plan identified key issues that must be addressed as work toward
the goal progresses.
COUNCIL OPTIONS
The following best outcomes are repeated from the memo to the Mayor and the council for the
February 11 work session.
?
Best Outcome: a police facility located downtown that meets essential service seismic
requirements
Although 300 Country Club Road is not immediately downtown, it is less than 5 minutes
from downtown via the Ferry Street bridge and would allow consolidation of all police
functions in safe, adequate space for the same or lower cost than a new Patrol Facility. A
downtown police presence would be maintained with a downtown public safety station as
well as regular patrols.
?
Best Outcome: appropriate space for the Municipal Court
Options for Municipal Court include space in the Beam Development, the WG Development,
or even the Atrium Building if the Permit & Information Center were moved to the Beam
Development. All options would be studied and the most appropriate location selected.
?
Best Outcome: new construction that reflects council’s goal for sustainable buildings and
services
Could readily be accomplished through our involvement in the downtown developments as
well as in the remodeling of 300 Country Club Road.
?
Best Outcome: enhanced customer service for the public
Would be accomplished for police by placing them in a safe, adequate building that has ready
access to major transportation routes. Would also be accomplished through creation of a
municipal government district between the Beam Development and the Library that would
reduce some of the current dispersion of City services.
Council Options
1.The council can choose to dedicate up to $16 million of the Facility Reserve for the
acquisition and remodeling of an appropriate building to serve as a consolidated Police
Z:\CMO\2009 Council Agendas\M090422\S090422A.doc
Facility. To this end, the council can direct that negotiations with the owners of 300 Country
Club Road should commence as soon as possible. The council can also direct that up to $6
million in Facility Reserve funds be used for relocation of the remaining functions at City
Hall—along with any with other functions currently in leased space—to space in the Beam
Development, the WG Development, and/or City-owned facilities (e.g. the Atrium).
2.Relocate Police Patrol Division to a new building, seismically upgrade City Hall, and
remodel a portion of City Hall for Municipal Court.
3.The council can choose to direct other actions with regard to the Police Facility and City Hall
or prioritize other uses for the Facility Reserve.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends option 1.
SUGGESTED MOTIONS
A.Move to direct the City Manager to dedicate up to $16 million in Facility Reserve funds for
the acquisition, planning, and remodeling of an appropriate building to serve as a
consolidated Police Facility. To that end, commence negotiations with the owners of 300
Country Club Road for the acquisition of the property and improvements at that address.
B.Move to direct the City Manager to use up to $6 million in Facility Reserve funds for
planning, relocation, and occupancy costs associated with moving the remaining City Hall
functions into space that supports new downtown developments, and continue with the
analysis to evaluate the long-term viability of the EWEB property.
ATTACHMENTS
A. Summary of Costs for New Police Building and City Hall Remodels
B. Conceptual Seismic Upgrade Narrative
C. Police Facility Options for City-Owned Sites
D. Facility Reserve History
FOR MORE INFORMATION
Staff Contact: Mike Penwell, Facility Management Division Manager (AIC)
Telephone: 682-5547
Staff E-Mail: michael.j.penwell@ci.eugene.or.us
Z:\CMO\2009 Council Agendas\M090422\S090422A.doc
New Police Building and City Hall Remodel for Seismic Bracing & Third Courtroom
City of Eugene - Central Services - Facility Management
3/31/2009
Predesign cost and Budget Estimate3
Feasibilty analysis and construction cost estimating provided by Berry Architects PC, KPFF Consulting Engineers and Construction Focus, Inc.
City Hall Upgrades
2
Total Project
Construction
1
Install seismic bracing
$4,452,119$6,010,361
Remodel to add third Courtroom$730,738$986,496
City Hall Upgrades Total$6,996,857
$5,182,857
Police Building in 2 phases
South of City Hall SiteFormer Agripac Cannery Site
22
Total ProjectTotal Project
ConstructionConstruction
Phase 1 - Patrol Facility$12,627,913$17,047,683$11,667,848$15,751,595
Phase 2 - EPD Admin, Investigations, Records etc.$12,800,069$17,280,093$13,854,743$18,703,903
Police Building Total
$34,327,776$34,455,498
- including Ph 1 & 2
$25,427,982$25,522,591
City Hall Remodel Sub-Total
$5,182,857$6,996,857$5,182,857$6,996,857
(from above)
Total for Police Building & City Hall Projects
$41,324,633$41,452,355
$30,610,839$30,705,448
notes:
1) Seismic bracing to be conventional occupancy standard.
2) Soft Costs are estimated at 26% of total project costs.
3) Estimates are in 2009 dollars.
ATTACHMENT C
Footer goes here
ATTACHMENT C
Footer goes here
ATTACHMENT D
FACILITY RESERVE HISTORY
The Facility Reserve was created in FY01 as a way for the organization to save for the City Hall
Complex master plan projects. The intention was that the organization could reduce the amount
asked from voters to pay for the City Hall projects by saving money in the Facility Reserve.
Overall, the amount in the Facility Reserve in FY10 is estimated to be $23 million, with $1
million of that total dedicated towards the second year of pothole patching. Below are brief
descriptions of some of the major revenues and expenditures transactions that have occurred in
the Facility Reserve since its creation in FY01.
Major Deposits into the Facility Reserve
Excess EWEB Wholesale CILT:
During FY01, $7.3 million was earned from one-time CILT
payments on wholesale electric sales to California. These funds were deposited into the Facility
Reserve during FY01and FY02.
Settlement of Telecommunications Lawsuits:
In FY05, the City deposited $15.4 million into
the Facility Reserve from the General Fund and the Telecommunications Fund. The revenues
were a result of additional licenses and permits from Qwest and other telecom providers.
Assessment Bond Fund Residual Assets:
In FY03, council reviewed the residual assets
contained in the assessment bond fund reserves and determined how to use the excess funds. At
that time, $2.3 million of the residual assets were deposited into the Facility Reserve to be used
for City Hall complex master plan projects.
Capitalization Component of Facilities Charge:
During FY02, a new component was added to
the Facilities Charge for certain downtown facilities. This charge was developed as a way to
systematically set aside funds for a new City Hall. Both General Fund and Non-General Fund
services have contributed to the Facility Reserve through Facility Capitalization Charges. In
FY09, the charge for all funds is about $900,000.
Other Miscellaneous Revenues:
The City deposited other one-time funds into the Facility
Reserve from time to time. Examples are proceeds from sale of the Olive Street parking lot
($350,000), the library asbestos settlement ($227,000), and return of excess budget for Library
construction project ($100,000).
Major Expenditures from the Facility Reserve
Roosevelt Police Building:
In FY02 and FY03, $3.9 million was transferred from the Facility Reserve to
pay for construction of the Forensic Evidence Unit/Property Control Unit facility at Roosevelt, which
allowed police to discontinue using the basement space at City Hall as regular working areas.
City Hall Master Plan:
Council dedicated approximately $3 million to the City Hall Master Plan from
the Facility Reserve in fiscal years 2006 through 2009.
Lane County Revenue Swap:
In FY09, $4.5 million was transferred to Lane County, so that the funds
could be used to pay for jail beds, prosecution services and other high-priority services. In return, the
County sent $4.5 million from their Road Fund to the City to pay for road maintenance, repair and
construction.
Transportation Utility Fund Transfer:
In FY09, the City transferred $1 million from the Facility
Reserve to the Transportation Utility Fund to pay for street maintenance, including pothole patching. The
City also expects to make a similar transfer in the FY10 budget.
Fire Station #1 Costs:
As part of the financing plan for construction of a new Fire Station #1, $270,000
was transferred out of the Facility Reserve in FY03 to pay for furnishings, fixtures and equipment
(FF&E). The bulk of the fire station was built with General Obligation bond funds approved by voters,
but the FF&E costs are not eligible for General Obligation Bond funding.
General Fund Budget Gap:
In FY04, $900,000 was transferred from the Facility Reserve to fill a
budget gap in the General Fund.
Other Miscellaneous Expenditures
: Facility Reserve contributions were also used to pay for the LRCS
Master Plan ($130,000), the EPD PERF Study ($35,000), and homeless prevention services ($150,000).