Loading...
HomeMy WebLinkAboutItem B: I-5/Franklin Update ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Work Session: I-5/Franklin Interchange Meeting Date: February 15, 2006 Agenda Item Number: B Department: Public Works Staff Contact: Lisa Gardner www.eugene-or.gov Contact Telephone Number: (541) 682-5378 ISSUE STATEMENT This work session is an opportunity for the City Council to receive an update on the outreach process conducted for the I-5/Franklin Proposed Interchange project in December 2005. The council is requested to approve the continuation of the project through a refinement study process. The refinement study will be funded by a $400,000 SAFTEA-LU earmark requiring a ten percent local match. If a refinement study is approved, then an FY07 General Fund decision package will be prepared for the City’s estimated $20,000 share of the local match BACKGROUND Over the past year, the Oregon Department of Transportation (ODOT) has engaged in a “Community Dialogue” on the potential for new interchange ramp connections between Interstate 5 and Franklin Boulevard. This process was initiated at the request of the cities of Eugene and Springfield. ODOT’s commitment to this process has included both funding the process and managing the contract administration and technical work program of the consultant team and project management team. The scope of the process has included a technical scan of eight interchange concepts. The results of the technical scan were summarized in four technical memos: 1) existing conditions and potential constraints; 2) engineering/environmental and cost analysis; 3) traffic forecasts; and 4) potential revenue sources. The process also had a public involvement component that included engaging citizen groups, business owners and residents, and holding a series of public workshops. At the November 14 work session, ODOT indicated that the council would be provided with an opportunity to give a “thumbs up, or thumbs down” following the scheduled public workshops in December 2005. At the February 15 work session, ODOT will provide a summary of the results of the public workshops, and will provide information on ODOT’s assessment of the project, and its potential role in further study of the project. In the attached memo, ODOT states that the study has not identified a state transportation problem that would be solved by adding ramps to the I-5 interchange at Franklin Boulevard, and therefore does not see a transportation justification for developing interchange ramps at this location within the next 20 years. However, ODOT does state that it would not preclude further consideration of this action if the decision is made locally to move forward with the refinement planning process for I-5 Franklin, and to explore other possible justifications for interchange improvements at this location. ODOT participation in the refinement planning process would be to commit to co-manage a more detailed refinement planning effort where ODOT staff manages procurement, contract administration, and the technical aspects of a refinement plan. ODOT participation in this process L:\CMO\2006 Council Agendas\M060215\S060215B.doc would be dependent on local jurisdictions’ commitment to providing staff resources needed to manage both the public and local political processes, as well as allocation of ten percent local funds to match the $400,000 SAFTEA-LU earmark. Because of proximity, both the I-5 interchange at Franklin and I-5 interchange at Glenwood have been included within the scope of the process to date. ODOT has concluded that there is no transportation problem at Franklin, but does not preclude the identification of other issues such as improved access to downtown Eugene, the University of Oregon, and Glenwood that could be addressed through interchange improvements. The Regional Transportation Plan (RTP) identifies two projects on the illustrative list: 1) I-5 at Willamette River/Franklin Boulevard Interchange, and 2) I-5 at Glenwood Interchange. The description of the Glenwood project is to reconfigure the interchange to address weaving and associated safety issues. The appropriation of $400,000 in the SAFETEA-LU transportation bill provides an opportunity to further study potential solutions to the transportation problems and other identified issues at the Glenwood interchange. COUNCIL OPTIONS City Council options include: 1.Approve the continued study of the I-5 at Franklin interchange (including I-5 at Glenwood) with a refinement planning process, with a financial contribution for the local match of federal funds. 2.Approve the continued study of the I-5 at Franklin interchange (including I-5 at Glenwood) with a refinement planning process, without a City of Eugene local match contribution. 3.Decline to support the refinement planning process. CITY MANAGER’S RECOMMENDATION The City Manager recommends supporting the continued study of the I-5 at Franklin interchange (including I-5 at Glenwood) with a refinement planning process. If approved, an FY07 General Fund decision package will be prepared to provide the City’s share of the local match to the $400,000 SAFTEA-LU earmark. SUGGESTED MOTION Move to approve the continued study of the I-5 at Franklin interchange (including I-5 at Glenwood) with a refinement planning process, with a financial contribution for the local match of federal funds. ATTACHMENTS A. ODOT Memo (Tom Boyatt, Senior Planner) to Eugene City Council dated February 6, 2006 B. Public Open House Summary FOR MORE INFORMATION Staff Contact: Lisa Gardner Telephone: (541) 682-5378 Staff E-Mail: lisa.a.gardner@ci.eugene.or.us L:\CMO\2006 Council Agendas\M060215\S060215B.doc ATTACHMENT B MEMORANDUM CH2MHILL Public Open House Summary: 1-5 Willamette River Crossing/ Glenwood Facility Plan Phase II PREPARED FOR: Tom Boyatt, ODOT Linda Girard, CH2M HILL Brandy Steffen, CH2M HILL PREPARED BY: cc: DATE: Project Management Team Sam Seskin, CH2M HILL Tim Burkhardt, CH2M HILL Revised: January 25,2006 The Oregon Department of Transportation hosted three public open houses in early December 2005 to discuss the possibility of a new interchange at 1-5 and Franklin Boulevard in Eugene and Springfield. Open houses were held on three different occasions to provide multiple opportunities for interested parties to participate: Thursday, December 1, 2005, 4:00 p.m. - 8:00 p.m. Springfield City Hall, Library Room 225 Fifth Street, Springfield Monday, December 5 2005, 4:00 p.m. - 8:00 p.m. Northwest Youth Corps, Community Room 2621 Augusta Street, Eugene Thursday, December 8, 2005 4:00 p.m. - 8:00 p.m. Eugene Library, Bascom-Tykeson Room 100 W. 10th Avenue, Eugene A press release announcing the meetings was issued to the Eugene Register Guard, the Springfield News, the Eugene Weekly and the Daily Emerald and to local radio and television stations by Lou Torres, ODOT Region 2 Public Information Officer. Notification, in the form of a postcard and email was sent to an 11 interested parties" mailing list and e- mail notification was made to representatives of nearby neighborhoods. An article on the project which included Open House information was published in the Eugene Register Guard on Saturday, November 26, 2005. An open house format was used at the meetings, allowing members of the public to attend at their convenience, have the opportunity to discuss results of the preliminary analysis on a potential interchange and ask questions of ODOT, its consultant team and local agency staff. Attendees were asked to complete a comment form indicating their level of interest in making a new interchange at 1-5 and Franklin Boulevard a regional transportation priority for the Eugene/Springfield area. Approximately 150 people attended the three open houses. OPEN HOUSE SUMMARY-012406,OOC PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING / GLENWOOD FACILITY PLAN PHASE II The following items were on display at the meeting: · Introduction, purpose of the study and the open house · Preliminary Interchange Concepts 1 · Environmental and Land Use Conditions · Economic Development and Accessibility Benefits · Traffic and Circulation Benefits · Traffic Issues · Cost and Constructability Issues · Stakeholder and Policy Issues Handouts distributed at the open house included the following: · Comment form · Background information paper As of January 24, 2006, a total of 135 comment sheets were received at the open houses and 38 comments were received via email. The comments are summarized below. Copies of each of the actual comment sheets are provided as a separate document. 1 Categories for Interchanges: Category 1: Full Interchange at Franklin Boulevard, with either a Diamond or Cloverleaf design Category 2: Partial Interchange at Franklin Boulevard, with either a Partial Diamond or Partial Cloverleaf design Category 3: Split Interchange at Franklin and Glenwood Boulevard, with either a Two Half-Diamonds or Connected Diamonds design Category 4: Full Interchange at Glenwood Boulevard, with either a Full Diamond design OPEN HOUSE SUMMARY-012406.DOC PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING I GLENWOOD FACILITY PLAN PHASE II Summary of Public Comments TABLE 1. SUMMARY OF ALL THREE OPEN HOUSES AND EMAILED COMMENTS. Should the study go forward? Number of Responses Locations . 54 26 - Thursday, December 1, 2005 - Springfield City Hall, 4-8 pm 7 - Monday, December 5, 2005 - Northwest Youth Corps, Eugene, 4-8 pm 21 - Thursday, December 8, 2005 - Eugene Library, 4-8 pm Yes o 20 4 - Thursday, December 1, 2005 - Springfield City Hall, 4-8 pm 10 - Monday, December 5,2005 - Northwest Youth Corps, Eugene, 4-8 pm 6 - Thursday, December 8, 2005 - Eugene Library, 4-8 pm Yes, but. . . 25 1 - Thursday, December 1, 2005 - Springfield City Hall, 4-8 pm 16 - Monday, December 5,2005 - Northwest Youth Corps, Eugene, 4-8 pm 8 - Thursday, December 8, 2005 - Eugene Library, 4-8 pm No, unless. . . 35 4 - Thursday, December 1, 2005 - Springfield City Hall, 4-8 pm 12 - Monday, December 5,2005 - Northwest Youth Corps, Eugene, 4-8 pm 19 - Thursday, December 8, 2005 - Eugene Library, 4-8 pm No No circle chosen Not applicable 38 Email Messages Received (through January 24, 2006) Total = 173 Most common comments from all answers and days (including emails): Prefer Category 4 (54) if the choice had to be made to build Concern for the environmental impacts, the Alton Baker and Whilamut parks, the wetlands, and the river (48) Feel that any option would require further information about impacts to local traffic, including the impact to local neighborhoods and other roads in the area (43) Concern for noise impacts and mitigation (24) Current access works well or no need for this study (24) Better signage is necessary for solving the problem (with or without other actions taken) (15) Feel that improvements would create an economic boost for the area (14) Need to consider alternative transportation, including bikes, pedestrians, rail, and buses (with or without other actions taken) (13) Prefer category 1 (7) OPEN HOUSE SUMMARY-012406.DOC PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING I GLENWOOD FACILITY PLAN PHASE II TABLE 2. OPEN HOUSE #1 (DECEMBER 1, 2005 - SPRINGFIELD CITY HALL) Should the study go forward? Number of Most common responses Responses . 26 Category 1 (2); Category 2 (2); Category 4 (7). It will bring economic benefit to the area (5); this project will determine the future of the area and relieve other areas (5); concern for the park/environment/river (1). Yes Category 1 (1); Category 2 (1); Category 4 (2). o 4 Economic concerns (1); examine local and regional plans first (1); focus on access to the University (1). Yes, but. . . Category 4 (1). No, unless. . . . 4 Need more facts and figures about transportation needs (1); concern for the park/environment/river (2); not a good use of money (2); would rather encourage alternative transportation instead of single auto use (2); should have better signage instead (1). No OPEN HOUSE SUMMARY-012406.DOC PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING I GLENWOOD FACILITY PLAN PHASE II TABLE 3. OPEN HOUSE #2 (DECEMBER 5, 2005 - NORTHWEST YOUTH CORPS, EUGENE) Should the study go forward? . Yes o Yes, but. . . No, unless. . . No Number of Responses 7 10 16 12 OPEN HOUSE SUMMARY-012406.DOC Most common responses Category 1 (1). Concerns for noise and mitigation (2); what about neighborhood acceptance and concerns (2); it will bring economic benefit to the area and is needed for the downtown and to create a 'front door' (2); concern for the park/environment/river (1); concern over funding source (1); promote alternative transport/bikes (1); keep the on/off, north-south ramps on same junction (1). Category 1 (1); Category 2 (1); Category 4 (2). Concern for environment/park/river (3); concern for access into and out of, preservation, and negative impacts to Laurel Hill Valley Neighborhood (6); concern over traffic distribution into neighborhoods and maintaining local access to 1-5 (3); need more information (2); economic benefits seem substantial (1); concern that this project is taking money away from other projects (1); would like to see the impacts to traffic/congestion at other interchanges due to this project (1); think outside of the box (1); need to upgrade the 1-5 ramps at Glenwood (1); must keep Glenwood exit open and functional (1); diamond ramps are a waste of time and money (1); concern about hazardous was and related expenses (1); plan for long term future growth (1). Prefer Category 4 (8). concern for noise (6); concern for environment/river/park/wetlands (7); concern for impact to neighborhood (1); concern about increased traffic and congestion (3); maintain local access to 1-5, Laurel Hill, and Glenwood (5); maintain bike access to Riverfront (1); impacts outweigh benefits (1); don't divert money away from other projects (2); must give local concerns high priority (1); how necessary is this project (1); limit reconstruction to Glenwood (2); unless traffic becomes a severe problem (1); consider alternative funding options (1); improve signage (1); no more than 2 bridges, otherwise eyesore and environmentally damaging (1); need better estimates of future growth/demand (1). Use Category 4 if needed (3). Neighborhood, historical, and environmental resources would be crushed (2); money should be spent on failing infrastructure (4); use signage to improve traffic flow (1); rethink site of UO arena (1); concern for the environment (4); cost is prohibitive (3); current exits work well (2); concern of building downstream of dams (1); consider peak oil (1); purpose of 1-5 is to access downtowns only (1); all categories would diminish access from neighborhoods to Franklin Blvd for bikers (1); concern for noise (1); should be developed on a long-term schedule (1); impacts outweigh the benefits (1). Did not choose a response, only said "great presentation" PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING / GLENWOOD FACILITY PLAN PHASE II TABLE 4. OPEN HOUSE #3 (DECEMBER 8, 2005 - EUGENE PUBLIC LIBRARY) Should the study go forward? . Yes o Yes, but. . . No, unless. . . . No Number of Responses 21 6 8 19 OPEN HOUSE SUMMARY-012406.DOC Most common responses Category 1 (2); Category 2 (2); Category 3 (1); Diamond on north side of river (1); Category 4 (6). Should be studied as part of new 1-5 bridge (2); address all concerns (1); Use new bridge to improve intersections and interchanges (2); study traffic reduction on 30th (1); help vitality/economics of both cities (4); creates an entrance (2); need roads to handle increased population and demand (4); focus on giving other towns access to the metro area (1); mitigating noise (1); concern for environment/river/park (2); keep full interchange at Franklin Blvd.loff ramp (2); will help to redevelop Glenwood (1); would alleviate congestion (1); need to start planning despite lack of money (2); would improve access to downtowns (2); reduce pressure at Beltline entrance (1); interest in aesthetics (1); start obtaining right of way for light rail to Vancouver, BC (1); move Franklin further from the river (1); Is there a demand for this? (1); easy access to UO (2). Category 2 (1); Category 4 (1); consider a split clover with East side having a connection close to Glenwood exit (1); create a diamond at Glenwood and make north bound ramp to Hwy. 99 a two way local access (1). Full interchange at Franklin seems like overkill (1); perhaps left lane exit/entrance ramps (1); concerned about sound mitigation (1); preserve local connection from Laurel Valley to Franklin (1); improve traffic merge with Glenwood interchange (1); take funds from WEP (1); needs to be combined with better streets in Glenwood (1); consider local connections to downtown Eugene (1); consider a bridge to Astes Street on north side of Willamette (1). Category 4 (4). Is it needed? (1); noise reduction/mitigation (1); retain local access (1); does the cost outweigh the benefit? (1); need a traffic impact study on.the Fairmount Neighborhood (1); concern parks/river/environment (6); don't need an expensive gateway (1); money better spent on Beltline congestion (1); need to shift to mass transit/alternative transportation options (1), What are the opportunity costs for these options? (1); should be a high priority part of the picture for further study (1); cost unreasonable for Categories 1-3 (3); consider the visual impacts (1); not needed until another hospital is sited in the Glenwood area (1); unsure, but inclined to support Category 4 with improved signage (1); no additional bridges are built (1); pedestrian and bike traffic should be planned for (1). Category 4 (1). Prefer no build, or Category 4 if required (5); concern for noise pollution in local neighborhoods (4); concern for entrances/exits from Laurel Hill to Franklin (2); concerned about the impact to old, established neighborhoods (3); better signage (4); concern for environment/park/river (9); currently adequate access from North and South (4); access is better than most cities (1); aesthetic concerns (1); no real need for this (7); additional interstate traffic will threaten nodal potential along BRT corridor (1); poor cost/benefit ratio (7); this would encourage local traffic on a congested 1-5 corridor (1); this would discourage public transportation (1); only good would be if a hospital were built in Glenwood (1); only advantage is to UO's arena, which I oppose, and Springfield downtown, however, that is growing north so this wouldn't help (1); Categories 1-3 cause more problems than they solve (2); .. . ? PUBLIC OPEN HOUSE SUMMARY: 1-5 WILLAMETTE RIVER CROSSING I GLENWOOD FACILITY PLAN PHASE II the interchange comply with federal and state policies? (1); please give up on this project (1); Franklin Blvd. can barely handle traffic now (2); opposed to bridging Glenwood Blvd. with Aspen Street to provide connection with Centennial (1); best option is alternative transportation, such as high speed rail and better service from L TD (2); how does it rank in priority with other projects? (1); What is the purpose/need? (2); What other options are being considered? (1); Why not fix the existing on/off access? (1); show me the money (1); the benefits to convenience or economics don't outweigh the cost in money and to environment (1); 1-5 improvements have more than adequately addressed access issues int%ut of Eugene from the north (1); reason for this is the new UO arena. The solution is hiring traffic control people for infrequent arena events and adding the cost to arena rental fees (1 ). TABLE 5. COMMENTS REVEIVED VIA EMAIL (AS OF JANUARY 24, 2006) Number of Most common responses Emails Received Concern for the environment, river, riparian habitat, and wetlands (34); need to provide non- motorized transportation options and consider the energy crisis and oil dependency (2); consider basic transportation needs for all, not just car owners (1); keep walkways and park paths contiguous (1); a new interchange would be an ecological and economical mistake (3); protecting the river corridor is more important than speed and efficiency (2); this natural area is a unique resource for an urban area, please preserve it (2); this area offers educational opportunities that will be lost if construction occurs (4); the park will be a desirable and valuable place for company relocations, tourists and natives in years to come (1); the Citizen Planning Committee for the Whilamut Natural Area of Alton Baker Park passed a motion to protect the scenic views and wildlife habitat of the greenway and recommends that no additional bridges be constructed within the riverside border of the park (1). 38 Work on improving the Glenwood Interchange instead (22); update and improve signage (7); propose site between Glenwood and the river (1); Franklin interchange is an expensive project without transportation value and no clear problem (10); don't see the need for this project (1); Glenwood exit allows for the Willamette Replacement bridge to be a signature gateway (1); focus on the Delta Highway improvements instead (1); putting more traffic onto Franklin Blvd is negative because it increases crime, create a "freeway" stop character to the proposed Walnut Station and the Fairmount Neighborhood, and Eugene already an exit for this area of town (1). Concern for noise (4); concern for increased traffic and noise within local neighborhoods (5); aesthetic concerns (8); on/off ramps crossing the Willamette are wrong (4); safety concerns for water recreation (1); concern for increased traffic on Franklin (2); safety concern for Walnut traffic light (1); concern for the cost (7); other projects could use the money more than this one (2); concern for sustainability (1). OPEN HOUSE SUMMARY-012406.DOC