HomeMy WebLinkAboutOrdinance No. 20362
ORDINANCE NO. 20362
AN ORDINANCE REPEALING RESOLUTION NO. 4127 AND
THE EUGENE PARKS AND RECREATION PLAN ADOPTED
THEREIN; AMENDING SECTION 9.8010 OF THE EUGENE
CODE, 1971; REPEALING SECTION 9.9550 OF THAT CODE;
AND ADOPTING A SEVERABiliTY CLAUSE.
The City Council of the City of Eugene finds that:
A. Portions of the current Eugene Parks and Recreation Plan ("1989 Plan")
were adopted by Resolution No. 4127 on July 10, 1989 as a refinement to the Eugene-
Springfield Metropolitan Area General Plan (Metro Plan).
B. As part of the land use code update process, the City incorporated some
of its adopted refinement plan polices into Chapter 9 to be used in evaluating applicable
adopted plan policies pertaining to subdivisions, partitions and site review. The 1989
Plan policies that were added to Chapter 9 are set forth at EC 9.9550.
C. Although they are now in the code, the 1989 Plan polices incorporated in
EC 9.9550 have no practical effect on subdivision, partitions or site review applications
either because the policies apply only to the City and have no impact on land use
applicants or because the policies are already addressed by specific land use
application requirements. Deleting the 1989 Plan policies from EC 9.9550 will have no
practical effect except to eliminate the current redundancy and clarify the requirements
for developers.
D. By separate Resolution, the City Council is adopting the Parks, Recreation
and Open Space Comprehensive Plan ("PROS Comprehensive Plan.) to provide long-
range direction for future strategies and actions to improve parks, provide recreation
opportunities, and protect natural resource values. The. PROS Comprehensive Plan will
not be a refinement to the Metro Plan, but will be a stand-alone plan serving as an
aspirational and guiding document for the City as it conducts long-range planning for
parks, recreation and open space.
E. Neither the Statewide Planning Goals nor the Metro Plan require that the
City's local parks and recreation plan be adopted as a refinement to the Metro Plan.
Thus, repealing the 1989 Plan and the corresponding code provisions set forth at EC
9.9550 of the Eugene Code, 1971 is consistent with applicable Statewide Planning
Goals and applicable provisions of the Metro Plan. Further, the City Council's separate
action of adopting the PROS Comprehensive Plan by resolution is supported by
findings of consistency with the statewide planning goals and the applicable Metro Plan
policies. Attachment A to this ordinance is a copy of the findings proposed for adoption
in support of Resolution No. 4858 adopting the PROS Comprehensive Plan.
Ordinance - 1
F. The City Council finds that Resolution No. 4127, and the Eugene Parks
and Recreation Plan adopted therein should be repealed; the entry for Eugene Parks
and Recreation Plan - 1989 in Section 9.8010 of the Eugene Code, 1971 should be
deleted; and Section 9.9550 of the Eugene Code, 1971, the Eugene Parks and
Recreation Policies, should be repealed as hereinafter set forth.
THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS:
Section 1. Based on the above findings, and the legislative findings in
Attachment A hereto, which are hereby adopted in support of this Ordinance, Resolution
No. 4127, and the Eugene Parks and Recreation Plan adopted therein, is hereby
repealed, as of the effective date of this Ordinance.
Section 2. Table 9.8010 of the Eugene Code, 1971 is hereby amended by
deleting the "Eugene Parks and Recreation Plan - 1989" entry therefrom.
Section 3. Section 9.9550 of the Eugene Code, 1971, is hereby repealed.
Section 4. The City Recorder, at the request of, or with the concurrence of the
City Attorney, is authorized to administratively correct any reference errors contained
herein or in other provisions of the Eugene Code, 1971, to the provisions added,
amended or repealed herein.
Section 5. If any section, subsection, sentence, clause, phrase or portion of this
Ordinance is for any reason held invalid or unconstitutional by a court of competent
jurisdiction, such portion shall be deemed a separate, distinct and independent
provision and such holding shall not affect the validity of the remaining portions hereof.
Passed by the City Council this
13th day of February, 2006
Approved by the Mayor this
tt
IS' day of February 2006
~
;, ! '"' , \ .~
C. Y Recorder
Ordinance - 2
Exhibit A to Resolution No. 4858
(1) The resolution is consistent with the Statewide planning goals.
Goal 1 Citizen Involvement: To develop a citizen involvement program that insures the
opportunity for citizens to be involved in all phases of the planning process.
The City has acknowledged provisions for citizen involvement that ensure the
opportunity for citizens to be involved in all phases of the planning process and sets out
requirements for such involvement. The action taken to adopt this resolution 1 did not
amend the citizen involvement program.
Throughout the PROS Comprehensive Plan drafting process, the City provided
numerous opportunities for citizen involvement. The City initiated the planning process
in the summer of 2002. The City engaged in significant outreach to community
members to identify their key issues, priorities and perceived needs. A Community
Needs Assessment was conducted to solicit feedback from a broad spectrum of City
residents and staff regarding their needs and preferences for parks and recreation
services. The Community Needs Assessment included, among other things, a survey
of 437 households, questionnaires completed by 647 high school and middle school
students, focus groups, a speakers bureau with 44 presentations to community groups
and organizations, twelve stakeholder interviews with identified community leaders, and
meetings with the Mayor's Advisory Committee and Steering Committee. The
Community Needs Assessment incorporated the findings from a variety of public
involvement activities, along with a community profile, a demographic profile, and a
technical analysis of programs, parks and facilities, and finances.
City staff, through the PROS Comprehensive Plan drafting process, provided the
Eugene Planning Commission and the Eugene City Council with periodic updates on
the draft Plan. For example, in December 8, 2004, City staff provided the City Council
with a draft of the PROS Comprehensive Plan and gave an informational presentation
the Council. Additionally, on January 24, 2005, City staff provided the Planning
Commission with a draft of PROS Comprehensive Plan and gave an informational
presentation to the Commission.
The City of Eugene land use code implements Statewide Planning Goal 1 by requiring
that notice of the proposed PROS Comprehensive Plan be given and public hearings be
held prior to adoption. Consideration of this resolution began with a Eugene Planning
Commission works session held on October 10, 2005. On October 11, 2005, a public
hearing was held before the Eugene Planning Commission on the proposed PROS
Comprehensive Plan. Department of Land Conservation and Development notice,
notice to interested parties and newspaper publication was provided for that hearing.
The Eugene Planning Commission left the public record open for additional written
comments until October 17, 2005. On December 12, 2005, the City Council held a
1 The term "this resolution" refers to the resolution that adopts the PROS Comprehensive Plan.
Exhibit A to Resolution No. 4858
1 of 10
public hearing on the PROS Comprehensive Plan.
The process for adopting this resolution complies with Goal 1 since it complies with, and
surpasses the requirements of the State's citizen involvement provisions.
Goal 2 - Land Use Plannina: To establish a land use planning process and policy
framework as a basis for all decisions and actions related to use of land and to assure
an adequate factual base for such decisions and actions.
The Eugene-Springfield Metropolitan Area General Plan (Metro Plan) is the policy tool
that provides a basis for decision-making in this area. The Metro Plan was
acknowledged by the State in 1982 to be in compliance with statewide planning goals.
These findings and record show that there is an adequate factual base for decisions to
be made concerning the proposed resolution.
Goal 2 requires that plans be coordinated with the plans of affected governmental units
and that opportunities be provided for review and comment by affected governmental
units. The Goal 2 coordination requirement is met when the City engages in an
exchange, or invites such an exchange, between the City and any affected
governmental unity and when the City uses the information obtained in the exchange to
balance the needs of the citizens. Because the PROS Comprehensive Plan does not
regulate when or how park land will be acquired, but rather is an aspirational plan that
sets forth the needs of the community and strategies for satisfying those needs, no
other governmental units are affected by this resolution.
Even though no other governmental units are affected by this resolution, in an effort to
educate neighboring jurisdictions about the PROS Comprehensive Plan, the City took
steps to provide neighboring jurisdictions an opportunity to comment on the proposed
PROS Comprehensive Plan. Specifically, in accordance with the Metro Plan, notice
and a copy of the proposed PROS Comprehensive Plan was mailed to the Planning
Directors of Springfield and Lane County. Additionally, on September 27, 2005, City
staff met with the Lane County Board of Commissioners to provide the Board
information regarding the PROS Comprehensive Plan. In response to concerns raised
by some of the Commissioners, the City made a number of revisions to the PROS
Comprehensive Plan. On November 1, 2005, City staff met with the Lane County
Planning Commission to provide the Commission with information regarding the PROS
Comprehensive Plan. There are no Goal 2 exceptions required for this resolution.
Goal 3 - Aaricultural Land: To preselVe and maintain agricultural lands.
Goal 3 is not applicable to this resolution as the PROS Comprehensive Plan does not
affect any agricultural land designation. The PROS Comprehensive Plan identifies the
park and recreational needs of City residents and sets forth strategies for meeting the
identified needs. The PROS Comprehensive Plan does not acquire, rezone or regulate
any land inside or outside the acknowledged urban growth boundary. Therefore, Goal 3
is not relevant and the resolution does not affect the area's compliance with Statewide
Exhibit A to Resolution No. 4858
2 of 10
- - - - -
- - -
---~ =--------
- - -
- - - - - _-------=---- - - I
Planning Goal 3.
Goal 4 - Forest Land: To conserve forest lands by maintaining the forest land base and
to protect the state's forest economy.
Goal 4 is not applicable to this resolution as the PROS Comprehensive Plan does not
affect any forest plan designation. The PROS Comprehensive Plan identifies the park
and recreational needs of City residents and sets forth strategies for meeting the
identified needs. The PROS Comprehensive Plan does not acquire, rezone or regulate
any land inside or outside the acknowledged urban growth boundary. Therefore, Goal 4
is not relevant and the resolution does not affect the area's compliance with Statewide
Planning Goal 4.
Goal 5 - Open Soaces. Scenic and Historic Areas. and Natural Resources: To protect
natural resources and conselVe scenic and historical areas and open spaces.
The adoption of this resolution does not create or amend the City's list of Goal 5
resources, does not amend a code provision adopted in order to protect a significant
Goal 5 resource or to address specific requirements of Goal 5, does not allow new uses
that could be conflicting with a Goal 5 resource and does not amend the acknowledged
UGB. Therefore, Goal 5 does not apply.
Goal 6 - Air. Water and Land Resources Quality: To maintain and improve the quality of
the air, water, and land resources of the state.
Goal 6 addresses waste and process discharges from development, and is aimed at
protecting air, water and land from impacts from those discharges. Adoption of this
resolution does not affect the City's compliance with Goal 6.
Goal 7 - Areas Subiect to Natural Disasters and Hazards: To protect people and
property from natural hazards.
Goal 7 requires that local government planning programs include provisions to protect
people and property from natural hazards such as land slides. This resolution does not
affect the City's restrictions on development in areas subject to natural disasters and
hazards. Further, this resolution does not allow for new development that could result in
a natural hazards. Therefore, Goal 7 does not apply.
Goal 8 - Recreational Needs: To satisfy the recreational needs of the citizens of the
state and visitors and, where appropriate, to provide for the siting of necessary
recreational facilities including destination resorts.
Goal 8 ensures provision of recreation facilities to Oregon citizens and is primarily
concerned with the provision of those facilities in non-urban areas of the state.
Implementation of the strategies set forth in the PROS Comprehensive Plan will satisfy
the recreational needs of the residents of Eugene area in adequate proportions and in
Exhibit A to Resolution No. 4858
3 of 10
such quantity, quality and location as is consistent with the availability of the resources
to meet those needs. Adoption of this resolution is consistent with Goal 8.
Goal 9 - Economic Development: To provide adequate opportunities throughout the
state for a variety of economic activities vital to the health, welfare, and prosperity of
Oregon's citizens.
The PROS Comprehensive Plan does not have a direct impact on economic activities.
It does not change the zoning, designation or allowed uses on any properties. While
the PROS Comprehensive Plan does include strategies to provide of a certain amount
of park acreage per 1 ,000 residents and identifies the need to acquire property for park
use, it does not rezone any property for park use. Thus, the PROS Comprehensive
Plan has no effect on the inventories of industrial or commercial lands. Therefore, the
resolution is consistent with Goal 9.
Goal 10 - Housina: To provide for the housing needs of the citizens of the state.
Goal 10 requires that communities plan for and maintain an inventory of buildable
residential land for needed housing units. This resolution does not have a direct impact
on residential development opportunities. The PROS Comprehensive Plan does not
change the zoning, designation or allowed uses on any properties. While the PROS
Comprehensive Plan does include strategies to provide a certain amount of park
acreage per 1 ,000 residents and identifies the need to acquire property for park use, it
does not rezone any property for park use. Thus, the PROS Comprehensive Plan has
no effect on the inventories of residential lands. Therefore, the resolution is consistent
with Goal 1 O.
In ensuring an adequate supply of residential land in the 1999 Residential Lands Study
(this area's acknowledged Goal 10 inventory), the jurisdictions took into account that
numerous nonresidential uses, including parks, would locate on residential land. Parks
are specifically discussed in the 1999 Residential Lands Study as a use that would need
to be accommodated on residentially designated lands. In determining the amount of
land that would be needed to satisfy a 20-year demand, the Study assumed that 32
percent of residential land would be used for parks and other nonresidential uses. This
is discussed on page 47 of the Eugene-Springfield Metropolitan Area Residential Lands
and Housing Study Draft Supply and Demand Technical Analysis (adopted as findings
by the City in support of its 1999 action). The table on page 48 of that document,
summarizing the supply and demand analysis through the year 2015, show that the
jurisdictions did not count a total of 6,031 acres from the overall total of buildable
residential lands to ensure that, without counting those 6,031 acres set aside for parks
and other nonresidential uses, the area still could meet the demand for residential
lands.
Exhibit A to Resolution No. 4858
4 of 10
Goal 11 - Public Facilities and Services: To plan and develop a timely, orderly and
efficient arrangement of public facilities and services to serve as a framework for urban
and rural development.
The provisions of this resolution do not affect the planning or development of future
public facilities or services. Therefore, this resolution is consistent with Goal 11.
Goal 12 - TransDortation: To provide and encourage a safe, convenient and economic
transporlation system.
Goal 12 is implemented through the Transportation Planning Rule (TPR). The Eugene-
Springfield Metropolitan Area Transportation Plan (TransPlan) provides the regional
policy framework through which the TPR is enacted at the local level.
The Transportation Planning Rule (OAR 660-012-0060) states that land use changes
that significantly affect a transportation facility shall require mitigation measures to
address the anticipated impacts. The rule states that:
(1) Amendments to functional plans, acknowledged comprehensive plans,
and land use regulations which significantly affect a transportation facility
shall assure that allowed land uses are consistent with the identified
function, capacity, and performance standards (e.g. level of service,
volume to capacity ration etc.) of the facility. This shall be accomplished
by either:
(a) Limiting allowed land uses to be consistent with the planned
function, capacity, and performance standards of the transportation
facility;
(b) Amending the TSP to provide transportation facilities to support the
proposed land uses consistent with the requirements of this
division;
(c) Altering land use designations, densities, or design requirements to
reduce demand for automobile travel and meet travel needs
through other modes; or
(d) Amending the TSP to modify the planned function, capacity and
performance standards, as needed, to accept greater motor vehicle
congestion to promote mixed use, pedestrian-friendly development
where multi modal travel choices are provided.
(2) A plan or land use regulation amendment significantly affects a
transportation facility if it:
(a) Changes the functional classification of an existing or planned
transportation facility;
(b) Changes standards implementing a functional classification system;
(c) Allows types or levels of land uses which would result in levels of
travel or access which are inconsistent with the functional
classification of a transportation facility; or
Exhibit A to Resolution No. 4858
5 of 10
- - ---- - - - - - - -
- - - - -
- - - - - - - --
- - -- -- - -
- __ - - - - - - - __ - - - - - - __ - - - - - - - - - _0- _ _ _ ___ _ __ _ _ _ __
-- - - -- -- - -~ ~- ~- - - -- -
.
(d) Would reduce the performance standards of the facility below the
minimum acceptable level identified in the TSP~
Adoption of the resolution will not change the functional classification of an existing or
planned transportation facility. Nor will it change standards implementing a functional
classification system. Further, it will not allow types or levels of land uses which would
result in levels of travel or access which are inconsistent with the functional
classification of a transportation facility or reduce the performance standards of any
facility. Therefore, Goal 12 is not implicated by this resolution.
Goal 13 - Enerov Conservation: To conserve energy.
This resolution does not concern energy conservation. Therefore, Goal 13 does not
apply.
Goal 14 - Urbanization: To provide for an orderly and efficient transition from rural to
urban land use~
Goal 14 does not apply to the City's adoption of this resolution
Goal 15 - Willamette River Greenwav: To protect, conselVe, enhance and maintain the
natural, scenic, historical, agricultural, economic and recreational qualities of lands
along the Willamette River as the Willamette River Greenway.
The Willamette Greenway area within the Eugene Urban Growth Boundary is governed
by existing local provisions which have been acknowledged as complying with Goal 15.
Those provisions are unchanged by this resolution.
Goal 16 throuah 19. Estuarine Resources, Coastal Shorelands, Beaches and Dunes,
and Ocean Resources.
There are no coastal, ocean, estuarine, or beach and dune resources related to the
property effected by this resolution. Therefore, these goals are not relevant and the
resolution will not affect compliance with Goals 16 through 19.
(2) The resolution is consistent with the applicable provisions of the Metro Plan.
Parks and Recreation Facilities Element
1 ~ Develop a system of regional-metropolitan recreational activity areas based on a
facilities plan for the metropolitan area that includes acquisition, development,
and management programs. The Plan should include reseIVoir and hill parks,
the Willamette River Greenway, and other river corridors.
In June, 2003, the cities of Eugene and Springfield and Lane County adopted
Rivers to Ridges, a metropolitan regional parks and open space study. Rivers to
Exhibit A to Resolution No. 4858
6 of 10
Ridges was developed based on extensive public input with an intended purpose
of setting forth what open space areas are vital to maintaining the regional quality
of life and devising methods to ensure these areas remain intact for future
generation. The PROS Comprehensive Plan does not amend Rivers to Ridges.
The PROS Comprehensive Plan contains the following strategies that ensure
consistency with Rivers to Ridges while also addressing this Metro Plan policy:
H-22 Continue participating in regional open space efforts with Rivers to Ridges
partner agencies.
1-11 Coordinate planning efforts with other City departments and regional
agencies, especially in support of the Rivers to Ridges region vision.
1-13 Maintain a regional planning approach by coordinating with Oregon State
Parks, River Road Park and Recreation District, Willamalane Park and
Recreation District, Lane County Parks and other neighboring
jurisdictions.
1-22 Work with Lane County and property owners of local gravel mining
operations located north of Eugene's urban growth boundary along the
Willamette and McKenzie Rivers, to explore the recreation potential of
those sites once mining operations are concluded.
2" Local parks and recreation plans and analyses shall be prepared by each
jurisdiction and coordinated on a metropolitan level.
In 1989 the City adopted the Eugene Parks and Recreation Plan as the City's
local park and recreation plan. The PROS Comprehensive Plan, being adopted
by the proposed resolution, take the place of the 1989 Plan as the City's local
park and recreation plan.
3. Accelerate the acquisition of park land in projected growth areas by establishing
guidelines determining where and when developers will be requires to dedicate
land for park and recreation facilities, or money in lieu thereof, to serve their
developments.
The PROS Comprehensive Plan contains the following strategies that address
this Metro Plan policy:
8-40 Acquire property or obtain access easements from private property
owners to fill missing Jinks and improve connectivity.
H-2 Develop programs to maximize donations, grants and partnerships to
increase the resources available for parks and recreation. Develop gift
catalogs for key parks, recreation, and open space facilities and programs.
Exhibit A to Resolution No. 4858
7 of 10
- - - -
- - -
- - - ~ ~ -- - - -- - - --- =-- - ---= -----= - - -------
_ __ _ _ _ _ _ _ __ _ _ _ _ _ _= -= _ =-- _ __ __----=--=-----=___=__ ------= r =-__---=- .__
- - - -~~ - - -
--. - ----
.
H-17 Pursue and maintain effective partnerships with public, private, and non-
profit organizations to acquire, develop, and maintain parks, open space,
and recreation facilities.
1-20 Coordinate with developers to ensure that new residents will have access
to and be adequately served by parks and open space.
1-23 Acquire parkland and natural open space in advance of need to reduce
land acquisition costs and to protect critical resources.
1-24 Identify and pursue opportunities with willing sellers as the preferred
approach when evaluating parkland and natural open space acquisition
options. Consider willingness of seller as a key criterion when prioritizing
acquisition opportunities.
1-26 Ensure that the City's acquisition program provides a balance of natural
areas and developed parks for active recreation consistent with
community values.
4. Encourage the development of private recreation facilities.
The PROS Comprehensive Plan contains the following strategies that address
this Metro Plan policy:
A-16 Increase outreach to community groups and other organizations that
support seniors, such as assisted-living facilities and faith groups.
A-23 Explore partnerships to expand outdoor recreation activities and programs
that promote environmental awareness, volunteerism, and stewardship,
including options that are affordable.
A-37 Partner/collaborate with resident companies and other cultural venues to
provide cultural opportunities.
C-2 Develop and maintain partnerships to increase access to recreation
facilities owned or managed by others.
C-27 Develop partnerships with gardening and horticultural clubs, such as the
Master Gardeners, the Hardy Plan Society, the Native Plant Society, and
the Rhododendron and Rose Societies, to enhance existing gardens and
to provide additional botanical gardens.
H-12 Pursue local business sponsors to subsidize fees for high-cost programs,
such as through an "Adopt-a-Program" effort.
Exhibit A to Resolution No. 4858
8 of 10
H-16 Partner with businesses to provide services and amenities, such as
vendors in parks.
H-17 Pursue and maintain effective partnerships with public, private, and non-
profit organizations to acquire, develop, and maintain parks, open space,
and recreation facilities.
Develop mechanisms and processes by which residents of an area to be served
by a neighborhood park or play lot can participate in the design, development,
and maintenance of the facility.
The PROS Comprehensive Plan contains the following strategies that address
this Metro Plan policy:
B-7 Prepare master plans for parkland and facilities prior to development,
major improvement, or renovation to promote cohesive, quality design and
to ensure plans are consistent with community needs.
D-10 Develop and maintain an interested parties list for natural resource issues
related to parks, recreation, and open space, and schedule periodic
workshops for feedback on issues, programs, and improvements.
F-1 Develop or update park designs or master plans before making significant
improvements to the site.
G-17 Continue facilitating and encouraging the formation of adopt-a-park groups
for each park and facility.
G-21 Provide public information to educate the community about parks
maintenance issues and benefits, such as invasive species, vandalism,
play area safety, native plants, etc. Partner with neighborhood
associations.
1-34 Balance long-term, community-wide interest with the interests of
neighborhoods and individuals when planning and designing the City's
park, recreation and open space system.
1-70 Continue involving citizens in park design and development, as well as in
program development from the earliest possible stage.
1-71 Increase innovative strategies to improve citizen involvement in parks and
open space planning efforts, such s teleconferences, electronic on-line
chat rooms, child care at meetings, and partnerships with schools.
Exhibit A to Resolution No. 4858
9 of 1 0
6, All metropolitan area parks and recreation programs and districts shall cooperate
to the greatest possible extent in the acquisition of public and private funds to
supporl their operations.
Chapter V of the PROS Comprehensive Plan describes potential funding sources
for the Plan improvements. The Plan identifies both public and private funding
sources. The identified public funding sources include: general fund, road fund,
stormwater & wastewater fees, and wetlands mitigation bank funds. The
identified private funding sources include: local option levy, private grants and
foundations, public/private partnerships, and fees and charges. Additionally, the
following funding sources were identified for capital expenses: system
development charges, donations, local improvement district, general obligation
bond, public/government grant programs, Intermodal Surface Transportation
Efficiency Act, local government grants, urban forestry grants, Oregon
Watershed Enhancement Board, land trusts, Nation Tree Trust, lifetime estates
and property exchanges.
Additionally, the PROS Comprehensive Plan contains the following strategies
that address this Metro Plan policy:
8-24 Coordinate long range planning of neighborhood parks with Eugene
School District 4J and Bethel School District 52, particularly with regard to
school consolidations, land disposal, or new school developments as
school facilities often function as focal points for neighborhood recreation.
8-33 Work with the River Road Park and Recreation District in long-range
planning to continue to meet community park needs in this area.
E-16 Coordinate with other agencies and providers to encourage the
development of a regional trail system linking Eugene/Springfield with
Fern Ridge Reservoir, the coast, the Cascades, and the Willamette and
McKenzie Rivers. Provide bicycle and pedestrian access through
agricultural areas in the Willow Creek, Bethel/Danebo, and Santa Clara
planning areas of Eugene.
H-14 I mprove partnerships with River Road Parks and Recreation District,
School Districts 4J and 52, Lane Transit District, EWES, Willamalane
Parks and Recreation District, Lane County Parks and other public
agencies to improve service and maximize efficiency.
Exhibit A to Resolution No. 4858
10 of 1 0