Public Hearing: Resolution 4984 Forming a Local Improvement District (LID) for
Paving, Constructing Curbs, Sidewalks, Medians, Street Lights, Stormwater Drainage
and Water Quality Facilities on Crest Drive from Blanton Road to Lincoln Street, Storey
Boulevard from Crest Drive to Lorane Highway, and Friendly Street from Lorane
th
Highway to 28 Avenue (Job #4546)
Meeting Date: June 15, 2009 Agenda Item Number: 4
Department: Public Works-Engineering Staff Contact: Mark Schoening
www.eugene-or.gov Contact Telephone Number: 682-5243
ISSUE STATEMENT
This public hearing is a continuance of the public hearing held before a hearings official on May 28,
2009, on a proposed Local Improvement District (LID) due to the receipt of remonstrance petitions from
property owners who will bear over 50% of the assessable costs of the proposed improvements. Action
on this item is scheduled for June 22, 2009.
BACKGROUND
This project was initiated by the council action on September 8, 2008, when the council authorized the
preparation of plans and specifications and call of bids for construction of the local improvements
pursuant to Section 7.160(5) of the Eugene Code, 1971.
Bids were opened on May 21, 2009, with Babb Construction Company, dba Delta Construction
Company, dba Delta Concrete, as the apparent low bidder. Bid prices were very competitive from the
five bidders and construction costs were well below the engineers estimate. The property owners were
notified of the pending LID hearing ten (10) days prior to the hearing as required by Eugene Code.
A LID formation hearing conducted by a hearings official was held on May 28, 2009. At that hearing,
information was presented about the City’s assessment policies and procedures and the estimated
assessments based on the low bid received.
Prior to the hearing, the City received a remonstrance petition signed by multiple property owners.
Taking into account the property owners who subsequently requested their names be removed from the
petition and the irrevocable petitions, the petition signatures represent 73 properties representing 65% of
the assessable frontage. Eugene Code requires that the public hearing be continued before City Council
if remonstrances are received from owners who would pay over 50% of the assessments.
Z:\CMO\2009 Council Agendas\M090615\S0906154.doc
RELATED CITY POLICIES
The Municipal Charter, Chapter IX- Public Improvements, provides the regulatory framework for public
improvement procedures and assessments. The Eugene Code, Chapter 7 – Public Improvements,
prescribes the process for the initiation of an assessment project, formation of a local improvement
district, and computation and allocation of assessments to benefiting properties.
COUNCIL OPTIONS
Not applicable, this is a public hearing only.
CITY MANAGER’S RECOMMENDATION
None, this is a public hearing on the proposed resolution.
SUGGESTED MOTION
None, this is a public hearing on the proposed resolution.
ATTACHMENTS
A.Proposed Resolution on the Formation of a Local Improvement District (LID) for Paving, Curbs,
Sidewalks, Medians, Street Lights, Stormwater Drainage and Water Quality Facilities on Crest Drive
from Blanton Road to Lincoln Street, Storey Boulevard from Crest Drive to Lorane Highway, and
thl
Friendly Street from Lorane Highway to 28 Avenue
B.Hearings Official’s Minutes, Findings and Recommendations, City Engineers Report
C.Vicinity Map
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 682-5243
Staff E-Mail: mark.a.schoening@ci.eugene.or.us
Z:\CMO\2009 Council Agendas\M090615\S0906154.doc
ATTACHMENT A
RESOLUTION NO.
___________
A RESOLUTION FORMING A LOCAL IMPROVEMENT DISTRICT
(LID) FOR PAVING, CONSTRUCTING CURBS, SIDEWALKS,
MEDIANS, STREET LIGHTS, STORMWATER DRAINAGE AND
WATER QUALITY FACILITIES ON CREST DRIVE FROM BLANTON
ROAD TO LINCOLN STREET, STOREY BOULEVARD FROM CREST
DRIVE TO LORANE HIGHWAY, AND FRIENDLY STREET FROM
TH
LORANE HIGHWAY TO 28 AVENUE. (JOB #4546)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a
Municipal Corporation of the State of Oregon, as follows:
Section 1.
After proper notice of the hearings required by Sections 7.165 and 7.166 of
the Eugene Code, 1971 (EC), and after conducting a public hearing on May 28, 2009, receiving
the hearings officer’s minutes, findings, and recommendations, and, in accordance with EC
7.166(2), continuing the public hearing before the City Council on June 15, 2009, the City
Council hereby declares it is in the public interest to construct the local improvements described
in Section 2 of this Resolution and assess part of the costs thereof to the specially benefitted
properties on Crest Drive from Blanton Road to Lincoln Street, Storey Boulevard from Crest
th
Drive to Lorane Highway, and Friendly Street from Lorane Highway to 28 Avenue.
Section 2.
The City Council hereby orders the establishment of a local improvement
district on Crest Drive from Blanton Road to Lincoln Street, Storey Boulevard from Crest Drive
th
to Lorane Highway, and Friendly Street from Lorane Highway to 28 Avenue and in that district
to pave, construct curbs, sidewalks, medians, street lights, stormwater drainage and water quality
facilities and related improvements (“the Improvements”).
Section 3.
The costs of the Improvements shall be borne by and assessed to the
properties in the district in accordance with EC 7.175. Included in the cost shall be the overhead
costs specified in EC 7.170 and whatever other special costs, such as acquisition of interests in
real property, that are necessary to make the Improvements. Upon completion of the
Improvements, the final costs therefore will be calculated and the owners of the benefitted
property shall be notified and the property assessed as provided in EC 7.185 to 7.240. The
assessments to be levied for the Improvements are hereby characterized for purposes of the
property tax limitation in Section 11b, Art. XI of the Oregon Constitution as assessments for a
local improvement, not subject to the constitutional limitation of $10 per thousand of real market
value. Notice of the intent to so characterize the assessments was sent to the affected property
owners prior to the adoption of this Resolution.
Section 4.
The City Council hereby declares that the construction of the Improvements,
as well as acquisition of temporary easements necessary for the construction, is for a public
purpose, is necessary for the public welfare, is authorized under the laws of the State of Oregon
and Charter and ordinances of the City of Eugene, and is directed by this Resolution.
Resolution - Page 1 of 2
Section 5.
The City of Eugene, Oregon expects to make expenditures from its available
funds to initially pay for the costs of the improvements to Crest Drive from Blanton Road to
Lincoln Street, Storey Boulevard from Crest Drive to Lorane Highway, and Friendly Street from
th
Lorane Highway to 28 Avenue (the “Project”). The City reasonably expects, and hereby
declares its intent, to issue bonds or other obligations (the “Reimbursement Bonds”) and to use
the proceeds of the Reimbursement Bonds to reimburse the City for the expenditures made from
the City’s available funds for the Project. The City expects that the principal amount of the
Reimbursement Bonds will not exceed the total project cost of $3,791,37.34. The
Reimbursement Bonds are secured by and payable from the installments of final assessments
established in accordance with Section 3 of this Resolution.
Section 6.
Lines of credit and other evidence of indebtedness authorized by City Council
Resolution No. 4937 may be issued to finance the construction of the Improvements.
Section 7.
Proceeds from unbonded assessments, improvement bonds, foreclosure of
liens based on the Improvements and from other budgeted funds including ad valorem taxes, if
levied, to pay the debt shall be deposited in the Special Assessments Capital Projects Fund until
the indebtedness issued to finance the Improvements is redeemed. Proceeds so deposited may be
used only to pay the indebtedness issued to finance the Improvements.
Section 8.
The City Manager, or the person designated in writing by the City Manager to
act under Resolution No. 4937, may sign the evidence of indebtedness issued to finance the
construction of the Improvements.
Section 9.
This Resolution shall become effective immediately upon its adoption.
The foregoing Resolution adopted the 22nd day of June, 2009.
________________________________________
AIC City Recorder
00229112.DOC;1
Resolution - Page 2 of 2
MEMORANDUM
DATE:
May 28, 2009
FROM:
Mark Schoening, City Engineer
TO:
Hearings Official
SUBJECT: PROPOSED FORMATION OF A LOCAL IMPROVEMENT DISTRICT (LID)
FOR PAVING, CURBS, SIDEWALKS, MEDIANS, STREET LIGHTS,
STORMWATER DRAINAGE AND WATER QUALITY FACILITIES ON CREST
DRIVE FROM BLANTON ROAD TO LINCOLN STREET, STOREY
BOULEVARD FROM CREST DRIVE TO LORANE HIGHWAY, AND
TH
FRIENDLY STREET FROM LORANE HIGHWAY TO 28 AVENUE
(JOB #4546)
BACKGROUND
This project was initiated by Council action on September 8, 2008, when the Council authorized the
preparation of plans and specifications and call of bids for construction of the local improvements
pursuant to Section 7.160(5) of the Eugene Code, 1971.
Bids were opened on May 21, 2009, with Babb Construction Co. dba Delta Const. Co. dba Delta
Concrete as the apparent low bidder. Bid prices were very competitive from the five bidders and
construction costs were well below the engineers estimate. The property owners were notified of the
pending LID hearing ten (10) days prior to the hearing as required by Eugene Code.
The LID formation hearing on May 28, 2009, is to review the bid information, confirm whether the LID
should be formed and to identify any special conditions that should be included in the resolution forming
the LID.
City Council Action History
The City Council adopted the November 1999 Eugene Street Classification Map with the adoption of
Ordinance Number 20181 on November 22, 1999. The streets in the Crest Drive Neighborhood were left
unclassified pending a study to determine the appropriate classifications and design standards for the
neighborhood.
The City Council directed the City Manager to implement the Crest Drive Neighborhood context
sensitive solutions (CSS) process on May 8, 2006. A General Fund appropriation of $240,000 was
approved as part of the FY07 budget to fund the CSS process. The definition of CSS follows:
Context Sensitive Solutions is a collaborative, interdisciplinary project development approach
that involves all stakeholders to develop a transportation facility that fits its physical setting
while maintaining safety and mobility for all users, and reflecting community needs. The goal of
CSS is to create early, open, honest, and continuous communication and sharing of information
and knowledge throughout the design process.
The City Council appropriated an additional $58,000 as part of Supplemental Budget #1 of FY07 to
expand the scope of the CSS process to include “Middle” Crest.
The City Council amended the Design Standards and Guidelines for Eugene Streets, sidewalks, Bikeways
and Accessways on October 22, 2007, to allow for a minimum street width of 18 feet (two 9-foot travel
lanes) in the Crest Drive area.
On April 14, 2008, the City Council approved the conceptual design of Crest Drive, Storey Boulevard and
Friendly Street as recommended by the Crest Drive Community Team. At this same meeting, City
Council amended the Design Standards and Guidelines for Eugene Streets, sidewalks, Bikeways and
Accessways to allow for a minimum sidewalk width of 4 feet in the Crest Drive area.
On September 8, 2008 the City Council approved a plan to fund the City’s share of the project and to
proceed with final design and construction of the project.
On October 27, 2008 the City Council approved an amendment to the Design Standards and Guidelines
for Eugene Streets, sidewalks, Bikeways and Accessways classifying all of the streets in the Crest Drive
area as local streets.
Context Sensitive Solutions Process History
The Crest Drive Community Team (CDCT) was selected by the Crest Drive Citizens Association
(CDCA) and included 21 members made up of property owners on the identified streets, at-large
neighborhood representatives and City staff. The CDCT began meeting in 2006. At the start of the
context sensitive solutions process, the CDCT developed a set of themes and values, including
environmental and ecological, aesthetic, cultural and historic, spiritual and economic values. The CDCT
used the themes and values to evaluate the different design concepts before reaching an overall design
recommendation.
The design process involved City staff working with five separate street teams on five separate street
segments – Upper Crest, Middle Crest, Lower Crest, Storey and Friendly. Each street team presented its
conceptual design to the entire CDCT. As part of the design process each street team evaluated its design
using the Themes and Values developed and approved by the CDCT. In addition to the CDCT meetings,
public open houses were held during the design process as follows:
Community Open House was held October 5, 2006 at the Crest Drive Elementary School. Notice
was provided in the Fall 2006 newsletters, postcard mailing and in the newspaper. The open
house consisted of various stations where residents could learn about the context sensitive
solutions and design process, the CDCT, and the work done to date. Handouts about the City’s
assessment policy were available at the open house. Approximately 53 residents participated
and/or attended the open house.
Community Open House was held February 13, 2007 at the United Lutheran Church. Notice was
provided in the Winter 2007 newsletters, postcard mailing and in the newspaper. The open house
consisted of various stations where residents could learn about the work to date and upcoming
milestones, the addition of “middle” Crest to the project scope, street right of way delineation and
the results of the topographic survey, and City assessment policies and procedures.
Approximately 45 residents participated and/or attended the open house.
Community Open House was held June 20, 2007 at the Amazon Community Center. Notice was
provided in postcard mailing and in the newspaper. The open house provided residents the
opportunity to view and provide feedback on the project street design concepts and to learn about
the context sensitive solutions process and the city assessment policies and procedures. The City
provided an assessment estimate of $180 – $200 per front foot at this open house. Approximately
75 residents participated and/or attended the open house.
Over the course of two CDCT meetings on June 28 and July 12, the CDCT reached consensus on the
conceptual design for all five street segments. The recommended design was presented at a general
meeting of the Crest Drive Citizens Association on January 15, 2008. The CDCA passed a motion
recommending approval of the design concept for Crest Drive, Friendly Street and Storey Boulevard at its
general meeting held on February 12, 2008. The City Council held a public hearing on the concept design
on February 19, 2008 and approved the concept design on April 14, 2008.
On October 22, 2008 a letter was sent to all property owners within the proposed LID providing basic
information about the City’s assessment policy and procedures. The letter also included the assessment
estimate of $180 - $200 per front foot with assessments projected to be due in late 2009 or early 2010. At
this time the total project cost was estimated at $5.75 million and the assessable portion of the cost at $2.6
million.
PROJECT SCOPE
The street improvements will consist of 18-foot wide paving (two 9-foot wide travel lanes) with curbs
(flat, or at grade, and 6” vertical), concrete walk on at least one side of the street, street lights at pedestrian
crossings, traffic calming (speed tables, chicanes, chokers, medians, and traffic circles), street trees, and
storm water drainage system with storm water quality facilities.
FUNDING AND ASSESSMENTS
The longstanding City practice has been for all properties adjacent to streets that have not been improved
to City standards to participate in the improvement cost. The funding sources for the City’s or non-
assessable share of the improvement project costs are the Capital Road Fund, Stormwater System
Development Charges (SDC) Fund and Stormwater Utility Fund.
There are 126 abutting property owners that will be assessed for the street portion of the improvement on
a per front foot basis as outlined in Chapter 7 of the Eugene Code. Per Eugene Code, property owners of
parcels within a low-density residential zone shall be assessed according to the functional classification of
the street. On a local street, low density residential properties are assessed for half the pavement width up
to 34’ of total width, and associated drainage system for the portion of pavement to be assessed. Because
the streets in this proposed LID will be 18’ wide, the property owners will be assessed for the half street
width of 9 feet. The City pays for the intersections and a portion of the stormwater drainage
improvements.
Property owners generally pay for actual frontages with exceptions based on the zoning, land use, lot size,
level of development and frontage. With the exception of parcels within a low-density residential zone,
developed and partially developed parcels within all zones shall be assessed for the full frontage abutting
the street improvement and for 9 feet of the pavement width.
Vacant parcels less than one-half acre in size and fully developed parcels with a single family
dwelling in residential zoning are assessed for the actual front footage abutting the improvements,
except no parcel shall be assessed less than 50 feet or more than 100 feet.
Partially developed parcels of one-half acre or larger with a single family dwelling or duplex in a
low density residential zone and having more than 100 feet of frontage abutting the improvement
shall be assessed for 100 feet of frontage at the time of the improvement, and the remaining
frontage shall be delayed until the property is further developed.
Vacant parcels of one-half acre of larger shall not be assessed at the time of the street
improvement, but will pay the assessment upon development of the property.
Costs listed below are the estimated assessment costs calculated using the low bid, known and projected
costs. The calculations are consistent with adopted Council policy.
Paving 9-foot (per front foot) $133.63
Sidewalk and drive aprons (per square foot) $5.34
Total Estimated Assessable Cost $ 2,025,907.11
Total Estimated City Cost: w/o Low Income Subsidy: $ 1,765,469.23
Total Estimated Project Cost $ 3,791,376.34
Assessment financing, a 10-year payment plan through the City, is available to all property owners within
the improvement district as identified by Eugene Code, Chapter 7. An interim interest rate of 8 percent is
set by administrative order and is in effect from the time assessments are levied until assessment bonds
are sold. The administrative order will be reviewed in the next several months with the goal of more
closely aligning the interim interest rate with the market interest rate. The final interest rate is dependent
upon the interest rate received on the bond sale.
LOW INCOME SUBSIDY
Approximately 107 residential property owners were notified of the Low-to-Moderate Income Street
Improvement Subsidy program. The subsidy program is available to property owners who occupy a
single family dwelling or duplex and meet other program criteria. Owners were sent fact sheets which
describe the household size and income levels for the subsidy program which is based on the current Lane
County Median Family Income. Application forms were also included in the mailing. Property owners
were given until May 5, 2009 to return their application forms to determine eligibility. Eighteen property
owners responded. At this time it appears that fourteen owners qualify for this program. If the project
goes forward there will be one more opportunity for property owners to apply for the program at the time
of final assessment, currently estimated to be in early 2011.
REMONSTRANCE PROVISION
Eugene’s Code specifies that unless properties are associated with previously signed irrevocable
agreements with the City, property owners who will bear a share of the cost of an improvement can
formally remonstrate (object to the project in writing). If those who will bear over 50 percent of the
assessable cost of the improvement sign and submit valid petitions or written objections to the project,
there must be a two-thirds majority vote of Council to override the remonstrance and approve the project.
The City has received a petition with the following wording:
“Petition of Remonstrance Again Crest-Storey-Friendly Area Road Improvement Project. The
following citizens directly involved in the assessment of the Crest-Storey-Friendly Area Road
Improvement Project hereby formally remonstrate.”
Since the submittal of the petition, two of the property owners who signed the petition have contacted
City staff to remove their name from the petition. One signature was for a property with no frontage
along an assessed street and was removed from the tally. Taking these exceptions into account, the
petition represents 84 properties and 72% of the assessable frontage, excluding the public property owned
by the City of Eugene, EWEB and School District 4J.
The following parcels have recorded irrevocable petitions:
18-03-07-22 Lot 3202
18-03-07-22 Lot 3203 (Signed Remonstrance Petition)
18-03-07-22 Lot 3204
18-03-07-23 Lot 103 (Signed Remonstrance Petition)
18-03-07-23 Lot 104 (Signed Remonstrance Petition)
18-03-07-23 Lot 105 (Signed Remonstrance Petition)
18-03-07-23 Lot 2600 (Signed Remonstrance Petition)
18-03-07-23 Lot 2601 (Signed Remonstrance Petition)
18-03-07-23 Lot 2701 (Signed Remonstrance Petition)
18-03-07-23 Lot 2702
18-03-07-23 Lot 2703 (Signed Remonstrance Petition)
18-03-07-24 Lot 1804 (Signed Remonstrance Petition)
18-03-07-24 Lot 1806 (Signed Remonstrance Petition)
18-03-07-24 Lot 1807 (Signed Remonstrance Petition)
18-03-07-32 Lot 5300
18-03-07-32 Lot 5400
18-03-07-32 Lot 6700
18-03-07-32 Lot 6800
Eleven of the properties with irrevocable petitions signed the remonstrance petition. Taking the
irrevocable petitions into account, the petition signatures may be reduced to 73 properties representing
65% of the assessable frontage.
Since publishing the Notice of the Public Hearing, the City has received five letters regarding the project.
Copies of the letters and petition are attached to this memo.
RECOMMENDATION
There has been substantial public process in developing the Crest Drive, Storey Boulevard and Friendly
Street improvement project. At numerous times in the public process information has been shared and
discussed on street design, assessment code, estimated project costs and assessments. In addition, the
City Council has held numerous work sessions and public hearings on various aspects of the project and
taken action during different phases of project development.
The City received five bids all of which were below the Engineer’s Estimate. The low bid was almost 30
percent below the Engineer’s Estimate. As a result of the very competitive bidding climate the estimated
assessments are substantially lower than earlier estimated.
Staff recommends approval of formation of the LID for the Crest Drive, Storey Boulevard and Friendly